    SAFETY PLAN(RENCANA PENGENDALIAN SAFETY, HEALTH &

    ENVIRONMENT

    UNTUK PEKERJAAN DENGAN RESIKO TINGGI)

    JUDUL PEKERJAAN : CONSTRUCTION NEW SLIDE GATE 230

    COPPER STORAGE UILDING PROJECT

    (CIVIL & MECHANICAL WORK)

    W!O NUMER :

    PIC PT SMELTING : YAHYA RIDWAN

    KONTRAKTOR : PT" OTE ENGINEERING INDONESIA

    PIC KONTRAKTOR : ALEF AULIA

    HARAP MENGISI FORM INI DENGAN BENAR, DAN JANGAN MENGABAIKAN POTENSIRESIKO YANG ADA DI LAPANGAN. HAL INI DIPERLUKAN MENGINGAT KEBIJAKANKESELAMATAN DAN KESEHATAN KERJA ANDA MERUPAKAN BAGIAN DARI KOMITMENTMANAJEMEN SAFETY DI LINGKUNGAN KERJA KITA.

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    2/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : 2 o#12

    SEMUA PEKERJAAN DENGAN TINGKAT RESIKO KECELAKAAN YANG TINGGI HARUSMELENGKAPI FORM RENCANA PENGENDALIAN SAFETY, HEALTH, DAN ENVIRONMENT.

    SETIAP PEKERJAAN YANG TIDAK RUTIN DENGAN MELIBATKAN BEBERAPA ORANGDENGAN KATAGORI PEKERJAAN PROJECT (PROJECT MODIFIKASI, PERBAIKAN, INSPEKSI) ADALAH TERGOLONG PEKERJAAN DENGAN RESIKO KECELAKAAN YANG TINGGI DENGANKETENTUAN SEBAGAI BERIKUT :

    a). PEKERJAAN DI KETINGGIAN, Misalnya Pekerjaan Roofing, Scaffolding, Overhead tank,overhead pipe Rack, Overhead cable tray, High stack, dll.

    b). PEKERJAAN DI PERAIRAN, Misalnya Pekerjaan dengan potensi terjatuh dan tenggelamdi laut, di ater Reservoire, di !ickenerr, dsb

    c). PEKERJAAN PENGGALIAN, Misalnya penggalian di area kabel ba"ah tanah, saluran air ba"ah tanah, Pemasangan tiang pancang, dsb. 

    ). CONFINED SPACE, Misalnya masuk di daerah tertutup atau ruangan terbatas,dengan

    intensitas O# yang terbatas, akses keluar masuk sempit dengan potensi gas berbahaya,terjatuh di kedalaman, dsb

    !). PEKERJAAN BERHUBUNGAN DENGAN PAPARAN CAIRAN KIMIA BERBAHAYA,Misalnya H#SO$, H%l, &lectrolyte, H#O#, dsb.

    "). PEKERJAAN BERHUBUNGAN DENGAN PAPARAN GAS KONSENTRASI TINGGI,Misalnya SO#, SO', %(#, )aHS, dsb

    #). PEKERJAAN BERHUBUNGAN DENGAN PAPARAN LOGAM BERAT YANG BERACUNKONSENTRASI TINGGI, Misalnya Pb, %u, !e, dsb

    $). PEKERJAAN BERHUBUNGAN DENGAN PAPARAN PANAS YANG TINGGI, Misalnya pekerjaan di sekitar area *urnace, casting, +cid %onverter, dsb.

    %). PEKERJAAN PADA LISTRIK TEGANGAN TINGGI, Misalnya pekerjaan di area sub station,S"itch gear, !rafo, %able *eeder, dsb. 

     &). PEKERJAAN PENGANGKATAN ATAU PENGANGKUTAN DENGAN MELIBATKAN

    KENDARAAN ATAU ALAT BERAT, Misalnya mengangkat barang di ketinggian denganmenggunakan alat berat misalnya unit mobil crane, dsb.

    '). PEKERJAAN DENGAN BAHAN YANG MUDAH MELEDAK, Misalnya peledakan accretiondi boiler.

    ) HAL HAL YANG DIKATEGORIKAN BERBAHAYA OLEH DEPARTEMEN OSH.

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    3/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : $ o#12

    *. PENJELASAN SINGKAT PEKERJAAN a+ RUANG LINGKUP PEKERJAAN

     

    Construction New Slide Gate 230 Copper Storage Building (Civil and Mechanical

    Work) erupakan suatu !agian dari peker"aan sipil (chipping# pengecoran)# $a!rikasi

    dan peasangan (install)% Se!agai ga!aran# &eker"aan Construction New Slide

    Gate 230 Copper Storage Building (Civil and Mechanical Work) ini akan eliputi

    peker"aan s!! '

    % *+N,-.*N W*/

      Measureent and Marking

      Cutting $loor $or /ailing Wa1

      Cutting $loor $or $oundation support

      Chipping $or concrete sla!

      cavation work

      Base Coarse 4 Copaction

      /e5!ar Work a!rication (Cutting Wheel) 4 .nstallation

      orwork installation and reove

      Concrete work

      ,isposal soil 4 ,e!ris

    B% /M*67 8.S-.NG

      Sca$$olding work

      /eoval eisting rolling door 

      /eposition Canop1 Gate

    C% M/GNC9 MN ,**/

      Sca$$olding Work

      ,isantle eisting wall

      Modi$ication siding wall

      ntrance $looring sla! work

      .nstallation door 

      Wall work

    ,% :N,/.7.NG W*/

      a!rication handrail

      .nstallation handrail

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    4/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : o#12

      General Cleaning

      +ntuk peker"aan &eker"aan Construction New Slide Gate 230 Copper StorageBuilding (Civil and Mechanical Work) ini akan diulai !ulan 2; Maret 20 Mei

    20

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    5/12

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    6/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : & o#12

    >. TATA CARA PENGA-AS DALAM MELAKUKAN PENGA-ASAN TERHADAP TINDAKANTIDAK AMAN (UNSAFE ACTION) MAUPUN KONDISI TIDAK AMAN (UNSAFECONDITION) DARI PERILAKU PEKERJA. (M%/a+5a !+#a+ 0!a''a+ 2

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    7/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : 7 o#12

     ANDI INDRA NURYADI FITTER * ;

    M. ANSHOR FITTER * 48 ;

    SUTRISNO ELECTRICAL * 4= ;

    CHOLID MA-ARDI OPERATOR ? 6 =*8

    M. SYAFI OPERATOR 4* =*

    BAMBANG SUMANTRISCAFFOLDER

    SPV > 6 =*

    FATHURROI SCAFFOLDER 4 ? =*8

     ANTOK MARUKHIHELPER

    SCAFFOLDER 8 ;

    M. IMAM GOALIHELPER

    SCAFFOLDER * > ;

     AHMAD FAISALHELPER

    SCAFFOLDER * 8 ;

     ALIMANHELPER

    SCAFFOLDER * 44 ;

    M. ROMLIHELPER

    SCAFFOLDER * 4> ;

    KASLIMHELPER

    SCAFFOLDER * 4? ;

    MARUF -ELDER 6 64 ;

    RIAU LINGGA -ELDER 4 6 ;

     A. N. BASHORI CIVIL SPV * 88 ;

    ERSAN CIVIL * 68 ;

    MOCH. SYAFII CIVIL * 6> ;

    MISNAN CIVIL * 88 ;

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    8/12

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    9/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : ( o#12

    *M&-NS.,.B.,NGN9# MM.7..S/-..-# MM.B*,9 :/NSS

    MN+7 -**7S

    5 -/?&.-5 -/G*/S5 -/&*-*NG5 M- MS+N G/M

    7+ B/-#-7

    &NG-SN 7-(.NS&S. *7: &-S)

    SB7+M M7+N&/?N# S-9G7*6S# S-9 G7SSS(G**G7S)#MNGG+NN&, SS+. S-N,/-#MMGNG 7- ,NGNC/ 9NG BN/

    KETERANGAN %O)!OH  :

    Ha+ 2

    ?N.S 7- &7.N,+NG ,./.

    +M+M *. Sa"!25 H!0!2

    . S!3a2 Sa"!25 

    4. Kaca0a2a Sa"!25 (Sa"!25 G

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    10/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : 10 o#12

     ALAT PELINDUNG DIRI (APD) HARUS SESUAI DENGAN STANDARD MUTU SAFETY YANGTELAH MENDAPATKAN PERSETUJUAN DARI PT SMELTING

    **. PERALATAN KERJA LISTRIK YANG AKAN DIPAKAI, MERK, TAHUN PEMBUATAN, DANKONDISI SAAT INI (BERDASARKAN HASIL PENGECEKAN OLEH DEPARTEMENT

    TERKAIT). Misalnya Mesin (as, enerator, Mesin erinda, kabel roll, dll.

    JENIS PERALATAN MERK 9 BRANDTAHUN

    PEMBUATAN

    KONDISI SAAT INI ( $a/% c!')

    KONDISIFISIK

    KONDISIFUNGSI

    G/.N,.NGMC:.N M.-

    20

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    11/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : 11 o#12

    *. METODE KOMUNIKASI ANTAR PEKERJA KONTRAKTOR. (M%/a+5a 0!!2%+# /!2%a3 3a#%%

  • 8/18/2019 Draft Safety Plan New New Slide Gate

    12/12

    Document No : SSC-FM-21-27-01

    Revision : 00

    Issued date : 7 April 201!a e : 12 o#12

     ,apak 1ang ter"adi selaa peker"aan adalah ti!ul ,e!u# Gas S*2 dan Noise

    (Bising) aki!at dari peker"aan terse!ut%

     

    *@. APAKAH SETIAP PEKERJA TELAH MENGETAHUI PROSEDUR PENANGANANPENANGANAN KEADAAN DARURAT

      Setiap peker"a akan di!eritahu engenai &rosedur &enanganan eadaan ,arurat

    elalui Sa$et1 Meeting dan 7MB/ *M+N.S. ,N ,/+/-

    DENGAN INI KAMI (KONTRAKTOR) YANG BERTUGAS UNTUK PELAKSANAAN PEKERJAAN

    SEPERTI YANG DIMAKSUD, SUDAH MENGETAHUI DAN MELAKUKAN RISK ASSESMENT

    YANG BENAR DAN MENGETAHUI POTENSI BAHAYA YANG ADA YANG BERHUBUNGAN

    DENGAN PEKERJAAN TERSEBUT. KAMI AKAN MEMENUHI SEMUA ATURAN DAN STANDARD

    SAFETY YANG TELAH DITETAPKAN DALAM KONTRAK KERJA.

    DISIAPKAN OLEH : C*N-/C-*/ &-% *- NG.N/.NG .N,*NS.

      TANGGAL NAMA ASS. MANAGER MANAGER

     (