DRAFT RFPT Standards of Practice 2017 04 25 Page 1 of 19 Registered Fire Protection Technician (RFPT) Standards of Practice (April 25, 2017) DRAFT FOR CONSULTATION ONLY

Upload: others

Post on 10-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 1 of 19

RegisteredFireProtectionTechnician(RFPT)StandardsofPractice

(April25,2017)

DRAFTFORCONSULTATIONONLY

Page 2: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 2 of 19

1. TableofContents

2. Disclaimer........................................................................................................................3

3. Acknowledgement...........................................................................................................3

4. PurposeoftheRFPTStandardsofPractice.......................................................................34.1. RFPTisrequiredtocomplywiththeStandardsofPractice.....................................................34.2. DutyofRFPTtoStayInformed...............................................................................................4

5. Definitions.......................................................................................................................4

6. InspectionandTesting.....................................................................................................66.1. RFPTinspectionand/ortestrecordrequirements..................................................................66.2. Tagsandtaggingfireprotectionequipmentandsystems.......................................................66.3. Specifications,graphiclayoutandwordingfortags................................................................76.4. Step-bystepInstructionsforcompletinganddisplayingtags.................................................86.5. Option1:Equipmentorsystemisfunctioningasintended.....................................................96.6. Option2:Equipmentorsystemisfunctioningbutthereareconcerns..................................106.7. Option3:Equipmentorsystemdoesnotmeettheintendedfunctionality...........................116.8. Option4:EquipmentorsystemDOESNOTfunctionadditionalworkisURGENT..................126.9. Guidelinesontheuseoftagsandtagging............................................................................13

7. Commercialkitchenexhaustcleaning............................................................................147.1. Specifications,graphiclayoutandwordingforkitchenexhaustlabels..................................147.2. Instructionsforcompletinganddisplayingkitchenexhaustcleaninglabels..........................15

8. Kitchenexhaustfiresuppressionsysteminspectionandtesting....................................158.1. Step-by-stepinstructionsfortaggingkitchenexhaustfiresuppressionsystems...................15

9. Reportinginspectionand/ortestresults........................................................................159.1. Responsibilitiesofthebuildingowner.................................................................................159.2. ResponsibilitiesoftheRFPTandfireprotectionservicecompany........................................159.3. Providingfireprotectioninspectionandtestingservices......................................................16

10. Ownership,responsibilityanduseofRFPTstamps......................................................1710.1. Stampownership...............................................................................................................1710.2. RFPTresponsibility............................................................................................................1710.3. Stolen,lostormisplacedstamps........................................................................................1710.4. Useofthestamp...............................................................................................................1710.5. Documentsrequiringastamp............................................................................................1710.6. Applicationofstamp..........................................................................................................1710.7. Electronicordigitalstampsandsignatures........................................................................18

11. StandardsandcodesreferencedintheRFPTStandardsofPractice..............................18

12. DocumentControlandRetentionRequirements.........................................................1912.1. Recommendedtimeforretainingrecords..........................................................................1912.2. ASTTBCProcessescomplaintsagainstmembers.................................................................19

Page 3: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 3 of 19

2. DisclaimerThisStandardsofPractice(SoP)documentprovidesasummaryofpracticesfortestingandinspectingfireprotectionandfiresafetyequipmentandsystems.TheSoPreferstolaws,regulations,codes,andstandardsapplicablewhentheSoPwaswritten.RegisteredFireProtectionTechnician(RFPTs)areadvisedtocheckby-laws,statutesandregulationsspecifictothemunicipalitiesinwhichtheyareinspectingandtestingfireprotectionandfiresafetyequipmentandsystems.TheSoPandanylinksorinformationfromothersourcesreferredtoinit,shouldnotberelieduponasasubstituteforspecializedtechnical,legalorotherprofessionaladvice.Theuserissolelyresponsibleforanyuse,interpretationorapplicationoftheSoP.

3. AcknowledgementTheStandardsofPracticewasdevelopedbyAppliedScienceTechnologistsandTechniciansofBC(ASTTBC)inconsultationwithstakeholdersincluding:localgovernmentfireprotectionofficers,FirePreventionOfficersAssociationofBC(FPOABC),RFPTs,fireprotectioncompanyowners,theBusinessOwnersandManagersAssociation(BOMA),insurancecompanies,subjectmatterexpertsandotherprofessionals.WewishtoacknowledgeallthosethatprovidedmanyhoursofvolunteerservicetoreachconsensusontheSoP.

Thesourcedocumentsarelistedbelow:

• NationalFireProtectionAssociation(NFPA)• NationalFireCodeofCanada• BritishColumbiaFireCode• NationalBuildingCodeofCanada• CanadianElectricalCode• BritishColumbiaBuildingCode• VancouverBuildingCode• VancouverFireCode• UnderwritersLaboratoryCanada(ULC)Standards• MunicipalFireBy-laws

4. PurposeoftheRFPTStandardsofPractice

4.1. RFPTisrequiredtocomplywiththeStandardsofPractice4.1.1TheStandardsofPractice(SoP)weredevelopedandapprovedbytheRegisteredFire

ProtectionTechnicianCertificationBoard(RFPTCB)undertheauthorityoftheASTTBCCouncil.TheSoPisintendedtocomplementtheRFPTCBPolicyandserveasaresourcetoallRegisteredFireProtectionTechnicians(RFPTs),theiremployers,theAuthoritiesHavingJurisdiction(AHJ),andbuildingownersortheiragents.

4.1.2RFPTsregardlessofwheretheyprovidetheirservicesinBritishColumbiaarerequiredtocomplywiththeASTTBCCodeofEthicsandtheSoPworkingwithinthescopeoftheireducation,trainingandexperiencespecifictoeachspecialtyendorsementinwhichtheyhavebeencertifiedandregistered.

Page 4: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 4 of 19

4.1.3CompliancetotheCodeofEthicsandadherencetotheSoPisessentialforconsistencyinprovidingbestpracticeswheninspectingandtestingfireprotectionequipmentandfiresafetysystems.

4.1.4WhileeveryefforthasbeenmadetoensuretheSoPiscompleteandaccurateinallrespects,RFPTsareultimatelyresponsibleforapplyingthestandardsandappropriatesafepracticeswhencarryingouttheirservices.Applicablecodes,standards,manufacturingspecifications,provincial,nationalandmunicipalregulationstakeprecedentovertheSoPandmustalwaysbeadheredto.

4.2. DutyofRFPTtoStayInformedCodes,standardsandpoliciesmayberevisedfrom time to time. Every RFPT has a duty to read notices and review applicable ASTTBC policies and SoP regularly and apply these to adjust their practices accordingly. Lack of awareness of current policies and compliance to the SoP is not an acceptable excuse for non-compliant practice.

5. DefinitionsApplicableCodeincludestheBCBuildingCode,ProvincialFireServicesAct,BCFireCode,NationalFireCodeofCanada,theElectricalCode,CityofVancouverFireBylawandotherMunicipalFireBylaws.Eachcodemayreferenceotherstandardsordocuments,whichbecomepartofthecode.WhenaconflictexistsbetweentheprovisionoftheapplicableCodeandthoseofareferencedstandardordocument,theprovisionoftheapplicableCodeshallgovern.

AuthorityHavingJurisdiction(AHJ)isthepersonholdingoneofthefollowingpositionsaFireCommissioner,FireInspectorandLocalAssistanttotheFireCommissioner(LAFC).ExemptionsincludebutarenotlimitedtoBCHydroandFederalProperties(Airport/Military).

Bylawalaworregulationthatismadebyalocalgovernmentandthatappliesonlytothelocalarea.ExemptionsincludebutarenotlimitedtoBCHydroandFederalorProvinciallawsorregulations.

Cleaninthiscontextreferstoo:freefromcombustiblesubstances.RFPTendorsementinCommercialKitchenExhaustCleaning(CO)referstocleaningtheexhaustventingsystemincludingfilters,fansandducts.TheInspectionandtestingofkitchenexhaustventingandfiresuppressionsystem,fusiblelinksandfireretardantcylinderrequirescertificationinFireSuppressionSystemseitherpre-engineered(SP-P)orcustomengineered(SP-C).

EndorsementreferstothefireprotectionspecialtyforwhichanRFPThasachievedthecertificationrequirementsandisregistered.AsfurtherdescribedintheFPCBPolicy,theendorsementsare:

1.PortableFireExtinguishers(EX)2.UnitEmergencyLighting(EM)3.FireAlarmSystems(AL)4.Water-BasedFireProtectionSystems(WA)5.CommercialKitchenExhaustCleaning(CO)6.FireSuppressionSystems-Pre-Engineered(SP-P)7.FireSuppressionSystems-CustomEngineered(SP-C)8.StationaryFirePumps(FP)9.SmokeControlSystems(SM)10.GeneratorSystems(GS)

FireServicesActistheBCFireServicesActwhichisaprovincialstatuteadministeredbytheFireCommissionerthatincludesfirepreventionlegislationfortheentireprovinceundertheLocal

Page 5: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 5 of 19

GovernmentAct.ExemptionsincludebutarenotlimitedtoBCHydroandFederalProperties(Airport/Military).

Inspecttolookatfireprotectionequipmentorsystemscriticallyandcarefullytodeterminethroughobservationandothermeansiftheconditionoftheequipmentorsystemislikelytofunctionasintendedincaseofafire.

LocalGovernmentacityortownthathasitsowngovernmenttodealwithlocalconcerns.

Maintenanceregardlessofhowminororroutineisnotconsideredasinspectionandtesting.Qualifiedandexperiencedpersonsmustdomaintenanceoffireequipmentorsystems.Maintenanceandrepairfunctionsshouldbecompletedbeforetheequipmentorsystemisinspectedandtested.

NeedsAdditionalWorkistheconditionofafireprotectionsystemorequipmentthatisdeterminednottobeinoperatingconditionnorfunctionasintendedbymanufacturerspecificationsorisinstalledinamannerthatisnotincompliancewithapplicablecodesorstandards.

Ownermeansthebuildingownerorapersonauthorizedbytheownertobethedesignatedagentoftheownerformattersrelatedtothefireprotectionandfiresafetysystemsinspectionandtesting.

ProvisionalRegisteredFireProtectionTechnician(RFPT(Provisional))isanindividualthathascompletedtheeducationandtrainingrequirementsforoneormorespecialtyendorsementsandisworkingunderthesupervisionofanRFPTtofullyachievetheexperiencerequirements.

RegisteredFireProtectionTechnician(RFPT)isanindividualwhohasachievedtheminimumeducation;training,workexperienceandotherrequirementsspecifiedintheFireProtectionCertificationBoard(FPCB)policyandiscertifiedandregisteredwithASTTBCinoneormorespecialtyendorsements.RegisteredFireProtectionTechniciansingoodstandingwithASTTBCareauthorizedtousethedesignationRFPTaftertheirname.ThetitleanddesignationarefederallyprotectedtrademarksreservedforuseonlybyRFPTswhoareASTTBCmembersingoodstanding.

Repairfixormend(athingsufferingfromdamageorafault).RFPTcertificationpertainstoinspectingandtesting.RFPTarenotcertifiedbyASTTBCtoconductrepairs(forexample,apartisreplaced).

Reportisadocumentapproved,stampedandsignedbyanRFPTastheofficialrecordoftheresults,findingsandoutcomeoftheinspectionandtestoffireprotectionequipmentand/orsystems.AsspecifiedintheBCFireCode,NFPA,ULCandotherstandardsandcodesthereportismandatory.OneprintedorhardcopyofthereportshallbeprovidedtotheownerorauthorizedagentandoneprintedorhardcopyshallbekeptonthepremisesandaccessibletotheAHJ.

Serviceistheactionofinspectingandtestingoffireprotectionandfiresafetyequipmentorsystems.

StampisaphysicaldevicewithstampingcapabilitiesissuedtoanRFPTexclusivelythroughASTTBC.ThestampincludestheRFPTname,numberandtheendorsementsforwhichtheRFPTisregistered.ThecenterofthestampisablankspacefortheRFPTtosignorinitialthestampedtaginamannerthatmatchesthesignatureorinitialonfileatASTTBC.Adigitalstampand/orsignatureonreportsorcorrespondenceispermittedsubjecttoconditionsspecifiedintheSoP.

Standardisadescriptionorspecificationofthecharacteristicsand/orperformanceoffireprotectionequipmentandsystems.StandardsdescribetheobservableandmeasurablefeaturesthatRFPTsusetodetermineifthefireprotectionequipmentand/orsystembeinginspectedandtestedfunctionsincompliancewiththemanufacturer’sspecificationsandtherequirementsspecifiedincodesandbylaws.

Tag(noun)meansafireprotectiontagorlabelasspecifiedintheSoP.Thepurposeofthetagistoprovideareadilyobservedsummaryassessmentoftheinspectionandortestresults.Uponcompletionoftheservicerequiredbytheapplicablecodeand/orstandardanRFPTshallattachoraffixaproperly

Page 6: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 6 of 19

completedtagtothefireprotectionequipmentorsystemthathasbeeninspectedand/ortested.Theprintedfaceofthetagshallbevisibletothepublic.

TagorTagging(verbs)meanswriting,stamping,signing,checking-offorpunchingoutthesummaryresultsofaninspectionortestofthefireprotectionequipmentorsystemonwhichtheRFPTshallaffixthetag.TagsshallbeasspecifiedintheSoP.Tagsshallbeplacedwiththesummaryresultsoftheinspectionortestfacingout.TheRFPTstampandinitialsshallbevisibleandeasilyreadbyanyperson.

Test(verb)meanstouseprescribedmethodstodetermineifthefireprotectionequipmentand/orsystemisfunctioningasintendedatthetimeoftheperiodicinspectionandtesting.TheRFPTshallcomparetheconditionoffireprotectionequipmentand/orsystemstothestandardsspecifiedbythemanufacturer,theapplicablecodes,andregulations.

6. InspectionandTestingFireprotectionequipmentshallbeinspectedandtestedasrequiredbytheapplicablecodes.AnydeviationsorvariationsfromthecodesmustbeapprovedinwritingbytheAHJinthemunicipalitywherethefireprotectionequipmentorsystemislocated.Deviationsorvariationsfromthecodesmustalsobeacceptabletotheownerwhoisresponsibleforcarryingouttheprovisionsofthecodes.Theownermayhaveadditionalobligationsregardingtheinspectionandtestingrelativetoaninsurancepolicyorcorporatelosscontrolprogram.

6.1. RFPTinspectionand/ortestrecordrequirementsWhenfireprotectionequipmentorsystemhasbeeninspectedandtestedcomparedtotheintendedfunctionalityasestablishedbythemanufacturerandinaccordancewiththeapplicableby-laws,codesandstandards,theRFPTthatconductedtheinspectionand/ortestshallfillout,stamp,initialandattachanewtag.TheRFPTshallprepareareportdescribingtheresultsoftheinspectionandtest.ThereportshallbeprovidedtotheRFPTsemployerrepresentativewithin7calendardaysfromthelastdayoftheserviceandtheemployerrepresentativewillprovidethereporttothebuildingownerordesignatedrepresentativewithin14calendardaysandacopyofthereportmustbemadeavailableatthebuildingfortheAHJ.

6.2. Tagsandtaggingfireprotectionequipmentandsystems6.2.1Tagsprovideavisualsummaryofthefindingsoftheinspectionand/ortest.Further

detailregardingtheresultsandrecommendationsoftheinspectionand/ortestaretobeprovidedtotheownerinthereportpreparedbytheRFPTthatdidtheinspectionand/ortesting.

6.2.2AnewtagbearingtheRFPT’sstampandsignatureorinitialshallbeattachedtothefireprotectionsystemorequipmentafterithasbeeninspectedand/ortested.TheRFPTshallfastenthetagtotheequipmentorsystemwiththeprinted,stampedandinitialedsurfaceofthetagfacingoutforgreatervisibilityparticularlyfortheownerandtheAHJ.

6.2.3TheinspectionreportshallbegiventotheownerordesignatedagentbytheRFPTorthefireprotectioncompanyrepresentative.ThereportshallincludethenameandcontactinformationofthefireprotectioncompanyshallbestampedandsignedordigitallysignedbytheRFPTthatdidtheinspectionandtesting.

6.2.4TheRFPTstampandinitialsorsignatureonthetagsandinspectionreportsatteststhattheRFPThastherequirededucation,experienceandcompetenciestoinspectandtesttheequipmentorsystemthatistagged.ThestampandinitialsorsignatureistheRFPT’sassurance

Page 7: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 7 of 19

thattheinspectionandortestinghavebeencompletedincompliancewiththeapplicablecodes,standardsandpractices.

6.3. Specifications,graphiclayoutandwordingfortags6.3.1Tagsshallincludeaperforationatthetopforinsertingatwisttieorsimilardevicefor

fasteningthetabtotheequipmentorsystem.

6.3.2Theminimumsizeofthetagshallbe7.5x15.0cm

6.3.3Thecompanyname,addressandcontactinformation(telephoneand/orwebsite)shallbeclearlyvisibleatthetopofthetag.

6.3.4Thegraphicdesign/wordingonthetagshallbeasshowninthefollowingexample.

¢ (TAG FRONT SIDE)

FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT

INFORMATION MUST BE DISPLAYED HERE

Fire Protection Equipment/System

Inspected/ Tested*

Additional Work

Required See

Report

Portable Fire Extinguisher (EX)

Unit Emergency Lighting (EM)

Fire Alarm System (AL) Sprinkler / Standpipe System (WA)

Fire Pump (FP) Generator System (GS) Smoke Control System (SM) Pre-engineered Suppression System (SP-P)

Custom-engineered Suppression System (SP-C)

* THE EQUIPMENT OR SYSTEM IS FUNCTIONING AS INTENDED

Technician Stamp and Initials

Serial # or Description Next service due on or before: YYYY / MM / DD

DO NOT REMOVE TAG

MONTH AND YEAR OF INSPECTION AND/OR TEST J F M A M J J A S O N D

2017 2018 2019 2020 2021

Page 8: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 8 of 19

6.4. Step-bystepInstructionsforcompletinganddisplayingtagsRFPTsareexpectedtocompletethefollowing5-stepstoindicatetheresultsofeachinspectionand/ortestoffireprotectionequipmentorsystems.

Step1:Punchorüonthebottomofanewtagthemonthandyearwhenyouareinspectingand/ortestingtheequipmentorsystem.

Step2:Printtheserialnumberorclearlyidentifytheequipmentorsystemthatwasinspectedand/ortested.

Step3:Punchorü theappropriateboxorboxesindicatingthefunctionalityoftheequipmentorsystembasedontheresultsoftheinspectionand/ortestthatyoudid.Selectoneofthefollowing4optionswhenmarkingthetag.Examplesofhowtomarkthetagsforeachofthe4optionsareprovidedin6.5to6.8ofthisguideline.

Option1:IfthefireprotectionequipmentorsystemisfunctioningasintendedtheRFPTshallpunchorütheappropriateboxinthe“Inspected/Tested”column.DONOTpunchorüthe“AdditionalWorkRequired”orthe“SeeReport”columns.

Option2:TheequipmentorsystemmeetstheintendedfunctionalitybutmayneedsomeupgradesortherearesomeconcernsobservedbytheRFPTthatrequiretheattentionofthebuildingowner.TheRFPTshallpunchorüthe“InspectedTested”andthe“SeeReport”columns.

Option3:TheequipmentorsystemDOESNOTMeetintendedfunctionalityandadditionalworkisrequiredtheRFPTshallpunchorüthe“AdditionalWorkRequired”and“SeeReport”columns.PrintASAPinthe“Nextservicedate”box.

Option4:TheWhentheequipmentorsystemDOESNOTfunctionasintendedandadditionalworkisURGENTLYrequiredtheRFPTshallpunchorüthe“AdditionalWorkRequired”and“SeeReport”columnsandmarkanXonthefrontandbackofthetag.PrintASAPinthe“Nextservicedate”box.

Step4:Printthenextserviceduedate,stampthetagandclearlysignorinitialinthespaceprovided.ThesignatureorinitialshallmatchthespecimensignatureorinitialonfileatASTTBC.

Step5:Securethetagtothefireprotectionequipmentorsystemmakingsurethefrontofthetagisclearlyvisible.

Additionalinformationandexplanationsontagsandtaggingisprovidedinsection6.9ofthisSoP.

Page 9: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 9 of 19

6.5. Option1:EquipmentorsystemisfunctioningasintendedWhenthefireprotectionequipmentorsystemisfunctioningasintendedtheRFPTshallpunchorütheappropriateboxinthe“Inspected/Tested”column.DONOTpunchorüthe“AdditionalWorkRequired”orthe“SeeReport”columns.

Functionality of Equipment or System The RFPT shall punch or ü the Inspected / Tested column in the appropriate row if the equipment or system is functioning as intended by the manufacturer and/or applicable by-laws, codes and standards. Technician Stamp and Initials The RFPT shall affix their stamp in the box labeled “Technician’s Stamp” and clearly sign or initial (matches the signature or initial on file at ASTTBC) Serial number or description The RFPT shall put the serial number or description of the equipment or system. Next service date The RFPT shall put the next service date here as outlined by Code or Standard. Current date of service The RFPT shall punch or üon the bottom of the tag the month and year when the system or equipment was inspected and tested.

(TAG FRONT SIDE)

¢ FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT INFORMATION MUST BE DISPLAYED HERE

Fire Protection

Equipment/System

Inspected/ Tested*

Additional Work

Required See

Report

Portable Fire Extinguisher (EX)

punch or ü

Emergency Lighting System (EM)

Fire Alarm System (AL) Sprinkler / Standpipe System (WA)

Fire Pump (FP) Generator System (GS) Smoke Control System (SM)

Pre-engineered Suppression System (SP-P)

Custom-engineered Suppression System (SP-C)

* THE EQUIPMENT OR SYSTEM IS FUNCTIONING AS INTENDED

Technician Stamp and Initials

Serial # or Description Next service due on or before: YYYY/MM/DD

DO NOT REMOVE TAG

MONTH AND YEAR OF TEST AND/OR INSPECTION J F M A M J J A S O N D

2017 2018 2019 2020 2021

Page 10: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 10 of 19

6.6. Option2:EquipmentorsystemisfunctioningbutthereareconcernsMeetsintendedfunctionalitybutmayneedsomeupgradesortherearesomeconcernsobservedbytheRFPTthatrequiretheattentionofthebuildingowner.TheRFPTshallpunchorüthe“InspectedTested”andthe“SeeReport”columns.

Functionality of Equipment or System The RFPT shall punch or ü the Inspected / Tested column in the appropriate row if the equipment or system is functioning as intended by the manufacturer and/or applicable by-laws, codes and standards. The RFPT shall punch or ü the See Report column in the appropriate row if the equipment or system is functioning as intended but there are other concerns (for example, updating equipment to meet current code). Technician Stamp and Initials The RFPT shall affix their stamp in the box labeled “Technician’s Stamp” and clearly sign or initial (matches the signature or initial on file at ASTTBC) Serial # or Description The RFPT shall put the serial number or description of the equipment or system. Next service date The RFPT shall put the next service date here as outlined by Code or Standard. Current Date of Service The RFPT shall punch or üon the bottom of the tag the month and year when the system or equipment was inspected and tested.

(TAG FRONT SIDE)

¢ FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT INFORMATION MUST BE DISPLAYED HERE

Fire Protection

Equipment/System

Inspected/ Tested*

Additional Work

Required See

Report

Portable Fire Extinguisher (EX)

Unit Emergency Lighting (EM)

Fire Alarm System (AL) punchorü

punchorü

Sprinklers / Standpipe System (WA)

Fire Pump (FP) Generator System (GS) Smoke Control System (SM) Pre-engineered Suppression System (SP-P)

Custom-engineered Suppression System (SP-C)

* THE EQUIPMENT OR SYSTEM IS FUNCTIONING AS INTENDED

Technician Stamp and Initials

Serial # or Description:

Next service due on or before: YYYY/MM/DD

DO NOT REMOVE TAG

MONTH AND YEAR OF TEST AND/OR INSPECTION J F M A M J J A S O N D

2017 2018 2019 2020 2021

Page 11: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 11 of 19

6.7. Option3:Equipmentorsystemdoesnotmeettheintendedfunctionality

WhentheequipmentorsystemDOESNOTMeetintendedfunctionalityandadditionalworkisrequiredtheRFPTshallpunchorüthe“AdditionalWorkRequired”and“SeeReport”columns.

Functionality of Equipment or System The RFPT shall punch or ü the Additional Work Required and See Report columns in the appropriate row if the equipment or system needs work because it is not functioning as specified by the manufacturer and/or applicable by-laws, codes and standards. Technician Stamp and Initials The RFPT shall affix their stamp in the box labeled “Technician’s Stamp” and clearly sign or initial (matches the signature or initial on file at ASTTBC) Serial # or Description The RFPT shall put the serial number or description of the equipment or system. Next service date The RFPT shall put ASAP here as required by Code or Standard. Current Date of Service The RFPT shall punch or üon the bottom of the tag the month and year when the system or equipment was inspected/tested.

(TAG FRONT SIDE)

¢ FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT INFORMATION MUST BE DISPLAYED HERE

Fire Protection

Equipment/System

Inspected/ Tested*

Additional Work

Required See

Report

Portable Fire Extinguisher (EX)

Emergency Unit Lighting (EM)

Fire Alarm System (AL) Sprinkler / Standpipe System (WA)

punchorü

punchorü

Fire Pump (FP) Generator System (GS) Smoke Control System (SM)

Pre-engineered Suppression System (SP-P)

Custom-engineered Suppression System (SP-C)

* THE EQUIPMENT OR SYSTEM IS FUNCTIONING AS INTENDED

Technician Stamp and Initials

Serial # or Description:

Next service due on or before: YYYY / MM / DD

ASAP

DO NOT REMOVE TAG

MONTH AND YEAR OF INSPECTION AND/OR TEST J F M A M J J A S O N D

2017 2018 2019 2020 2021

Page 12: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 12 of 19

6.8. Option4:EquipmentorsystemDOESNOTfunctionadditionalworkisURGENTWhentheequipmentorsystemDOESNOTfunctionasintendedandadditionalworkisURGENTLYrequiredtheRFPTshallpunchorüthe“AdditionalWorkRequired”and“SeeReport”columns.Iftheequipmentorsystemisinurgentneedofadditionalworkorreplacement,thefrontandbackofthetagshallbemarkedwithanXasshownbelow.TheRFPTshalladvisethefireprotectioncompanyandthebuildingowneroftheconditionsthaturgentlyneedtobefixed.

A felt pen, preferably red, is recommended to mark the X. Functionality of Equipment or System The RFPT shall punch or ü the Additional Work Required and the See Report columns in the appropriate row if the equipment or system needs work because it is not functioning as established by the manufacturer and/or applicable by-laws, codes and standards. Technician Stamp and Initials The RFPT shall affix their stamp in the box labeled “Technician’s Stamp” and clearly sign or initial (matches the signature or initial on file at ASTTBC) Serial # or Description The RFPT shall put the serial number or description of the equipment or system. Next service date The RFPT shall put ASAP here as outlined by Code or Standard. Current Date of Service The RFPT shall punch or üon the bottom of the tag the month and year when the system or equipment was inspected/tested.

(TAG FRONT SIDE)

¢ FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT INFORMATION MUST BE DISPLAYED HERE

Fire Protection

Equipment/System

Inspected/ Tested*

Additional Work

Required See

Report

Portable Fire Extinguisher (EX)

Unit Emergency Light (EM)

Fire Alarm System (AL) Sprinkler / Standpipe System (WA)

punchorü

punchorü

Fire Pump (FP) Generator System (GS) Smoke Control System (SM)

Pre-engineered Suppression System (SP-P)

Custom-engineered Suppression System (SP-C)

* THE EQUIPMENT OR SYSTEM IS FUNCTIONING AS INTENDED

Technician Stamp and Initials

Serial # or Description: Next service due on or before: YYYY / MM / DD

ASAP DO NOT REMOVE TAG

MONTH AND YEAR OF TEST AND/OR INSPECTION J F M A M J J A S O N D

2017 2018 2019 2020 2021

Page 13: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 13 of 19

6.9. Guidelinesontheuseoftagsandtagging6.9.1Afterarepair,whentheRFPTisre-inspectingorre-testingfireprotectionequipment

orsystemsdonotremovetheoriginaltag.CompleteSteps1to5(seesection6.5)usinganewtagthatistobefastenedtotheequipmentorsystemsothenewtagisontopoftheoldone.

6.9.2IfanRFPTissupervisingtheworkofaProvisionalmemberwhoisinspectingand/ortestingtheequipmentorsystemtheRFPT(Provisional)shallinitialthetagabovethestampofthesupervisingRFPT.OnlytheRFPTingoodstandingwithASTTBCispermittedtostampandinitialorsigninthespaceprovideinthecenterofthestamp.

6.9.3Whenthedeficienciesfromaninspectionand/ortesthavebeencorrected,andtheequipmentorsystemisre-inspectedorre-tested,theoriginaltagshallremainandanewtagshallbeplacedontheequipmentorsystem.TheRFPTshallcompleteanewreporttodescribewhatwasre-testedand/orre-inspected.Twotagswillbeinplace(ormoredependingontheneed).Inthiscase,theoriginalRFPT’stagandthenewtagcompletedbytheRFPTthatre-testedand/orre-inspectedtheequipmentand/orsystem.

6.9.4Thenew“re-testedand/orre-inspected”tag(s)shallbedatedtoshowwhenthenextserviceisdueinaccordancewiththefirsttag’scycleandasestablishedbytheapplicableCode.

6.9.5Briefnotesmaybewrittenonthebackofthetagforhandyreferencetoinformationsuchasvoltagetestresults.Writinginformationonthebackofthetagisnotasubstituteforcompletinganinspectionand/ortestreport.

6.9.6Aredtagmaybeattachedtotheinspectiontagtomakeidentificationofamajorproblemwithasystem,componentordevicemorereadilyobviousforurgentcorrectiveaction.

6.9.7Tagsmayhavesequentialnumbershandwrittenorstampedonthefrontorbackofthetagtoassistwithrecordingthenumberoftags,locationorcomponenttagged,orotheradministrativepurposeasperfireprotectioncompanyinstructions.

6.9.8WhenafireprotectionsystemoranindividualpieceofequipmentisNOTfunctioningasintendedbythemanufacturer,by-law,codeorstandard,theRFPTshallselecteitherOption3or4andpunchorcheckonlytwocolumnsonthetag.Acompletedescriptionofthedeficienciesshallbedescribedintheinspectionreport.Theinspectionreportshallbestampedandbeclearly signedorinitialedbytheRFPT.TheinspectionreportshallbeprovidedtotheownerordesignatedagentbytheRFPTorbythefireprotectioncompanyrepresentative.

6.9.9ExamplesofdeficienciesbasedontheapplicableCodes,StandardsorManufacturingSpecificationsthatwouldresultinanRFPTpunchingorchecking“AdditionalWorkRequired”includebutnotlimitedto:

a. Upgradethefiresafetysystemorequipmenttomeetcurrentcode/standard;b. Addunitemergencylightingtocorridorsorstairways;c. Recommendchangingtheheightofportablefireextinguishers

6.9.10ExamplesofdeficienciesbasedontheapplicableCodes,StandardsorManufacturingSpecificationsthatwouldresultinanRFPTpunchingorchecking“URGENTLY”includebutnotlimitedto:

a. Abatterypackthatdoesnotwork;b. Afireextinguisherthathasbeendischarged;c. Afirepumpthatdoesnotstart;d. EvenifONEofthefollowingdevicesFAILs:

• Audiblealarmdevicesonafirealarmsystemdonotwork;

Page 14: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 14 of 19

• Alarminitiatingdevicesonafirealarmsystemdonotwork;• Asprinklerorstandpipesystemoperationisimpaired;• Aspecialfiresuppressionsystemoperationisimpaired;• AsystemorequipmentwasnottestedinaccordancewiththeFireCodeand3

monthsoverdueforinspectionandtesting;• Extinguishingagentdischargeplug(squib)missingordisconnected;• Aportablefireextinguisherthatismorethan6monthsoverduefora

hydrostatictest;• Firehosethatisrottedand/oroverdueforahydrostatictest.• Asmokecontrolorrequiredexhaustsystemisimpaired.• Accesstoroomwithasystemorsystemcomponentsuchasasmokeorheat

detectororpullstationwasdeniedornotpossible.

7. CommercialkitchenexhaustcleaningReportingtheconditionofcommercialkitchenexhaustsystemsrequiresaformatdifferentfromthetagspreviouslydescribed.Themostconvenientformatforrecordinganddisplayingtheresultsofcommercialkitchenexhaustsystemcleaningisastick-onlabelthatliststhekeycomponentsofthekitchenexhaustsystem.

7.1. Specifications,graphiclayoutandwordingforkitchenexhaustlabelsTheminimumsizeofthelabelis10cmx14cm.Thecompanynameandcontactinformationmustbeclearlydisplayedonthelabel.Thetextandgraphiclayoutareshowninthefollowingexample.Aself-stickingpeel-offlabelthatwillbeplacedinavisiblelocationontheexhausthoodispreferred.Theprintingandanymarkingonthelabelshouldbewithpermanentinkormarkertoavoidbeingsmudgedorerased.

FIRE PROTECTION COMPANY NAME, ADDRESS AND CONTACT INFORMATION MUST BE DISPLAYED HERE

Condition of the following components:

Cleaned Inspected/ Tested

Additional Work

Required

See Report

Hoods Ducts Vents Fans Filters Drip cup

Date when system was cleaned & inspected/tested: YYYY/MM/DD

Technician Stamp and Initials

Next cleaning, inspection & testing recommended before: YYYY/MM/DD

Page 15: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 15 of 19

7.2. Instructionsforcompletinganddisplayingkitchenexhaustcleaninglabels

TheRFPTwillpunchoutorütheappropriateboxeson the labelshownto indicate theresultsof thecleaning, inspection and/or test completed on various component parts of the system. If additionalworkisrequired,theRFPTwillmarktheappropriateboxonthetagorlabelandprovideadescriptioninthereportthatisgiventotheownerortheowner’sdesignatedagent. TheRFPTmustreportareasthathavenotbeencleanedor inspected/testeddue to inaccessibilityorotherreasonssuchasaccesspanels need to be installed to provide access to parts of the system. The next service datemust benoted.TheRFPTthenstampsthelabel,signsor initialsandaffixes it totheexhaustventhoodsoit isreadily visible to any observer. The sticker is to be affixed to the unit only when the cleaning andinspection/testhasbeencompleted.

8. KitchenexhaustfiresuppressionsysteminspectionandtestingInspectingandtestingthefusiblelinks,systemsuppressantagentcylinderandotherfeaturesofacommercialkitchenexhaustsystemshallbecompletedbyanRFPTwithendorsementineitherpre-engineered(SP-P)orcustom-engineered(SP-C)firesuppressionsystems.Inspectionandtestingofcommercialkitchenexhaustfiresuppressionsystemsshallbedoneaspermanufacturers’specificationandtheapplicablecodesandstandards.

8.1. Step-by-stepinstructionsfortaggingkitchenexhaustfiresuppressionsystemsInstructionsforcompletingtagsforkitchenexhaustfiresuppressionsystemsaredescribedinsection6.4ofthisguideline.

9. Reportinginspectionand/ortestresults

9.1. ResponsibilitiesofthebuildingownerItistheresponsibilityofbuildingownertocarryouttheprovisionsoftheCode,whichincludesmaintainingfirepreventionequipmentandsystemsingoodorderandtomakearrangementsfortherequiredinspectionsandtesting.Itistheowner’sresponsibilitytoinitiaterepairsoradditionalworkandfollow-upinspectionandtestingtobeincompliancewithmanufacturerspecifications,codes,standardsandmunicipalregulations.

9.2. ResponsibilitiesoftheRFPTandfireprotectionservicecompanyTheRFPTandthecompanycontractedbythebuildingownerareresponsibleforprovidingthefireprotectioninspectionandtestingservicesinaccordancewithapplicablepracticesandstandards.ItistheresponsibilityoftheRFPTthatdoestheinspectionandtestingtoinformtheownerofallobserveddeficienciesinthefireprotectionequipmentorsystemsinthereport.TheRFPTshallalsoadvisetheownerofanyequipmentorsystemsthathavenotbeeninspectedortested.IftheRFPTworksforafireprotectioncompany,itistheresponsibilityoftheRFPTtoinformthefireprotectioncompanyonthesamedayofanydeficienciesidentifiedduringtheinspectionandtest.

TheRFPTthatdidtheinspectionand/ortestingofthefireprotectionequipmentorsystemsisresponsibleforcompletingthemandatoryreporttobesubmittedtotheownerordesignatedagentwithin30calendardaysfromcompletionoftheinspectionandtesting.Thereportmustdescribetheinspectionandtestresultsforequipmentorsystemsthatwerefoundtobedysfunctionalcomparedto

Page 16: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 16 of 19

manufacturerspecifications,by-laws,codesorstandards.AcopyofthereportstampedandsignedbytheRFPTthatdidtheinspectionandtestingmustbeavailableatthebuildingandaccessibletotheAHJ.ThereportshallbeprovidedtotheRFPTsemployerrepresentativewithin7calendardaysfromthelastdayoftheserviceandtheemployerrepresentativewillprovidethereporttothebuildingownerordesignatedrepresentativewithin14calendardaysandacopyofthereportmustbemadeavailableatthebuildingfortheAHJ.

9.3. Providingfireprotectioninspectionandtestingservices

9.3.1TheRFPTorfireprotectioncompanyrepresentativeshoulddeterminethescopeofservicetobecompletedandschedulethemostconvenienttimefortheworktobedone.TheRFPTwillneedtodeterminewiththebuildingowneroragenttheinformationprovidedinpreviousreports,telephoneandcontactinformationofpeoplethatmayberequiredtofacilitatetheinspectionandtesting.Atalltimes,theRFPTshallcomplywiththeASTTBCCodeofEthicsandshallbecourteous,cooperativeandinformativewiththebuildingowneroragent.

9.3.2TheRFPTshouldpreparebyreviewingthereportsfrompreviousinspectionsandtests.Anydeficienciesnotedinthepreviousreportshouldbeofparticularinterestduringthecurrentinspectionandtesting.Understandingtheactivities,occupancy,purposeandtypeofthebuilding(s)inwhichthefireprotectionequipmentand/orsystemsareinstalledisextremelyimportant.

9.3.3TheRFPTshouldobserveallconditionsinthebuildingwhichcouldaffecttheproperandsafeoperationofthefireprotectionequipmentandsystems.Thisincludesproperlocationandaccessibilitytofireprotectionequipment;anynewoccupancyoruseofthebuildingthatchangetheleveloffireprotectionneeded;obstructionstofireprotectionequipmentorsystemcontrols;andanythingelsethatmightaffecttheproperfunctioningofthefireprotectionsystemsorcompromisethehealthandsafetyoftheoccupants.

9.3.4AttheconclusionoftheinspectionandtestingservicetheRFPTorfireprotectionservicecompanyrepresentativeshallinformtheowneroragentoftheresults.TheRFPTorfireprotectionservicecompanyrepresentativeshallclearlyexplaintotheowneroragentwhyitisnecessarytocorrectthedeficienciesandtheconsequencesofnotdoingtheadditionalworkrequired.

9.3.5WhentheRFPTidentifiesequipmentorsystemsthataredeficienttoapointthattheleveloffireprotectionfunctionalityiscompromisedandthesafetyofthepropertyand/oroccupantsmaybeatrisktheRFPTisobligedtoadvisethebuildingowneroragentoftheurgencyofthesituation.TheRFPTshalladvisethefireprotectioncompany.InsituationswheretheRFPTisoftheopinionthatthepublicisplacedinurgentdangertheRFPTshallnotifytheAuthorityHavingJurisdiction(AHJ)bytelephone,inpersonorbyothermeans.TheinitialcommunicationwiththeAHJshallbefollowed-upbynotificationinwritingwithacopytothebuildingownerandthefireprotectionservicecompany.

9.3.6TheRFPTshouldadvisethebuildingownerontheconditionofthefireprotectionequipmentandsystemsinthebuildingrelativetotheacceptabilityoftheequipmentandsystemsatthetimeofoccupancy,orwhenthefireprotectionequipmentorsystemwasupgraded.Itisnottheintentofperiodicchangesinthecodetoupgradeeverybuilding,fireprotectionequipmentorsystemtothecurrentcode.However,thereareinstancesthatitmaybemorecosteffectivetoinstallnewcode-compliantequipmentthantorepairormaintainexistingequipment.

Page 17: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 17 of 19

10. Ownership,responsibilityanduseofRFPTstamps

10.1. StampownershipThe cost for an RFPT to be issued a stamp shall be considered a lease fee for an indefinite length of time, provided the RFPT remains in good standing as an ASTTBC member. The stamp remains the property of ASTTBC and must be returned upon written request by the Registrar. Any unauthorized reproduction; production or modification of an RFPT stamp is a matter for civil and criminal proceedings. The Practice Review Board (PRB), the AHJ and the fire protection company (employer) shall be advised if an unauthorized stamp has been used. Failure to return a stamp within 30 days of receiving notification from the Registrar shall result in temporary suspension of the RFPT right to practice. The AHJ and the fire protection company (employer) shall be so advised.

10.2. RFPTresponsibilityThe RFPT is responsible for the safekeeping and use of the stamp issued in their name. Any stamp that is misplaced, lost, stolen or damaged beyond use shall be reported immediately to ASTTBC. It is the responsibility of the RFPT to use the stamp in compliance with the ASTTBC Act and Regulations and the policies, standards and codes applicable to RFPTs. The use of the stamp is restricted to the RFPT whose name appears on the stamp. The inspection and/or testing done by the RFPT is restricted to the specialty endorsements for which the RFPT is qualified, certified and registered.

10.3. Stolen,lostormisplacedstampsAn RFPT shall submit to ASTTBC a signed affidavit indicating the disposition of the stamp. In the case of a stolen stamp a police report may be requested. The RFPT is responsible for costs to prepare and submit an affidavit and for ASTTBC to issue a replacement stamp.

10.4. UseofthestampUse of the stamp is protected under the ASTT Act and Regulations. The right to use the stamp is a privilege granted by ASTTBC. Only a RFPT in good standing may use their stamp. Pre-stamping of tags and documents other than at the applicable job site is prohibited. Tags and documents shall not be reproduced with a stamp imprinted on them. The right to have and use a stamp may be revoked if not used in an ethical or professional manner in compliance with the RFPT Standards of Practice.

10.5. DocumentsrequiringastampThe RFPT shall stamp all applicable documents regardless of whether the municipality has enacted a bylaw requiring inspection and testing of fire protection equipment and systems to be done by ASTTBC RFPTs. The RFPT shall stamp tags and reports for the work done in the specialty endorsements in which the RFPT is registered and is in good standing. All tags, stick-on labels for commercial kitchen exhaust cleaning, reports and any other document specifically requested by an employer or an AHJ shall be stamped and signed or initialed.

10.6. ApplicationofstampThe stamp shall be applied in a clear and legible manner to final documents that have been prepared by the RFPT or under the supervision of the RFPT. The signature or initials of the RFPT that did the inspection and testing shall be clearly shown in the space provided in the center of the stamp. The signature or initials should be consistent with specimen on file at ASTTBC. The date the stamp is used shall be noted.

Page 18: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 18 of 19

10.7. ElectronicordigitalstampsandsignaturesThe RFPT may use a digital stamp and/or signature on reports, letters and e-mail correspondence. The RFPT is responsible for safeguarding the digital stamp and/or signature by whatever electronic means possible. The RFPT remains liable for any document or correspondence bearing their digital stamp and/or signature.

11. StandardsandcodesreferencedintheRFPTStandardsofPractice

NFPA

Natio

nal F

ire C

ode

of

Cana

da

BC F

ire C

ode

Natio

nal B

uildin

g Co

de o

f Ca

nada

BC

Buil

ding C

ode

ULC

Cana

da

Cana

dian

Elec

tric C

ode

Munic

ipal F

ire B

y-law

s Ot

her

Portable Fire Extinguishers (EX)

10 Yes Yes Yes Yes No No Yes No

Unit Emergency Lighting (EM)

No Yes Yes Yes Yes No Yes Yes C22.2 No. 141

Fire Alarm Systems (AL) 72 Yes Yes Yes Yes S536 Yes Yes No Water-Based Fire Protection Systems (WA)

13, 25, 20 Yes Yes Yes Yes No No Yes No

Commercial Kitchen Exhaust Cleaning (CO)

96 Yes Yes Yes Yes No No Yes No

Fire Suppression Systems - Pre-Engineered (SP-P)

11, 11A, 12, 12A, 12B. 15, 16, 17, 17A, 18

Yes Yes Yes Yes No No Yes No

Fire Suppression Systems - Custom Engineered (SP-C)

11, 11A, 12, 12A, 12B. 15, 16, 17, 17A, 18

Yes Yes Yes Yes No No Yes No

Stationary Fire Pumps (FP)

14, 25, 20 Yes Yes Yes Yes No No Yes No

Smoke Control Systems (SM)

No Yes Yes Yes Yes No No Yes Supplement to the National Building Code of Canada

Generator Systems (GS) 37 Yes Yes Yes Yes No Yes Yes CAN/CSA 282-M

Page 19: DRAFT FOR CONSULTATION ONLY - Fire Protection · 25/04/2017  · 5. Commercial Kitchen Exhaust Cleaning (CO) 6. Fire Suppression Systems - Pre-Engineered (SP-P) 7. Fire Suppression

DRAFT RFPT Standards of Practice 2017 04 25 Page 19 of 19

12. DocumentControlandRetentionRequirementsThe ASTTBC Act and Regulations specifies: “Complaints against any member or registrant must be made in writing to the Registrar within two years of the occurrence of the substance of the complaint. Any complaint not received within such period will be considered to be extinguished.”

However, recent interpretation of the 2 year limit on reporting a complaint have used the date of discovery of a problem and not the date when the work was done. Example: It is possible that work done in 2012 and problem discovered in 2015 with complaint submitted in 2016 could be considered within the 2-year time limit. Various interpretation of the regulations may and do occur.

Preparing and keeping well-organized records of work done is extremely important in any situation alleging that an RFPT has been non-complaint to the ASTTBC RFPT Standards of Inspection or the Code of Ethics.

12.1. RecommendedtimeforretainingrecordsThe minimum time that an RFPT should retain records of their work is seven years from the date the work was done.

12.2. ASTTBCProcessescomplaintsagainstmembersWhen ASTTBC receives a complaint it is the RFPT that must respond to the allegations and provide any counterargument. ASTTBC does not process complaints against a company. RFPTs that submit reports to their company may be vulnerable defending a complaint if the company does not support or help the RFPT by providing documentation such as dates, time and location of work done, photographs, reports and any other evidence in support of the RFPT. The RFPT becomes more vulnerable in situations where they have changed employer.