DRAFT "DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). June 14, 2019 County Fiscal Year Intially Proposed Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Senate District Assembly District Alameda 19/20 New Road Maintenance & Rehabilitation Stanton Ave Sidewalk Construction Project This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Stanton Avenue from Castro Valley Boulevard to Miramar Avenue Construction 12/2019 12/2021 40-60 10 20 Alameda 19/20 New Road Maintenance & Rehabilitation Somerset Ave Sidewalk Construction Project This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development Somerset Avenue from Redwood Road to Lake Chabot Road Pre-Construction 07/2019 12/2022 40-60 10 20 Alameda 19/20 New Road Maintenance & Rehabilitation E 14th Street Corridor Improvement Project - Phase II This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) East 14th Street from 162nd Avenue to I-238 Construction 01/2020 12/2021 40-60 10 20 Alameda 19/20 New Road Maintenance & Rehabilitation Greenville Road at Tesla Road Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Greenville Road at Tesla Road Intersection Construction 12/2019 12/2020 40-60 7 16 Alameda 19/20 New Road Maintenance & Rehabilitation Rural Road Shoulder Safety Project This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development Vasco Road from Dalton Road to the County Line; Crow Canyon Road from Coldwater Drive to the County Line; Palomares Road from Palo Verde Road to Niles Canyon Road; and Altamont Pass Road from Greenville Road to Grant Line Road Pre-Construction 07/2019 12/2021 15-20 7 16 Alameda 19/20 New Road Maintenance & Rehabilitation Trash Capture Project Phase II This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development San Lorenzo/Cherryland/Castro Valley Areas Pre-Construction 07/2019 12/2021 15-25 10 20 Alameda 19/20 New Road Maintenance & Rehabilitation Foothill Road Storm Damage Repair Phase II This project will include: storm damage repair Foothill Road, MM 6.89 Construction 04/2020 06/2021 40-60 7 16 Alameda 19/20 New Road Maintenance & Rehabilitation Crow Canyon Road Pavement Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 03/2021 15-20 10 20 Alameda 19/20 New Road Maintenance & Rehabilitation Stanley/Bruns/Kelso FAS Pavement Rehabilitation Project This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development Stanley Blvd from Pleasanton City Limit to Livermore City Limit; Bruns Road from Kelso Road to the County Line; and Kelso Road from Bruns Road to the County Line Pre-Construction 07/2019 12/2020 15-20 7 16 Alameda 19/20 New Road Maintenance & Rehabilitation 19-20 Pavement Rehabilitation Project (East County/Sunol) This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) Altamont Pass Road from I-580 to Landfill; Bond Street from Foothill Rd to Main St; Main Street from Kilkare Rd to Niles Canyon Rd; Foothill Road from Bond St to Kilkare Rd; Kilkare Road from Main St to Foothill Rd Pre-Construction and Construction 03/2019 03/2020 03/2020 06/2021 15-20 7 16 Alameda 19/20 New Road Maintenance & Rehabilitation 19-20 Pavement Rehabilitation Project (Castro Valley Area) This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) Alana Rd, Omega Av - Heyer Ave; Badger Ct, Greenridge Rd - NE - End; Balkan Ct, W Cavendish Dr - SE - End; Blue Bird Ct, Shadow Ridge Dr - NE - End; Crown Ct, Greenridge Rd - SE - End; Dawn View Ct, Shadow Ridge Dr - E - End; Feather Ct, Greenridge Rd - SE - End; Greenridge Ct, Greenridge Rd - W & SW - End; Greenridge Rd, Crow Canyon Rd - 405 ft N Badger Ct; Lomond Wy, Greenridge Rd - E Cavendish Dr; Mountain Ct, Mountain Ln - NW - End; Mountain Ln, Greenridge Rd - Cold Water Dr; Sun Ridge Ct, Pre-Construction and Construction 03/2019 03/2020 03/2020 03/2021 15-20 10 20 *This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Upload: others

Post on 13-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Alameda 19/20 New Road Maintenance & Rehabilitation

Stanton Ave Sidewalk Construction Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Stanton Avenue from Castro Valley Boulevard to Miramar Avenue Construction 12/2019 12/2021 40-60 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation

Somerset Ave Sidewalk Construction Project

This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development Somerset Avenue from Redwood Road to Lake Chabot Road Pre-Construction 07/2019 12/2022 40-60 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation

E 14th Street Corridor Improvement Project - Phase II

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

East 14th Street from 162nd Avenue to I-238 Construction 01/2020 12/2021 40-60 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation

Greenville Road at Tesla Road Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Greenville Road at Tesla Road Intersection Construction 12/2019 12/2020 40-60 7 16

Alameda 19/20 New Road Maintenance & Rehabilitation Rural Road Shoulder Safety Project This project will include: Cost Estimating, Feasibility Study, Environmental

Study/Documents, Preliminary Design, Project Scope Development

Vasco Road from Dalton Road to the County Line; Crow Canyon Road from Coldwater Drive to the County Line; Palomares Road from Palo Verde Road to Niles Canyon Road; and Altamont Pass Road from Greenville Road to Grant Line Road

Pre-Construction 07/2019 12/2021 15-20 7 16

Alameda 19/20 New Road Maintenance & Rehabilitation Trash Capture Project Phase II This project will include: Cost Estimating, Feasibility Study, Environmental

Study/Documents, Preliminary Design, Project Scope Development San Lorenzo/Cherryland/Castro Valley Areas Pre-Construction 07/2019 12/2021 15-25 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation

Foothill Road Storm Damage Repair Phase II This project will include: storm damage repair Foothill Road, MM 6.89 Construction 04/2020 06/2021 40-60 7 16

Alameda 19/20 New Road Maintenance & Rehabilitation

Crow Canyon Road Pavement Rehabilitation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 03/2021 15-20 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation

Stanley/Bruns/Kelso FAS Pavement Rehabilitation Project

This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development

Stanley Blvd from Pleasanton City Limit to Livermore City Limit; Bruns Road from Kelso Road to the County Line; and Kelso Road from Bruns Road to the County Line

Pre-Construction 07/2019 12/2020 15-20 7 16

Alameda 19/20 New Road Maintenance & Rehabilitation

19-20 Pavement Rehabilitation Project (East County/Sunol)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Altamont Pass Road from I-580 to Landfill; Bond Street from Foothill Rd to Main St; Main Street from Kilkare Rd to Niles Canyon Rd; Foothill Road from Bond St to Kilkare Rd; Kilkare Road from Main St to Foothill Rd

Pre-Construction and Construction

03/2019 03/2020

03/2020 06/2021 15-20 7 16

Alameda 19/20 New Road Maintenance & Rehabilitation

19-20 Pavement Rehabilitation Project (Castro Valley Area)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Alana Rd, Omega Av - Heyer Ave; Badger Ct, Greenridge Rd - NE - End; Balkan Ct, W Cavendish Dr - SE - End; Blue Bird Ct, Shadow Ridge Dr - NE -End; Crown Ct, Greenridge Rd - SE - End; Dawn View Ct, Shadow Ridge Dr -E - End; Feather Ct, Greenridge Rd - SE - End; Greenridge Ct, Greenridge Rd - W & SW - End; Greenridge Rd, Crow Canyon Rd - 405 ft N Badger Ct; Lomond Wy, Greenridge Rd - E Cavendish Dr; Mountain Ct, Mountain Ln -NW - End; Mountain Ln, Greenridge Rd - Cold Water Dr; Sun Ridge Ct,

Pre-Construction and Construction

03/2019 03/2020

03/2020 03/2021 15-20 10 20

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 2: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Alameda 19/20 New Road Maintenance & Rehabilitation

19-20 Pavement Rehabilitation Project (Fairview/El Portal Ridge/Ashland/Cherryland)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

171st Av, E 14th St - Esteban St; 172nd Av, E 14th St - Los Banos St; Bevilaqua St, Kent Av - Ventry Wy; Connolly Av, Videll St - 115 ft W Mooney Ave; Crest Av, S Crest Av - Miramar Av; Delano St, Kent Av - Elgin St; Ehle St, 170th Av, - Elgin St; Ehle St, 170th Av - Regent Wy; Hill Av, 351ft E Templeton St - 759ft NE Templeton Av; Linnea Av, Elgin St - Connolly Av; Lomita Dr, Winding Bl - 218ft W Winding Bl; Melody Wy, Elgin St - N R/W L Fwy 238; Pico Pl, Page St - Russell Ct; Ranspot Dr, Rol

Pre-Construction and Construction

03/2019 03/2020

03/2020 03/2021 15-20 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation 19-20 Microseal Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Nelson Av, Grant Av - Via Vista; Channel St, Bockman Rd - Grant Ave; Via Lacqua, Channel St - Via Eduardo; Corte Mariana, Via Lacqua - SE - End; Corte Geraldo, Via Lacqua - SE - End; Corte Yolanda, Via Lacqua - SE -End; Via Seco, Grant Av - SE - End; Via Del Rey, Via Manzanas - Bockman Rd; Robscott Av, Hacienda Av - Perkins Rd; Ginger Av, Robscott Av -Bengal Ave; Perkins Av, Robscott Av - Ricardo Ave; Melrose Av, Ginger Av -Perkins Rd; Bengal Av, Hacienda Av - Perkins Rd; Oxford Av, Bengal Av

Pre-Construction and Construction

03/2019 03/2020

03/2020 03/2021 6-10 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation 19-20 Slurry Seal Project

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Birch St, Grove W y - Mattox Rd; Brookdale Bl, Lake Chabot Rd - NW - End; Cambridge Av, Hampton Rd - Medford Ave; Camden Av, Hampton Rd -Medford Av; Concord Av, Hampton Av - Medford Av; Florence St, Hathaway Av - Times Av; Grasslands Dr, W End - E End; Hacienda Av, Hesperian Bl -Via Alamitos; Lucot St, Hathaway Av - Times Av; Medford Av, Meekland Av -W estern Bl (S); Via Cielo, Via Manzanas - Hacienda Av; Via Encinas, Hacienda Av - NW - End; Via Flores, Via Manzanas -Hacienda Av; Via Magdalena

Pre-Construction and Construction

03/2019 03/2020

03/2020 03/2021 4-6 10 20

Alameda 19/20 New Road Maintenance & Rehabilitation 19-20 Pedestrian Ramp Project This project will include: Cost Estimating, Environmental Study/Documents, Preliminary

Design, ADA Curb Ramp Rehab/Repair (Existing) Various Locations Pre-Construction and Construction

06/2019 03/2020

03/2020 03/2021 40-50 10 20

Alameda 18/19 In-Progress Complete Streets Components

Hesperian Boulevard Corridor Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping

Hesperian Boulevard from I-880 to A Street Construction 03/2020 12/2022 18-20 10 20

Alpine 19/20 New Road Maintenance & Rehabilitation

W oodfords/Mesa Vista Slurry Seal Project

This project will include: Pavement Rehab/Repair (Existing) | 6.57 total miles of slurry seal in the Woodfords/Mesa Vista area of Alpine County

6.57 total miles of slurry seal on the following streets in the W oodfords/Mesa Vista area of Alpine County: Cedar Lane; Aspen W ay; Sage Avenue; Carson River Road; California Road; Topaz Place; Carson View; Diamond View; Nevada Road; Larson Canyon; Barber Road; Hawkins Peak Road

Construction 08/2019 10/2019 7-7 1 5

Alpine 19/20 New Road Maintenance & Rehabilitation Markleeville Area Treatments This project will include: Pavement Rehab/Repair (Existing) | to 1.24 miles of road in the

Markleeville area of Alpine County

Pavement treatments on 1.24 miles of road in the Markleeville area of Alpine County as follows: Laramie Street - Single Chip Seal; Montgomery Street - Thin Overlay; W ater Street - Chip and Slurry Seal; Turtle Rock Park Road - Chip and Slurry Seal;

Cole Court - Pavement reconstruction

Construction 08/2019 06/2020 7-20 1 5

Amador 19/20 New Road Maintenance & Rehabilitation Countywide Dig-Outs Repair Project This project will include: Paving and/or Striping Installation (New Safety), Pavement

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Tabeaud, Shenandoah, Climax, Curran, Old Sacramento, Fiddletown, Sugar Pine, Sutter Creek, W illow Creek, Pine Grove Volcano, Sutter Ione Construction 07/2019 06/2020 10-15 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 3: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Amador 19/20 New Traffic Control Devices Countywide Striping Project This project will include: Paving and/or Striping Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety)

Charleston Rd, Sutter Creek Rd, Carbondale Rd, Jackson Valley Rd, Dave Brubeck, Village Dr, Mohawk Ct, Fox Ct, Hoya Ct, Goose Creek Ct, Nabo Ct, Duck Creek Rd, Goose Creek Rd, Newman Hill Dr, Newman Hill Ct, Coyote Dr, Papoose Dr, Snowbird Rd, Bevers W ay, Inyo Ct, Hoko Ct, Grapevine Gulch Rd, Charmstone W ay, Teepee Ct, Quiver Dr, Teton Ct, Yuma Ct, Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County

Construction 07/2019 06/2020 5-7 8 5

Amador 19/20 New Road Maintenance & Rehabilitation Countywide Culvert Repair Project This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing), Storm

Drain/Culvert Installation (New) China Graveyard, Sutter Ione, Stony Creek, Ridge, Pine Grove Volcano, Shenandoah, Hale, Clinton, Shake Ridge, Buena Vista Construction 07/2019 06/2020 30-50 8 5

Amador 19/20 New Road Maintenance & Rehabilitation

Countywide Roadway Maintenance Project

This project will include: Minor Repairs: Crack Filling and Sealing, HMA Potholes, HMA Patching, Miscellaneous HMA, Rock, Minor Facilities

Latrobe Road, Carbondale Road, Fiddletown Road, Ridge Road, and Clinton Road. All locations listed are an estimate and have yet to be finalized. Construction 07/2019 06/2020 5-20 8 5

Amador 19/20 New Road Maintenance & Rehabilitation Equipment and Tools Replacement This project will include: Procurement of Public Works Equipment, Repair and Servicing of

Public Works Equipment County Roads Procurement / Operational Needs 07/2019 07/2020 10-15 8 5

Amador 19/20 New Road Maintenance & Rehabilitation Countywide Roadside Maintenance This project will include: Roadside maintenance for ditching , brushing, cutting Latrobe Road, Carbondale Road, Fiddletown Road, Ridge Road, and Clinton

Road. All locations listed are an estimate and have yet to be finalized. Construction 07/2019 07/2020 3-5 8 5

Amador 19/20 New Road Maintenance & Rehabilitation

Shenandoah Road Microsurface Project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Shenandoah Road Construction 07/2019 07/2021 7-10 8 5

Butte 17/18 In-Progress Road Maintenance & Rehabilitation Hegan Lane

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Railroad Grade Separation Rehab/Repair, Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

From BSNF Railroad to Dayton RoadThe project is located southwest of the city of Chico, and begins at the intersection of Hegan Lane and Dayton Road running approximately 2.35 miles northeasterly along Hegan Lane to approximately 80’ east of the Union Pacific Rail Road Tracks.

Pre-Construction and Construction

01/2018 05/2020

11/2019 12/2020 25-30 4 3

Butte 17/18 In-Progress Road Maintenance & Rehabilitation New Skyway

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Structural Overlay | Pre-construction underground utility work will proceed this project

From Paradise Town Limit to Coutolenc Road Pre-Construction and Construction

01/2020 05/2021

12/2020 12/2021 20-25 4 3

Butte 17/18 In-Progress Road Maintenance & Rehabilitation Foothill Blvd.

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Grind existing structural section, grade aggregate base back to finish grade. Overlay with 3" of asphalt concrete (AC). Place striping, pavement markers, pavement markings, and prepare finish grade for the traveling public. Grade roadside ditches to drain. | This project is 90% preliminary design and is ready for construction.

Oro Bangor Hwy. to Pinedale Ave. Pre-Construction and Construction

01/2018 06/2019

06/2019 12/2019 20-25 4 3

Butte 18/19 Carried Over Road Maintenance & Rehabilitation

Centerville Road Reconstruction (Lower)

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction/Rehabilitation Strom Damage Repairs

0.5 Miles North east of Honey Run Road Intersection Pre-Construction and Construction

04/2017 06/2019

06/2019 12/2020 30-30 4 3

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 4: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Butte 18/19 Carried Over Road Maintenance & Rehabilitation Oro-Quincy Highway Reconstruction

This project will include: Right of Way Acquisition, Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction and Rehabilitation of Storm Damage Repairs

Site 1 in Mt. House and Site 2 is 0.75 miles North east of Site 1. Pre-Construction and Construction

03/2017 05/2019

03/2019 12/2019 30-30 4 3

Butte 18/19 Carried Over Safety Skyway Median Guardrail This project will include: Right of Way Acquisition, Cost Estimating, Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | Safety Improvement Median Guardrail | MBGR Standard MBGR upgrades

5.5 Miles East of the Intersection of Skyway and Honey Run Road. Pre-Construction and Construction

03/2017 06/2019

06/2019 12/2019 30-30 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Ophir Road Rehabilitation Project

This project will include: Right of Way Acquisition, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | Roadway Damaged is due to a combination of normal wear and excessive truck traffic due to the DWR spillway incident and the debris hauling associated with the Camp Fire recovery efforts.

Lincoln Blvd. to Lower Wyandotte Rd. Pre-Construction and Construction

03/2019 09/2019

08/2019 11/2019 20-30 4 3

Butte 18/19 Carried Over Road Maintenance & Rehabilitation

Bidwell Avenue Strom Damage Repair

This project will include: Document Preparation, Environmental Study/Documents, Preliminary Design | Storm Damage Repairs (Design and Permitting)

Three Sites Between W . Sacramento St. on the W est and Oak Lawn Ave. on the East. Pre-Construction 07/2019 03/2020 20-20 4 3

Butte 18/19 Carried Over Road Maintenance & Rehabilitation Las Plumas Avenue Overlay

This project will include: Cost Estimating, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of W ay Acquisition, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development | Structural Overlay

From Las Plumas W ay to Lower W yandotte Rd. Pre-Construction and Construction

01/2017 06/2019

06/2019 12/2020 30-30 4 3

Butte 18/19 Carried Over Road Maintenance & Rehabilitation 2018 Butte County Slurry Seal

This project will include: Right of Way Acquisition, Pavement Rehab/Repair (Existing), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Slurry Seal Various Roads throughout the County

Roads to be Slurry Sealed Achilles Ct., Adrian Dr., Arthur Ct., Athens Ct., Auroa Ct., Babson Ct., Bremer Ct., Bronx Ct., Carver Ct., Cascade Dr., Chestnut Cir., Colby Ct., Compton Dr., Concord Ct., Coppel Ct., Curtis Ct., Dade Ct., David Ct., Delta Ct., Dimitri, Ct., Drexel Dr., Drury Dr., Ed Ct., Einstoss Ct., Eureka Dr., Ferguson Dr., Finch Ct., Fritz Ct., Glendale Dr., Heller Ct., Hobart Ct., Hood Ct., Iona Ct., Janine Ct., Jarvis Cir., Jennifer Ct., Kingsdale Ct., La Rosa Ct., Lander Ct., Layton Ct., Linda Lee Ct., Lucas Ct., Marsh Ct., Metzger Ct., Molinari Ct., Mooz Ct., Napa Ct., Oak Ridge Dr., Olivet Dr., Otis Ct., Pawn Ct., Penn Ct., Peterson Estates Dr., Pineland Cir., Potomac Dr., Providence Ct., Pueblo Dr., Rim Rock Dr., Rutgers Ct., Salk Ct., Sarah Ann Ct., Scripps Ct., Shaw Cir., Shoup Ct., Simonson Ct., Southwind Ct., Sunsup Ln., Tracy Ranch Rd., Tufts Ct., Tulsa Ct., Union Ct., Ventura Dr., Wake Ct., Wichita Dr., Woodbury Dr., Woodpecker Rd., Wyack Ct., Zuckerman Ct.

Pre-Construction and Construction

01/2019 07/2019

12/2019 12/2020 5-7 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Upper Centerville Road

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development | Repair and Rehabilitation of existing roadway infrastructure lost during heavy rain event within the Camp Fire footprint.

Three (3) miles south of Nimshew Road. Pre-Construction and Construction

02/2019 05/2020

12/2019 12/2020 25-35 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Dark Canyon Road

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Repair and Rehabilitation of the existing roadway infrastructure lost during a heavy rain event with in the Camp Fire footprint.

2.5 Miles Southeast of Big Bend Road Pre-Construction and Construction

02/2019 06/2020

12/2019 12/2020 25-35 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Monte Vista/Lower W yandotte

This project will include: Right of Way Acquisition, Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Lincoln Blvd. to Lower W yandotte Road. Pre-Construction and Construction

01/2018 09/2021

08/2021 12/2022 20-30 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Autrey Lane

This project will include: Right of Way Acquisition, Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Las Plumas Ave. to Monte Vista Ave. Pre-Construction and Construction

01/2018 09/2021

09/2021 12/2022 20-30 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Monte Vista Avenue This project will include: Preliminary Design Autry Lane to W estern Property line of Las Plumas High School. Pre-Construction 01/2020 12/2020 20-30 4 3

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 5: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Butte 19/20 New Road Maintenance & Rehabilitation Neal Road

This project will include: Right of Way Acquisition, Cost Estimating, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Repair of existing roadway due to excessive heavy truck traffic associated with the debris removal efforts of the Camp Fire recovery.

4.9 Miles Northeast of SR99 to Paradise Town Limit Pre-Construction and Construction

04/2019 01/2020

12/2019 12/2020 5-15 4 3

Butte 19/20 New Road Maintenance & Rehabilitation Baldwin Ave (Palermo)

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Lincoln Blvd. to Hewitt Ave. Pre-Construction and Construction

01/2019 08/2022

01/2022 12/2022 20-30 4 3

Butte 19/20 New Road Maintenance & Rehabilitation 2019 Butte County Chip Seal This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Project

Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) Cohasset Rd.; Rock Creek Rd.; Rock Creek Dr.; Sycamore Valley Rd.; Vilas Rd.; Harvey Rd.; Oro Quincy Hwy.; Lincoln Blvd.

Pre-Construction and Construction

01/2019 08/2019

08/2019 12/2019 5-9 4 3

Calaveras 18/19 Carried Over Road Maintenance & Rehabilitation District 4 - Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruction of .66 miles of Parrotts Ferry Road due to embankment failure

Parrotts Ferry Road in Douglas Flat Construction 04/2019 10/2019 20-25 8 5

Calaveras 18/19 Carried Over Road Maintenance & Rehabilitation District 2 - Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal 3.9 Miles of Ridge

Road: Hwy 26 to Railroad Flat Road Railroad Flat, Ridge Road: Hwy 26 to Railroad Flat Road Construction 04/2019 10/2019 10-15 8 5

Calaveras 19/20 New Road Maintenance & Rehabilitation District 1- Local Roads

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | General maintenance and repair of County maintained roads in District 1.

District 1 includes the communities of Burson, Campo Seco, San Andreas, Valley Springs, and Wallace. The County maintained roads in District 1 will be assessed for the maintenance work described. The final locations selected will be provided in the Expenditure Report upon completion.

Construction 04/2019 07/2020 15-20 8 5

Calaveras 19/20 New Road Maintenance & Rehabilitation District 2- Local Roads This project will include: Pavement Rehab/Repair (Existing) | General maintenance and

repair of County maintained roads in District 2.

District 2 includes the communities of Calaveritas, Glenco, Mokelumne Hill, Mountain Ranch, Paloma, Rail Road Flat, Sheep Ranch, W est Point and W ilseyville. The County maintained roads in District 2 will be assessed for the maintenance work described. The final locations selected will be provided in the Expenditure Report upon completion.

Construction 04/2019 07/2020 15-20 8 5

Calaveras 19/20 New Road Maintenance & Rehabilitation District 3- Local Roads This project will include: Pavement Rehab/Repair (Existing) | General maintenance and

repair of County maintained roads in District 3.

District 3 includes the communities of Arnold, Avery, Camp Connell, Dorrington, Douglas Flat, Hathaway Pines, Murphys, Tamarack and W hite Pines. The County maintained roads in District 3 will be assessed for the maintenance work described. The final locations selected will be provided in the Expenditure Report upon completion.

Construction 04/2019 07/2020 15-20 8 5

Calaveras 19/20 New Road Maintenance & Rehabilitation District 4- Local Roads This project will include: Pavement Rehab/Repair (Existing) | General maintenance and

repair of County maintained roads in District 4.

District 4 includes the communities of Altaville, Carson Hill, Copperopolis, and Vallecito. The County maintained roads in District 4 will be assessed for the maintenance work described. The final locations selected will be provided in the Expenditure Report upon completion.

Construction 04/2019 07/2020 15-20 8 5

Calaveras 19/20 New Road Maintenance & Rehabilitation District 5- Local Roads This project will include: Pavement Rehab/Repair (Existing) | General maintenance and

repair of County maintained roads in District 5.

District 5 includes the communities of Jenny Lind and Milton. The County maintained roads in District 5 will be assessed for the maintenance work described. The final locations selected will be provided in the Expenditure Report upon completion.

Construction 04/2019 07/2020 15-20 8 5

Calaveras 17/18 Carried Over Road Maintenance & Rehabilitation District 3 - Chip Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Chip Seal 1.04 miles of road in Murphys, Calaveras County. Perform structural digouts, ditching, drainage, shoulder backing, chip seal application, crack seal, striping and stenciling double coat.

Adams Court (.06 mi.), Wingdam Road (.32 mi.), Roaring Camp Drive (.261 mi.), Coyote Drive (.32 mi.), Kenny Road (.08 mi.). Construction 04/2019 10/2019 15-20 8 5

Calaveras 17/18 Carried Over Road Maintenance & Rehabilitation

District 3 - Culvert Replacement/New

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New) | Replace 3 culverts and installation of 1 new culvert in Arnold, Calaveras County.

Meadow Drive (7"x45'). Love Creek (6"x25'). Pine Drive (36"x30'). Dunbar (New 24"x80'). Construction 04/2019 10/2019 25-35 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 6: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Calaveras 17/18 Carried Over Road Maintenance & Rehabilitation District 4 - Chip Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Chip Seal 1.4 miles of road in Copperopolis, Calaveras County. Perform structural digouts, ditching, drainage, shoulder backing, chip seal application, crack seal, striping and stenciling double coat.

Bow Drive 1.4 miles from Little John Road to Little John Road Construction 04/2019 10/2019 15-20 8 5

Calaveras 17/18 Carried Over Road Maintenance & Rehabilitation District 5 - Chip Seal (Cane Lane)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Chip Seal .22 miles of road in Valley Springs, Calaveras County. Perform structural digouts, ditching, drainage, shoulder backing, chip seal application, crack seal, striping and stenciling double coat.

Cane Lane .22 miles from Rippon to Hartvickson Lane. Construction 04/2019 10/2019 15-20 8 5

Calaveras 17/18 Carried Over Road Maintenance & Rehabilitation

District 5 - Chip Seal (McDaniel Lane)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Chip Seal .27 miles of road in Valley Springs, Calaveras County. Perform structural digouts, ditching, drainage, shoulder backing, chip seal application, crack seal, striping and stenciling double coat.

McDaniel Lane & Marden Lane .27 miles from Heinneman Lane to Hartvickson Lane. Construction 04/2019 10/2019 15-20 8 5

Colusa 18/19 Carried Over Road Maintenance & Rehabilitation Lone Star Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Resurface Lone Star Road

from HW Y 20 to Able Road In the center area of the County, south of Highway 20, east of the City of Williams. Construction 04/2020 08/2020 20-25 4 3

Contra Costa 19/20 New Road Maintenance & Rehabilitation

Surface Treatments - Single Chip Seal

This project will include: Pavement Rehab/Repair (Existing) | Work will also include surface preparation and pavement striping and markings. (RMRA funding = $700,000)

The project will apply a single chip to various roads in the unincorporated area which may include but are not limited to the following roadways: Briones Road, Eden Plains Road, Second Street, First Street, A Street, Curlew Connex, Tule Lane, Holland Tract Road and Orwood Roa.d

Construction 07/2019 10/2019 7-7 7, 9 11, 14, 15, 16

Contra Costa 19/20 New Road Maintenance & Rehabilitation

Surface Treatments - Double Chip Seal Project (2019)

This project will include: Pavement Rehab/Repair (Existing) | Work will also include surface preparation and pavement striping and markings. (RMRA funding = $800,000)

This project will apply a double chip seal to various roads as a pavement preservation project in the unincorporated Contra Costa County which include but are not limited to the following: Bear Creek Road, Chestnut Street, Sunset Road, Delta Road, Sellers Avenue, Eden Plains Road,, Byron Highway, Knightsen Avenue, Marsh Creek Road, Point of Timber Road, Bixler Road, Byron Highway and Camino Diablo.

Construction 07/2019 10/2019 7-7 7, 9 11, 14, 15, 16

Contra Costa 19/20 New Road Maintenance & Rehabilitation

Surface Treatment - Asphalt Rubber Cape Seal Project (2019)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | The project will apply an asphalt rubber chip seal covered with a type II slurry seal to the pavement surface. W ork will also include surface preparation and pavement striping and markings. (RMRA funding = $2,500,000)

The project will apply a pavement surface treatment to various roadways in the Bay View (19 streets), Montalvin (18 streets), Unincorporated Lafayette and Martinez (67 streets) areas.

Construction 07/2019 10/2019 7-7 7 14

Contra Costa 19/20 New Road Maintenance & Rehabilitation

Surface Treatments - Microsurface Project (2019)

This project will include: Pavement Rehab/Repair (Existing) | This project will apply a microsurface seal to to the pavement surface. W ork will also include surface preparation and pavement striping and markings. (RMRA = $500,000)

Pleasant Hill Road and Taylor Boulevard in the unincorporated area of Martinez and Lafayette area. Construction 07/2019 10/2019 7-7 7, 9 11, 14, 15, 16

Contra Costa 19/20 New Safety Kirker Pass Road Northbound Truck Lanes

This project will include: Right of Way Acquisition, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New) | The project consists of roadway widening for a truck lane and paved shoulder, construction of six retaining walls and two bioretention areas, drainage improvements, relocation of existing roadside features, signing and striping, and pavement rehabilitation on both the north and southbound lanes. Pavement rehabilitation will involve a 0.10’ grind and overlay of rubberized hot mix asphalt open grade on existing and new roadway pavement. (RMRA = $2,350,000)

Kirker Pass Road – from Clearbrook Drive to approximately 140 feet east of the driveway to 6141 Kirker Pass Road. Construction 07/2019 07/2020 7-50 7 14

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 7: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Contra Costa 19/20 New Road Maintenance & Rehabilitation Road Drainage Maintenance

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | All of the following are routine maintenance items: Ditch Cleaning – Perform drainage ditch cleaning to remove debris and vegetation which may obstruct the passage of stormwater and cause local flooding. (RMRA = $300k) | Clean Catch Basin – Perform cleaning of sediment and prevent obstructions of catch basins (drainage inlets) and related pipe systems. (RMRA $550k) Inspect Catch Basin – Perform inspections of catch basins and associated systems. This includes a visual inspection of the drainage inlet and any clean water inserts. Follow-up video inspections may be required for deeper inlets and/or suspected structural issue concerning the inlets. (RMRA = $300k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian W ay, Fred Jackson W ay, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Construction 07/2019 06/2020 15-40 7, 9 11, 14, 15, 16

Contra Costa 18/19 Carried Over Road Maintenance & Rehabilitation Traffic Safety Devices Maintenance

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Traffic Signing – This routine maintenance item is to perform sign repair, replacement, and installation along the unincorporated County roadways. (RMRA = $350k) Traffic Striping – This routine maintenance item is to perform new painting, routine painting and replacement of pavement striping along the unincorporated County roadways to enhance public safety. (RMRA = $350k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian W ay, Fred Jackson W ay, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Construction 07/2019 06/2020 2-10 7, 9 11, 14, 15, 16

Contra Costa 19/20 New Road Maintenance & Rehabilitation Pavement Repairs and Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | • Pot Hole Patching – (RMRA = $500k) • Pavement Fabric Patching – (RMRA = $500k) • Pavement Failure Repair - Backhoe – (RMRA = $600k) • Pull Box Paving – (RMRA = $625k) • Hand Patching – (RMRA=$600k) • Crack Sealing – (RMRA = $700k) • Leveling – (RMRA = $475k) • Pavement Failure Repair – Grinder – (RMRA = $500k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian W ay, Fred Jackson W ay, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Construction 07/2019 06/2020 7-7 7, 9 11, 14, 15, 16

Del Norte 19/20 New Road Maintenance & Rehabilitation 2020 Countywide Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | The project includes 5.24 miles of chip seals, 5.75 miles of preparatory work, .and .6 miles of paving on 12 County roads. All work is to be performed by the County Roads Division staff. Chip seal projects include Sarina Road, Kings Valley Road and Kings Valley Cross Road. Overlay projects include Alder Road while preparatory projects include Elk Valley Road between U.S. Highway 101 and Jordan Creek and within Bertsch Tract.

The projects are at the following locations: 1) Sarina Road from First Street to U.S. Highway 101; 2) Kings Valley Cross Road from U.S. Highway 199 to U.S. 101; 3) Kings Valley Cross Road from U.S. 101 to Lake Earl Drive; 4) Alder Road from Boulder Avenue to Lake Earl Drive; 5) Elk Valley Road from U.S. Highway 101 to Jordan Creek; and 6) Bertsch Tract (various).

Construction 07/2019 10/2020 7-20 2 2

Del Norte 19/20 New Road Maintenance & Rehabilitation ADA Curb Ramp Improvements This project will include: ADA Curb Ramp Rehab/Repair (Existing) | The County proposes

to contract to have up to 12 ADA curb ramp improvements completed on County roads. The ADA curb ramp improvements will be located along roads within the Filkins Tract. Construction 04/2020 06/2020 30-40 2 2

Del Norte 18/19 In-Progress Road Maintenance & Rehabilitation 2019 Countywide Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project includes 1.96 miles of overlays, 1.12 miles of paving and 13.5 miles of chip sealing on 13 County roads. All work is to be performed by County Roads Division staff. The projects are clustered within the Crescent City urban area and the Smith River area. All road surfaces will be restriped and fog sealed (chip

The projects are at the following locations: 1) Cooper Avenue from El Dorado Street to Inyo Street; 2) Inyo Street from Cooper Avenue to Pacific Avenue; 3) Butte Street from Cooper Avenue to Pacific Avenue; 4) Fred Haight Drive from U.S. 101 South to Hight Bridge; 5) First Street from entrance of Smith River School to Sarina Road; 6) Ocean View Drive from Mouth of Smith River Road to U.S. Highway 101 (south) AND from Mile Post 1.62 to U.S. Highway 101 (north); 7) Rowdy Creek Road from U.S. Highway 101 to end of pavement; 8) Lake Earl Drive from Bachelor Road to Purdy Lane; 9)

Construction 03/2019 10/2020 7-20 2 2

seals only). | This project will use both Fiscal Year 2018-19 and 2019-20 RMRA Funds in its delivery.

Westbrook Lane from First Street to U.S. HIghway 101; 10) South Bank Road from Lake Earl Drive to end of paved surface; 11) W ilson Lane from Fred Haight Drive to U.S. Highway 101; 11) Elk Valley Road from Jordan Creek to Parkway Drive; and 13) Arlington Drive from W ashington Boulevard to W . Jefferson Street.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 8: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

El Dorado 17/18 In-Progress Road Maintenance & Rehabilitation

Grizzly Flats Section 1 Subdivision Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the subdivision.

Approximately eleven (11) miles of roadway. Average PCI is 43.

Located in the Southern part of El Dorado County off of main arterial Grizzly Flat Road.

Roads include but are not limited to: Capps Crossing Rd, Cypress Point Cir, Cypress Point Dr, Deertract Ct, Deerwood Ct, Deerwood Dr, Edgewood Cir, Forest Glen Dr, Grizzly Creek Dr, Meadow Glen Dr, Merrywood Ln, Road #1926, Road #1965, Parkside Ct, Parkside Dr, Pinehaven Dr, Quietwood Dr, Sciaroni Rd, Southwood Dr, Storybrook Ct, String Canyon Ct, Tyler Dr, Winding Way, and Winding Way Ct.

Construction 03/2018 11/2019 10-15 1 5

El Dorado 18/19 In-Progress Road Maintenance & Rehabilitation

Lake Hills Subdivision Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the subdivision. Approximately five and a half (5.5) miles of roadway. Average PCI is 44.

Lake Hills Subdivision can be entered from Lake Hills Drive or Francisco Drive in El Dorado Hills.Roads include but are not limited to: Alena W ay, Bolivar Court, Bonita Court, El Nido Court, El Sur Court, Encina Court, Encina Drive, Fitch W ay, Francisco Drive, Gordo Court, Guadalupe Drive, Lakehills Drive, Lazo Court, Loma Verde Court, Loma Verde Drive, Lomita W ay, Planeta W ay, Torero W ay, Toro Court, Vera Court, and Zapata Drive.

Construction 12/2018 11/2019 10-15 1 5

El Dorado 19/20 New Road Maintenance & Rehabilitation Paving Machine This project will include: Procurement of Public W orks Equipment | Replacement for a

paving machine that is over twenty (20) years old. Placerville, CA Procurement / Operational Needs 08/2019 06/2020 15-20 1 5

El Dorado 19/20 New Safety CMS Board

This project will include: Procurement of Public Works Equipment | Two (2) replacement CMS boards to be used on roadways under construction. The equipment will allow the public to be aware of current and upcoming projects enhancing safety for workers and the public.

Placerville, CA. Procurement / Operational Needs 08/2019 06/2020 10-15 1 5

El Dorado 19/20 New Road Maintenance & Rehabilitation Highflow Skidsteer

This project will include: Procurement of Public Works Equipment | The skidsteer will be used on projects throughout the County to enhance roadway shoulders and paving projects.

Placerville, CA. Procurement / Operational Needs 08/2019 06/2020 15-20 1 5

El Dorado 19/20 New Road Maintenance & Rehabilitation

Roads of Placerville Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads.

Approximately 2.78 miles of roadway. Average PCI is 31.

Various county maintained roads throughout Placerville, CA.

Roads include but are not limited to: Mona Drive, Pierce Court, Prescott Avenue, Jacquier Road, No Name Road, Smith Flat Cemetery Road, Smith Flat Road and Smith Flat School Road.

Construction 10/2019 09/2020 10-15 1 5

El Dorado 19/20 New Road Maintenance & Rehabilitation

Diamond Springs Business Park Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the business park. Approximately 1.85 miles of roadway. Average PCI is 35.

Diamond Springs Business Park is located in Diamond Springs, CA between Highway 49 and Highway 50.

Roads include but are not limited to: Bright Court, Capitol Avenue, Clear Court, Commerce W ay, Enterprise Court, Enterprise Drive, Industrial Drive and Merchandise W ay.

Construction 10/2019 09/2020 10-15 1 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 9: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

El Dorado 19/20 New Road Maintenance & Rehabilitation

Cameron Park Subdivison Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the subdivision.

Approximately 7.01 miles of roadway. Average PCI is 34.

Cameron Park Subdivision is located in Cameron Park, CA and is north of Highway 50 and west of Cameron Park Drive consisting of approximately 21 roads.

Roads include but are not limited to: Braniff Court, Castlebrook Road, Cessna Drive, De Sabla Court, De Sabla Road, Eagle View Drive, El Dorado Royale Drive, El Encanto Road, Fairway Drive, Garden Circle, Linwood Lane, Los Santos Drive, Navion Court, No Name Court, Piper Court, Sage Drive, Sky Court, Sudbury Road, Toronto Road and W ood Lane.

Construction 10/2019 09/2020 10-15 1 5

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

El Dorado 19/20 New Road Maintenance & Rehabilitation

Roads of Pollock Pines Rehabilitation and Surface Treatment

Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads.

Located in Pollock Pines, CA north of Highway 50 between Sly Park Road and Ridgeway Drive.Roads include but are not limited to: Pony Express Trail, W illow Street, Fir Drive, Fairview Drive, North Street, Polaris Street, Laurel Drive, Balsam Drive, Maple Drive, Maple Avenue, Pine Street, Sanders Drive, Center View Court, and Center View Drive.

Construction 10/2019 08/2020 10-15 1 5

Approximately 5.98 miles of roadway. Average PCI is 44.

Fresno 18/19 Carried Over Traffic Control Devices Copper Avenue and Auberry Avenue Traffic Signal

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | Install traffic signal and appurtenant improvements Copper Avenue and Auberry Avenue Pre-Construction and

Construction 04/2019 07/2019

07/2019 12/2019 20-30 8 23

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Mt. Whitney Reconstruction and Pedestrian Improvements

(Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct roadway where necessary and overlay where possible Construct drainage and pedestrian improvements, construct Americans with Disabilities Act compliant

Mt. W hitney Avenue from Marks Avenue to Blythe Avenue Pre-Construction and Construction

05/2019 08/2021

08/2021 12/2021 20-30 12 31

pedestrian facilities, construct appurtenant facilities such as signage and striping.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Cerini Avenue Reconstruction and Pedestrian Improvements

(Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct roadway and construct drainage and pedestrian improvements, construct Americans with Disabilities Act compliant pedestrian facilities, construct appurtenant

Cerini Avenue from East Avenue to Cedar Avenue Pre-Construction and Construction

05/2019 08/2021

08/2021 12/2021 20-30 12 31

facilities such as signage and striping.

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Jensen Avenue Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct roadway and construct drainage improvements, construct appurtenant facilities such as signage and striping.

Jensen Avenue from Chateau Fresno to Cornelia Avenue Pre-Construction and Construction

04/2019 06/2021

06/2021 10/2021 20-30 14 31

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk

Fresno 18/19 In-Progress Road Maintenance & Rehabilitation

Fig and North Reconstruction and Pedestrian Improvements

Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct roadway and construct pedestrian improvements,

Fig Avenue from 2,000 ' south of North Avenue to North Avenue and North Avenue from 1,300 ' west of Fig Avenue to Fig Avenue.

Pre-Construction and Construction

06/2018 06/2019

06/2019 10/2019 20-30 14 31

construct appurtenant facilities such as signage and striping.

Fresno 18/19 Carried Over Safety Ashlan Avenue Intersection Improvements This project will include: Feasibility Study Ashlan corridor within City Spheres of Influence. Pre-Construction 04/2019 07/2020 20-30 8 23

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Big Creek Road slide repair and mitigation

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Repair slide damage and install preventative measures for future slides.

Big Creek Road - various locations Pre-Construction and Construction

06/2019 08/2020

08/2020 12/2020 10-12 8 23

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Outside Main Canal on Russell Bridge Replacement This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design Russell Avenue at the Outside Main Canal Pre-Construction and

Construction 04/2019 09/2019

09/2019 04/2020 50-70 12 31

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 10: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Travers Creek Bridge repalcement on Manning Avenue

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace existing bridge Travers Creek Bridge at Manning Avenue Pre-Construction and

Construction 05/2019 08/2020

08/2020 12/2020 50-70 14 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Delta Mendota Canal Bridge on Nees Avenue Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace existing bridge Delta Mendota Canal Bridge at Nees Avenue Pre-Construction and

Construction 05/2019 08/2022

08/2022 12/2022 50-70 12 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

James Bypass Overflow on Manning - Replace 2 Bridges

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace 2 existing bridges James Bypass Overflow at Manning Pre-Construction and

Construction 05/2019 08/2022

08/2022 12/2022 50-70 12 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Dry Creek on Burrough Valley Road Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace Bridge Dry Creek at Burrough Valley Road Bridge Pre-Construction and

Construction 05/2019 08/2021

08/2021 12/2021 50-70 8 23

Fresno 18/19 Carried Over Other Golden State Boulevard over Fowler Switch Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace Bridge Golden State Boulevard at Fowler Switch Bridge Pre-Construction and

Construction 04/2019 08/2023

08/2023 12/2023 50-70 14 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

North Fork Road over San Joaquin River Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design | Replace Bridge North Fork Road at San Joaquin River Bridge Pre-Construction and

Construction 04/2019 08/2025

08/2025 12/2025 50-70 8 23

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

American Avenue Road Reconstruction

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Perform HMA overlay, reconstruct intersection of American Avenue and Golden State Boulevard, install traffic signal and railroad preemption.

American Avenue from State Route 99 to Temperance Avenue Pre-Construction and Construction

04/2019 06/2022

06/2022 10/2022 50-70 14 31

Fresno 18/19 Carried Over Other North Avenue CMAQ Shoulder Improvements

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construct 8 ' wide Hot Mix Asphalt shoulders on each side of roadway

North Avenue from McCall Avenue to Indianola Avenue Construction 05/2019 09/2019 20-30 8, 14 23, 31

Fresno 18/19 Carried Over Other Jensen Avenue Shoulder Improvements

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Construct 4 ' wide Hot Mix Asphalt shoulders on each side of roadway

Jensen Avenue from State Route 145 to Dickenson Avenue Pre-Construction and Construction

04/2019 05/2020

05/2020 09/2020 20-30 12 31

Fresno 18/19 Carried Over Other American Avenue Shoulder Improvements

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Construct 4 ' wide Hot Mix Asphalt shoulders on each side of roadway

American Avenue from State route 145 to Placer Avenue Pre-Construction and Construction

04/2019 05/2020

05/2020 09/2020 20-30 12 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay of Huntington Lake Road from 3.81 miles NE of State Route 168 to 7.48 miles NE of State Route 168

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Huntington Lake Road from 3.81 miles NE of State Route 168 to 7.48 miles NE of State Route 168

Pre-Construction and Construction

04/2019 09/2019

09/2019 12/2019 10-12 8 23

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 11: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of North Ave. from Chestnut to Maple

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

North Ave. from Chestnut to Maple Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 14 31

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay on Clovis Ave. from Jensen to SR-99

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Clovis Ave. from Jensen to SR-99 Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8, 14 31

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Lincoln from W alnut to Chateau Fresno Alignment

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Lincoln from Walnut to Chateau Fresno Alignment Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 12 31

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Fowler from Elkhorn to the Fresno/Kings County line

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Fowler from Elkhorn to the Fresno/Kings County line Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 12, 14 31

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Chestnut from Herndon to Alluvial

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Chestnut from Herndon to Alluvial Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8 23

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Clay from Peach to the Fresno City/County line

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Clay from Peach to the Fresno City/County line Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8 31

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Helm from Belmont to Harvey

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Helm from Belmont to Harvey Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 14 31

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 12: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Blythe from McKinley to W eldon

project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and

Blythe from McKinley to W eldon Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8 23

shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Marks from Barstow to the RR Crossing S of Barstow

project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and

Marks from Barstow to the RR Crossing S of Barstow Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8 23

shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The

Fresno 19/20 New Road Maintenance & Rehabilitation

Overlay of Barstow from Marks to Van Ness

project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and

Barstow from Marks to Van Ness Pre-Construction and Construction

07/2019 08/2020

08/2020 12/2020 10-12 8 23

shoulder backing will be performed as necessary.

Fresno 17/18 In-Progress Road Maintenance & Rehabilitation

Overlay of Fowler Avenue from South Avenue to Elkhorn Avenue

This project will include: Pavement Rehab/Repair (Existing) | Perform hot mix asphalt concrete overlay with localized dig outs, grinding as necessary, match drive approaches, ADA improvement as necessary, and re-striping.

Fowler Avenue from South Avenue to Elkhorn Avenue Construction 05/2018 06/2019 10-12 12 31

Fresno 17/18 In-Progress Road Maintenance & Rehabilitation

Contract 17-23-C SB-1 RMRA Overlays

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Design overlay project, the description of work includes: perform hot mix asphalt concrete overlay with localized dig outs, grinding as necessary, match drive approaches, ADA improvement as necessary, and re-striping on 13.51 miles of roadway.

Burrough Valley Road from 0.10 miles E/O Tollhouse Road to Sandpiper Lane; Jayne Avenue from El Dorado Avenue to State Route 33; Jayne Avenue from Siskiyou Avenue to State Route 169; Huntington Lake Road from 2.71 miles NE/O State Route 168 to 3.81 miles NE/O State Route 168; Nees Avenue from Fairfax Avenue to Millux Alignment

Pre-Construction and Construction

07/2017 06/2018

06/2018 07/2019 10-12 8, 12 23, 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Fresno County Overlays: Carry Over from FY 2016/17 SB 1 Funds -Various Locations

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and dig outs and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Church Ave from 0.238 miles west of Orange Ave to Cedar Ave. Maple Ave from the Fresno City Limits to Cornell Ave. Shaw Ave Eastbound from Fresno City Limits to Palm Ave and Westbound from College Ave to W ishon Ct. Palm Ave from Dakota Ave to Van Ness Ave and from Van Ness Ave to Shaw Ave. W illow Ave from Silaxo Ave to Friant Rd. Central Ave from Maple Ave to Peach Ave.

Pre-Construction and Construction

04/2019 04/2020

04/2020 07/2020 10-12 8, 12, 14 23, 31

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation

Fresno County Overlays: New FY 2017/18 Sites - Various Locations

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and dig outs and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Lincoln Ave from the Grantland Alignment to State Route 145. Central Ave from Bethel Ave to Newmark Ave. Minnewawa Ave from Shepherd Ave to Copper Ave. Blythe Ave from State Route 180 to Belmont Ave. Fruit Ave from American Ave to Lincoln Ave. Coalinga-Mendota Rd from 2.5 Miles Southeast of Derrick Ave to 5.37 Miles Southeast of Derrick Ave. McCall Ave from State Route 180 to Ashlan Ave. Orange Ave from Jensen to Fresno City/County limit.

Pre-Construction and Construction

04/2019 08/2019

08/2019 12/2019 10-12 8, 12, 14 23, 31

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 13: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Glenn 19/20 New Road Maintenance & Rehabilitation Chip Seals - Various Sites - 36 Miles This project will include: Maintenance Program Plan Development

Road 20, from Road E to M; Road Z, from SH 162 to Road 48; Road 48, from Road Z to County line; Road S, from SH 32 to Road 33; Road D, from Road 48 to 33; Road 45, from Road MM to P, Road MM, from Road 45 to 47; Road 47, from Road 48 to MM; Road 48, from 99W to Road 47; Road 24, from SH 45 to Road S; Road 25, from Road C to 99W

Pre-Construction and Construction

07/2019 08/2019

08/2019 06/2020 5-10 4 3

Glenn 19/20 New Road Maintenance & Rehabilitation Fog Seal - Various Sites - 14 Miles This project will include: Maintenance Program Plan Development Road 39, from W ilson Creek to Interstate 5; Road V, from 29 to SH 162;

Road 29, from Road V to SH 45 Pre-Construction 07/2019 06/2020 2-5 4 3

Humboldt 19/20 New Road Maintenance & Rehabilitation

County-wide ADA Curb Ramp/Rehabilitation

This project will include: ADA Curb Ramp Installation (New) | This project covers installation of accessible curb ramps in various locations throughout the county. | This project's estimated schedule changed after the adoption of the FY 2019-20 Resolution (attached). The correct dates are reflected in the Submittal.

Myrtletown (North, Central & South): Hoover St, Vernon St (North), John Hill Rd (North & South), Terrace W ay (South), Nedra St, Quaker St, Eighteenth St, Isaac Ct, Highland Circle, Emerald Ct, Lindy Ln, Frank St, Ohio St, Jersey Ave, Hall Ave, Pleasant St, Hubbard Ln, Harris St, Freese Ave, W alford Ace, Montgomery St, Harrison Ave, along with 8 additional streets in the Cutten (North & South) region, 4 streets in the Rosewood region and 11 streets in the Pine Hills (North & South) region.

Construction 07/2019 03/2020 20-20 2 2

Humboldt 19/20 New Road Maintenance & Rehabilitation

County-wide Roadway and Culvert Maintenance / Rehabilitation

This project will include: Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials | This project covers labor, materials and equipment needed for road system maintenance repairs throughout the County. These activities include, but are not limited to; crack filling and sealing, pothole patching, grading, grader patching, dig outs, slurry seal, chip seal, striping, painting and brush cutting. | Materials required to complete these tasks include, but are not limited to; hot and cold mix, tar, thermoplastic striping paints, culvert piping and couplers, aggregate and many other materials used in the express intent of repairing a roadway projects pertaining to safety. This project's estimated schedule changed after the adoption of the FY 2019-20 Resolution (attached). The correct dates are reflected in the Submittal.

County-wide Procurement / Operational Needs 07/2019 06/2020 20-20 2 2

Humboldt 19/20 New Road Maintenance & Rehabilitation Emergency Services

This project will include: Pavement Rehab/Repair (Existing) | Culvert repair such as trenching, tunneling, compacting, armoring, as well as flagging, detouring, hauling, repairing, and providing essential services such as transporting and accommodating citizens who have been deprived of the ability to utilize roadways due to unexpected road damages and closures. | This project's estimated schedule changed after the adoption of the FY 2019-20 Resolution (attached). The correct dates are reflected in the Submittal.

All roads within the County Public Works responsibility districts, including but not limited to: Briceland to Thorn Rd, Shelter Cove Rd, Alderpoint Rd (Redway /Garberville and Fortuna area), Kneeland Rd, Bell Springs Rd, (Garberville/Fortuna Area) Centerville Rd, Mattole Rd, Lighthouse Rd (Ferndale Area), Central Ave, Harrison Ave, Myrtle Ave (Eureka/McKinleyville Area)

Construction 07/2019 06/2020 1-15 2 2

Humboldt 19/20 New Safety Illegal Dumping and Encampment Reclamation Costs

This project will include: Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials | This project covers the costs to clean up illegally dumped materials and restore sites where dumping has occurred and discourage future illegal dumping. Costs include labor, materials and equipment required to clean, repair and reclaim affected sites. It is anticipated that illegal dumping will continue to occur at sites until efforts to discourage illegal dumping take effect. As such the useful life of the project is based upon the probable reoccurrence of illegal dumping. | This project's estimated schedule changed after the adoption of the FY 2019-20 Resolution (attached). The correct dates are reflected in the Submittal.

County-wide Procurement / Operational Needs 07/2019 06/2020 1-5 2 2

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 14: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Humboldt 19/20 New Safety Roadside Brush Clearing for Traffic Safety and Fire Fuels Reduction

This project will include: Procurement of Road Maintenance and Rehab Materials | This project covers the added cost for labor materials and equipment required to perform brush clearing on county-maintained roads. This will also enhance the grant funding that the county has received for this type of work. | This project's estimated schedule changed after the adoption of the FY 2019-20 Resolution (attached). The correct dates are reflected in the Submittal.

County-wide Procurement / Operational Needs 07/2019 06/2020 1-3 2 2

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation Hawk Road Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate approximately 0.29 miles of road. The project will consist of recycling of existing pavement and repavement of road, removal and replacement of damaged sidewalks, pedestrians ramps, associated drainage work and road markings.

Hawk Road from Dogwood Road to Heber Avenue Pre-Construction and Construction

12/2017 02/2019

02/2019 12/2019 7-10 40 56

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation

Road Maintenance and Rehabilitation (Slurry Seal) on Various Roads at Gateway of the Americas

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repair potholes and other damaged road areas, resurface the road with Asphalt Slurry Seal, remove and replace Concrete Sidewalks and Curbs, and re-striping as necessary. | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Pan American Street from Rood Road to Los Alamos Road; Nina Lee Road from Pan American Street to Carr Road; Carr Road from Nina Lee Road to Rood Road; Rood Road from Stergios Road to Zinetta Road; Rood Road from Zinetta Road to Maggio Road; Stergios Road from Rood Road to Clara Nofal Road; Clara Nofal Road from Stergios Road to Zinetta Road; Menvielle Court Road from North End to South End

Pre-Construction and Construction

12/2017 09/2018

09/2018 12/2019 2-3 40 56

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation

Road Surface Repair Program in Imperial County

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repair potholes and repave/skinpatch failure areas of road for approximately 0.5 to 2.2 miles of road and restriping as necessary. | Maintenance work to be completed by County's forces. Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Drew Rd (Interstate 8 to Diehl Rd), Rockwood Rd (Heber Rd to Correll Rd), Silsbee Rd (Interstate 8 to McCabe Rd), Yourman Rd (Jasper Rd to Heber Rd), Austin Rd (Evan Hewes Highway to Ross Rd 0.3 Mi. S.), Imler Rd (Forrester Rd to Huff Rd 3.4 Mi. E.), Brandt Rd (Lindsey Rd to Young Rd), Eddins Rd (Kalin Rd 0.5 Mi. E to Brandt Rd), Schartz Rd (Dogwood Rd to Old Highway 111), Carter Rd (Forrester Rd to Loveland Rd), Casey Rd (Keystone Rd to Harris Rd), Snyder Rd (Norrish Rd to State Route 111)

Construction 07/2017 06/2019 4-6 40 56

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation

Road Improvements for Baughman Rd. from Forrester Rd. to Lack Rd. & Casey Rd. from Griffin Rd. to Hwy. 78

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate approximately 2.5 miles of road. The project will include the re-paving with Asphalt Concrete and the repair of failure areas of road markings. | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Baughman Road from Forrester Road to Lack Road; Casey Road from Griffin Road to State Route 78

Pre-Construction and Construction

12/2017 04/2020

03/2020 07/2020 6-10 40 56

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation Schartz Road Project 1

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate approximately 1.5 miles of road. The project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

Schartz Road McConnell Road to Old Highway 111 Pre-Construction and Construction

10/2017 04/2020

03/2020 07/2020 4-5 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 15: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation Dogwood Road Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate approximately 1.49 miles of road. The project will include the recycling of existing paving and road base material, new pavement, associated drainage work and road markings. | This project is funded in part by FHWA. Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

El Centro city limits to Imperial city limits Pre-Construction and Construction

07/2017 09/2018

09/2018 12/2019 12-15 40 56

Imperial 17/18 In-Progress Road Maintenance & Rehabilitation Heber Avenue Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate approximately 0.5 miles of road. The project will include the re-paving with asphalt concrete or the resurfacing with slurry seal, construction of ADA ramps, associated drainage work and road markings. | This project is funded in part by Federal Funds.

Heber Ave. from Correll Road to State Route 86 Pre-Construction and Construction

07/2017 01/2020

12/2019 07/2020 8-10 40 56

Imperial 17/18 In-Progress Safety Lack Road Bridge Project

This project will include: Document Preparation, Bridge Structure Rehab/Repair (Existing), Preliminary Design | The project consists of replacement of structurally compromised road bridge over the New River. The project is anticipated to require multiple years to be completed.

Lack Road Bridge over New River, County Brodge No. 58C-0101 Pre-Construction and Construction

12/2017 05/2020

04/2020 12/2020 50-75 40 56

Imperial 17/18 In-Progress Safety Forrester Road Bridge Project

This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project consists of the replacement of existing road bridge to retrofit seismically (Low Sufficiency rated). The project will be require a multiple years. | This project is funded in part by FHWA.

Forrester Road Bridge over W estside Main Canal, County Bridge No. 58C-0104

Pre-Construction and Construction

07/2017 05/2022

04/2022 12/2022 50-75 40 56

Imperial 17/18 In-Progress Safety Winterhaven Drive Bridge Project This project will include: Document Preparation, Bridge Structure Rehab/Repair (Existing), Preliminary Design | The project consists of seismic retrofitting existing road bridge due to the its current low sufficiency rating. | This project is funded in part by FHWA.

W interhaven Drive Bridge over California W asteway Channel, County Bridge No. 58C-0094

Pre-Construction and Construction

07/2017 05/2022

04/2022 12/2022 50-75 40 56

Imperial 17/18 In-Progress Safety Cady Road Intersection Project

This project will include: Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design | Highway Intersection Safety Improvements. The project will consist of adding lighting, advance curve warning signs, flashing beacons stop signs, upgraded chevron signs with fluorescent sheeting and installation of rumble strips to the road intersection. | This project is funded in part by FHWA.

Cady Road and W eiman Road Intersection Pre-Construction and Construction

07/2017 06/2019

05/2019 12/2019 7-10 40 56

Imperial 17/18 In-Progress Safety Keystone Road Intersection Project

This project will include: Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | Highway Intersection Safety improvement. The project will consist of adding lightning, paving, rumble strips, flashing beacons, and warning signs to the road intersection. | This project is funded in part by FHWA.

Keystone Road and Austin Road Intersection Pre-Construction and Construction

07/2017 03/2020

02/2020 12/2020 7-10 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 16: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Araz Rd.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping | Maintenance work to be completed by County's forces.

Araz Road from Quick Road to Quick Road (2 Mi. W .) Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Brockman Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping. | Maintenance work to be completed by County's forces.

Brockman Road from McCabe Road to Lyons Road (.5 Mi. N.) Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Drew Road from Lyons Road (0.5 Mi. N.) to Diehl Road.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping. | Maintenance work to be completed by County's forces

Drew Road from Lyons Road (0.5 Mi. N.) to Diehl Road. Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation

Drew Road from SR 98 to 2.2 Mi. N of SR 98

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Grinding of existing Asphalt Concrete pavement, placing 3-inch of conventional Asphalt Concrete overlay, Dig Out repairs, shoulder backing, pavement markings, and signage.

Drew Road from SR 98 to 2.2 Mi. N of SR 98 Pre-Construction and Construction

07/2019 10/2020

10/2020 06/2021 7-10 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation Forrester Road Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | 3-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Forrester Road: from Evan Hewes Highway to Interstate 8, from Evan Hewes Highway to Hackleman Road, from 0.80 Mi. N. of W orthington Road to Larsen Road, from 0.15 Mi. N. of Worthington Road to 0.20 Mi. S of Murphy Road, from Thompson Road to Keystone Road

Pre-Construction and Construction

07/2019 07/2020

06/2020 06/2021 7-10 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Austin Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces.

Austin Road from Harris Road to Larsen Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Larsen Road

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Larsen Road from SR 86 to Clark Road Construction 03/2019 09/2019 4-6 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 17: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Ross Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Ross Road from Forrester Road to Silsbee Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation Silsbee Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Full Depth Reclamation of existing pavement, shoulder backing, striping and signage.

Silsbee Road from Hackleman Road to Aten Road Pre-Construction and Construction

07/2019 07/2020

06/2020 06/2021 10-15 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Bowles Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Bowles Road from English Road to Lyerly Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Carter Road Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Carter Road from Loveland Road to Webster Road (0.7 Mi. S). Carter Road from W ebster Road (0.7 Mi. S) to W ebster Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Gentry Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Gentry Road from Eddins Road to Vail Canal Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Kalin Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Kalin Road from Carter Road to Cady Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Rutherford Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Rutherford Road from Kershaw Road to HWY 115 (1.75 Mi. E) Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation Dogwood Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Dogwood Road from Keystone Road to Harris Road Pre-Construction and Construction

07/2019 09/2020

08/2020 06/2021 7-10 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 18: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Meloland Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

Meloland Road from Evan Hewes Highway to Grumbles Road Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Neighbors Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces.

Neighbors Road from County Line to Arizona State Line Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Worthington Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and restriping | Maintenance work to be completed by County's forces

W orthington Road from James Road to Alamo River Construction 03/2019 09/2019 4-6 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation Zenos Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Zenos Road from SR 115 to Melon Road Pre-Construction and Construction

07/2019 09/2020

08/2020 06/2021 7-10 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation A avenue at Bombay Beach

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

A avenue at Bombay Beach from SR 111 to Fifth Street Pre-Construction and Construction

10/2019 10/2020

09/2020 06/2021 7-10 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation Menvielle Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | 3-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage. | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Menvielle Road from SR 98 to SR 7 Pre-Construction and Construction

07/2017 07/2021

06/2021 12/2021 7-10 40 56

Imperial 18/19 Carried Over Safety Rural School Safety Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Safety Improvements Signage/striping.

Magnolia Union Elementary at intersection of Casey Road and Silliman Road Pine Elementary at intersection of Holt Road and Townsend Road Meadows Union Elementary at Intersection of Bowker Road and Evan Hewes Highway

Pre-Construction and Construction

09/2019 03/2020

02/2020 12/2020 5-10 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Winterhaven Dr. Bridge over California Wasteway

This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project consists of seismic retrofitting existing road bridge due to the its current low sufficiency rating.

W interhaven Dr. Bridge over California W asteway. Pre-Construction and Construction

07/2017 05/2022

04/2022 12/2022 10-15 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 19: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Lack Rd. Bridge over New River Repair/Replacement.

This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project consists of replacement of structurally compromised road bridge over the New River. The project is anticipated to require multiple years to be completed.

Lack Rd. Bridge over New River Repair/Replacement. Pre-Construction and Construction

12/2017 05/2020

04/2020 12/2020 45-50 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Forrester Road Bridge Over Westside Main Canal Replacement

This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project consists of the replacement of existing road bridge to retrofit seismically (Low Sufficiency rated). The project will be require a multiple years.

Forrester Road Bridge Over W estside Main Canal Pre-Construction and Construction

07/2017 05/2022

04/2022 12/2022 45-50 40 56

Imperial 18/19 Carried Over Road Maintenance & Rehabilitation Picacho Road Bridge

This project will include: Document Preparation, Bridge Structure Rehab/Repair (Existing), Preliminary Design | The project will consist on the design and construction of the Bridge Rehabilitation for Picacho Road Bridge over Yuma Main.

Picacho Road Bridge over Yuma Main Pre-Construction and Construction

09/2019 04/2021

03/2021 12/2021 10-15 40 56

Imperial 18/19 Completed Road Maintenance & Rehabilitation Meloland Road Bridge

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists in the replacement of existing structurally deficient two lane bridge with a culvert structure | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Meloland Road Bridge over Central Drain Construction 07/2018 11/2018 45-50 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Resurfacing of Various Roads in Heber Townsite

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | AC overlay, ARAM, Slurry Seal Coat and Road Markings

10th St, 11Th Ave, 14Th St, 2nd St, 3rd St, 6Th St, 9th St, Baker Ave, Cantaloupe St, Clifford Ave, Crane Ln, Dove Ct, Grand Ave, Hawk St, Lettuce St, Mallard Ct, Niki St, Parkyns Ave, Pheasant Ct, Pheasant St, Sparrow St, Valley Blvd, 7Th St, Baker Ave, Gill Rd, Ingram Rd, Paulin, 6th St, Desert Sunrise Ave, Heber Ave, Heffernan Ave, Maple Ave, Palm Ave, Correll Rd

Pre-Construction and Construction

07/2018 02/2019

01/2019 12/2019 4-10 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Resurfacing of Various Roads in Desert Shores Townsite

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | AC Overlay, ARAM, Slurry Seal Coat and Road Markings

Mountain View Dr. (Northbound and Southbound), Scott Dr., Cherokee Dr., Palo Verde Dr., Newport Ave., Zuma Ave., Pismo Ave., Del Mar Dr., Catalina Dr., Hermosa Ave., Shoreview Dr., Hermosa Ave., Malibu Ave., Desert View Dr., Del Mar Dr., Carmel Ave., Balboa Ave., Catalina Dr., Redondo Ave., Balboa Ave., Laguna Ave., La Jolla Ave., Coronado Ave., Thomas Ave., Acapulco Ln., Honolulu Ln., Venice Ln., Naples Ln., Marseille Ln., Capri Ln.

Pre-Construction and Construction

07/2018 02/2019

01/2019 12/2019 4-6 40 56

Imperial 18/19 In-Progress Road Maintenance & Rehabilitation

Gateway of the Americas Road System This project will include: Preliminary Design

Maggio Road from HW Y 7 to Rood Road, Zinetta Road from Clara Nofal Road to Rood Road, Pan American Road from Nina Lee Road to Rood Road, Rood Road from Pan American Rood to Stergios Road, Menville Road from HW Y 7 to Menvielle Court , Nina Lee Road from Carr Road to HW Y 7, Los Alamos Road from Pan American Road to North End

Pre-Construction 05/2019 09/2019 7-10 40 56

Imperial 19/20 New Road Maintenance & Rehabilitation

AC Skin Patching for Various County Roads

This project will include: Pavement Rehab/Repair (Existing) | Maintenance work to be completed by County's forces.

Board Rd, Bowker Rd, Evan Hewes Highway, Holt Road, Hovley Road, Imperial Road, Kalin Road, McCabe Rd, Miller Rd, Ross Rd, Rutherford Rd, Underwood Rd, W ahl Road, Yuma Rd, and Heber Road. Locations are estimates not yet final.

Construction 03/2020 09/2020 4-6 40 56

Imperial 19/20 New Road Maintenance & Rehabilitation

Pavement Overlay for Various County Roads This project will include: Preliminary Design

Clark Road from W ahl Road to .5 N. of HW Y 98, McCabe Road from Dogwood Road to HW Y 86, Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road from HW Y 86 to Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Pre-Construction 08/2019 12/2021 7-10 40 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 20: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Imperial 19/20 New Road Maintenance & Rehabilitation

Fog Seal and Pothole Repair for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will just include Fog Seal and Pothole Repair.

Various County Roads including Seeley Townsite and Niland Townsite. Locations are estimates not yet final. Construction 02/2020 06/2020 2-3 40 56

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #1 , Rubberized Crack fill / Patching Project, Phase III This project will include: Pavement Rehab/Repair (Existing)

Countywide, the Inyo County Road Route system, where several roads are grouped in areas, or ‘zones’ will be used for identification of the residential streets, outlying roads, and individual roads receiving the crack fill / patching application. The routes identified are both residential and outlying roads, roads within the routes will receive some application, towns and routes are as follows;

Construction 09/2019 06/2020 1-2 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project # 2, Phase III Road Striping and Pavement Markings Project,Phase III

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

County wide, the Inyo County Road Route system, where several roads are grouped in areas, or ‘zones’ will be used for identification of the residential streets, outlying roads, and the individual roads receiving the marking application. The routes identified below are both residential and outlying roads, roads within the routes will receive some application.

Construction 07/2019 06/2020 1-2 8 26

Inyo 18/19 Carried Over Road Maintenance & Rehabilitation

Project# 5 - South Lake Road Project

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Feasibility Study, Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | RMRA funding will be used towards the design phase and pre-construction of the South Lake Road Project. The project will pulverize and reclaim the existing pavement and portion of the existing subgrade for use as a new base course and overlay with a new asphalt concrete pavement section on 6.9 miles of South Lake Road, as well as minor widening along the first 2.1 miles with additional standard rehab and repair. The Count may use RMRA funds for the construction phase of this project.

South Lake Road (#2022) between US 168 and the South Lake trailhead parking area, approximately 12 miles Southwest of Bishop, California.

Pre-Construction and Construction

07/2018 09/2019

04/2019 06/2021 15-20 8 26

Inyo 19/20 New Safety Project #6, Phase I Meadow Creek I/II, Lazy A Subdivision Sidewalk Improvement

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, ADA Curb Ramp Installation (New), Feasibility Study, Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

Meadow Creek I, Meadow Creek II, and the Lazy A subdivisions are located approximately 2 miles North W est of the City of Bishop, in Inyo County. This project will be located in Route #1004, in the Inyo County Road Route system, and over the life of this project will some or all of the sidewalk sections of 35 of the 50 roads identified in this Route.

Pre-Construction and Construction

08/2019 04/2020

01/2020 12/2024 5-20 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #7 First St. / West Jay Street improvement project

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | This will be a County contribution using a percentage of RMRA funds for improvements that the City of Bishop will be performing to a County Road. W hile the City will be preforming a utility extension and upgrade for public safety.

Street First (W est Jay Street) is located south of the City of Bishop, W est of US395 (Main St.) and shares the City of Bishop/Inyo County Boundary. Construction 07/2019 06/2020 15-20 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #8 Onion Valley Road Storm Damage repair

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New) | The Onion Valley Road Replacement project will address damages caused by a 2017 storm system that destroyed 1500’ of West bound lane. The County is using a percentage of its RMRA funds as a match for the State of California OES disaster funds being received for design and construction.

Onion Valley Road is located in Inyo County, just W est of Independence. The damaged section that will be repaired is 13 miles west of the intersection of Onion Valley Road/Market St. and US395 in Independence.

Construction 06/2019 06/2021 15-20 8 26

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 21: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Inyo 19/20 New Road Maintenance & Rehabilitation Project #9 Cactus Flat Road Repair This project will include: Pavement Rehab/Repair (Existing), Landscape Safety

Rehab/Repair (Existing), Landscape Safety Installation (New)

Cactus Flat Road is located in Inyo County, just south of Olancha. The section that will be repaired is approximately 5 miles west of the intersection of Cactus Flat Road and US395, 5 miles south of Olancha.

Construction 07/2019 12/2024 15-20 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #10 North Round Valley Bridge Replacement, Birchim Lane improvement; State matching funds requirement

This project will include: Paving and/or Striping Installation (New Safety), Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Environmental Study/Documents, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development | The North Round Valley Bridge Replacement and Birchim Lane improvement project will address damages caused by a 2017 storm system that destroyed the bridge and access route for the 40 Acres Community. The County is using a percentage of its RMRA funds as a match for the State of California OES disaster funds being received for design and construction.

North Round Valley Road, with the damaged bridge, and Birchim Lane, that intersects North Round Valley Road, is located in Inyo County, 15 miles North W est of Bishop.

Pre-Construction and Construction

01/2019 07/2019

06/2019 12/2025 20-50 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #11, Phase I Panamint Valley Road Cold Mix Overlays, various locations

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Panamint Valley Road is located in the Southern section of Inyo County; it connects US190 in Panamint Valley (Adjacent to the W est edge of Death Valley National Park) , and Trona-W ildrose Road, a County Road, to the South near the San Bernardino County line.

Construction 08/2019 12/2022 3-7 8 26

Inyo 19/20 New Road Maintenance & Rehabilitation

Project #12, Phase I Old Spanish Trail Road Cold Mix Road Overlays, Various Locations

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Old Spanish Trail Road is located in the South East section of Inyo County; it connects to SR127 Approximately 10 South of the town of Shoshone (Adjacent to the East edge of Death Valley National Park) , and the Nevada State line, at the Southern edge of Pahrump, NV.

Construction 08/2019 12/2022 3-7 8 26

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Asphalt Concrete Stockpile and W indrow at Various Locations in East and W est Kern County

This project will include: Public Works Staffing, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public W orks Safety Materials and Gear | This road maintenance project consists, in general, of purchasing approximately 50,000 tons of road maintenance asphalt material and self performing pothole patching and thin asphalt overlays on the road system throughout Kern County.

East Kern County including Caliente Bodfish Road, Old Kern Canyon Road, Tehachapi Road Yard, Edison Highway, James Road Yard, and Oilfield Road in Kern County; West Kern County including Arvin Road Yard, Buttonwillow Road Yard, Lost Hills Road Yard, Taft Road Yard, Lebec Road Yard, Curnow Road Yard, Elmo Highway, W asco Road Yard, Lake of the W oods, and State Route 43

Procurement / Operational Needs 05/2019 07/2019 1-2 14, 16 32, 34, 36

Kern 18/19 In-Progress Complete Streets Components

Shoulder Improvements on Banducci Road from Stallion Springs Drive to Pelliser Road

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | This safety and complete street component project consists, in general, of paving approximately 1.3 miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

Banducci Road from Stallion Springs Drive to Pelliser Road Pre-Construction and Construction

01/2019 03/2019

03/2019 07/2019 15-20 16 34

Kern 18/19 In-Progress Complete Streets Components

Shoulder Improvements on Backus Road from Tehachapi W illow Springs Road to State Route 14

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | This safety and complete street component project consists, in general, of paving approximately 7.4 miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

Backus Road from Tehachapi W illow Springs Road to State Route 14 Pre-Construction and Construction

05/2018 08/2018

08/2018 05/2019 15-20 16 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 22: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Belle Terrace from W ible Road to City Limit

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of digging out failed segments of roadway throughout approximately 1 mile and resurfacing the roadway with an asphalt overlay.

Belle Terrace from W ible Road to City Limit Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 8-10 14 34

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Eberle Road from Shafter Road to Houghton Road and on Lindsay Road from Gosford Road to Ashe Road

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of resurfacing approximately 2 miles of roadway with an asphalt overlay.

Eberle Road from Shafter Road to Houghton Road and Lindsay Road from Gosford Road to Ashe Road

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 8-10 14, 16 32, 34

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Habecker Road from Segrue Road to Hall Road

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of digging out failed segments of roadway throughout approximately 0.25 mile and resurfacing the roadway with an asphalt overlay.

Habecker Road from Segrue Road to Hall Road Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 8-10 14 32

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Mc Cray Street from West Day Avenue to Merle Haggard Drive

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of milling out and filling failed segments of roadway throughout approximately 0.5 mile.

Mc Cray Street from W est Day Avenue to Merle Haggard Drive Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 10-15 14 34

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Rosamond Boulevard from Sierra Highway to Edwards Air Force Base W est Boundary

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of overlaying approximately 1 mile of roadway with asphalt.

Rosamond Boulevard from Sierra Highway to Edwards Air Force Base W est Boundary

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 8-10 16 36

Kern 18/19 Carried Over Road Maintenance & Rehabilitation

Overlay on Jewetta Avenue from Rosedale Highway to City Limit and on Palm Avenue from Allen Road to Old Farm Road

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of digging out failed segments of roadway throughout approximately 1.25 miles and resurfacing the roadway with an asphalt overlay.

Jewetta Avenue from Rosedale Highway to City Limit and Palm Avenue from Allen Road to Old Farm Road

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 8-10 16 34

Kern 18/19 In-Progress Road Grade Separation Standard Street Alternate Access

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Railroad Grade Separation Rehab/Repair, Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Right of W ay, Storm Drain/Culvert Installation (New) | Carryover Project Status Update - This safety, railroad grade separation, and complete street component project consists, in general, of constructing a grade separation, curb, gutter, sidewalk, drainage, and paved roadway on Atlas Court from Standard Street to Hageman Road. In the interest of public safety and aiding motor vehicle traffic, the new railroad crossing will serve as a second ingress/egress point to allow emergency responders, as well as the public, to freely enter and exit the area without disruption from rail traffic.

Atlas Court at the San Joaquin Valley Railroad and from Standard Street to Hageman Road

Pre-Construction and Construction

12/2018 01/2019

01/2019 10/2020 15-20 16 34

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 23: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Kern 19/20 New Road Maintenance & Rehabilitation

W estwood Blvd from W oodford Tehachapi Road to red Apple Avenue

Preparation, Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists in general, of reconstructing a 1.4 mile segment of roadway and

W estwood Blvd from W oodford Tehachapi Road to Red Apple Avenue Pre-Construction and Construction

08/2019 01/2020

01/2020 06/2020 8-10 16 34

resurfacing with an asphalt overlay.

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Kern 19/20 New Road Maintenance & Rehabilitation

Airport Drive from State Road to West China Grade Loop

Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists in general, of

Airport Drive from State Road to W est China Grade Loop Pre-Construction and Construction

08/2019 01/2020

01/2020 06/2020 8-10 16 34

reconstructing a 1.6 mile segment of roadway and resurfacing with an asphalt overlay.

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Kern 19/20 New Road Maintenance & Rehabilitation

Lake Isabella Boulevard from Kernville Road/Nugget Avenue to Kern River Canyon Road

Preparation, Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists in general, of reconstructing a 3.0 mile segment of roadway and

Lake Isabella Boulevard from Kernville Road/Nugget Avenue to Kern River Canyon Road

Pre-Construction and Construction

08/2019 01/2020

01/2020 06/2020 8-10 16 26

resurfacing with an asphalt overlay.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety),

Kern 19/20 New Complete Streets Components

Various Streets within Rexland Acres

ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Active Transportation Plan, Storm Drain/Culvert Installation (New) | This project consists, in general, of construction of storm drain lines, sidewalks, curb ramps, drive approaches, bike lanes, high visibility cross walks and solar powered street lights

Various streets within Rexland Acres located east on Union Avenue, west of Central Branch Kern Canal, north of Bakersfield city limit, south Pacheco Road

Pre-Construction and Construction

07/2018 09/2019

09/2019 12/2020 15-20 16 32

and safety signs.

Kern 19/20 New Road Maintenance & Rehabilitation

Nord Avenue from Stockdale Highway to Reina Road

This project will include: Bicycle Lane (New) | This project consists, in general, of construction of 4.0 miles of asphalt concrete shoulders and class II bike lanes. Nord Avenue from Stockdale Highway to Reina Road Pre-Construction and

Construction 01/2019 09/2019

09/2019 08/2020 15-20 16 34

Kern 19/20 New Road Maintenance & Rehabilitation

Renfro Road from Rosedale Highway/State Route 58 to Hageman Road

This project will include: Bicycle Lane (New) | This project consists, in general, of construction of 1.0 mile of asphalt concrete shoulders and class II bike lanes. Renfro Road from Rosedale Highway/State Route 58 to Hageman Road Pre-Construction and

Construction 01/2019 07/2019

07/2019 06/2020 15-20 16 34

Kern 19/20 New Road Maintenance & Rehabilitation

Vineland Road from Edison Highway to Eucalyptus Drive

This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | This project consists, in general, of construction of 0.8 mile of asphalt concrete shoulder and class II bike lanes.

Vineland Road from Edison Highway to Eucalyptus Drive Pre-Construction and Construction

01/2019 04/2019

04/2019 08/2019 15-20 16 34

Kern 19/20 New Road Maintenance & Rehabilitation

Universe Avenue from McCray Street to North Chester and Stockton Avenue from China Grade Loop to Universe Avenue

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing) | This rehabilitation project consists, in general, of resurfacing 1.8 miles of roadway with and overlay and reconstruct, addition of ADA compliant curb ramps.

Universe Avenue from McCray Street to North Chester and Stockton Avenue from China Grade Loop to Universe Avenue

Pre-Construction and Construction

02/2019 05/2019

05/2019 08/2019 15-20 16 26, 34

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 24: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Kern 19/20 New Road Maintenance & Rehabilitation

Twenty Mule Team Road and Boron Road

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This bike/pedestrian path project consists, in general, of construction of curbs, gutters, sidewalks and closing gaps in existing infrastructure such as curb ramps, high profile cross walks and sidewalk.

Located in Boron along the commercial frontage of Twenty Mule Team Road and Boron Road

Pre-Construction and Construction

08/2019 01/2020

01/2020 06/2020 15-20 16 36

Kern 19/20 New Road Maintenance & Rehabilitation

Located on Various Street in Kern County

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | This road maintenance and rehabilitation project consists, in general, of placing a chip seal on approximately 44 miles of county roadways to preserve and protect the pavement.

Located on various streets including; Granite Road from W oody Road to State Highway 155, China Lake Boulevard from Highway 395 to City limits, Mahan Street from China Lake Boulevard to city limits, 20 miles of Brown Road from Highway 395 and additional streets as funding permits

Pre-Construction and Construction

08/2019 01/2020

01/2020 06/2020 15-20 16 26, 34

Kern 18/19 In-Progress Complete Streets Components

Shoulder and Guardrail Improvements on Shafter Road at San Joaquin Valley Railroad

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This safety and complete street component project consists, in general, of paving roadway shoulders and installing metal guardrail near the railroad crossing.

Shafter Road at San Joaquin Valley Railroad Pre-Construction and Construction

05/2018 08/2018

08/2018 11/2018 15-20 14 32

Avenal Cut-off 25th Ave-Laurel Ave, Laurel Ave-Nevada Ave, Kansas Ave

Kings 19/20 New Road Maintenance & Rehabilitation

Kings HMA Overlay over Paving Fabric 2019-2020

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation

12th Ave-13th Ave, Houston Ave12th Ave-14th Ave, Grangeville Blvd 2nd Ave to 6th Ave, Laurel Ave/Main St Empire St- SR 41,Empire Street 6th

Pre-Construction and Construction

04/2020 07/2020

06/2020 10/2020 15-25 14 32

Street-Lansing Ave

Kings 19/20 New Road Maintenance & Rehabilitation

Kings Slurry & Micro Seals 2019-2020

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation

6th St Empire St-20 1/2 Ave, 5th St Empire St-Railroad St, 4th St Empire St-Railroad St, Cross St 5th-2nd St, 3rd St Empire St-Railroad St

Pre-Construction and Construction

04/2019 06/2019

05/2019 07/2019 5-7 14 32

This project will include: Big Canyon Road - Resurface .8 miles of road. Current work

Lake 17/18 Carried Over Road Maintenance & Rehabilitation

Big Canyon Road; Harrington Flat Road

includes preliminary engineering and quantity development; Harrington Flat Road -Resurface 5 miles of road. Current work includes preliminary engineering and quantity W ardlaw St. to Harbin Springs Rd.; Bottle Rock Road to State Route 175 Pre-Construction 05/2019 06/2019 10-20 2 4

development.

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document

Lake 17/18 Carried Over Road Maintenance & Rehabilitation Scotts Valley Road;Soda Bay Road Preparation, Preliminary Design | Resurface 500 feet of road on Scotts Valley Road and

Resurface 0.5 miles of road on Soda Bay Road. Current work includes project design and Lakeport City Limit to Mountview Rd.; Transfer Station to Big Valley Road Pre-Construction and Construction

05/2019 09/2019

08/2019 11/2019 10-20 2 4

development of bid documents.

Lake 19/20 New Road Maintenance & Rehabilitation Harrington Flat Road This project will include: Pavement Rehab/Repair (Existing) | Roadway resurfacing Harrington Flat Road from Bottle Rock Road to Sulphur Creek Road Construction 09/2019 11/2019 10-20 2 4

Lake 19/20 New Road Maintenance & Rehabilitation

South Main/Soda Bay Road Intersection This project will include: Pavement Rehab/Repair (Existing) | Resurface intersection South Main/Soda Bay Road Intersection with State Route 175 Construction 09/2019 11/2019 10-20 2 4

Lake 17/18 Carried Over Road Maintenance & Rehabilitation

Rainbow Road Rehabilitation and Resurfacing

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct and resurface Rainbow Road Lakeshore Blvd. to Howard Ave.; Lakeport City Limit to Park W ay Construction 05/2019 06/2019 10-20 2 4

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 25: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Lassen 18/19 Carried Over Road Maintenance & Rehabilitation

Center Road, County Road 215 Rehab. Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Center Road, County Road 215 (approximate 4 mile section - 0.904 miles east of Cramer Lane to 1.4 miles west of Juniper Ridge Road. Construction 07/2020 10/2020 10-15 1 1

Lassen 19/20 New Road Maintenance & Rehabilitation

Center Road, County Road 215 Rehab. Project - phase 2

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Center Road, County Road 215 from 1.4 miles west of Juniper Ridge Road intersection to W ard Lake Road intersection Construction 09/2020 10/2020 10-15 1 1

Angeles Forest - Glendora Mountain This project will include: Cost Estimating, Document Preparation, Environmental Los Angeles 18/19 In-Progress Traffic Control Devices Rd- Big Dalton Canyon Rd to East Study/Documents, Preliminary Design | Install and update curve advisory signs. Glendora Mountain Rd- Big Dalton Canyon Rd to East Fork Rd Pre-Construction 08/2017 07/2020 10-10 25 41

Fork Rd Construction is not anticipated until FY 20-21

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Los Angeles 18/19 In-Progress Traffic Control Devices Covina - Arrow Hwy at Enid Av Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Project Scope Development | Traffic signal upgrade - add protected/permissive left turn phasing for

Arrow Highway at Enid Avenue, unincorporated Covina area Pre-Construction and Construction

07/2018 04/2020

10/2020 10/2020 15-15 22 48

westbound traffic

Los Angeles 18/19 In-Progress Traffic Control Devices East Los Angeles - 1st Street at Herbert Ave (17/18 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install flashing beacons at crosswalk on west approach East Los Angeles - 1st Street at Herbert Avenue Construction 03/2019 07/2019 20-20 24 51

Los Angeles 18/19 In-Progress Traffic Control Devices East Los Angeles - 1st Street at Mednik Ave (17/18 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Installation of protected/permissive left-turn phasing for northbound and southbound traffic.

1st St at Mednik Ave in East Los Angeles Construction 03/2019 07/2019 15-15 24 51

Los Angeles 18/19 In-Progress Traffic Control Devices East Los Angeles - Olympic Bl at Saybrook Av

This project will include: Cost Estimating, Preliminary Design, Project Scope Development | Upgrade the existing vehicle heads, pedestrian heads and pedestrian pushbuttons at the intersection of Olympic Boulevard and Saybrook Avenue.

Olympic Boulevard and Saybrook Avenue - East Los Angeles Pre-Construction 01/2020 07/2020 15-15 24 51

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Los Angeles 18/19 Carried Over Traffic Control Devices W est Valinda - Amar Rd at Vineland Av

Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | The objective of this project is to install protected left-turn phasing to the east and west approaches to an existing traffic signal at

Amar Road and Vineland Avenue in the unincorporated County community of W est Valinda

Pre-Construction and Construction

07/2019 04/2020

01/2020 07/2020 15-15 22 57

the intersection of Amar Road at Vineland Avenue.

Los Angeles 18/19 In-Progress Traffic Control Devices W est Valinda - Vineland Av at Giordano St

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design | The objective of this project is to install a rectangular rapid flashing beacons on the north approach of Vineland Avenue and Giordano Street.

Vineland Avenue at Giordano Street in the unincorporated County community of W est Valinda.

Pre-Construction and Construction

07/2018 09/2019

06/2020 03/2020 15-15 22 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 26: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 18/19 In-Progress Traffic Control Devices W illowbrook - 120th St at Normandie Av and 120th St at Compton Av

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, master arms, vehicle heads, bicycle and vehicle detection, protected-permissive left-turn phasing, access ramps, communication, and other associated equipment at the intersections of 120th Street at Normandie Avenue and 120th Street at Compton Avenue.

The intersections of 120th Street at Normandie Avenue and 120th Street at Compton Street in the unincorporated County community of W illowbrook. Pre-Construction 07/2018 06/2020 15-15 35 62

Los Angeles 18/19 In-Progress Traffic Control Devices Willowbrook - 120th St at Compton Creek (17/18 Carryover)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Removal of existing uncontrolled crosswalk at 120th Street and Parmelee Avenue. Signage to prohibit pedestrians from crossing 120th Street at Parmelee Avenue. Installation of pedestrian activated traffic signal on 120th Street at Compton Creek with a yellow painted crosswalk. Note this project was merged with 1st/Mednik et al in 2017-18 reporting

The intersection of 120th Street and Compton Creek in the unincorporated community of W illowbrook. Pre-Construction 07/2017 12/2020 20-20 35 64

Los Angeles 18/19 Carried Over Traffic Control Devices Calabasas - Cornell Rd - Mulholland Hwy to Cornell W ay

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Cornell Road.

Cornell Road beginning at Mulholland Highway and ending at 900’ S/O Cornell W ay in unincorporated community of Calabasas. Pre-Construction 07/2019 05/2020 10-10 27 50

Los Angeles 18/19 Carried Over Traffic Control Devices Topanga - Old Topanga Cyn Rd -Valdez Rd to Topanga Cyn Blvd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Old Topanga Canyon Road.

Old Topanga Canyon Road beginning at 2723’ S/O Valdez Road and ending at Topanga Canyon in unincorporated community of Topanga. Boulevard.

Pre-Construction 10/2019 05/2020 10-10 27 50

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

East Irwindale - Newburgh St, ET AL.

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement preservation (micro-milling, scrub seal, slurry seal) of 5.4 miles of residential roads, parkway improvements, curb ramp upgrade

East Irwindale community Pre-Construction and Construction

09/2017 07/2019

07/2019 12/2019 7-7 22 48

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

East Los Angeles - Whiteside St, et al.

This project will include: Document Preparation, Preliminary Design | Reconstruct 5.1 miles of residential roads, parkway improvements, curb ramp upgrade | (Construction in FY 2020-21)

East Los Angeles community bounded by Interstate 10, City of Los Angeles, and Indiana Street, and W oods Avenue from State Route 60 and Pomona Boulevard

Pre-Construction 10/2017 09/2020 20-20 24 51

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

South San Jose Hills - La Seda, ET AL.

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The primary objective of this project is to preserve 5 miles of residential roads. The project will be constructed in two phases. Phase 1 will include pavement preparation and all concrete related works including installation of any missing sidewalks. Phase 2 will include the pavement preservation treatments.

South San Jose Hills community bounded by Giano Avenue, City of West Covina, La Seda Road, and Valley Boulevard

Pre-Construction and Construction

09/2017 07/2019

07/2019 12/2019 7-7 22 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 27: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Ladera Heights - Centinela Av, ET AL.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 1.2 miles of roadway, parkway improvements, curb ramp upgrade | (Construction in FY 2020-21)

Ladera Heights community - W est Centinela Ave from Green Valley Cir to La Tijera Blvd. and South Centinela Ave from Jefferson Blvd to Compton Creek. Pre-Construction 08/2017 06/2020 20-20 30 54

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Windsor Hills - 59th St, ET AL. -Reconstruction

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Right of Way | Reconstruct 2.2 miles of residential roads, parkway improvements, curb ramp upgrade | (Construction in FY 2021-22)

Windsor Hills community bounded by La Cienega Boulevard, Slauson Avenue, Fairfax Avenue, and City of Los Angeles Pre-Construction 08/2017 06/2021 20-20 30 54

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Hacienda Heights - Garo St, ET AL.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct 5.7 miles of residential roads, parkway improvements, curb ramps upgrade | Project currently in design. RMRA funds used effective FY 2017-18.

Hacienda Heights bounded by State Route 60, Stimson Avenue, Halliburton Road, and Fieldgate Avenue

Pre-Construction and Construction

03/2013 11/2019

07/2019 05/2020 20-20 32 57

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Hacienda Heights - Leticia Dr, ET AL.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 11.4 miles of residential roads, parkway improvements, curb ramps upgrade | (Construction in FY 2020-21)

Hacienda Heights bounded by Los Altos Drive, Hacienda Boulevard, Colima Road, Camino Del Sur, and Vallecito Drive Pre-Construction 10/2017 06/2020 20-20 32 57

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Long Beach Island - Harco St, ET AL.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 3.5 miles of residential roads, parkway improvements, curb ramps upgrade

Unincorporated area surrounded by City of Long Beach between W oodruff and Palo Verde Avenues

Pre-Construction and Construction

08/2017 09/2019

07/2019 12/2019 20-20 33 70

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

W est W hittier - Los Nietos/South Whittier - Sunshine Acres - Keith Dr, ET AL.

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct 9.7 miles of residential roads, and alleys, including parkway improvements, tree removals and replanting (84 trees), curb ramp upgrades, and roadway reconstruction.

W est W hittier - Los Nietos/South W hittier communities bounded by Norwalk Boulevard, Mines Boulevard, Colima Road, and City of W hittier

Pre-Construction and Construction

10/2017 12/2019

07/2019 04/2021 20-20 32 57

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Roosevelt - Avenue E - 35th St East to 140th St East

(Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct 9.5 miles of rural major roads,

Roosevelt - Avenue E - 35th St E to 140th St E Pre-Construction and Construction

10/2017 07/2019

07/2019 10/2019 20-20 21 36

striping and pavement markings

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 28: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

West Chatsworth - Lake Manor Dr, ET AL.

This project will include: Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct 1.9 miles of residential roads, parkway improvements, curb ramps upgrade | (Construction in FY 2021-22)

West Chatsworth unincorporated community Pre-Construction 10/2017 06/2021 20-20 27 45

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Santa Clarita Valley - Hasley Hills South

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct 5.8 miles of residential roads, parkway improvements, curb ramps upgrade | (Construction in FY 2020-21)

Castaic community, Hasley Hills neighborhood Pre-Construction 10/2017 08/2020 20-20 21 38

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Santa Monica Mountains - Culvert Upgrades - Phase II

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Right of W ay | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter

11 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas Pre-Construction 09/2017 08/2020 50-50 27 50

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

Santa Monica Mountains - Culvert Upgrades - Phase III

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter

29 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas Pre-Construction 09/2017 08/2020 50-50 27 50

Los Angeles 17/18 In-Progress Traffic Control Devices Fairgrove Ave at Sandia Ave et al

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Install flashing beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Protected left-turn phasing for west approach. Includes TDS0001514, TDS0001516, TDS0001517, TDS0001545, and TDS0001563. | Estimated advertising date 08/2019

W est Valinda - Fairgrove Av at Sandia Av; Hacienda Heights - Gale Av at Falstone Av; Hacienda Heights - Hacienda Bl at Shadybend Dr ; South W hittier - Telegraph Rd at Victoria Av

Pre-Construction and Construction

07/2017 08/2019

08/2019 06/2020 20-20 22, 32 48, 57

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Los Angeles 17/18 In-Progress Traffic Control Devices South San Gabriel - Del Mar Av at Potrero Grande Dr

Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Preliminary Design | Add protected left turn phasing to all South San Gabriel - Del Mar Av at Potrero Grande Dr Pre-Construction and

Construction 08/2017 10/2019

10/2019 04/2020 15-15 22 49

approaches.

This project will include: Cost Estimating, Document Preparation, Feasibility Study,

Los Angeles 17/18 In-Progress Safety W alnut Park - Miscellaneous crossing improvements

Environmental Study/Documents, Preliminary Design, Active Transportation Plan | Install curb extensions, ADA ramps, restripe crosswalks | In FY 19-20, funds to prioritize locations and evaluate feasibility of implementing improvements recommended in the

W alnut Park Pre-Construction 02/2018 06/2020 20-20 33 59

W alnut Park Pedestrian Plan.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 29: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Traffic Control Devices Hacienda Heights - Halliburton Rd at Stimson Av

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | Protected left-turn phasing for east and west approaches

Hacienda Heights - Halliburton Rd at Stimson Av Pre-Construction and Construction

07/2017 08/2019

08/2019 02/2020 15-15 32 57

Los Angeles 17/18 In-Progress Traffic Control Devices Rowland Heights - Pathfinder Rd at Blandford Dr

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Preliminary Design | Protected left-turn phasing for east and west approaches

Rowland Heights - Pathfinder Rd at Blandford Dr Pre-Construction and Construction

07/2017 09/2019

09/2019 03/2020 15-15 29 55

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights,

Los Angeles 17/18 In-Progress Traffic Control Devices Rowland Heights - Pathfinder Rd at Gallio Av

and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Rowland Heights - Pathfinder Rd at Gallio Av Pre-Construction and

Construction 07/2017 09/2019

09/2019 03/2020 20-20 29 55

New traffic signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Los Angeles 17/18 In-Progress Traffic Control Devices Altadena - Lake Av at Mendocino St Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design | Add split left turn phasing on Mendocino Altadena - Lake Av at Mendocino St Pre-Construction and

Construction 07/2017 01/2020

01/2020 06/2020 15-15 25 41

Street

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights,

Los Angeles 17/18 In-Progress Traffic Control Devices Altadena - Lincoln Av at Crosby St and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Altadena - Lincoln Av at Crosby St Pre-Construction and

Construction 07/2017 07/2019

01/2019 01/2020 15-15 25 41

New rapid rectangular flashing beacons

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage

Los Angeles 17/18 In-Progress Traffic Control Devices Altadena - Lincoln Av at Palm St Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair Altadena - Lincoln Av at Palm St Pre-Construction and

Construction 08/2017 07/2019

03/2019 01/2020 15-15 25 41

(Existing Safety) | New rapid rectangular flashing beacons at existing marked crosswalk

Los Angeles 17/18 In-Progress Traffic Control Devices Littlerock - Palmdale Bl at 90th St East

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | Protected left turn phasing | 90% design plans were completed previous fiscal years.

Littlerock - Palmdale Bl at 90th St East Pre-Construction and Construction

07/2017 05/2020

06/2019 11/2020 15-15 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 30: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Traffic Control Devices Quartz Hill - Avenue L at 42nd St West

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | New traffic signal | Does not include expenses prior to initiation of RMRA.

Quartz Hill - Avenue L at 42nd St West Pre-Construction and Construction

07/2017 05/2020

09/2019 11/2020 20-20 21 36

Los Angeles 17/18 In-Progress Traffic Control Devices Olympic Boulevard at Garfield Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mastarms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Work done by County force account labor. Currently in design.

Unincorporated East Los Angeles - Olympic Bl at Garfield Av Pre-Construction 03/2018 01/2020 15-15 24 51

Los Angeles 17/18 In-Progress Traffic Control Devices Whittier Boulevard at Eastern Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | W ork to be done through County force account labor.

Unincorporated East Los Angeles - W hittier Boulevard at Eastern Avenue Pre-Construction 03/2018 01/2020 15-15 24 51

Los Angeles 17/18 In-Progress Traffic Control Devices Badillo Avenue at Irwindale Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | W ork to be done by County force account labor.

Unincorporated Covina islands - Badillo Avenue at Irwindale Avenue Pre-Construction 03/2018 01/2020 15-15 22 48

Los Angeles 17/18 In-Progress Traffic Control Devices Covina Boulevard at Hollenbeck Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Right of Way | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | W ork done by County force account labor.

Unincorporated Covina island - Covina Boulevard at Hollenbeck Avenue Pre-Construction 03/2018 01/2020 15-15 22 48

Los Angeles 17/18 In-Progress Traffic Control Devices Avenue P at 15th Street East -Palmdale plan review

This project will include: Preliminary Design | Review traffic signal plans and issue permit for traffic signal shared with City of Palmdale | Plan review and permitting costs only.

Unincorporated area adjacent to City of Palmdale - Avenue P at 15th Street East Pre-Construction 08/2017 08/2019 20-20 21 36

Los Angeles 17/18 In-Progress Traffic Control Devices Las Virgenes Road at Mulholland Highway and Piuma Road

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Environmental Study/Documents, Preliminary Design, Right of Way, Paving and/or Striping Rehab/Repair (Existing Safety) | Upgrade vehicle heads, install video detection, battery back up, CCTV system and establish communications with LA County Traffic Management Center (TMC)

Unincorporated Santa Monica Mountains - Las Virgenes Road at Mulholland Highway and Piuma Road

Pre-Construction and Construction

08/2017 10/2019

06/2019 05/2020 15-15 27 45

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 31: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Traffic Control Devices Cypress Street at Vincent Avenue This project will include: Cost Estimating, Document Preparation, Preliminary Design, Right of Way | Upgrade standards, mastarms, vehicle heads, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment.

Unincorporated Covina islands - Cypress Street at Vincent Avenue Pre-Construction 04/2018 01/2020 15-15 22 43

Los Angeles 17/18 In-Progress Traffic Control Devices W orkman Mill Road at Lomitas Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated North W hittier area - W orkman Mill Road at Lomitas Avenue Pre-Construction 04/2018 01/2020 15-15 22 57

Los Angeles 17/18 In-Progress Traffic Control Devices Baldwin Park Boulevard at Amar Road

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated Bassett area - Baldwin Park Boulevard at Amar Road Pre-Construction 04/2018 01/2020 15-15 22 57

Los Angeles 17/18 In-Progress Traffic Control Devices Santa Anita Avenue at Freer Street This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated South Arcadia area - Santa Anita Avenue at Freer Street Pre-Construction 04/2018 01/2020 15-15 22 49

Los Angeles 17/18 In-Progress Traffic Control Devices Azusa Avenue at Temple Avenue This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated Valinda area - Azusa Avenue at Temple Avenue Pre-Construction 03/2018 01/2020 15-15 22 48, 57

Los Angeles 17/18 In-Progress Traffic Control Devices Enid Avenue at Newburgh Street

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Preliminary Design | Install curb ramp and striping for crosswalk. | The work consists of upgrading signing including the installation of the necessary pavement markings for the uncontrolled school crossing along Enid Avenue south of Newburgh Street. It will also include the upgrading of School zoning signage along Enid Avenue. W ork to be performed by County force account labor.

Unincorporated Covina island - Enid Avenue at Newburgh Street Pre-Construction and Construction

04/2018 03/2020

03/2020 06/2020 20-20 22 48

Los Angeles 17/18 In-Progress Traffic Control Devices Sierra Highway at Baker Canyon Road

This project will include: Install right turn pocket | Work is being completed through County force account labor.

Unincorporated Canyon Country area - Sierra Highway at Baker Canyon Road Construction 04/2018 07/2020 10-10 21 36, 38

Los Angeles 17/18 In-Progress Traffic Control Devices Lake Hughes Road - Elizabeth Lake Road to Ridge Route Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Environmental Study/Documents, Preliminary Design | Install chevron signs and curve advance warning signs

Unincorporated Castaic - Lake Hughes Road - Elizabeth Lake Road to Ridge Route Road

Pre-Construction and Construction

05/2018 02/2019

01/2019 08/2019 20-20 21 36, 38

Los Angeles 17/18 In-Progress Traffic Control Devices San Francisquito Canyon Road -Elizabeth Lake Road to Santa Clarita city limits

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Environmental Study/Documents, Preliminary Design | Install chevron signs and curve advance warning signs to enhance driver awareness of existing horizontal curves

Angeles National Forest - San Francisquito Canyon Road - Elizabeth Lake Road to Santa Clarita city limits

Pre-Construction and Construction

05/2018 01/2019

01/2019 08/2019 10-10 21 36, 38

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Hambledon Ave Et Al - Design

This project will include: Pavement preservation (micro-milling, scrub seal, slurry seal) of 11.6 miles of residential roads, parkway improvements, curb ramp upgrade | Design and construction occurring concurrently due to concrete work and other preparation which needs to be done prior to issuance of contract.

South San Jose Hills community Pre-Construction 10/2017 07/2019 7-7 22 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 32: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation Hambledon Ave Et Al - Construction

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement preservation (micro-milling, scrub seal, slurry seal) of 8.5 miles of residential roads, parkway improvements, curb ramp upgrade | Design and construction occurring concurrently due to concrete work and other preparation which needs to be done prior to issuance of contract.

South San Jose Hills community Construction 11/2017 07/2020 7-7 22 57

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

87th Street et al - Phase II -Construction

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement preservation (micro-milling, scrub seal, slurry seal) of 7.0 miles of residential roads, parkway improvements, curb ramp upgrade | Design and construction occurring concurrently due to concrete work and other preparation which needs to be done prior to issuance of contract. (Design completed Spring 2019)

Florence - Firestone community bounded by Firestone Boulevard, Bandera Street, 92nd Street, and Zamora Avenue Construction 10/2017 11/2019 7-7 33 59

Los Angeles 17/18 In-Progress Safety Escondido Canyon Road Guardrail near MM 1.65

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Design and construction of 300 feet of guardrail on a mountain road near MM 1.65. | Currently in conceptual design. (Construction in FY 2021-22)

Escondido Canyon Road in unincorporated Acton-Agua Dulce community. Pre-Construction 04/2019 04/2020 20-20 21 36

Los Angeles 17/18 In-Progress Safety Stunt Road guardrail

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Guardrail replacement on Stunt Road in Santa Monica Mountains at MM 2.55. | Project currently in design. (Construction in FY 2021-22)

Stunt Road north of City of Malibu. Pre-Construction 05/2018 04/2020 20-20 27 50

Los Angeles 17/18 In-Progress Safety Angeles Forest Highway guardrail

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Design and construct necessary guardrail replacement on Angeles Forest Highway at MM 9.44. | Currently in preliminary design. (Construction in FY 2022-23)

Guardrail along Angeles Forest Highway in Angeles National Forest - 169 ft south of Mile Marker 9.44 to 479 ft south of Mile Marker 9.44 Pre-Construction 05/2018 06/2021 20-20 25 36

Los Angeles 17/18 In-Progress Road Maintenance & Rehabilitation

West Carson - New Hampshire Av, ET AL. Phase II Design

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Preserve 3 miles of local streets. | FY 17-18 and FY 18-19 work consists of concrete work completed prior to completion of design of project. Primary construction to occur in FY 19-20 and FY 20-21.

W est Carson community bounded by City of Carson, Carson Street, City of Los Angeles Construction 05/2018 12/2020 7-7 35 66

Los Angeles 18/19 In-Progress Traffic Control Devices Rowland Heights - Pathfinder Road at Wellesley Dr

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | Upgrade the existing traffic signal on Pathfinder Road at W ellesley Drive with protected left-turn phasing for westbound traffic.

Pathfinder Road and W ellesley Drive in the unincorporated County community of Rowland Heights.

Pre-Construction and Construction

10/2018 09/2019

09/2019 03/2020 15-15 29 55

Los Angeles 18/19 Carried Over Traffic Control Devices West Whittier/Los Nietos - Norwalk Bl at Reichling Ln

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Norwalk Boulevard and Reichling Lane.

Intersection of Norwalk Boulevard and Reichling Lane in the unincorporated County community of West Whittier. Pre-Construction 09/2019 03/2020 20-20 32 57

Los Angeles 18/19 In-Progress Traffic Control Devices Agua Dulce - Bouquet Cyn Rd -Elizabeth Lake Rd to City of Santa Clarita Boundary Line

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road.

Bouquet Canyon Road beginning at Elizabeth Lake Road and ends at the Santa Clarita City Boundary. Pre-Construction 01/2019 04/2020 10-10 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 33: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 18/19 Carried Over Traffic Control Devices Agua Dulce - Godde Hill Rd -Soledad Cyn Rd to Sierra Hwy

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Godde Hill Road.

Godde Hill Road beginning at 674’ N/O Elizabeth Lake Road and ending at 11,345’ N/O Elizabeth Lake Road in the unincorporated community of Quartz Hill.

Pre-Construction 09/2019 04/2020 10-10 21 38

Los Angeles 18/19 Carried Over Traffic Control Devices Agua Dulce - Sierra Hwy at Vasquez Canyon Rd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade the existing traffic signal on Sierra Highway at Vasquez Canyon Road with protected left-turn phasing for northbound and southbound traffic.

Sierra Highway at Vasquez Canyon Road in the uincorporated County community of Agua Dulce . Pre-Construction 11/2019 04/2020 15-15 21 38

Los Angeles 18/19 Carried Over Traffic Control Devices Agua Dulce - Vasquez Cyn Rd -Bouquet Cyn Rd to Sierra Hwy

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Vasquez Canyon Road.

Vasquez Canyon from Bouquet Canyon Road to Sierra Highway in unincorporated community of Agua Dulce. Pre-Construction 03/2020 09/2020 10-10 21 38

Los Angeles 18/19 In-Progress Traffic Control Devices Altadena - Windsor Av at Figueroa Dr

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install new traffic signal on W indsor Avenue at Figueroa Drive.

The intersection of W indsor Avenue and Figueroa Drive in the unincorporated County community of Altadena. Pre-Construction 01/2019 12/2019 15-15 25 41

Los Angeles 18/19 In-Progress Traffic Control Devices Arcadia - Temple City Bl at Naomi Av (17/18 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | New traffic signal at Temple City Boulevard and Naomi Avenue.

Temple City Boulevard and Naomi Avenue is in the unincorporated community of Arcadia. Construction 03/2019 08/2019 20-20 22 49

Los Angeles 18/19 Carried Over Traffic Control Devices Castaic - Del Valle Rd - Hunstock Ave to Hasley Cyn Rd

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Del Valle Road.

Del Valle Road from Hunstock Avenue to Hasley Canyon Road in the unincorporated community of Castaic. Pre-Construction 01/2020 04/2020 10-10 21 38

Los Angeles 18/19 Carried Over Traffic Control Devices Canyon Country - Sand Canyon Rd -4500' N/O Soledad Cyn Rd to Sierra Hwy

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sand Canyon Road.

San Canyon Road from 4500 feet north of Soledad Canyon Road to Sierra Highway in the unincorporated community of Canyon Country. Pre-Construction 01/2020 04/2020 10-10 21 36

Los Angeles 18/19 Carried Over Traffic Control Devices Charter Oak - Cienega Av at Sunflower Av

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade pedestrian heads and curb ramps, install highway safety lighting, and remove striping within crosswalk at the intersection of Cienega Avenue and Sunflower Avenue.

The intersection of Cienega Avenue and Sunflower Avenue in the unincorporated County community of Covina. Pre-Construction 09/2019 02/2020 15-15 22 48

Los Angeles 18/19 Carried Over Traffic Control Devices Charter Oak - Covina Hills Rd -Rancho La Carlota Rd to Via Verde

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Covina Hills Road.

Covina Hills Road beginning at 490’ W/O Rancho La Carlota Road and ending at 50’ S/O Via Verde Street in the unincorporated community of Charter Oak.

Pre-Construction 09/2019 12/2019 10-10 29 55

Los Angeles 18/19 Carried Over Traffic Control Devices Covina - Arrow Hwy at Sunflower Av This project will include: Cost Estimating, Document Preparation, Preliminary Design | Upgrade the existing traffic signal on Arrow Highway at Sunflower Avenue with protected left-turn phasing for eastbound and westbound traffic.

The intersection of Arrow Highway and Sunflower Avenue in the unincorporated County community of Covina. Pre-Construction 09/2019 01/2020 15-15 22 48

Los Angeles 18/19 Carried Over Traffic Control Devices Del Sur - Avenue D - 14 Fwy to Sierra Hwy

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Avenue D.

Avenue D beginning at Highway 14 and ending at Sierra Highway in unincorporated community of Del Sur. Pre-Construction 01/2020 04/2020 10-10 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 34: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 18/19 Carried Over Traffic Control Devices Lake Hughes - Johnson Rd -Elizabeth Lake Rd to 110th St West

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Johnson Road.

Johnson Road beginning at Elizabeth Lake Road and ending at 110th Street W est in the unincorporated community of Elizabeth Lake. Pre-Construction 01/2020 04/2020 10-10 21 36

Los Angeles 18/19 Carried Over Traffic Control Devices Llano - 170th Street East - 165th St East to Avenue J

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 170th Street East.

170th Street East beginning at Avenue J and ending 165th Street East in the unincorporated community of Lake Los Angeles and Llano. Pre-Construction 01/2020 04/2020 10-10 21 36

Los Angeles 18/19 Carried Over Traffic Control Devices Littlerock - 110th Street East -Avenue S to Palmdale Bl

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 110th Street East.

110th Street East beginning at Avenue S and ending at Palmdale Boulevard in the unincorporated community of Littlerock. Pre-Construction 01/2020 04/2020 10-10 21 36

Los Angeles 18/19 Carried Over Traffic Control Devices South Antelope Valley - 90th Street East - Avenue P-8 to Avenue M

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 90th Street East.

90th Street East beginning at Avenue P-8 and ending at Avenue M in the unincorporated community of Sun Village. Pre-Construction 01/2020 04/2020 10-10 21 36

Los Angeles 18/19 Carried Over Traffic Control Devices Stevenson Ranch - The Old Road at Pico Canyon Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Upgrade the existing traffic signal on The Old Road at Pico Canyon Road.

The intersection of The Old Road and Pico Canyon Road in the unincorporated County community of Agua Dulce. Pre-Construction 01/2020 04/2020 15-15 27 38

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Avocado Heights - Temple Av Et Al (Phase I)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Resurface 2.9 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing. Uses recycled and in-place materials.

Various roadways within the Unincorporated Community of Avocado Heights. Pre-Construction 03/2020 07/2020 10-10 22 48

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

East Los Angeles Community – City Terrace Drive Et Al

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Reconstruct 3.1 miles of major roads, including parkway improvements and curb ramps upgrade. | (Construction in FY 2020-21)

Various roadways within the Unincorporated Community of East Los Angeles Pre-Construction 04/2020 07/2020 20-20 24 51

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation Walnut Park – Walnut Street Et Al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Reconstruct 7.1 miles of residential roads, including parkway improvements and curb ramps upgrade. | (Construction in FY 2020-21)

Unincorporated Walnut Park community bounded by City of Huntington Park, Seville Avenue, and City of South Gate Pre-Construction 12/2018 04/2020 20-20 33 59

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

West Puente Valley – Fairgrove Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Preserve 6.0 miles of residential roads, including pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | (Construction in FY 2020-21)

Unincorporated West Puente Valley community bounded by City of La Puente, Sunset Avenue, Fairgrove Avenue, and W illow Avenue Pre-Construction 04/2020 09/2020 6-8 22 48

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation Rosewood – Stanford Avenue, et al.

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Preserve 7.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface.

Unincorporated Rosewood community bounded by City of Compton, Stanford Avenue, and Compton Boulevard.

Pre-Construction and Construction

01/2019 06/2020

05/2020 10/2020 6-8 35 64

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 35: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation West Carson – Milton Street, et al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct 2.3 miles of residential roads. The project includes parkway improvements and curb ramps upgrade. | (Construction in FY 2020-21)

Unincorporated community of West Carson bounded by City of Los Angeles, Torrance Boulevard, and New Hampshire Avenue. Pre-Construction 10/2018 04/2020 20-20 35 66

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation Westmont – 99th Street, et al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Reconstruct 2.3 miles of residential roads. The project includes parkway improvements and curb ramps upgrade. | (Construction in FY 2020-21)

Unincorporated community of Westmont bounded by City of Los Angeles and Century Boulevard Pre-Construction 12/2018 05/2020 20-20 30 59, 62

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Wiseburn – Ocean Gate Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Preserve 6 miles of residential roads. The project includes pavement prep-work and pavement preservation. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface.

Unincorporated Wiseburn community bounded by El Segundo Boulevard and City of Hawthorne

Pre-Construction and Construction

07/2018 07/2019

07/2019 10/2019 6-8 35 62

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

East La Mirada – Imperial Highway Et Al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct 2.7 miles of major roads. The project includes parkway improvements, and curb ramps upgrade.

Lambert Road, First Avenue, and Imperial Highway in the unincorporated community of East La Mirada Pre-Construction 07/2019 07/2020 20-20 32 57

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

Los Nietos Community – Pioneer Boulevard et al

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Resurface 1.6 miles of major roads including parkway improvements and curb ramps upgrade.

Pioneer Boulevard, Norwalk Boulevard, and W ashington Boulevard in the unincorporated community of Los Nietos bounded by the Cities of Pico Rivera, Santa Fe Springs, and W hittier.

Pre-Construction 09/2019 07/2020 10-10 32 48, 57

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

North Whittier – Mission Mill Road, et al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Preserve 6.7 miles of residential roads including pavement prep-work, parkway improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface.

Unincorporated community of North Whittier bounded by Cities of Industry, Pico Rivera, and W hittier. Pre-Construction 01/2020 07/2020 6-8 32 57

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Rowland Heights – Saleroso Drive, et al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct 3.0 miles of residential roads including parkway improvements and curb ramps upgrade.

Calle Barcelona, Calle Madrid, Crosshaven Drive, Saleroso Drive, and Sunrise Drive bounded by Colima Road, Fullerton Road, the City of La Habra Heights, and Schabarum Regional Park.

Pre-Construction 12/2018 03/2020 20-20 29 55

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

South Whittier – Leland Avenue Et Al.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Reconstruct 5.6 miles of residential roads including parkway improvements and curb ramps upgrade.

Unincorporated community of South Whittier bounded by Carmenita Road, Meyer Road, Leffingwell Road, and Telegraph Road. Pre-Construction 12/2018 05/2020 20-20 32 57

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation Canyon Country – Sierra Highway

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Reconstruct 1.1 miles of urban major road to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses, parkway improvements, and curb ramps upgrade.

Unincorporated area of Canyon Country - City of Santa Clarita to Sand Canyon Road Pre-Construction 04/2019 08/2020 20-20 21 36

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Castaic/Val Verde Communities – Hillcrest Parkway

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate 2.0 miles of urban major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses, parkway improvements, and curb ramps upgrade.

Unincorporated Castaic and Val Verde communities - Hillcrest Parkway from The Old Road to 370' north of Terraza Court

Pre-Construction and Construction

09/2018 06/2019

06/2019 10/2019 20-20 21 38

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 36: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Del Sur Community – 60th Street West

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Resurfacing 2 miles of rural major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses.

60th Street W est - Avenue B to Avenue D Pre-Construction 02/2019 06/2021 10-10 21 36

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Del Sur Community – 80th Street W est

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Resurfacing 2 miles of rural major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses.

80th Street W est - Avenue D to Avenue F Pre-Construction 02/2019 06/2021 10-10 21 36

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety),

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation Del Sur Community – Avenue F

Pavement Rehab/Repair (Existing), Document Preparation, Pavement Improvement (New), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing 2 miles of rural major road to repair the deteriorating pavement, including

Unincorporated community of Del Sur - Avenue F - 70th Street West to 90th Street W est

Pre-Construction and Construction

10/2018 07/2019

07/2019 10/2019 10-10 21 36

pavement dig-outs associated with severe pavement distresses.

This project will include: Cost Estimating, Document Preparation, Environmental

Los Angeles 18/19 Carried Over Road Maintenance & Rehabilitation

East Pasadena – Lotus Avenue, et al.

Study/Documents, Preliminary Design | Preserve 8.9 miles of residential roads, including pavement prep-work, parkway improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving

Unincorporated community of East Pasadena bounded by Del Mar Boulevard, Rosemead Boulevard, Huntington Drive, and the Cities of San Marino and Pasadena.

Pre-Construction 07/2019 12/2019 6-8 22 41

surface.

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

La Crescenta-Montrose – La Crescenta Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Rehabilitate 5.2 miles of major roads, including parkway improvements and curb ramps upgrade. Formerly known as La Crescenta-Montrose – Pennsylvania Avenue, et al.

Unincorporated La Crescenta-Montrose area surrounded by the Cities of Glendale and La Canada Flintridge. Pre-Construction 01/2019 07/2020 20-20 25 43

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Lake Los Angeles Community – Palmdale Boulevard (Phase I)

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of W ay, Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct 3 miles of rural major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses.

Unincorporated community of Lake Los Angeles - Palmdale Boulevard from 140th St East to 170th St East

Pre-Construction and Construction

04/2019 04/2020

04/2020 09/2020 20-20 21 36

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

Quartz Hill Community – Avenue L (Phase I)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Resurface 0.3 mile of urban major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses.

Unincorporated Quartz Hill community - Avenue L - 52nd Street West to 55th Street W est. Pre-Construction 01/2019 06/2021 10-10 21 36

This project will include: Cost Estimating, Document Preparation, Environmental

Los Angeles 18/19 In-Progress Road Maintenance & Rehabilitation

South Antelope Valley Community – Avenue P

Study/Documents, Preliminary Design, Right of Way | Rehabilitate 2.0 miles of urban major road to repair the deteriorating pavement, including pavement dig-outs associated

Unincorporated Palmdale area - Avenue P from 30th Street East to 50th Street East. Pre-Construction 04/2019 08/2020 20-20 21 36

with severe pavement distresses.

Los Angeles 19/20 New Traffic Control Devices Avocado Heights - Don Julian Rd at 5th Ave

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety)

Don Julian Rd and 5th Ave within the unincorporated County of Los Angeles community of Avocado Heights

Pre-Construction and Construction

07/2019 04/2020

10/2019 10/2020 20-20 22 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 37: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Traffic Control Devices Avocado Heights - W orkman Mill Rd - Cambray Dr/Crossroads Parkway South

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | The objective of this project is to install a video detection system at the existing signalized intersection of W orkman Mill Rd - Cambray Dr/Crossroads Pkwy S.

W orkman Mill Rd - Cambray Dr/Crossroads Pkwy S in the Community of Avocado Heights. Construction 05/2019 07/2019 15-15 22 57

Los Angeles 19/20 New Traffic Control Devices Covina Island - Cypress St at Irwindale Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install protected/permissive left-turn phasing.

The intersection of Cypress St and Irwindale Ave within shared jurisdiction between the City of Irwindale and the County of Los Angeles.

Pre-Construction and Construction

01/2019 09/2019

07/2019 03/2020 15-15 22 48

Los Angeles 19/20 New Traffic Control Devices East Los Angeles -Atlantic Blvd and 6th St, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install additional traffic signal equipment by upgrading the pedestrian equipment with an audible pedestrian system at the intersections of Atlantic Blvd at 6th St, Whittier Blvd at Goodrich Blvd, Sadler Ave at Beverly Blvd, and Whittier Blvd at Hoefner Ave. (Construction in FY 2020-21)

Atlantic Blvd at 6th St, Whittier Blvd at Goodrich Blvd, Sadler Ave at Beverly Blvd, and Whittier Blvd at Hoefner Ave in the unincorporated County of Los Angeles community of East Los Angeles and the City of Commerce.

Pre-Construction 01/2020 12/2020 15-15 24 51

Los Angeles 19/20 New Traffic Control Devices East Los Angeles - Eastern Avenue at Ramona Boulevard

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install left-turn phasing to an existing traffic signal at the intersection of Eastern Avenue at Ramona Boulevard. (Construction in FY 2020-21)

Eastern Avenue and Ramona Boulevard, in the unincorporated County of Los Angeles community of East Los Angeles. Pre-Construction 01/2020 09/2020 15-15 24 51

Los Angeles 19/20 New Traffic Control Devices East Los Angeles - Whittier Blvd at Atlantic Blvd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Whittier Blvd at Atlantic Blvd. (Construction in FY 2020-21)

Whittier Blvd at Atlantic Blvd in the unincorporated community of East Los Angeles. Pre-Construction 01/2020 08/2020 15-15 24 51

Los Angeles 19/20 New Safety East Los Angeles and Saybrook Communities Traffic Safety Improvements

This project will include: Roundabout Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install traffic circle/islands for traffic calming purposes at the intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge W ay.

The intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge W ay, in the unincorporated County of Los Angeles communities of East Los Angeles and Saybrook.

Construction 01/2019 07/2019 10-10 24 51

Los Angeles 19/20 New Traffic Control Devices South San Gabriel -Del Mar Avenue at Redding Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install a new traffic signal at the intersection of Del Mar Avenue and Redding Avenue. (Construction in FY 2020-21)

f Del Mar Avenue and Redding Avenue, in the unincorporated County of Los Angeles community of South San Gabriel. Pre-Construction 01/2020 09/2020 20-20 22 49

Los Angeles 19/20 New Traffic Control Devices Walnut Park – Pacific Boulevard at Broadway

This project will include: Cost Estimating, Document Preparation, Right of W ay | The objective of this project is to install protected left-turn phasing to the north, south and east approaches to an existing traffic signal at the intersection of Pacific Boulevard at Broadway. (Construction in FY 2020-21)

Pacific Boulevard at Broadway, in the unincorporated County of Los Angeles community of W alnut Park. Pre-Construction 01/2020 07/2020 15-15 33 59

Los Angeles 19/20 New Traffic Control Devices W est Valinda - Amar Road at W illow Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install protected and permissive left-turn phasing to an existing traffic signal at the intersection of Amar Road at W illow Avenue

Amar Road and W illow Avenue, in the unincorporated County of Los Angeles community of W est Valinda and the City of La Puente.

Pre-Construction and Construction

01/2019 07/2019

07/2019 08/2019 15-15 22 57

Los Angeles 19/20 New Traffic Control Devices West Valinda – Azusa Avenue at Gemini Street

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install cut back loops, add vehicle head, update push button, and install bike detection to an existing traffic signal at the intersection of Azusa Avenue at Gemini Street. (Construction in FY 2020-21)

This project is located at the intersection of Azusa Avenue at Gemini Street, in the unincorporated County of Los Angeles community of West Valinda Pre-Construction 07/2019 07/2020 15-15 22 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 38: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Traffic Control Devices Covina Islands - Arrow Highway at Lark Ellen Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install left-turn phasing to an existing traffic signal at the intersection of Arrow Highway and Lark Ellen Avenue. (Construction in FY 2020-21)

Arrow Highway and Lark Ellen Avenue, in the unincorporated County of Los Angeles community of Covina Islands. Pre-Construction 01/2020 09/2020 15-15 22 48

Los Angeles 19/20 New Traffic Control Devices Del Rey - Centinela Avenue at Lucile Street

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to upgrade the traffic signal at the intersection of Centinela Avenue at Lucile Street to include left-turn phasing. (Construction in FY 2020-21)

Centinela Avenue at Lucile Street, in the unincorporated County of Los Angeles community of Del Rey and the City of Los Angeles. Pre-Construction 04/2020 12/2020 15-15 26 62

Los Angeles 19/20 New Traffic Control Devices Manhattan Beach Blvd at Cranbrook Ave and at Cerise Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install pedestrian-actuated overhead flashing beacons (PAOFBs), high-visibility yield lines and remove advance flashing beacons.

Manhattan Beach Blvd and Cranbrook Ave, and Manhattan Beach Blvd and Cerise Ave, in the unincorporated County of Los Angeles community of El Camino Village.

Pre-Construction and Construction

10/2018 06/2019

04/2019 08/2019 15-15 35 66

Los Angeles 19/20 New Traffic Control Devices Florence Firestone - Hooper Avenue at 84th Place

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install rectangular rapid flashing beacons and required striping at the existing marked pedestrian crossing on Hooper Avenue and 84th Place. (Construction in FY 2020-21)

Hooper Avenue and 84th Place, in the unincorporated County of Los Angeles community of Florence/Firestone. Pre-Construction 04/2020 01/2021 15-15 33 59

Los Angeles 19/20 New Traffic Control Devices Lennox - Hawthorne Bl at Lennox Bl

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project consists of various traffic signal improvements, including upgrading all existing vehicle heads to larger vehicle heads, installing new pavement markings and signage to provide clearer lane assignments, installing new advanced vehicle detection along Lennox Boulevard, and relocated the advanced vehicle detection on Hawthorne Boulevard.

Hawthorne Bl and Lennox Bl in the unincorporated County community of Lennox

Pre-Construction and Construction

01/2019 08/2019

08/2019 02/2020 15-15 35 62

Los Angeles 19/20 New Traffic Control Devices Willowbrook - Rosecrans Avenue at Broadway

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to upgrade the traffic signal at the intersection of Rosecrans Avenue at Broadway to include left-turn phasing. (Construction in FY 2021-22)

Rosecrans Avenue at Broadway, in the unincorporated County of Los Angeles community of W illowbrook. Pre-Construction 06/2020 06/2021 15-15 35 64

Los Angeles 19/20 New Traffic Control Devices W iseburn - La Cienega Boulevard at 133rd Street and 137th Street

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install a pedestrian activated warning system at existing marked pedestrian crossings at the intersections of La Cienega Boulevard at 133rd Street and 137th Street.

La Cienega Boulevard at 133rd Street and 137th Street, in the unincorporated County of Los Angeles community of Wiseburn.

Pre-Construction and Construction

10/2018 05/2019

05/2019 09/2019 15-15 35 62

Los Angeles 19/20 New Traffic Control Devices Calabasas - Kanan Rd from Mulholland Hwy to 3096ft N/O Silver Creek Rd

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Kanan Rd from Mulholland Hwy to 3096ft N/O Silver Creek Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22)

County of Los Angeles unincorporated community of Calabasas Pre-Construction 01/2020 12/2020 10-10 27 50

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 39: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Traffic Control Devices Malibu Lake - Kanan Dume Rd from 2560ft N/O Cavalleri Rd to Mulholland Hwy

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Kanan Dume Rd from 2560ft N/O Cavalleri Rd to Mulholland Hwy. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22)

County of Los Angeles unincorporated community of Malibu Lake. Pre-Construction 01/2020 12/2020 10-10 27 50

Los Angeles 19/20 New Traffic Control Devices Monte Nido - Malibu Canyon Rd from 1050ft N/O Malibu Crest Dr to Piuma Rd

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Right of Way | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Malibu Canyon Rd from 1050ft N/O Malibu Crest Dr to Piuma Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

County of Los Angeles unincorporated community of Monte Nido. Pre-Construction 01/2020 12/2020 10-10 27 50

Los Angeles 19/20 New Traffic Control Devices La Rambla - 7th Street at Patton Avenue

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install rectangular rapid flashing beacons and required striping at the existing marked pedestrian crossing on 7th Street and Patton Avenue.

7th Street and Patton Avenue, in the unincorporated County of Los Angeles community of La Rambla.

Pre-Construction and Construction

07/2019 02/2020

11/2019 06/2020 15-15 35 70

Los Angeles 19/20 New Traffic Control Devices Los Nietos / West Whittier - Mines Blvd at Glengarry Ave

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install a traffic signal with marked crosswalks.

Mines Blvd and Glengarry Ave in the unincorporated County of Los Angeles community of Los Nietos / W est W hittier.

Pre-Construction and Construction

09/2018 08/2019

07/2019 02/2020 20-20 32 57

Los Angeles 19/20 New Traffic Control Devices Marina Del Rey - Fiji W ay at Lincoln Bl

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install split phasing for the East and W est approaches of the signalized intersection at Fiji W ay and Lincoln Bl.

Fiji Way and Lincoln Bl, in the unincorporated County of Los Angeles community of Marina Del Rey.

Pre-Construction and Construction

07/2019 02/2020

12/2019 06/2020 15-15 26 62

Los Angeles 19/20 New Traffic Control Devices Marina Del Rey - Via Marina at Channel Walk

This project will include: Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install a new traffic signal at the intersection of Via Marina at Channel W alk.

Via Marina at Channel W alk, in the unincorporated County of Los Angeles community of Marina Del Rey.

Pre-Construction and Construction

07/2019 02/2020

11/2020 06/2020 20-20 26 62

Los Angeles 19/20 New Traffic Control Devices Rowland Heights - Fullerton Rd at Harbor Blvd

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Right of W ay, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install a new traffic signal at the intersection of Fullerton Rd at Harbor Blvd.

Fullerton Rd at Harbor Blvd, in the unincorporated County of Los Angeles community of Rowland Heights.

Pre-Construction and Construction

07/2019 01/2020

10/2019 06/2020 20-20 29 55

Los Angeles 19/20 New Traffic Control Devices Rowland Heights - Fullerton Road at Sunrise Drive

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install protected and permissive left-turn phasing to an existing traffic signal at the intersection of Fullerton Road and Sunrise Drive.

Fullerton Road at Sunrise Drive, in the unincorporated County of Los Angeles community of Rowland Heights.

Pre-Construction and Construction

01/2019 09/2019

07/2019 03/2020 15-15 29 55

Los Angeles 19/20 New Traffic Control Devices South Whittier - Leffingwell Road at Stamy Road

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install traffic signals with marked crosswalks.

Leffingwell Road and Stamy Road in the unincorporated County of Los Angeles community of South Whittier and East Whittier.

Pre-Construction and Construction

01/2019 05/2020

11/2019 10/2020 20-20 32 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 40: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Traffic Control Devices South W hittier - Mulberry Drive at Calmada Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to upgrade the traffic signal at the intersection of Mulberry Drive at Calmada Avenue to include left-turn phasing.

Mulberry Drive at Calmada Avenue, in the unincorporated County of Los Angeles community of South Whittier.

Pre-Construction and Construction

07/2019 02/2020

11/2019 06/2020 15-15 32 57

Los Angeles 19/20 New Traffic Control Devices Bouquet Canyon Rd at Vasquez Canyon Rd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install new traffic signal. (Construction in FY 2020-21)

Bouquet Canyon Road and Vasquez Canyon Road in the unincorporated County of Los Angeles community of Agua Dulce. Pre-Construction 11/2018 04/2020 20-20 21 36

Los Angeles 19/20 New Traffic Control Devices Agua Dulce - Sierra Hwy from 2100ft S/O Quinn Dr to Avenue S

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from 2100ft S/O Quinn Dr to Avenue S. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2020-21)

County of Los Angeles unincorporated community of Agua Dulce/Acton. The length of the entire project is approximately 27 miles. Pre-Construction 01/2020 06/2020 10-10 21 38

Los Angeles 19/20 New Traffic Control Devices Castaic - Copper Hill Dr at Avenida Rancho Tesoro

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to upgrade the traffic signal at the intersection of Copper Hill Dr at Avenida Rancho Tesoro by installing additional vehicle heads, countdown pedestrian heads, and bicycle detection. (Construction in FY 2020-21)

Copper Hill Dr at Avenida Rancho Tesoro, in the unincorporated County of Los Angeles community of Castaic and the City of Santa Clarita. Pre-Construction 10/2019 04/2020 15-15 21 38

Los Angeles 19/20 New Traffic Control Devices Castaic -Hillcrest Pkwy at Beryl Place

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to install flashing beacons and required striping at the existing marked school crossing on Hillcrest Pkwy at Beryl Place.

Hillcrest Pkwy at Beryl Place, in the unincorporated County of Los Angeles community of Castaic/Val Verde.

Pre-Construction and Construction

01/2020 06/2020

04/2020 12/2020 15-15 21 38

Los Angeles 19/20 New Traffic Control Devices Charter Oak - Sunflower Ave at Cypress Street

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install a new traffic signal. (Construction in FY 2020-21)

Sunflower Ave and Cypress Street In the unincorporated community of Charter Oak. Pre-Construction 01/2020 06/2020 20-20 22 48

Los Angeles 19/20 New Traffic Control Devices Covina Islands - Arrow Highway at Barranca Ave/Citrus Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install additional traffic signal equipment by upgrading the pedestrian equipment with an audible pedestrian system at the intersections of Arrow Highway and Barranca Ave, and Arrow Highway at Citrus Ave.

Arrow Highway at Barranca Ave, and Arrow Highway and Citrus Ave in the unincorporated community of Covina Islands.

Pre-Construction and Construction

01/2019 11/2019

07/2019 05/2020 15-15 22 48

Los Angeles 19/20 New Traffic Control Devices Del Sur - Sierra Highway at W Avenue E

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | The objective of this project is to shift striping by 2.5 feet on the North Approach of the intersection.

Sierra Highway and Avenue E, in the unincorporated community of Del Sur. Pre-Construction and Construction

01/2019 07/2019

07/2019 10/2019 10-10 21 36

Los Angeles 19/20 New Traffic Control Devices Del Sur - Sierra Hwy - Avenue G to Avenue A

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from Avenue G to Avenue A. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2020-21)

County of Los Angeles unincorporated community of Del Sur. Pre-Construction 01/2020 06/2020 10-10 21 36

Los Angeles 19/20 New Traffic Control Devices Desert View Highlands - Elizabeth Lake Rd at Mesquite Rd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to upgrade the traffic signal at the intersection of Elizabeth Lake Rd at Mesquite Rd by installing vehicle heads, bicycle detection, and detectable warning surface.

Elizabeth Lake Rd at Mesquite Rd, in the unincorporated County of Los Angeles community of Desert View Highlands. Pre-Construction 09/2019 04/2020 15-15 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 41: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Traffic Control Devices

Leona Valley/Lake Hughes -Elizabeth Lake Rd from Lake Hughes Rd to 2095ft E/O Bouquet Cyn Rd

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Elizabeth Lake Rd from Lake Hughes Rd to 2095ft E/O Bouquet Cyn Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2020-21)

County of Los Angeles unincorporated community of Leona Valley/Lake Hughes. Pre-Construction 02/2020 06/2020 10-10 21 36

Los Angeles 19/20 New Traffic Control Devices Stevenson Ranch - Pico Canyon Road at Stevenson Ranch Parkway

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The objective of this project is to install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Pico Canyon Rd and Stevenson Ranch Parkway. (Construction in FY 2020-21)

Pico Canyon Road at Stevenson Ranch Parkway in the unincorporated community of Stevenson Ranch. Pre-Construction 02/2019 04/2020 15-15 27 38

Los Angeles 19/20 New Safety Kanan Dume Road Guardrail Replacement On-System

This project will include: Guardrail replacement (On-system) in response to the 2018 W oolsey Fire in Malibu. Unincorporated Santa Monica Mountains Construction 01/2019 08/2019 20-20 27 50

Los Angeles 19/20 New Safety Kanan Road Guardrail Replacement This project will include: Guardrail replacement (On-system) in response to the 2018 W oolsey Fire Unincorporated Santa Monica Mountains Construction 01/2019 08/2019 20-20 27 50

Los Angeles 19/20 New Safety Latigo Canyon Road, et al. Guardrail Replacement Off-System

This project will include: Guardrail replacement (Off-system) in response to the 2018 W oolsey Fire Unincorporated Santa Monica Mountains Construction 01/2019 08/2019 20-20 27 50

Los Angeles 19/20 New Safety Mulholland Highway, et al. Guardrail Replacement On-System

This project will include: Guardrail replacement (On-system) in response to the 2018 W oolsey Fire Unincorporated Santa Monica Mountains Construction 01/2019 08/2019 20-20 27 50

Los Angeles 19/20 New Safety Santa Monica Mountains - Kanan Road at the entrance to the tunnels

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | The objective of this project is to extend the existing guardrail along the centerline of Kanan Road, at the northbound direction entering the tunnels. (Construction in FY 2021-22)

Centerline of Kanan Road, at the northbound direction entering the three tunnels along the roadway in the unincorporated community of Malibu. Pre-Construction 06/2020 12/2020 20-20 27 50

Los Angeles 19/20 New Safety Santa Monica Mountains - Malibu Canyon Rd near Francisco Ranch Rd

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | The objective of this project is to install a total of approximately 695 feet of embankment guardrail along the east side of Malibu Canyon Road, between approximately 350 feet to 670 feet north of Mile Marker 2.32 and 1,080 feet to 1,365 feet north of Mile Marker 2.32. (Construction in FY 2022-23)

The east side of Malibu Canyon Road, between approximately 350 feet to 670 feet north of Mile Marker 2.32 and 1,080 feet to 1,365 feet north of Mile Marker 2.32 in the unincorporated community of Agoura Hills.

Pre-Construction 06/2020 12/2020 20-20 27 50

Los Angeles 19/20 New Safety Hacienda Heights - Miramar Drive s/o Casino Drive

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Install embankment guardrail at the southern terminus of Miramar Drive (100 feet south of Casino Drive). Guardrail installation by Force Account labor.

Southern terminus of Miramar Drive (100 feet south of Casino Drive) in unincorporated Hacienda Heights

Pre-Construction and Construction

01/2019 07/2019

07/2019 12/2019 20-20 27 50

Los Angeles 19/20 New Safety Acton - Sierra Highway near Mile Marker 23.64

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | The objective of this project is to install approximately 362 feet of embankment guardrail along the east side of Sierra Highway, between approximately 62 feet south of Mile Marker 23.64 and 300 feet north of Mile Marker 23.64. (Construction in FY 2020-21)

Sierra Highway between approximately 62 feet south of Mile Marker 23.64 and 300 feet north of Mile Marker 23.64 in the unincorporated community of Acton.

Pre-Construction 07/2019 04/2020 20-20 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 42: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Safety Angeles National Forest - Little Tujunga Canyon Road near Mile Marker 9.39

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Extend the existing embankment guardrail along the south side of Little Tujunga Canyon Road near Mile Marker 9.39 for approximately 200 feet. (Construction in FY 2021-22)

South side of Little Tujunga Canyon Road, near Mile Marker 9.39 in the unincorporated community of Angeles National Forest. Pre-Construction 06/2020 12/2020 20-20 25 39

Los Angeles 19/20 New Safety Lake Hughes - Johnson Rd west of 110th St West

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Right of W ay | The objective of this project is to install fixed object guardrail adjacent to Johnson Road approximately 1,584 feet west of 110th Street West. (Construction in FY 2020-21)

Johnson Road approximately 1,584 feet west of 110th Street W est in the unincorporated community of Lake Hughes and Del Sur . Pre-Construction 12/2019 04/2020 20-20 21 36

Los Angeles 19/20 New Safety Lake Hughes - Lake Hughes Road near Mile marker 12.02

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | The objective of this project is to install approximately 700 feet of embankment guardrail along the east side of Lake Hughes Road, between approximately 400 feet north of Mile Marker 12.02 and 300 feet south of Mile Marker 12.02. (Construction in FY 2020-21)

Lake Hughes Road between approximately 400 feet north of Mile Marker 12.02 and 300 feet south of Mile Marker 12.02 in the unincorporated community of Lake Hughes

Pre-Construction 12/2019 04/2020 20-20 21 38

Los Angeles 19/20 New Safety Leona Valley - Elizabeth lake Road near Avenue O-8

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development | The objective of this project is to install fixed object guardrail and/or relocate utilities adjacent to Elizabeth Lake Road near Avenue O-8. (Construction in FY 2020-21)

Elizabeth Lake Road near Avenue O-8 in the unincorporated community of Leona Valley Pre-Construction 12/2019 04/2020 20-20 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Avocado Heights – 6th – Valley Bl and Lomitas Ave (City/County Coop)

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | The primary objective of this project is to rehabilitate 0.8 miles of local roads. The project includes roadway reconstruction. Cost is only County share.

Unincorporated County community of Avocado Heights and City of Industry Construction 08/2019 12/2019 20-20 22 57

Los Angeles 19/20 New Road Maintenance & Rehabilitation Avocado Heights - Pellisier Village

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 1.4 miles of residential roads. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Avocado Heights. Pre-Construction 06/2020 06/2021 20-20 22, 32 57

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Claremont/Pomona – Towne Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The primary objective of this project is to rehabilitate 0.8 miles of an arterial roadway, including roadway reconstruction and curb ramp upgrade. Cost is County share only.

Unincorporated County Community adjacent to Claremont and Pomona, Towne Ave from Foothill Blvd to Bonita Ave Construction 07/2019 10/2019 20-20 20 52

Los Angeles 19/20 New Road Maintenance & Rehabilitation

East Los Angeles - Cesar E Chavez Avenue

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 1.9 miles of major roads, including parkway improvements, curb ramps upgrade, and pavement resurface. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of East Los Angeles. Pre-Construction 01/2020 06/2021 10-10 24 51

Los Angeles 19/20 New Road Maintenance & Rehabilitation

East Los Angeles - Michigan Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 8.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

Various roadways within the Unincorporated Community of East Los Angeles Pre-Construction 01/2020 06/2021 6-8 24 51

Los Angeles 19/20 New Road Maintenance & Rehabilitation

East Los Angeles - W hiteside Street, et al. (Phase II)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 2.1 miles of residential roads. The project includes parkway improvements, curb ramp upgrades, new sidewalks (as it is appropriate), and roadway reconstruction. (Construction in FY 2020-21)

Various roadways within the Unincorporated Community of East Los Angeles. Pre-Construction 07/2019 12/2020 20-20 24 51

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 43: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Avocado Heights/San Jose Hills -Valley Boulevard

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 2.7 miles of major roadways. The project includes parkway improvements, curb ramps upgrades, and roadway reconstruction. (Construction in FY 2020-21)

Various roadways within the Unincorporated Community of Avocado Heights/San Jose Hills Pre-Construction 01/2020 06/2021 20-20 22 57

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Del Aire Community Road Improvements

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The primary objective of this project is to reconstruct 1.2 miles of residential roads.

Various roadways within the Unincorporated Community of Del Aire. Pre-Construction and Construction

05/2019 06/2020

03/2020 12/2020 20-20 35 62

Los Angeles 19/20 New Road Maintenance & Rehabilitation

East Rancho Dominguez - Compton Bl, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 2.1 miles of major roadways. The project includes parkway improvements, curb ramps upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of East Rancho Dominguez. Pre-Construction 01/2019 06/2021 20-20 35 64

Los Angeles 19/20 New Road Maintenance & Rehabilitation

West Rancho Dominguez - 139th Street, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 6.6 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of W est Rancho Dominguez. Pre-Construction 07/2019 06/2021 20-20 35 64

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Westchester - Sophomore Drive, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 1.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of W estchester Pre-Construction 06/2020 06/2021 6-8 26, 30 54, 62

Los Angeles 19/20 New Road Maintenance & Rehabilitation Rolling Hills - Crenshaw Blvd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 0.6 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Rolling Hills Pre-Construction 01/2020 06/2021 10-10 26 66

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Rowland Heights - Otterbein Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 5.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Rowland Heights. Pre-Construction 06/2020 06/2021 6-8 29 55

Los Angeles 19/20 New Road Maintenance & Rehabilitation

West Whittier/Los Nietos - Mines Boulevard, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | The primary objective of this project is to rehabilitate 3.0 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of W est W hittier Los Nietos. Pre-Construction 01/2020 06/2021 20-20 32 57

Los Angeles 19/20 New Road Maintenance & Rehabilitation

West Whittier Los Nietos - Rivera Road, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 4.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of W est W hittier Los Nietos. Pre-Construction 06/2020 06/2021 6-8 32 57

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 44: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Road Maintenance & Rehabilitation Altadena - Glenrose Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 9.5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Altadena. Pre-Construction 06/2020 06/2021 6-8 25 41

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Altadena - Altadena Dr and Washington Blvd Roadway Improvement

This project will include: Cost Estimating, Document Preparation, Preliminary Design | he primary objective of this project is to reconstruct 1.6 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2020-21)

Various roadways within the Unincorporated Community of Altadena. Pre-Construction 04/2019 06/2020 20-20 25 41

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Angeles National Forest - Big Tujunga Canyon Road (Ph I)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to rehabilitate 10.1 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Angeles National Forest. Pre-Construction 06/2020 06/2021 20-20 25 39, 43

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Bouquet Canyon - Bouquet Canyon Road - Spunky Canyon Road to Elizabeth Lake Road

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to rehabilitate 4.7 miles of major/local roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Unincorporated Community of Bouquet Canyon Pre-Construction 01/2020 06/2021 20-20 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation Castaic - Hillcrest Parkway, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 8.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Castaic Pre-Construction 06/2020 06/2021 6-8 21 38

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Del Sur - Avenue G - 20,040' W/O 90th Street West to 70th Street West

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 3.4 mile of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2021-22)

Unincorporated community of Del Sur Pre-Construction 06/2020 06/2021 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Kagel/Lopez Canyons - Kagel Canyon Road, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 8.6 miles of major urban roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Kagel/Lopez Canyons Pre-Construction 01/2020 06/2021 10-10 25 39

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Lake Los Angeles - 240th Street East, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 9.5 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Lake Los Angeles. Pre-Construction 01/2020 06/2021 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Lake Los Angeles - Palmdale Boulevard (Phase II) - 170th St East to 215th St East

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 4.5 miles of major rural roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Palmdale Pre-Construction 06/2020 06/2021 10-10 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 45: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Road Maintenance & Rehabilitation Leona Valley - Godde Hill Road

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to rehabilitate 2.4 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Leona Valley Pre-Construction 01/2020 06/2021 20-20 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Monrovia – Hurstview Ave Mill and Overlay

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Roadway resurfacing of Hurstview Ave – California Ave to Shamrock Ave. Cost is County share only.

Unincorporated County Community, near Monrovia, Hurstview Ave from California Ave to Shamrock Ave. Construction 06/2019 09/2019 7-7 22 41

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Palmdale - Pearblossom Hwy - 45th St East to 53rd St East

This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The primary objective of this project is to rehabilitate 3.2 miles of principal arterial road to repair the deteriorating pavement. The project includes roadway reconstruction and reconstructing existing curb ramps . Project is administered by the City of Palmdale. Cost includes County share only.

Unincorporated Palmdale community - Pearblossom Hwy between 45th St E & 53rd St E Construction 09/2019 03/2020 20-20 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Quartz Hill - 20th St West - Avenue O-12 to Avenue M

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 2.8 miles of local roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2021-22)

Unincorporated area of Quartz Hill. Pre-Construction 06/2020 06/2021 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Quartz Hill - 55th Street West -Avenue M to Avenue M-8

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 0.75 mile of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2021-22)

Unincorporated community of Quartz Hill Pre-Construction 06/2020 06/2021 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Quartz Hill - Avenue L (Phase 2) -52nd Street West to 40th Street W est

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 1.2 mile of urban major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2021-22)

Unincorporated community of Quartz Hill Pre-Construction 06/2020 06/2021 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Roosevelt - Avenue J - 150th Street East to 240th Street East

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 9 miles of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2022-23)

Unincorporated community of Roosevelt Pre-Construction 06/2020 06/2022 10-10 21 36

Los Angeles 19/20 New Road Maintenance & Rehabilitation

South Antelope Valley - Avenue N -50th St East to 90th St East

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to rehabilitate 4 miles of local roads. The project includes parkway improvements curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Unincorporated Community of Palmdale. Pre-Construction 01/2020 06/2021 20-20 21 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 46: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Los Angeles 19/20 New Road Maintenance & Rehabilitation

South Monrovia Islands - Walnut Grove Avenue, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 3.8 miles of major roadways. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Communities of Mayflower Village and East San Gabriel. Pre-Construction 01/2020 06/2021 20-20 22 48, 49

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Stevenson Ranch - Stevenson Ranch Tract (Phase I)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 8.5 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway reconstruction. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Stevenson Ranch. Pre-Construction 01/2020 06/2021 20-20 21 38

Los Angeles 19/20 New Road Maintenance & Rehabilitation

Quartz Hill - 30th Street West -Avenue N-8 to Avenue O-12

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to reconstruct 1.2 miles of major highway. (Construction in FY 2021-22) Previously known as W hite Fence Farm - 30th Street W est - Avenue N-8 to Avenue O-12

Unincorporated Community of Quartz Hill Pre-Construction 01/2020 06/2021 20-20 21 36

Madera 19/20 New Road Maintenance & Rehabilitation

Avenue 18 1/2 Full Depth Reclamation This project will include: Pavement Rehab/Repair (Existing) Avenue 18 1/2 at Golden State Avenue continuing 5 miles west Construction 10/2019 06/2020 15-20 12 5

Madera 19/20 New Road Maintenance & Rehabilitation Avenue 7 Full Depth Reclamation This project will include: Pavement Rehab/Repair (Existing) Avenue 7 at Road 30 1/2 to State Route 145 Construction 10/2019 06/2020 15-20 12 5

Madera 19/20 New Road Maintenance & Rehabilitation Avenue 12 Full Depth Reclamation This project will include: Pavement Rehab/Repair (Existing) Avenue 12 at Road 23 to Road 19 Construction 10/2019 06/2020 15-20 12 5

Madera 19/20 New Road Maintenance & Rehabilitation Road 400 Overlay This project will include: Pavement Rehab/Repair (Existing) Road 400 at Adobe Ranch Drive to Road 406 Construction 10/2019 06/2020 12-20 12 5

Marin 19/20 New Road Maintenance & Rehabilitation

Central Region Road Rehabilitation Project 2019-2020

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repair existing soldier pile wall on Briar Rd

The proposed project will rehabilitate existing asphalt roadways in the Murray Park neighborhood in unincorporated Marin County as follows:Oak Knoll Rd; Hillcrest Ln; Black Log Rd; Briar Rd; Upper Briar Rd; Estelle Ave; Fern Rd; Murray Ave

Construction 06/2020 09/2020 15-30 2 10

Marin 19/20 New Road Maintenance & Rehabilitation

Southern Region Road Rehabilitation Project 2019-2020

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

The proposed project will rehabilitate the asphalt roadway along Lomita Avenue near Mill Valley from Ashford Avenue to Highway 101. The portion of Lomita within City of Mill Valley jurisdiction, from Shell to Edna Mcguire, may not be included in the project. Subject to available funding provided by Mill Valley.

Construction 06/2020 10/2020 15-30 2 2

Marin 18/19 Carried Over Road Maintenance & Rehabilitation

Northern Region Road Rehabilitation 2019-2020

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Repaving of 4.01 miles of Dillon Beach Road, rehabilitation of approximately 10 culverts, striping, signage and shoulder widening where possible

The proposed project will rehabilitate the asphalt roadway on Dillon Beach Road from Highway 1 (MP 0.00) to Cypress Avenue (MP 4.01) Construction 06/2020 09/2020 15-30 2 10

Mariposa 17/18 In-Progress Road Maintenance & Rehabilitation Road Improvements Texas Hill Rd. This project will include: Pavement Rehab/Repair (Existing) | Grade 3.12 Miles of Texas

Hill Rd. Area included in the of County Maintained System Construction 06/2019 07/2019 2-3 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 47: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mariposa 17/18 In-Progress Safety Road Striping This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Stripe Applicable County Maintained Roads 1/3 of County Roads Construction 07/2019 08/2019 4-6 8 5

Mariposa 17/18 Carried Over Road Maintenance & Rehabilitation Beach Rd Improvements This project will include: Pavement Rehab/Repair (Existing) | Grade 2.75 Miles Beach Rd.

| Project delayed due to staff availability given the Ferguson Fire State Declared Disaster Area included in the of County Maintained System Construction 06/2019 07/2019 2-3 8 5

Mariposa 17/18 In-Progress Road Maintenance & Rehabilitation Storm Drainage Projects

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Storm Drainage Maintenacce, Repair and Improvements | Planning and priority locations for this project were delayed due to the gathering of vulnerable area information and the lack of staff availability due to the Ferguson Fire

Countywide Construction 05/2019 10/2019 3-10 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Road Maint. Agua Fria Rd This project will include: Pavement Rehab/Repair (Existing) Agua Fria Mile post 11.00 to 12.00 Construction 06/2019 07/2019 2-5 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Banderilla Rd Maint. This project will include: Pavement Rehab/Repair (Existing) Banderilla Rd Mile post 10.00 - 14.45 Construction 07/2019 08/2019 3-5 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Ben Hur Rd Maint. Improvements This project will include: Pavement Rehab/Repair (Existing) Ben Hur Rd. Milepost 10.00 to 18.31 Construction 06/2019 07/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Buckeye Rd Maint. This project will include: Pavement Rehab/Repair (Existing) Buckeye Rd Milepost 10.00 to 12.43 Construction 07/2019 09/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Dexter Rd This project will include: Pavement Rehab/Repair (Existing) Dexter Rd Milepost 10.00 - 12.50 Construction 07/2019 08/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Ernst Rd Maint. This project will include: Pavement Rehab/Repair (Existing) Ernst Rd Milepost 10.00 - 12.96 Construction 08/2019 09/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Granite Springs Rd. Maint This project will include: Pavement Rehab/Repair (Existing) Granite Springs Rd from Milepost 10.00 - 14.80 Construction 07/2019 08/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Greeley Hill Rd. This project will include: Pavement Rehab/Repair (Existing) Greeley Hill Rd Milepost 10.00 - 18.47 Construction 07/2019 08/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Holtzel Rd Maint. This project will include: Pavement Rehab/Repair (Existing) Holtzel Rd. Milepost 10.00 - 12.83 Construction 05/2019 06/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Jones St. Maint This project will include: Pavement Rehab/Repair (Existing) Jones St from Milepost 10.00 - 10.81 Construction 06/2019 07/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Miller Rd Maint. This project will include: Pavement Rehab/Repair (Existing) Miller Rd Milepost 10.00 - 11.12 Construction 06/2019 07/2019 10-15 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 48: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mariposa 19/20 New Road Maintenance & Rehabilitation Mykleoaks Drive This project will include: Pavement Rehab/Repair (Existing) Mykleoaks Drive from Milepost 10.00 - 10.32 Construction 07/2019 08/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Scott Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Scott Rd Milepost 10.00 - 11.07 Construction 07/2019 08/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Silverbar Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Silver Bar Rd from Milepost 10.00 - 12.34 Construction 08/2019 09/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Tip Top Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Tip Top Road Milepost 11.00 - 12.42 Construction 08/2019 09/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Triangle Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Triangle Rd Milepost 10.00 - 18.54 Construction 07/2019 09/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Verin Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Verin Rd Milepost 10.00 to 10.54 Construction 07/2019 08/2019 12-16 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Yaqui Gulch Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) Yaqui Gulch Milepost 11.00 - 12.22 Construction 08/2019 09/2019 10-15 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Anderson Valley Rd. Maint. This project will include: Pavement Rehab/Repair (Existing) | Grade Gravel Surface Anderson Valley Road 10.00 - 18.19 Construction 07/2019 09/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Bull Creek Maint. This project will include: Grade Gravel Surface Bull Creek Milepost 12.00 - 18.83 Construction 06/2019 07/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Cuneo Rd. Maint. This project will include: Grade Gravel Surface Cuneo Rd Milepost 10.00 - 11.98 Construction 06/2019 07/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Hunters Valley Rd. This project will include: Grade Gravel Surface Hunters Valley Rd. Milepost 14.00 - 15.55 Construction 07/2019 08/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Incline Rd. Maint. This project will include: Grade Gravel Surface Incline Rd from Milepost 12.00 - 14.00 Construction 07/2019 08/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Indian Peak Rd Maint This project will include: Grade Gravel Surface Indian Peak Rd Milepost 10.00 - 11.50 Construction 08/2019 09/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Mt. Gain Rd Maint This project will include: Grade Gravel Surface Mt. Gain Rd Milepost 11.00 - 13.60 Construction 05/2020 06/2020 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation No. Nine Mile Rd Maint. This project will include: Grade Gravel Surface No Nine Mile Rd Milepost 10.00 - 11.92 Construction 05/2020 06/2020 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Pendola Garden Rd This project will include: Grade Gravel Surface Pendola Garden Rd Milepost 10.00 - 14.00 Construction 05/2020 06/2020 2-4 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 49: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mariposa 19/20 New Road Maintenance & Rehabilitation Preston Rd Maint This project will include: Grade Gravel Surface Preston Rd Milepost 10.00 - 18.52 Construction 05/2020 06/2020 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Schilling Rd Maint. This project will include: Grade Gravel Surface Schilling Rd. Milepost 10.00 - 15.00 Construction 07/2019 10/2020 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Slaughterhouse Rd Maint This project will include: Grade Gravel Rd Slaughterhouse Rd Milepost 13.00 - 13.41 Construction 08/2019 09/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Stumpfield Mountain Rd Maint. This project will include: Grade Gravel Rd Stumpfield Mountain Rd Milepost 10.50 - 11.00 Construction 08/2019 09/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Texas Hill Rd Maint. This project will include: Grade Gravel Rd Texas Hill Rd. Milepost 10.00 - 13.12 Construction 08/2019 09/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Usona Rd. Maint. This project will include: Grade Gravel Rd Usona Rd. Milepost 10.00 - 12.47 Construction 07/2019 08/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Wagner Rd Maint. This project will include: Grade Gravel Rd Wagner Rd. Milepost 10.00 - 11.20 Construction 07/2019 08/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation West Westfall Rd. Maint. This project will include: Grade Gravel Rd West Westfall Rd. Milepost 10.00 - 15.89 Construction 07/2019 08/2019 2-4 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation West Whitlock Rd This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair West Whitlock Rd. Entire Length Construction 07/2019 10/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Nevada Falls Rd Maint. This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Nevada Falls Rd. Entire Length Construction 06/2019 07/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Mt. Bullion Cutoff Rd Maint. This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Mt. Bullion Cutoff Rd. Entire Length Construction 07/2019 08/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Jerseydale Rd Maint. This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Jerseydale Rd entire length Construction 08/2019 09/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Darrah Rd Maint. This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Darrah Rd Maintenance entire length Construction 08/2019 09/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Cole Rd Maint This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Cole Rd entire length Construction 08/2019 09/2019 15-20 8 5

Mariposa 19/20 New Road Maintenance & Rehabilitation Incline Rd Maintenance This project will include: Pavement Rehab/Repair (Existing) | Road Shoulder and

Pavement Repair Incline Rd entire length Construction 08/2019 09/2019 15-20 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 50: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mendocino 19/20 New Road Maintenance & Rehabilitation

2019 AC Maintenance Project on Various County Maintained Roads

This project will include: Pavement Rehab/Repair (Existing) | Some road segments will be Leveling Course/Double Chip Seal, some road segments will be In Place Recycle/Double Chip Seal, and one road segment will be Single Chip Seal.

Summers Lane, ; Benson Lane, ; Hanson Rd, ; Noyo Acres Dr, ; Basin View Dr, ; Ft Bragg Sherwood Rd, ; Boice Lane,;; Pearl Dr, ; Benson Lane, ; Ward Ave, ; Simpson Lane, ; Ellison W ay, ; Mitchell Creek Dr;; Simpson Lane, ;

Construction 07/2019 06/2020 15-21 2 2

Merced 18/19 Carried Over Road Maintenance & Rehabilitation

Gurr Road Overlay Project (FY 18/19 Carryover) This project will include: Pavement Rehab/Repair (Existing) | Overlay 0.62-miles of road. Gurr Road from SR 140 to W ardrobe Road. Construction 10/2019 06/2020 10-15 12 21

Merced 18/19 Carried Over Road Maintenance & Rehabilitation

Childs Avenue Rehabilitation Project (FY 18/19 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | Full Depth Reclamation (FDR) and Overlay or 4.5-miles of road. Childs Avenue between Tower Road and Plainsburg Road Construction 07/2019 06/2020 15-20 12 21

This project will include: Paving and/or Striping Installation (New Safety) | Local match

Merced 19/20 New Safety Merced Falls Road HSIP Project (Local Match)

requirement of FHW A funding. This project is a Highway Safety Improvement project. To increase road safety, this project will install centerline rumble strips and traffic stripes, widen the paved roadway shoulders on both sides of the roadway and add edgeline rumble

On Merced Falls Road approximately 1.0 mile east of La Grange Road in the community of Snelling. Construction 01/2020 06/2020 10-15 12 21

strips. This project is 83.0% federally funded with a 17% local match requirement

This project will include: Bridge Structure Rehab/Repair (Existing) | Local match

Merced 19/20 New Complete Streets Components

La Grange Road Over Dry Creek Bridge Replacement Project (Local Match)

requirement for FHWA funding. This project involves the replacement of the existing 2-lane bridge on La Grange Road at Dry Creek. The new bridge will provide adequate and safe vehicle access by realigning the north and south approaches and increasing the sight distance. Therefore, meeting current safety design standards and enhancing public

On La Grange Road approximately 4.0 miles north of the community of Snelling. Construction 06/2019 06/2020 25-50 12 21

safety. This project is 88.53% federally funded with an 11.47% local match requirement.

Merced 19/20 New Road Maintenance & Rehabilitation

Misc Roadway Repairs/Overlay Preparation W ork At Various Locations

This project will include: Pavement Rehab/Repair (Existing) | This project consists of routine pot-hole repairs and this asphalt overlays within unincorporated areas of Merced County. This project also includes roadway surface and shoulder preparation work for upcoming overlays on various roads.

Specific locations are yet to be determined; all locations will be selected based upon priority, need, resources and available funding. Construction 07/2019 06/2020 1-10 12 21

Merced 19/20 New Road Maintenance & Rehabilitation

Rahilly Road and Sultana Drive Overlay Project

This project will include: Pavement Rehab/Repair (Existing) | Rahilly Road: overlay 3.0 miles of road. Sultana Drive: overlay 1.5 miles of road.

On Rahilly Road from SR59 to 3.0 miles west of SR59. On Sultana Drive, from Bell Drive to Magnolia Avenue. Construction 07/2019 06/2020 10-15 12 21

Modoc 19/20 New Road Maintenance & Rehabilitation Chip Seal Modoc County Roads This project will include: Pavement Rehab/Repair (Existing)

County Road 71; County Road 268; County Road 230; County Road 221; County Road 78; County Road 78A; County Road 78B; County Road 78C; County Road 87; County Road 87A; County Road 93; County Road 94; County Road 198; County Road 111s; County Road 112n; County Road 112s; County Road 124; County Road 114; County Road 1; County Road 11; County Road 48; County Road 133B; County Road 133C

Construction 07/2019 10/2019 7-9 1 1

Mono 19/20 New Road Maintenance & Rehabilitation

County-W ide Fog Seal and Stripe -Phase 2

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various roads not included in Phase 1 - Rock Creek Road, Convict Lake Road, etc. Construction 06/2020 09/2020 3-5 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 51: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Mono 19/20 New Road Maintenance & Rehabilitation

Eastside Lane Rehabilitation - Phase 1

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development Antelope Valley Pre-Construction 11/2018 07/2019 10-25 8 5

Mono 19/20 New Road Maintenance & Rehabilitation Long Valley Streets Rehabilitation This project will include: Cost Estimating, Document Preparation, Environmental

Study/Documents, Preliminary Design, Project Scope Development Long Valley - Including Crowley Lake, Sunny Slopes, and a portion of Swall Meadows Pre-Construction 01/2020 04/2021 10-25 8 5

Mono 19/20 New Road Maintenance & Rehabilitation Twin Lakes Road Maintenance This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Bridgeport Valley Construction 05/2020 09/2020 3-5 8 5

Mono 19/20 New Road Maintenance & Rehabilitation Bridge Maintenance Program This project will include: Bridge Structure Rehab/Repair (Existing) Antelope Valley, Bridgeport, Long Valley, etc. Construction 05/2020 09/2020 5-10 8 5

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation Gloria Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct/rehabilitate 1.9 miles of road. | Multi-year project. Project was pushed back a year (to FY18/19 work plan).

On Gloria Road, from Tavernettie Road to Iverson Road, near the City of Gonzales. Pre-Construction 07/2019 06/2022 10-20 12 30

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation Iverson Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct/rehabilitate 2.2 miles of road. | Multi-year project. Project was pushed back a year (to FY 18/19 work plan).

On Iverson Road, from Gloria Road to Johnson Canyon Road, near the City of Gonzales. Pre-Construction 07/2019 06/2022 10-20 12 30

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation Johnson Canyon Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct/rehabilitate 0.9 of a mile of road. | Multi-year project. Project was pushed back a year (to FY18/19 work plan).

On Johnson Canyon Road, from Iverson Road to SVSW A Entrance, near the City of Gonzales. Pre-Construction 07/2019 06/2022 10-20 12 30

Monterey 17/18 In-Progress Road Maintenance & Rehabilitation River Road

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design | Overlay 1.6 miles of road. | Project was pushed back a year (to FY18/19 work plan).

On River Road, From Las Palmas Road to Las Palmas Parkway, near the City of Salinas.

Pre-Construction and Construction

07/2018 07/2019

06/2019 11/2019 5-10 12, 17 29, 30

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation River Road This project will include: Pavement Rehab/Repair (Existing) | Reconstruct/rehabilitate 2

miles of road. | Project was pushed back a year (to FY18/19 work plan). On River Road, from Chular River Road Bridge to 1.1 mi n/o Limekiln Road, near the community of Chualar. Construction 07/2019 11/2019 10-20 12, 17 30

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation Elkhorn Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct/rehabilitate 2.3 miles of road. | Project was pushed back a year (to FY18/19 work plan).

On Elkhorn Road, from Hall Road to Kirby Road, near the community of Las Lomas. Pre-Construction 07/2019 06/2020 10-20 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 52: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Monterey 17/18 Carried Over Road Maintenance & Rehabilitation Old Stage Road

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design | Reconstruct/rehabilitate 6.4 miles of road. | Project was pushed back a year (to FY18/19 work plan). Project limits was extended from Esperanza Rd to Iverson Rd.

On Old Stage Road, from Alisal Road to Iverson Road, near the City of Salinas. Pre-Construction 07/2018 06/2020 10-20 12 30

Monterey 19/20 New Road Maintenance & Rehabilitation Street Sweeping

This project will include: Perform street sweeping on County roads at various urbanized locations, totaling approximately 300 miles of sweeping. Sweeping is performed at least twice per year for each location, typically in September and April. (NPDES)

Carmel Communities – Scenic Point, Mission Fields, Mid Valley, Brookdale Carmel Valley Communities – Carmel Village, Carmel W oods, High Meadows, Jacks Peak Highway 68 Communities – Toro Park & Serra Village, Las Palmas, San Benancio, Corral de Tierra, Spreckles Northern County Communities – Castroville, Pajaro, Las Lomas, Prunedale, Bolsa Knolls, Boronda, Moss Landing, Oak Hills, Aromas, Davis Rd & Blanco Rd

Construction 07/2019 06/2020 1-1 12, 17 29, 30

Monterey 19/20 New Road Maintenance & Rehabilitation Drainage Clearing

This project will include: Perform drainage clearing on County roads at various locations to prevent localized flooding during rain/storm events, which could lead to road pavement failure.

County wide at various locations. A partial list of roads is as follows: Carpenteria Rd, Dunbarton Rd, Hall Rd, Las Lomas Dr, Oak Vale Rd, Rodgers Rd, Hartnell Rd, Old Stage Rd, Potter Rd, Potter Rd, Rosehart W ay, Rosehart W ay, Arroyo Seco Rd, Camphora - Gloria Rd, Camphora Rd, Central Ave South, Chualar Rd, Clark Rd, Colony Rd, Fairview Rd, Foothill Rd, Fort Romie Rd, Gloria Rd, Hobson Ave, Jolon Rd, Lagomarsino Ave, Lewis Creek Rd, Lonoak Rd, Los Coches Rd

Construction 07/2019 06/2020 1-1 12, 17 29, 30

Monterey 19/20 New Road Maintenance & Rehabilitation Vegetation Clearing/Removal

This project will include: Perform vegetation clearing/removal along County roads at various locations. Vegetation often encroaches onto road right-of-way blocking and hindering motorists' sight distance. This would ensure to keep sight distance clear.

County wide at various locations. A partial list of roads is as follows: Allison Rd, Amaral Rd, Archer Rd, Aromas Rd, Avila Rd, Baumann Rd, Bay Farms Rd, Bay View Rd, Bayhill Rd, Berry Rd, Berta Canyon Rd, Bishop St, Blackie Rd, Blohm Ave, Bluff Rd, Boronda Rd, Brentwood Ct, Calle Del Adobe, Carneros Ct, Carneros Rd, Carpenteria Rd, Castroville Blvd, Chester Dr, Clausen Rd, Coker Rd, Collins Rd, Corey Rd

Construction 07/2019 06/2020 1-1 12, 17 29, 30

Monterey 19/20 New Road Maintenance & Rehabilitation Replacement of Damage Signs This project will include: Replace damaged roadside signs at various locations on County

roads. Road side signs were damaged due to recent major storm events.

County wide at various locations. A partial list of roads is as follows: Salinas Rd, San Juan Rd, Vega Rd, Trafton Rd, Garin Rd, Blackie Rd, San Juan Grade Rd, Davis Rd, Blanco Rd, Boronda Rd, San Jon Rd, Calle de Adobe, Harrison Rd, Hartnell Rd, Potter Rd, Alisal Rd, Crazy Horse Rd, Echo Valley Rd, San Miguel Cyn Rd, Monte Rd, Nacional St, Rio Rd, Hall Rd, Carpenteria Rd, Old Stage Rd

Construction 07/2019 06/2020 5-10 12, 17 29, 30

Napa 18/19 Carried Over Road Maintenance & Rehabilitation Stice Subdivision This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Pavement Seals

Bello Avenue - Stice Lane to end; Garden Avenue - Zinfandel Lane to Stice Lane; Mtn. View Avenue - Zinfandel Lane to Stice Lane; Stanton Drive -Inglewood Avenue to Lydia Lane; Stice Lane - State Route 29 to Mountain View Avenue; Victoria Lane - Zinfandel Lane to end; Vineland Avenue -Zygmunt Drive to Stice Lane; W alnut Avenue - Mountain View Avenue to Bello Avenue; Zygmunt Drive - Vineland Avenue to Mountain View Avenue

Construction 09/2019 11/2019 20-25 3 4

Napa 19/20 New Road Maintenance & Rehabilitation Oakville Grade This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Road slide repair Oakville Grade, Mile Post Marker 1.35 Construction 07/2019 11/2019 40-50 3 4

Napa 17/18 Carried Over Road Maintenance & Rehabilitation Milton Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Full Depth Replacement (FDR) / double chip seal Milton Road - End of County road North to railroad tracks Construction 09/2019 11/2019 20-50 3 4

Napa 17/18 In-Progress Other Traffic Signal and Street Light Installation and Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade for existing traffic signals and install and repair approximately 10 street lights.

Traffic Signals - Airport Road, Atlas Peak Road, Trancas Street, Silverado Trail. New street lights - Old Sonoma Road/Congress Valley Road

Construction 06/2018 07/2020 15-20 3 4

Napa 17/18 Carried Over Road Maintenance & Rehabilitation

Mount Veeder/Dry Creek Road Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Subgrade stabilization and overlays Mount Veeder Road/Dry Creek Road - Various locations entire length Construction 05/2020 06/2020 20-50 3 4

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 53: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Napa 17/18 Carried Over Road Maintenance & Rehabilitation Soda Canyon Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Subgrade stabilization and overlays From Loma Vista continuing east 1 mile Construction 04/2020 06/2020 20-50 3 4

Napa 17/18 Carried Over Road Maintenance & Rehabilitation Partrick Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Subgrade stabilization and overlays End of County road continuing East for 1 mile Construction 04/2020 06/2020 20-50 3 4

Napa 17/18 Forecasted Road Maintenance & Rehabilitation Soda Canyon Road This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Pavement Overlay Silverado Trail to Loma Vista Construction 04/2021 06/2021 20-20 3 4

Napa 17/18 Forecasted Road Maintenance & Rehabilitation Berryessa Highlands This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Rebuild, Overlay, seal, as required

Arroyo Grande Drive, Arroyo Lindo Court, Bahia Vista Court, Black Oak Lane, Blue Cove Drive, Cape Cod Court, Carlson W ay, Clearwater Court, Eastridge Drive, Headlands Drive, Jasmine Court, Kona Court, Manzanita Lane, Neptune Court, Nile Court, Noah Court, Overland Drive, Parkview Lane, Poppy Lane, Redrock Drive, Rimrock Drive, Steele Canyon Road, W estridge Drive, W oodhaven Court

Construction 06/2022 11/2022 20-20 3 4

Napa 17/18 Forecasted Road Maintenance & Rehabilitation Berryessa Estates This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Seals

Bridle Street, Colt Court, Deputy Drive, Harness Drive, Lariat Street, Mustang Court, Pony Court, Sage Court, Spur Court, Spur Street, Stagecoach Canyon Road, Stallion Court, W agon W heel Drive, W agon W heel Court

Construction 07/2022 11/2022 10-10 3 4

Napa 17/18 Forecasted Road Maintenance & Rehabilitation Silverado Trail Phase K This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Pavement Overlay Oak Knoll Avenue to Yountville Crossroad Construction 06/2021 08/2021 20-20 3 4

Napa 17/18 In-Progress Road Maintenance & Rehabilitation Zinfandel Lane Overlays

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Active Transportation Plan, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | RMRA Funds are being used in the Pre-Construction/Design phase of this project that will Seal and Overlay as needed; Pavement Overlay | The Silverado Trail Phase I & J was originally part of this project, but upon design, it was split.

Zinfandel Lane- State Highway 29 to Silverado Trail Pre-Construction and Construction

04/2018 05/2020

05/2020 07/2020 20-25 3 4

Napa 17/18 Forecasted Road Maintenance & Rehabilitation Buhman Road Bridge

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Bridge Repair

Buhman Avenue at Congress Valley Road Construction 07/2020 11/2020 40-40 3 4

Napa 17/18 Forecasted Other Mt. Veeder Road Bridge

This project will include: Paving and/or Striping Installation (New Safety), Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Bridge Repair/Replace

Mt. Veeder Road, Mile Post Marker 2.13 Construction 07/2020 12/2020 40-75 3 4

Napa 17/18 Carried Over Road Maintenance & Rehabilitation Silverado Trail Phase I & J

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement Overlays | Project was originally consolidated with Zinfandel Lane, but upon design, the project was split.

Silverado Trail - Oakville Crossroad to Skellenger Lane Silverado Trail -Yountville Crossroad to Oakville Crossroad Construction 05/2019 07/2019 20-25 3 4

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 54: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Nevada 18/19 In-Progress Road Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Program - 2018/2019 Microsurface and Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) | This 2018/19 road maintenance and rehabilitation plan will resurface or repave roads throughout Nevada County. Roads are selected and prioritized based on the County’s Pavement Management System to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment. The plan includes various potential pavement preservation and replacement techniques. The 2018/19 plan is part of a comprehensive 5-year road maintenance and rehabilitation program, adopted annually by the Board of Supervisors and accounted for in the county’s Capital Improvement Program (CIP).

Some or all of the following roads: Indian Springs, Lower Colfax Rd, W illow Valley Road, Quaker Hill Cross Road, Birchville Road, Pleasant Valley Road Construction 06/2019 10/2019 7-20 1 1

Nevada 19/20 New Road Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Program - 2019/2020 Overlay and Pavement Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development

Throughout Nevada County and may include the following streets: Scotts Flat Rd, E. Empire St, Boulder St, E Lime Kiln Rd, Tammy Way, Alexandra Way, Alta Sierra Dr, Gary W ay, Carrie Dr, Karen Dr, Brunswick Rd, Duggans Rd, Wet Hill Rd

Pre-Construction and Construction

12/2019 06/2020

04/2020 10/2020 5-20 1 1

Nevada 19/20 New Road Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Program - 2019/2020 Brushing and Shoulder Work Project

This project will include: Landscape Safety Rehab/Repair (Existing) | Brushing and Shoulder Work in order to maintain roadways and in preparation of the 2019/2020 Overlay and Pavement Rehabilitation Project.

Throughout the county and may include: Scotts Flat Rd, E Empire St, Boulder St, E Lime Kiln Rd, Tammy Way, Alexandra W ay, Alta Sierra Dr, Gary Way, Carrie Dr, Karen Dr, Brunswick Rd, Duggans Rd, Wet Hill Rd

Construction 02/2020 06/2020 2-5 1 1

Nevada 19/20 New Complete Streets Components

Combie Road Corridor Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Combie Road from State Route 49 to W . Hacienda Drive Construction 06/2019 11/2019 10-30 1 1

Orange 19/20 New Road Maintenance & Rehabilitation

Annual Road Maintenance Northwest Tustin

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Hewes Avenue from 17th Street to Foothill Blvd, Dodge Avenue from Hewes Avenue to Newport Avenue and various Streets South of Dodge Avenue Construction 07/2019 12/2020 7-10 37 68

Orange 19/20 New Road Maintenance & Rehabilitation

Annual Road Maintenance Cowan Heights

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Newport Blvd and various streets within Cowan Heights Service Area, south of Newport Blvd and North of Skyline, Lemon Heights Drive Construction 07/2019 12/2020 7-10 37 68

Orange 19/20 New Road Maintenance & Rehabilitation

Annual Road Maintenance Anaheim Island

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Various Streets North of Ball Road, East of Gilbert Street, South of Broadway and W est of Brookhurst Street Construction 07/2019 12/2020 7-10 29 65

Orange 19/20 New Road Maintenance & Rehabilitation

Annual Road Maintenance Trabuco Canyon

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of remedial repairs of AC & PCC, grind and overlay, traffic striping, pavement marking and related minor construction.

Trabuco Oaks Drive Construction 07/2019 12/2020 7-10 36 73

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 55: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Orange 19/20 New Road Maintenance & Rehabilitation

Bridge Maintenance - Santa Ana River Channel Bridges

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of sealing deck cracks with methacrylate and performing joint seal replacement on Bridge #55C0017; repairing exposed rebar at southwestern corner of the bridge, and spalling on concrete railing and sidewalk on Bridge #55C0097; addressing efflorescence on the bridge soffit on Bridge #55C0154; and repairing exposed reinforcement in concrete barrier, and clearing debris build up on pier nosing on Bridge #55C0344.

Bridge #55C0017 Lincoln Avenue over Santa Ana River; Bridge #55C0097 Talbert/MacArthur over Santa Ana River; Bridge # 55C0154 Edinger Avenue over Santa Ana River; Bridge # 55C0344 Adams Avenue over Santa Ana River

Construction 05/2020 12/2020 5-10 34, 37 68, 69, 72, 74

Orange 19/20 New Road Maintenance & Rehabilitation

Bridge Maintenance - Tonner Canyon Road over Brea Canyon Channel

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of fixing horizontal cracks on culvert walls. Bridge #55C0119 Tonner Canyon Road over Brea Canyon Channel Construction 05/2020 12/2020 5-10 29 55

Orange 19/20 New Road Maintenance & Rehabilitation

Bridge Maintenance - El Modena/Orange Park Acres Bridges

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of replacing galvanized coating at the pipe bottom and fixing the rusted culvert invert on Bridge #55C0511 and performing minor crack repairs on Bridge #55C0690.

Bridge # 55C0511 Villa Park Road over Santiago Creek and Bridge #55C0690 Orange Park Boulevard over Handy Creek Construction 05/2020 12/2020 5-10 37 68

Orange 19/20 New Safety Foothill, Old Foothill, Fairhaven, Hewes, and Fowler Sidewalk Improvements (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development | The project consists of constructing sidewalk improvements.

Foothill Boulevard - Old Foothill Boulevard to Hewes Avenue, Old Foothill Boulevard - 600 ft. n/o Foothill Boulevard to Hewes Avenue, Fairhaven Avenue - Hewes Avenue to Artnell Road, Hewes Avenue - Fairhaven Avenue to Fowler Avenue, Fowler Avenue - Hewes Avenue to Charmaine Lane

Pre-Construction 07/2019 06/2023 20-25 37 68

Orange 19/20 New Safety ADA (Americans with Disabilities Act) Upgrades (Annual)-Anaheim Island

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, driveway upgrades and improvements to satisfy current ADA standards and requirements.

Various streets within the unincorporated Anaheim island Construction 08/2019 07/2021 20-25 29 65

Orange 19/20 New Safety Sidewalk Gap Closure (Annual) Anaheim Island

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of constructing sidewalk improvements to close sidewalk gaps.

Various streets within the unincorporated Anaheim island Construction 01/2020 06/2021 20-25 29 65

This project will include: Document Preparation, Preliminary Design, Project Scope

Orange 19/20 New Safety Crawford Canyon Road Sidewalk Extension (Design Phase)

Development | The project consists of extending sidewalk along Crawford Canyon Road to enhance pedestrian safety and access by addressing the gap in connectivity. The project also includes upgrades to the existing traffic signal system at the Newport Avenue

Crawford Canyon Road between El Roy Drive and Newport Avenue in the county unincorporated area of North Tustin Pre-Construction 07/2019 12/2021 20-25 37 68

intersection.

This project will include: Document Preparation, Environmental Study/Documents,

Orange 18/19 Carried Over Safety Olive Heights Sidewalk Gap Closure (Design Phase)

Preliminary Design, Project Scope Development | The project work consists of removing and reconstructing pavement within the roadway, construct 4 feet ADA sidewalk, Various streets with the Olive Heights area in City of Anaheim Pre-Construction 07/2019 06/2021 5-10 37 68

driveways, and curb ramps, upgrade signs, and small retaining walls.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 56: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Orange 19/20 New Traffic Control Devices Traffic Management Center Fiber Optics Expansion (Annual)

This project will include: The project consists of expanding the fiber optics network components to provide real-time data in order to improve transportation safety and mobility.

Various intersections along, Oso Parkway, Cow Camp Road, Crown Valley Parkway, Los Patrones Parkway, Gilbert Street Construction 10/2019 06/2020 15-20 29, 36 65, 73

Orange 19/20 New Traffic Control Devices Traffic Signal Upgrades (Annual) – Villa Park Road at Hewes Street

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Intersection of Villa Park Road at Hewes Street in unincorporated Orange Construction 02/2020 06/2020 15-20 37 68

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Orange 19/20 New Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at La Loma Drive

Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new

Intersection of Newport Avenue at La Loma Drive in the county unincorporated area of North Tustin Construction 02/2020 06/2020 15-20 37 68

equipment.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Orange 19/20 New Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at La Colina Drive

Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new

Intersection of Newport Avenue at La Colina Drive in the county unincorporated area of North Tustin Construction 02/2020 06/2020 15-20 37 68

equipment.

Orange 19/20 New Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at Cowan Heights Drive/Rockhurst Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new equipment.

Intersection of Newport Avenue at Cowan Heights Drive/Rockhurst Avenue in unincorporated North Tustin Construction 02/2020 06/2020 15-20 37 68

This project will include: Document Preparation, Feasibility Study, Environmental

Orange 18/19 Carried Over Complete Streets Components

Laguna Canyon Road - Segment 4, Phases II to IV (Design Phase)

Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project will widen shoulders to facilitate a 3500 feet Class II bike lane and undergrounding Southern California Edison power poles. Combined project with Caltrans includes

El Toro Road to State Route-73 Pre-Construction 07/2019 06/2020 20-25 37 74

construction of drainage culvert, roadway widening, and restriping and mitigation.

This project will include: Document Preparation, Pavement Rehab/Repair (Existing),

Orange 19/20 New Complete Streets Components

Santa Ana Avenue and University Drive Drainage & Pavement Improvements (Design and Construction Phases)

Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of reconstructing storm drain catch basin to accommodate ADA access ramps, reconstructing pavement and constructing a neighborhood park

Southeast corner of Santa Ana Avenue and University Drive; and University Drive from Santa Ana Avenue to W illo Lane, within the City of Costa Mesa and unincorporated County

Pre-Construction and Construction

07/2019 10/2019

09/2019 12/2020 40-50 37 74

facility to treat roadway runoff.

Orange 19/20 New Complete Streets Components

Brookhurst Street Road and Sidewalk Improvements (Design and Construction Phase)

This project will include: Document Preparation, Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Project Scope Development | The project consists of constructing an additional southbound lane to improve traffic flow, as well as construction of a bike lane and sidewalk improvements

Brookhurst Street from Cerritos Avenue to Ball Road Pre-Construction and Construction

07/2019 04/2020

03/2020 06/2021 20-25 29 65

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 57: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Orange 18/19 In-Progress Other Brea Boulevard / Brea Canyon Road Widening Project- Phase I (Design & Construction Phase)

This project will include: Right of Way Acquisition, Paving and/or Striping Installation (New Safety), Document Preparation, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Right of W ay, Project Scope Development, Storm Drain/Culvert Installation (New) | The project consists of reconstruction of roadway pavement, installation of raised medians and traffic signals, removal and reconstruction of 3 new bridges, construction of retaining walls, roadway and intersection grading, and utility relocations.

Canyondale Drive to Orange County / Los Angeles County Boundary Limit Pre-Construction and Construction

07/2019 10/2019

09/2019 09/2023 20-25 29 55

Orange 19/20 New Other OC Loop Segment H El Cajon Bikeway (Design and Construction Phase)

This project will include: Document Preparation, Bicycle Lane (New), Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project consists of 1.2 miles of class I, II, III and IV bikeways

Yorba Linda Recreational Trail to Santa Ana River Trail Pre-Construction and Construction

07/2019 10/2020

09/2020 09/2023 20-25 29, 37 55, 68

Orange 19/20 New Other Peters Canyon Bikeway Extension (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project consists of 3.1 miles of class I (off-road) bikeway.

Along east side of Jamboree Road from Canyon View Ave to Portola Parkway Pre-Construction 07/2019 06/2024 20-25 37 68

Orange 19/20 New Other OC Loop Segment D El Cajon Bikeway (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project consists of .67 miles long class I (off-road) bikeway.

Bastanchury Road to Imperial Avenue Pre-Construction 07/2019 06/2023 20-25 29 55

Orange 19/20 New Other OC Loop Segment O Coyote Creek Bikeway (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project consists of 1.1 miles long class I (off-road) paved bikeway

North Fork Trail to Artesia Boulevard Pre-Construction 07/2019 06/2024 20-25 29, 32 65

Orange 19/20 New Other OC Loop Segment P Coyote Creek Bikeway (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development | The project consists of .6 miles long class I (off-road) paved bikeway

Artesia Boulevard to Knott Avenue Pre-Construction 07/2019 06/2024 20-25 32 65

Orange 19/20 New Other OC Loop Segment Q Coyote Creek Bikeway (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of W ay, Project Scope Development | The project consists of 1 miles long class I (off-road) paved bikeway

Knott Avenue to La Mirada Boulevard Pre-Construction 07/2019 06/2024 20-25 32 65

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Annual Road Maintenance - Midway City

Rehab/Repair (Existing Safety) | The project consists of performing remedial repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement

Various streets within Midway City; South of Hazard Avenue, East of Magnolia Street, Northeast of 405 Freeway Construction 07/2019 12/2020 10-20 34 72

marking and related minor construction.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 58: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Orange 17/18 In-Progress Road Maintenance & Rehabilitation

Bridge Maintenance - Santa Ana Avenue over Santa Ana Delhi Channel

This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | Bridge Deck Replacement - removing up to 10" of asphalt concrete deck and placing a polyester deck over girders for approximately 4300 SF of deck area | Design completed 6/27/18. Construction has been postponed to future fiscal years with increased scope and coordination with neighboring Cities

Bridge #55C0572 Irvine Avenue over Santa Ana Delhi Channel; Bridge # 55C0205 Santa Ana Avenue over Santa Ana Delhi Channel 0.1 miles south of Bristol Street within the City of Santa Ana

Pre-Construction and Construction

03/2018 05/2020

06/2018 12/2020 5-5 37 74

Orange 18/19 Carried Over Road Maintenance & Rehabilitation

Trabuco Creek Road Stabilization (Design Phase)

This project will include: Document Preparation, Environmental Study/Documents, Preliminary Design, Project Scope Development | The project will reconstruct approximately 2.8 miles of existing dirt road with environmentally friendly geofabric material, pervious base material, and construct roadway drainage to facilitate emergency vehicle access.

Along Trabuco Creek Road at Trabuco Canyon Road to Cleveland National Forest Pre-Construction 07/2019 12/2022 5-10 36 73

Orange 17/18 In-Progress Safety Santiago Canyon Road Safety Roadway Improvements

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Project Scope Development | The project work consists of providing high friction surface treatment, installing flashing beacons, delineators, reflectors, rumble strips, upgrading signage, and increasing bicycle safety by striping a buffer zone, along 11 miles of road.

SR-241 to North Live Oak Canyon Road Pre-Construction and Construction

08/2017 05/2020

04/2020 06/2021 7-10 36, 37 68, 73

Orange 17/18 In-Progress Safety Gilbert Street Improvements - Phase II

This project will include: Document Preparation, Preliminary Design, Project Scope Development | The project work consists of constructing two raised medians (approximately 200 feet) to enhance safety at a railroad crossing by preventing left turn movements, and ADA accessible curb ramps and sidewalk improvements.

Along Gilbert Street at Pacific Place Union Pacific Railroad (UPRR) Crossing in the Cities of Anaheim and Stanton Pre-Construction 01/2018 06/2022 15-20 29 65

Orange 17/18 In-Progress Safety Southwest Anaheim Sidewalk Improvements (Design Phase)

This project will include: Document Preparation, Feasibility Study, Environmental Study/Documents, Preliminary Design, Project Scope Development | The project will construct continuous 5 feet sidewalks and ADA improvements, along 7700 feet of roadway.

Various streets within the City of Southwest Anaheim (bounded by Ball Road, Gilbert Street, Orange Avenue, Rosebay St) Pre-Construction 07/2017 06/2022 15-20 29 65

Orange 17/18 In-Progress Road Maintenance & Rehabilitation

Annual Road Maintenance -Rossmoor

This project will include: Document Preparation, Preliminary Design | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, Microsurfacing, traffic striping, pavement marking and related minor construction

Various streets within Rossmoor South of Katella Avenue, East of 605 Freeway, North of 405 Freeway and W est of Los Alamitos Blvd

Pre-Construction and Construction

03/2018 07/2019

10/2019 12/2020 10-20 34 72

Orange 17/18 In-Progress Complete Streets Components

Collins Avenue and Eckhoff Street Cul-De-Sac Improvements (Design Phase)

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project work consists of building out the cul-de-sacs along approximately 650 LF of streets following a cell tower relocation. W ork consists of removal and replace asphalt concrete, replace fencing and gate, curb and gutter, ADA improvements, and replacement of driveways.

Collins Avenue cul-de-sac to the intersection at Eckhoff Street, and Eckhoff Street cul-de-sac to the intersection of Collins Avenue, within in the City of Orange

Pre-Construction and Construction

06/2017 07/2019

07/2019 12/2020 10-15 37 68

Placer 19/20 New Road Maintenance & Rehabilitation

Purchase of Aggregate/Asphalt Material for miscellaneous repairs. This project will include: Procurement of Road Maintenance and Rehab Materials Various locations throughout the County pending road review. Materials will

be used for pothole patching and repair of surface pavement rideability. Procurement / Operational Needs 07/2019 06/2020 2-7 1, 4 1, 5, 6

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 59: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Placer 19/20 New Road Maintenance & Rehabilitation

Auburn Ravine/Foresthill Road Overpass Surface Repairs and Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) Auburn Ravine/Foresthill Road overpass Construction 07/2019 12/2019 25-50 1 1

Placer 19/20 New Road Maintenance & Rehabilitation 36" Culvert Lining This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Greenstone Ct, Auburn Construction 07/2019 12/2019 30-50 1 1

Placer 19/20 New Traffic Control Devices Traffic Signal Maintenance Upgrade This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

33 separate signalized intersections located on the following roads: Placer Hills Rd, Atwood Rd, Bell Rd, Douglas Blvd, Auburn-Folsom Rd, Industrial Av, Athens Av, Sunset Av, PFE Rd, Walerga Rd, Cook Riolo Rd

Construction 07/2019 06/2020 7-10 1, 4 1, 6

Placer 18/19 Carried Over Road Maintenance & Rehabilitation HMA Overlay / Slurry Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety)

HMA Overlay - Tahoe W est Shore and Kings Beach, Todd Valley/Foresthill, Meadow Vista, Lincoln, Sheridan Slurry Seal - Granite Bay subdivisions: Treelakes, Greyhawk, Douglas Ranch, Grosvenor Downs, Hidden Lakes, Lakeland, Wood Bridge Ranch; roads in or near these subdivisions in Auburn, Penryn and Foresthill: Lomida, The Vineyard, New Airport Rd, Trailhead, Blackhawk, Monte Verde, W alter's W ay

Construction 04/2020 12/2020 7-25 1, 4 1, 6

Placer 18/19 Carried Over Road Maintenance & Rehabilitation ADA Curb Repair Purchase Order This project will include: ADA Curb Ramp Rehab/Repair (Existing)

Auburn area subdivisions, Granite Bay subdivisions All locations are subject to change and will be selected based on priority need based on ADA complaints and requests.

Construction 07/2019 06/2020 30-50 1, 4 1, 3, 5, 6

Various locations throughout Placer County based on need and complaints.

Placer 18/19 Carried Over Road Maintenance & Rehabilitation

Tree Trimming / Vegetation Management Purchase Order

This project will include: Landscape Safety Rehab/Repair (Existing) | Routine trimming and/or removal of roadside vegetation by contracted forces on an as-needed basis. Locations to be determined.

Planned areas include: English Colony W ay, Taylor Road, Butler Road, Swetzer Road, Citrus Colony Road, Delmar Road, Humphrey Road. All locations are subject to change and will be selected based on priority need

Construction 07/2019 06/2020 5-10 1, 4 1, 3, 5, 6

throughout the year

This project will include: Pavement Rehab/Repair (Existing) | Place chip seal on

Placer 18/19 Carried Over Road Maintenance & Rehabilitation Chip Seal - Western Placer County

approximately 75 miles of County roads. Project includes purchase of equipment (chip spreader and 9-wheel rubber tire rollers) for this and future chip seal projects. Targeted areas are western Placer County, west of Interstate 80, including the areas of Riego,

Roseville and Lincoln: South of Nicolaus Rd, W est of W att Ave to Sacramento and Sutter County lines; Penryna/Loomis/Newcastle/Ophir areas from Rock Springs Rd to Crater Hill Rd

Construction 07/2019 12/2019 7-10 1, 4 1, 5, 6

Sunset Boulevard West, Sheridan, Camp Far West, Thermalands, and rural Lincoln.

Plumas 19/20 New Other Quincy-LaPorte Road Slipout Repair 2019 Storm Damage

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design | Repair embankment and structural section at slide.

Quincy-La Porte Road, C.R. 511, 11.5 miles south of SR 70 (south of Nelson Creek Bridge)

Pre-Construction and Construction

07/2019 07/2019

07/2020 07/2020 10-15 1 1

Plumas 19/20 New Other Slate Creek Culvert Repair This project will include: Environmental Study/Documents, Preliminary Design | Repair undermining of 9' diameter culvert with concrete and RSP.

Bucks Lake Road, C.R. 511, at the intersection of Slate Creek Road, at the confluence of Slate Creek and Spanish Creek

Pre-Construction and Construction

07/2019 07/2019

11/2020 11/2020 15-25 1 1

Plumas 19/20 New Road Maintenance & Rehabilitation

W inter Maintenance Materials Contract This project will include: Procurement of Road Maintenance and Rehab Materials Purchase and delivery of winter sanding materials Procurement /

Operational Needs 07/2019 12/2019 1-3 1 1

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 60: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Plumas 19/20 New Other Equipment Acquisition This project will include: Procurement of Public Works Equipment 10-wheeler dump trucks for Beckwourth, Greenville and Quincy Districts. Paint striper truck based in Quincy

Procurement / Operational Needs 07/2019 07/2020 25-35 1 1

Plumas 19/20 New Road Grade Separation County Route A13 Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design

County Route A13, C.R. 313, between SR 36 and SR 147 on the Almaonr Peninsula

Pre-Construction and Construction

07/2019 07/2019

11/2020 11/2020 10-20 1 1

Plumas 19/20 New Road Maintenance & Rehabilitation

County Route A23 Pavement Repairs This project will include: Pavement Rehab/Repair (Existing), Preliminary Design County Route A23, C.R. 109, Beckwourth-Calpine Road from Marble Hot

Springs Road to the Sierra County Line, p.m. 4.80-8.63 Pre-Construction and Construction

07/2019 07/2019

12/2021 12/2021 10-15 1 1

Plumas 19/20 New Other Asphalt Materials Storage This project will include: Environmental Study/Documents, Preliminary Design | Construct covered storage building for asphalt materials (cold mix and grindings) Quincy Maintenance District Materials Storage Yard Pre-Construction and

Construction 07/2019 07/2019

12/2021 12/2021 30-40 1 1

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation La Sierra Ave #2 This project will include: Pavement Rehab/Repair (Existing), Storm Drain/Culvert

Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) Cajalco Rd to El Sobrante Rd Pre-Construction and Construction

02/2018 09/2019

03/2019 12/2019 15-20 28, 31 60, 67

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation La Sierra Ave #1

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

El Sobrante Rd to Middleborough Rd Pre-Construction and Construction

08/2017 04/2019

06/2018 09/2019 12-15 28 67

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation Village Center Dr and Park Ln

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Village Center Dr: North Circle Dr to South Circle Dr and Park Ln: North Circle Dr to Ridgeview Dr

Pre-Construction and Construction

08/2017 05/2019

10/2018 09/2019 12-15 28 71

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation Whittier Ave

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

San Jacinto St to Old Agency Rd Pre-Construction and Construction

08/2017 09/2019

03/2019 01/2020 12-15 28 71

Riverside 18/19 In-Progress Road Maintenance & Rehabilitation Lincoln St This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation

(New), Sidewalk and/or Crosswalk Installation (New) 5th St/Hammond Rd to 62nd Ave Pre-Construction and Construction

09/2017 09/2019

04/2019 05/2020 12-15 28 56

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation Thousand Palms Canyon Rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Ramon Rd/Washington St to Dillon Rd Pre-Construction and Construction

07/2017 02/2020

10/2019 06/2020 12-15 28 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 61: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation Ramona Expy

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Rider St to E'ly 5th St 0.10 mi Pre-Construction and Construction

07/2017 03/2020

12/2019 07/2020 15-20 23, 31 42, 61, 67

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Riverside 17/18 In-Progress Road Maintenance & Rehabilitation 52nd Ave and 54th Ave Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle

Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or 52nd Ave: Fillmore St to W'ly 0.38 mi. and 54th Ave: Harrison St to Grapefruit Blvd

Pre-Construction and Construction

07/2017 05/2019

11/2018 09/2019 12-15 28 56

Striping Rehab/Repair (Existing Safety)

Riverside 19/20 New Safety Cajalco Rd This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) Brown St to Day St Pre-Construction and

Construction 08/2015 10/2019

04/2019 09/2020 12-15 28 61

Riverside 19/20 New Road Maintenance & Rehabilitation 2nd District Slurry Seal This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Various Roads in the 2nd District. https://www.rctlma.org/Districts Pre-Construction and Construction

09/2019 03/2020

12/2019 06/2020 5-7 31 60

Riverside 19/20 New Road Maintenance & Rehabilitation Center St

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

I-215 to NW'ly I-215 0.35 mi Pre-Construction and Construction

06/2019 04/2020

10/2019 12/2020 15-20 31 61

Riverside 19/20 New Road Maintenance & Rehabilitation Johnston Ave

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

San Jacinto St to E'ly Stanford 0.12 mi Pre-Construction and Construction

05/2019 08/2020

02/2020 01/2021 15-20 23 67

18th Ave: W'ly 0.12 mi & E'ly 0.06 mi of Langlois Rd, Aurora Rd: Langlois Rd

Riverside 19/20 New Road Maintenance & Rehabilitation Sky Valley Area Resurfacing Group This project will include: Pavement Rehab/Repair (Existing) to W'ly Langlois Rd 0.62 mi, Clifton St: Langlois Rd to E'ly Langlois rd 0.12

mi, Corkill Rd: Dillon Rd to S'ly Dillon Rd 0.50 mi and Langlois Rd: Aurora Rd Pre-Construction and Construction

02/2019 12/2019

07/2019 02/2020 12-20 28 56

to Clifton St

Riverside 19/20 New Road Maintenance & Rehabilitation 4th District Chip Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Various Roads in the 4th District. https://rctlma.org/Districts Pre-Construction and Construction

07/2019 09/2019

08/2019 06/2020 5-7 28 42, 56

Riverside 19/20 New Road Maintenance & Rehabilitation

Bubbling Wells Rd & Camino Aventura

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Bubbling Wells Rd: Dillon Rd to Camino Campanero and Camino Aventura: Bubbling Wells Rd to E'ly 0.25 mi

Pre-Construction and Construction

07/2014 08/2020

02/2020 10/2020 15-20 28 56

Riverside 19/20 New Road Maintenance & Rehabilitation Datil Rd & Sierra Del Sol This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) Datil Rd: Thelma Ave to San Miguelito Dr and Sierra Del Sol: Ramon Rd to La Canada W ay

Pre-Construction and Construction

02/2019 06/2020

12/2019 10/2020 15-20 28 56

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 62: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Riverside 19/20 New Road Maintenance & Rehabilitation Hammond Rd & 66th Ave This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair

(Existing), Sidewalk and/or Crosswalk Installation (New) 2nd St to Date Palm St Pre-Construction and Construction

03/2019 02/2021

10/2020 06/2021 15-20 28 56

Riverside 19/20 New Road Maintenance & Rehabilitation Lovekin Blvd & Mesa Dr

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Lovekin Blvd: Seeley Ave to Blythe City Limits and Mesa Dr: Bellwood Dr to Black Rock Rd/Hobson W ay

Pre-Construction and Construction

08/2019 03/2020

12/2019 07/2020 12-20 28 56

Riverside 19/20 New Road Maintenance & Rehabilitation

5th District Various Road Resurfacing

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Various Roads in the 5th District. http://www.rivcodistrict5.org/marion-ashley/about-the-district/district-map

Pre-Construction and Construction

09/2019 02/2020

12/2019 08/2020 12-15 23, 28, 31 42, 61, 67

Riverside 19/20 New Road Maintenance & Rehabilitation Gilman Springs Rd This project will include: Paving and/or Striping Installation (New Safety), Pavement

Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) SH 60 to SH 79 Pre-Construction and Construction

02/2019 06/2019

04/2019 11/2019 10-12 23, 31 42, 61

Riverside 19/20 New Road Maintenance & Rehabilitation Oak Glen Rd This project will include: Environmental Study/Documents, Preliminary Design, Project

Scope Development Orchard St to S.B. County Line Pre-Construction 08/2012 06/2020 15-20 23 42

Riverside 19/20 New Road Maintenance & Rehabilitation Ramona Expy This project will include: Environmental Study/Documents, Preliminary Design, Project

Scope Development W'ly Warren Rd 0.55 mi to E'ly Warren Rd Pre-Construction 07/2019 06/2020 15-20 23 42

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing

Riverside 19/20 New Road Maintenance & Rehabilitation Stetson Ave Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Sidewalk

and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Santa Fe to Hemet St Pre-Construction and Construction

06/2019 07/2020

01/2020 10/2020 12-15 23 67

Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Sacramento 19/20 New Traffic Control Devices HSIP Traffic Signal System Upgrade

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Provide enhanced traffic signal coordination and monitoring at 39 existing signalized intersections by upgrading the signal control equipment to allow for traffic responsive signal coordination on the new County central signal system.

Signalized intersections along the following street segments: W alnut Ave. from W inding W ay to El Camino Ave.; Marconi Ave. from Norris Ave. to Mission Ave.; El Camino Ave. from Garfield Ave. to Mission Ave.; Elkhorn Bl. from Cantel W ay to Garfield Ave.; Hazel Ave. from Central Ave. to Madison Ave.; W inding W ay, from Garfield Ave. to San Juan Ave.

Construction 09/2019 12/2019 10-20 1, 4, 6 6, 7, 8

Sacramento 17/18 In-Progress Road Maintenance & Rehabilitation

44th Avenue Pedestrian Improvements, Phase 2

This project will include: Cost Estimating, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, Active Transportation Plan | Rehabilitate existing sidewalks including replacement of damaged sidewalks and installation of ADA-compliant curb ramps, Repair and overlay damaged pavement at Martin Luther King, Jr., Blvd. intersection.

44th Avenue, from Franklin Blvd. to 39th Street Pre-Construction and Construction

09/2016 03/2019

11/2018 10/2019 20-30 6 7

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 63: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sacramento 18/19 In-Progress Road Maintenance & Rehabilitation

Pavement Rehabilitation and Overlay Projects (Residential Streets)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

Residential streets in the following unincorporated Sacramento County neighborhoods: Fruitridge area bounded by 44th St., 14th Ave., Stockton Blvd., and Parker Ave.; S. Sacramento/Florin area bounded by Florin Rd., Power Inn Rd., and Stockton Blvd.; Arden-Arcade area bounded by Arden W ay, Morse Ave., Northrop Ave. and W att Ave.; Arden-Arcade area bounded by Arden, Morse, W emberley and W att.; Rosemont area bounded by Manlove Rd., Sutters Gold Dr., Mojave Dr., Port Dr. and New Dawn Dr.

Construction 03/2019 09/2019 20-25 6 7, 8, 9

Sacramento 19/20 New Safety Accessible Curb Ramp Improvements

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | Install and upgrade curb ramps to current ADA standards at non-signalized intersections throughout the unincorporated areas of Sacramento County.

Briggs Dr. - 53rd Ave., Steelman Cir. (South and North), and McClure Ct. intersections. Northrop Ave. - 340' East of Morse. Heartland Dr. and Tetotom Parkway. 9601 Lake Natoma Dr. Norris Ave. and Ronk Wy. 7454 Handfield Dr. Oxwood Dr.. and Rose Valley W y. Rosefield W y. and Rose Valley W y. Roseport W y. and Leafmont W y.

Construction 02/2019 12/2019 50-60 4, 6 6, 7, 8, 9

Sacramento 19/20 New Safety LED Street Light Project Phase 2 This project will include: Install approximately 18 LED street lights along residential streets for pedestrian and traffic safety.

The residential streets within the neighborhood bounded by Florin Rd., Stockton blvd., 65th St., 53rd Ave., and Briggs Dr. Construction 05/2019 12/2019 20-30 6 9

Sacramento 19/20 New Road Maintenance & Rehabilitation

Pavement Maintenance and Rehabilitation #2

This project will include: Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, including: removal and replacement of failed pavement and base material, pothole repair, patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. This project is continuous throughout the fiscal year and involves pavement maintenance on roadways in all communities of unincorporated Sacramento County.

Powerline Rd.; San Juan Rd.; W . Elverta Rd.; Bar Du Lane; Reese Rd.; Rogers Rd.; Campoy St.; Vincent Ave.; 18th St.; Mountain Ave.; Poker Lane; Boessow Rd.; Clay Station Rd. All locations listed are an estimate and have yet to be finalized. W ork will be completed at additional locations as needed; new locations will be reported in the Expenditure Report.

Construction 06/2019 06/2020 20-25 1, 4, 6, 8 6, 7, 8, 9

Sacramento 19/20 New Road Maintenance & Rehabilitation

Pavement Rehabilitation and Overlay Project Phase 3

This project will include: Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

40th Ave; 14th Ave; 44th Ave; 18th Ave; 23rd Ave; Del Norte Blvd; 42nd St; 26th Ave; Mendocino Blvd; 47th Ave; Skander Wy-Power Inn Rd-Gerber Rd-Clement Cir; Andrea Blvd; Ashton Dr; Barberry Ln; California Ave; Charleston Dr; Doneva Ave; Gold Run Ave; Harrington W ay; Holly Dr; Howe Ave; Kingsford Dr; Marshall Ave; Robertson Ave; Saverien Dr; W att Ave; W ixford W ay; Hazel Ave; Kenneth Ave; Rio Linda Blvd; Elkhorn Blvd; Alta Mesa Rd; Arnold Way along with 15 other locations included in project list

Construction 06/2020 06/2021 20-25 1, 3, 4, 6, 8 6, 7, 8, 9, 11

Sacramento 17/18 In-Progress Traffic Control Devices HSIP Traffic Signal System Upgrade

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design | Provide enhanced traffic signal coordination and monitoring at 71 existing signalized intersections by upgrading the signal control equipment to allow for traffic responsive signal coordination on the new County central signal system.

Coyle Ave. from W oodleigh Dr. to Dewey Dr.; Hillsdale Blvd. from Frizell Ave. to McCloud Dr.; Watt Ave. from Elkhorn Blvd. to 700’ north of Elkhorn Blvd.

Pre-Construction and Construction

06/2016 07/2019

03/2019 11/2021 20-30 4 6, 7, 8

Sacramento 18/19 Carried Over Road Maintenance & Rehabilitation

Pavement Rehabilitation and Overlay Project #2 (Arterial Streets)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Rehabilitate 12 arterial streets, including: repair failed areas of the pavement (base repair); overlay the roadway with rubberized asphalt concrete pavement; install complete street features including ADA compliant curb ramps and bike lanes; install video vehicle detection; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

Elkhorn Blvd. from Sacramento City Limits to 2nd St.; Hillsdale Blvd. from Frizell Ave. to W alerga Rd.; Oak Ave. from Hazel Ave. to Main Ave; El Camino Ave. from Mission Ave. to Garfield Ave.; Marconi Ave. from Eastern Ave. to W alnut Ave.; Madison Ave. from Dewey Dr. to San Juan Ave.; Hazel Ave. from Pershing Ave. to Greenback Ln.; Kenneth Ave. from Central Ave. to Elm Ave.; Rio Linda Blvd. from Elverta Rd. to Placer Co. Line

Construction 06/2019 09/2019 20-25 4, 6, 7 8

Sacramento 17/18 In-Progress Road Maintenance & Rehabilitation

Alta Mesa Rd Bridge Replacement at Laguna Creek

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally-deficient two-lane concrete deck on timber stringers bridge with a new two-lane concrete slab bridge.

Alta Mesa Road at Laguna Creek, located north of State Route 104 Pre-Construction and Construction

07/2017 10/2020

10/2020 09/2021 75-90 8 8

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 64: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sacramento 18/19 Carried Over Road Maintenance & Rehabilitation

Ione Road Bridge Replacements at Buckeye Creek and W illow Creek

This project will include: Pavement Rehab/Repair (Existing) | Replace the existing structurally deficient two-lane steel reinforced concrete with steel stringers bridge at Buckeye Creek with a new two-lane steel reinforced concrete bridge. Replace the existing structurally deficient two-lane concrete bridge at W illow Creek with a new two-lane steel reinforced concrete slab bridge. (17/18 carryover)

Ione Road at Buckeye Creek, located south of Meiss Road. Ione Road at W illow Creek, located south of Carbondale Road. Construction 05/2019 10/2019 75-90 8 8

Sacramento 17/18 In-Progress Other McKenzie Road Bridge Replacement at Laguna Creek

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient two-lane reinforced concrete slab on timber stringers bridge with a new two-lane concrete slab bridge.

McKenzie Road at Laguna Creek, located south of Arno Road Pre-Construction and Construction

08/2011 05/2019

11/2018 10/2019 75-90 8 9

Sacramento 17/18 In-Progress Other Michigan Bar Road Bridge Replacement at Cosumnes River

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient modular concrete panel deck on modular steel box deck trusses and steel girders bridge with a new one-lane concrete slab bridge.

Michigan Bar Road at the Cosumnes River, located approximately one mile north of State Route 16

Pre-Construction and Construction

07/2011 04/2020

11/2019 12/2020 75-90 8 8

Sacramento 17/18 In-Progress Other New Hope Road Bridge Replacement at Grizzly Slough

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient two-lane concrete bridge with a new two-lane pre-tension multiple-girder bridge.

New Hope Road at Grizzly Slough waterway, located approximately one half-mile north of the San Joaquin County line

Pre-Construction and Construction

05/2012 04/2020

12/2019 11/2020 75-90 5 9

Sacramento 17/18 In-Progress Complete Streets Components

Old Florin Town Improvements Phase 2

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay, Active Transportation Plan, Storm Drain/Culvert Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Construct complete street improvements including new sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, center medians, and traffic signal upgrades including ADA-compliant pedestrian signals. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay.

Florin Road, from Power Inn Road to French Road/Florin Perkins Road Pre-Construction and Construction

07/2014 06/2019

11/2018 11/2019 50-60 6 9

Sacramento 17/18 In-Progress Complete Streets Components Power Inn Rd Improvements Project

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay, Active Transportation Plan, Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New) | Construct complete street improvements including new sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, and center medians. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay.

Power Inn Road, from 450 feet south of Loucreta Drive to 52nd Avenue Pre-Construction and Construction

08/2016 05/2020

01/2020 12/2020 50-60 6 9

Sacramento 17/18 In-Progress Other Twin Cities Road Bridge Replacement at Snodgrass Slough

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient movable swing, steel bridge with a new concrete structure and roadway approaches.

Twin Cities Road at Snodgrass Slough, located 2.0 miles east of River Road Pre-Construction and Construction

04/2017 06/2020

12/2019 11/2021 75-90 3 9

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 65: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sacramento 17/18 In-Progress Other Winding Way Bridge Replacement at Chicago Creek

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient concrete slab bridge and perform erosion control measures in the creek channel.

W inding Way at Chicago Creek, located west of Chicago Avenue Pre-Construction and Construction

05/2012 05/2019

02/2019 12/2019 75-90 1 6

Sacramento 17/18 In-Progress Other Franklin Blvd Bridge Replacement at Lost Slough

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of W ay | Replace the existing structurally deficient two-lane timber trestle bridge with a new two-lane steel reinforced concrete bridge.

Franklin Boulevard at Lost Slough waterway, located south of Twin Cities Road and east of Interstate 5

Pre-Construction and Construction

05/2010 04/2020

11/2019 10/2020 75-90 3 9

Sacramento 17/18 In-Progress Safety Rosemont Area Street Light Project

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Environmental Study/Documents, Preliminary Design, Right of Way | Install approximately 45 new LED street lights along residential streets for pedestrian and traffic safety.

The residential streets within the neighborhood surrounding the Sequoia Elementary School, and the area bounded by Rosemont Dr., Kiefer Blvd., and Pageant Dr.

Pre-Construction and Construction

03/2017 05/2019

11/2018 09/2019 20-30 6 8

San Benito 19/20 New Road Maintenance & Rehabilitation

Fairview Road, San Benito Street, Union Road, Buena Vista Road, and Cienega Road Heavy Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Coring to determine existing pavement structural section.

Fairview Road from Ludis Lane to HW Y 156; San Benito St from Southside Rd to Union Rd; Union Rd from 1 MI S Union Heights to W/S PCC Bridge; Buena Vista Road from HWY 156 limit to 200' East HWY156; Cienega from Cowden Rd to 1200' SW Cowden Rd.

Pre-Construction and Construction

06/2019 03/2020

09/2019 06/2020 5-10 12 30

San Benito 19/20 New Road Maintenance & Rehabilitation

Crestview Lane, Hillcrest Road, and Southside Road Heavy Maintenance

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

Crestview Ln from Valleyvie Rd to End; Hillcrest Rd from 200' E Busby Ct to 0.3 MI W Fairview Rd; Southside Rd from 1 MI S Blossom Rd (S) to W/S PCC Bridge

Pre-Construction and Construction

06/2019 03/2020

09/2019 06/2020 5-10 12 30

San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Reche Road and Other Roads This project will include: Pavement Rehab/Repair (Existing) | Chip seal of 21 miles in the

Morongo Valley area.

Border Avenue (Golden Street North to Reche Road), Conejo Road (Hess Boulevard Loop W est & North & East of Hess Boulevard), Hess Boulevard (Conejo Road North to SH 62), Hill Avenue (Tamarisk Drive North to Vista Drive), Palo Verde Road (Pinon Avenue East to Juniper Avenue), Pioneertown Road (0.71 Miles North of W amego Trail North to Pipes Canyon Road), Reche Road (Old W oman Springs Road East to Border Ave), Tamarisk Drive (Hill Ave East to Juniper Avenue), Yucca Mesa Road (0.13 Miles North of Buena Vista Drive North to Aberdeen Drive)

Construction 07/2019 10/2019 7-10 16 42

San Bernardino 18/19 In-Progress Road Maintenance & Rehabilitation Green Valley Lake Area Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip seal and overlay on 14

miles in the Green Valley Lake area.

Angeles Drive (Green Valley Lake Rd North to San Antonio Dr), (San Antonio Dr East .37 Miles), Ash Drive; Beechnut Drive; Bluebird Drive; Bolsa Chica Ave; Briar Lane ; Canyon Drive; Canyon Drive; Fir Drive; Green Valley Ln ; Iris Drive; Juniper Lane (End East to Dahlia Dr), (Dahlia Dr East to W ild Rose), Lakeside Drive, Loma Alta Lane, Oak Lane, Piedras Grande; Spring Lane; Squirrel Drive ; Weeping Willow Drive; Wild Cherry Drive; Wild Cherry Drive, Green Valley Lake Rd, Dahlia Drive, Esquimoux Drive, Falling Leaf Dr,

Construction 03/2019 06/2019 7-10 23 33

Fern Drive, Fir Drive, Holcomb Creek Dr, Holcomb Creek Dr, Lakeside Drive; Lupin Drive; Maple Lane; Oak Knoll Circle, Oak Knoll, Spruce Drive, Tulip Drive, W ildrose Drive, W ildrose Drive, W ildrose Drive, Yukon Drive, Hemlock Drive; Pine Lane, Ridge W ay, Robin Drive

San Bernardino 18/19 In-Progress Road Maintenance & Rehabilitation Wrightwood area Chip Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Chip seal on 37 miles in the W rightwood area.

27 Miles throughout the Wrightwood Area may be subject to the work described. For a full list of locations proposed to receive this treatment, please contact the County's Transportation Planning Division, [email protected].

Construction 05/2019 06/2019 7-10 23 36

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 66: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Victorville Area Chip Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping

Rehab/Repair (Existing Safety) | Chip seal on 27 miles in the Victorville area.

27 Miles throughout the Victorville Area may be subject to the work described. For a full list of locations proposed to receive this treatment, please contact the County's Transportation Planning Division, [email protected].

Construction 04/2020 05/2020 7-10 21 33

San Bernardino 18/19 In-Progress Road Maintenance & Rehabilitation Spring Valley Lake Area Roads This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Spring

Valley Lake Area Roads overlay Various Roads in Spring Valley Lake Area Pre-Construction and Construction

03/2019 07/2019

06/2019 12/2019 12-15 21 33

San Bernardino 19/20 New Road Maintenance & Rehabilitation Cedar Street and Other Roads This project will include: Pavement Rehab/Repair (Existing)

Daybreak Court (Cedar St N/End); Aberdeen Court (Palm St S/End); Buena Vista Drive (Buena Vista Ln E/End); Fuente Avenue (Elm St S/Cedar St); Cedar Street (Escondido Avenue E/.07me,Escondido Av); Palm Street (Escondido Avenue E/.07me,Escondido Av); Cedar Street (.06me,Cedar Ln E/Fuente Ave); Fuente Avenue (Elm St N/Palm St); Fuente Lane (Buena Vista Ln E/Fuenta Ave); Elm Street (Valley View Dr E/Fuenta Ave); Panorama Circle (Elm St E/Panorama Ln); Panorama Lane (Elm St N/Panorama Cir); Mesa Aven

Construction 07/2019 08/2019 7-10 21 33

San Bernardino 19/20 New Road Maintenance & Rehabilitation Cadiz Road This project will include: Pavement Rehab/Repair (Existing) AT&SF NW/National Trails Highway Construction 07/2019 08/2019 7-10 16 33

San Bernardino 19/20 New Road Maintenance & Rehabilitation Crafton Ave and Other Roads This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair

(Existing), ADA Curb Ramp Rehab/Repair (Existing)

Beryl Avenue (Colton Ave N/.02m S,Moss St); (.02m S,Moss St N/Nice Ave); (Nice Ave N/Capri Ave); Crafton Avenue (Fifth Ave N/Colton Ave); (Colton Ave N/Sh38); Crafton Avenue (Sh38 N/Madeira); Crafton Avenue (Madeira N/Anzio); Nice Avenue (.03m E,Jasper Ave E/Opal Ave); Nice Avenue (Opal Ave E/.02m W ,Beryl Ave); Nice Avenue (.02m W ,Beryl Ave E/Rock St); Nice Avenue (Rock St E/Agate Ave); Nice Avenue (Agate Ave E/Crafton Ave); Nice Avenue (Cr

Construction 07/2019 12/2019 12-20 23 42

San Bernardino 19/20 New Road Maintenance & Rehabilitation

Rabbit Springs Road and Other Roads This project will include: Pavement Rehab/Repair (Existing)

Cambria Road (Midway E/Lincoln); Camp Rock Road (Old Wmn Spgs Rd N/ Granite Rd); Christenson Road (Sh18 N/.22m N,Rabbit Springs Rd); Cove Road (Gobar Rd Nw/.63m N&W,Exter St); Dido Avenue (East End Rd N/.06m N,Porter St); East End Road (Camp Rock Rd E/.43me,Dallas Av); Kendall Road (Sh18 N/Gobar Road); Ladera Avenue (Gypsy Rd N/Rabbit Springs Rd); Lincoln Road (Cambria Rd N/ Granite Rd); Medanos Avenue (Old Wmn Spgs Rd N/ Rabbit Spgs Rd); Midway Avenue (Sh247 Old W Sprgs N/Rabbit Sprgs Rd); Pos

Construction 09/2019 05/2020 7-10 16 33

San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Pipeline Ave and Other Roads This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, Project

Scope Development, ADA Curb Ramp Rehab/Repair (Existing)

Chino Avenue (Sh71 E/Mc Kinley Ave); (Mc Kinley Ave E/.06m W,Pipe Line Ave); (.06m W,Pipe Line Ave E/ Pipeline Ave); (Pipe Line Ave E .13m); Pipe Line Avenue (Chino Ave N/Riverside Dr); (Riverside N/.28m S,Walnut(Chino Cl); (.28m S,Walnut(Chino Cl) N/ 0.41 M (Chino Cl); (.13m N,Walnut Ave(Chi Cl) N .25m); (0.13m S/ Philadelphia Ave N/ .04m S,Philadelphia);

Pre-Construction and Construction

04/2019 07/2020

06/2020 12/2020 12-15 20 52

San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Valley Boulevard and Other Roads This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Preliminary

Design, ADA Curb Ramp Rehab/Repair (Existing) Cedar Avenue (Valley Blvd N/Randall Ave); Valley Boulevard (Alder Ave E/Spruce Ave); Slover Avenue (Tamarind Ave E/Cedar Ave)

Pre-Construction and Construction

06/2019 09/2020

08/2020 12/2020 12-15 20 47

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 67: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Phelan Road

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design | INSTALL LEFT-TURN AND RIGHT-TURN LANES WITH ACCELERATION LANES

at Arrowhead Road, Sunny Vista Road, Tumbleweed Road, and Sonora Road Pre-Construction and Construction

04/2019 09/2020

08/2020 12/2020 15-20 23 33

San Bernardino 19/20 New Road Maintenance & Rehabilitation Mission Boulevard and Other Roads This project will include: Pavement Rehab/Repair (Existing)

Ada Avenue (Mission Blvd N/State St); Applegate Street (Gala Ln E/Vernon Ave); Avalon Court (Humbolt Ave E .04m); Bel Air Avenue (Howard Ave N .13m); Biscayne Street (Melrose Ave E/Pipe Line Ave); Biscayne Street (.09m W ,Preciado Ave E/Preciado Ave); Bolton Avenue (Greenwood N/Clair); Boyer Street (Roswell Ave E/Pipe Line Ave); Cannery Row (Phillips Blvd N .07m); Carlton Street (.03m W ,Gala Ln E/Vernon Ave); Carlton Street (Vernon Ave E .06m); Central Place (Central Ave Nly/State St); Chaparral

Construction 06/2020 11/2020 7-10 20 52

San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Beech Avenue This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair

(Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Fontana Avenue to Muscat Avenue Pre-Construction and Construction

04/2019 09/2020

08/2020 12/2020 12-20 20 52

San Bernardino 19/20 In-Progress Road Maintenance & Rehabilitation Alder Avenue This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation

(New), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) 0.08M S,Taylor Street to San Bernardino Avenue Pre-Construction and Construction

03/2019 01/2021

12/2020 04/2021 12-20 20 47

San Diego 19/20 New Road Maintenance & Rehabilitation FY 2019-20 Pavement Seal

This project will include: Maintenance Program Plan Development, Document Preparation, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development

Work on this contract will include numerous locations in the unincorporated areas of San Diego County. For a complete listing of the roads proposed as part of this project please visit the following website which includes both a list and an interactive map identifying the location and name of roads in this project (Fiscal Year 19/20):

https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacing_Progra m.html

Pre-Construction and Construction

01/2019 05/2020

04/2020 12/2020 7-10 38 71

San Diego 19/20 New Road Maintenance & Rehabilitation FY 2019-20 AC Overlay

This project will include: Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development

Work on this contract will include numerous locations in the unincorporated areas of San Diego County. For a complete listing of the roads proposed as part of this project please visit the following website which includes both a list and an interactive map identifying the location and name of roads in this project (Fiscal Year 19/20):

https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacing_Progra m.html

Pre-Construction and Construction

01/2019 05/2020

04/2020 12/2020 10-15 36, 38, 40 71, 75, 76,

77, 79

San Francisco 19/20 New Road Maintenance & Rehabilitation

PW 41 st Ave and 44th Ave Pavement Renovation

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of 44 ADA compliant curb ramps Grind and pave 22 Blocks Grind and pave 8 Intersections

36th Ave : Kirkham St to Lawton St; 41st Ave : Chain Of Lakes Dr \ Lincoln Way to Vicente St; 44th Ave : Irving St to Santiago St; 46th Ave : Irving St to Judah St; 47th Ave : Judah St to Kirkham St

Construction 08/2019 02/2021 14-21 11 19

San Francisco 19/20 New Road Maintenance & Rehabilitation

PW Various Locations Pavement Renovation No 44

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of ADA compliant curb ramps Grind and pavement of 31 Blocks Grind and pavement of 22 Intersections

Various residential street blocks in the Lakeshore area, south of Sloat Boulevard. The project includes blocks of 26th Ave, Berkshire W ay, Lake Merced Blvd, Elmhurst Dr, Eucalyptus Dr, Everglade Dr, Gellert Dr, Huntington Dr, Lagunitas Dr, Lakeshore Dr, Rossmoor Dr, San Fernando W ay, and Sylvan Dr.

Construction 09/2019 03/2021 14-21 11 19

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 68: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Francisco 19/20 New Road Maintenance & Rehabilitation

PW Various Locations Pavement Renovation No 45

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of 74 ADA compliant curb ramps Grind and pavement of 44 Blocks Grind and pavement of 25 Intersections

Bay St : Kearny St to Midway St; Beale St : Folsom St to Harrison St; Card Aly : Stockton St to End; Filbert St : Kearny St to Jasper Pl; Front St : Fremont St \ Market St to Clay St; Green St : Kearny St to Polk St; Hemlock St : Larkin St to Polk St; Sansome St : California St to Lombard St; Stockton St : Columbus Ave \ Green St to Union St; Wetmore St : End to Washington St

Construction 10/2019 05/2021 14-21 11 17

San Francisco 19/20 New Road Maintenance & Rehabilitation

PW Various Locations Pavement Renovation No 46

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of 56 ADA compliant curb ramps Grind and pavement of 20 Blocks Grind and pavement of 12 Intersections

Armstrong Ave ; Baldwin Ct; Donner Ave; Fairfax Ave; Keith St; Kirkwood Ave; Kiska Rd; Lindsay Cir; Newhall St; Northridge Rd; Revere Ave; Van Dyke Ave;

Construction 12/2019 08/2021 14-21 11 17

San Francisco 19/20 New Road Maintenance & Rehabilitation

PW Various Locations Pavement Renovation No 47 and Sewer Replacement

This project will include: Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pavement Improvement (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of 94 ADA compliant curb ramps Grind and pavement of 31 Blocks Grind and pavement of 15 Intersections

Brewster St; Corbett Ave; Gardenside Dr ; Hickory St; Lily St ; Linden St; Mcallister St; Montcalm St; Rose St; Sanchez St; Shrader St Construction 01/2020 07/2021 14-21 11 17, 19

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation Murphy Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 4.0 miles of existing roadway with asphalt concrete. Lone Tree Road to Dodds Road Construction 06/2019 07/2019 10-15 5 13

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation Fernwood Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 1.2 miles of existing roadway with asphalt concrete. Ashley Lane to North End Construction 06/2019 07/2019 10-15 5 13

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation Chip Seal 2018-2019 This project will include: Pavement Rehab/Repair (Existing) | Resurface and rehabilitate

approximately 54.3 miles of existing roadways with chip seal.

SD 1: Jack Tone Road; McKinley Avenue. SD 2: Cherokee Road; Eight Mile Road. SD 3: Tracy Boulevard; Union Road. SD 4: Carter Road; Cherokee Road; Cometa Road; Comstock Road; Copperopolis Road; Eight Mile Road; Elliott Road; Jack Tone Road; Jahant Road; N. 99 Frontage Road (E); Santa Fe Road; Turner Road; Walnut Grove Road SD 5: Byron Road; Lammers Road; Linne Road; Valpico Road; W est Ripon Road

Construction 06/2019 08/2019 5-7 5 9, 12, 13

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation Foppiano Lane Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 1.8 miles of existing roadway with asphalt concrete. N. 99 Frontage Road (E) to CCTC RR Construction 09/2019 10/2019 10-15 5 13

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation Kasson Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 3.3 miles of existing roadway with asphalt concrete. Stanislaus County Line to Airport W ay Construction 10/2019 11/2019 10-15 5 12, 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Harlan Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 1.17 miles of existing roadway with asphalt concrete. Lathrop City Limits to Mathews Road Construction 08/2019 09/2019 10-15 5 13

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 69: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Joaquin 19/20 New Road Maintenance & Rehabilitation Henry Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface

approximately 1.5 miles of existing roadway with asphalt concrete. Santa Fe Road to Orange Avenue Construction 10/2019 11/2019 10-15 5 13

San Joaquin 18/19 Carried Over Road Maintenance & Rehabilitation

Bradford Street and River Drive Resurfacing

This project will include: Pavement Rehab/Repair (Existing) | Repair and resurface approximately 1.1 miles of existing roadway with asphalt concrete.

Bradford Street: Hiawatha Avenue to Sanguinetti Road. River Drive: Fairway Drive to Rainier Avenue Construction 07/2019 08/2019 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation

Ellen Street and Shaw Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

SR 26 to North End Pre-Construction and Construction

04/2019 03/2020

02/2020 04/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation N 99 Frontage Road E Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 1.0 miles of existing roadway with asphalt concrete.

W oodbridge Road to Acampo Road Pre-Construction and Construction

04/2019 03/2020

02/2020 04/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Carpenter Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.8 mile of existing roadway with asphalt concrete.

S 99 Frontage Road E to Mariposa Road Pre-Construction and Construction

04/2019 03/2020

02/2020 04/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Copperopolis Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 2.3 miles of existing roadway with asphalt concrete.

Hewitt Road to Escalon-Bellota Road Pre-Construction and Construction

04/2019 03/2020

02/2020 04/2020 10-15 5 12

San Joaquin 19/20 New Road Maintenance & Rehabilitation Trahern Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 1.3 miles of existing roadway with asphalt concrete.

Airport W ay to Manteca Road Pre-Construction and Construction

04/2019 03/2020

02/2020 04/2020 10-15 5 12

San Joaquin 19/20 New Road Maintenance & Rehabilitation

Emerson Road and Eunice Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.5 mile of existing roadway with asphalt concrete.

Emerson Road: 1330' W est of N 99 Frontage Road W to N 99 Frontage Rd Eunice Road: Calimyrna Rd to Collier Road

Pre-Construction and Construction

04/2019 06/2020

05/2020 07/2020 10-15 5 9

San Joaquin 19/20 New Road Maintenance & Rehabilitation Horner Avenue Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

Drake Avenue to W alker Lane Pre-Construction and Construction

04/2019 06/2020

05/2020 07/2020 10-15 5 13

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 70: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Joaquin 19/20 New Road Maintenance & Rehabilitation

Paloma Avenue and Portola Avenue Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.5 mile of existing roadway with asphalt concrete.

Paloma Avenue: Thornton Road to Lower Sacramento Road Portola Avenue: Balboa Avenue to Cortez Avenue

Pre-Construction and Construction

04/2019 06/2020

05/2020 07/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation

Magnolia Avenue and Mahon Avenue Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 2.0 miles of existing roadway with asphalt concrete.

Escalon-Bellota Road to Campbell Road (both roads) Pre-Construction and Construction

04/2019 06/2020

05/2020 07/2020 10-15 5 12

San Joaquin 19/20 New Road Maintenance & Rehabilitation Shippee Lane Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

N 99 Frontage Road E to Alhambra Avenue Pre-Construction and Construction

04/2019 06/2020

05/2020 07/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Chip Seal 2019-2020

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to resurface and rehabilitate approximately 63 miles of existing roadways with chip seal.

SD1:Access St; Austin Rd; Mathews Rd; Newcastle Rd; JackTone Rd W/S. SD2:N 99 Frontage Rd E; McAllen Rd; Newton Rd SD3: Austin Rd; Howard Rd; Lathrop Rd; Roberts Rd; Thornton Rd W/S. SD4:Cometa Rd; Comstock Rd; Davis Rd; Dodds Rd; French Camp Rd; Harney Ln; JackTone Rd; JackTone Rd E/S; Lone Tree Rd; Lower Sacramento Rd; N 99 Frontage Rd E; N 99 Frontage Rd W; New Hope Rd; River Rd; Thornton Rd; Turner Rd; West Ripon Rd S/S. SD5:Corral Hollow Rd; 11th St; Grant Line Rd; Linne Rd; West Ripon Rd

Pre-Construction and Construction

04/2019 06/2020

05/2020 08/2020 5-7 5 9, 12, 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation

Slurry Seal Arterial and Collector Roads 2019-2020

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and Construction to repair and apply slurry seal to approximately 14.9 miles of existing arterial and collector roadways.

SD1: Boggs Tract; Burkett Gardens/Orchard Homesites; French Camp; Mosswood/Taft Park. SD2: Alpine Heights; Lincoln Village Central; Lincoln Village East; Lincoln Village W est; Lower Sacramento Rd; Oakridge. SD3: Elkhorn Golf Course Estates; Lathrop Rd; Lower Sacramento Rd; W agner Heights. SD4: Morada North; Morada South; Morada Central. SD5: Larch Rd; W oodward Ave.

Pre-Construction and Construction

04/2019 07/2020

05/2020 08/2020 5-7 5 9, 12, 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation

West Country Club Reconstruction, Phase 9

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to reconstruct approximately 0.3 mile of existing roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

De Ovan Avenue: Kirk Avenue to Ryde Avenue Pre-Construction and Construction

04/2019 08/2020

07/2020 09/2020 15-20 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation

East Country Club Reconstruction, Phase 3

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to reconstruct approximately 0.4 mile of existing roadway with asphalt concrete, and repair curb, gutter and sidewalk where needed.

Monterey Avenue: Franklin Avenue to Marine Avenue. Sonoma Avenue: Plymouth Avenue to Delaware Avenue.

Pre-Construction and Construction

04/2019 08/2020

07/2020 10/2020 15-20 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Durham Ferry Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 1.6 miles of existing roadway with asphalt concrete.

SR 33 to 1.5 miles West of Kasson Road Pre-Construction and Construction

04/2019 08/2020

08/2020 09/2020 10-15 5 13

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 71: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Joaquin 19/20 New Road Maintenance & Rehabilitation

New Hope Road, Nowell Road and Thornton Road Resurfacing

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair and resurface approximately 1.2 miles of existing roadway with asphalt concrete.

Thornton Road to Nowell Road; South End to New Hope Road; W alnut Grove Road to New Hope Road

Pre-Construction and Construction

04/2019 08/2020

08/2020 09/2020 10-15 5 13

San Joaquin 19/20 New Road Maintenance & Rehabilitation Peltier Road Resurfacing/W idening

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Right of Way | Design and construction to repair, resurface and widen approximately 1.7 miles of existing roadway with asphalt concrete.

Thornton Road to Ray Road Pre-Construction and Construction

04/2019 08/2020

08/2020 10/2020 10-15 5 13

San Luis Obispo 19/20 New Road Maintenance & Rehabilitation

2019-20 AC Overlay Various North County Roads

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work includes resurfacing approximately 8.6 miles of various North San Luis Obispo County roads.

•Camp 8 Road •Rocky Canyon Road •W illow Creek Road

Construction 03/2019 12/2020 20-25 17 35

San Luis Obispo 19/20 New Road Maintenance & Rehabilitation

2019-20 AC Overlay Various South County Roads

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work includes resurfacing approximately 13.3 miles of various South San Luis Obispo County roads.

Charing; Chiswick; Cornwall; Croyden; Downing; Emerson; Eton; Evelyn; Evensong; Exeter; Hudson; Kathryn; Macleod; Melrose; Newhall; Ogden; Orville; Patterson; Pickwick; Pierce; Pineridge; Ramsey; Randall; Romney; Saint James; Saint Thomas; Santa Rosa Creek; School House; Smith; Somerset; Thirteenth; Village; W ellington; W eymouth; W ilcombe; W indsor; W ood; W oodview; Yorkshir; Amherst; Arlington; Ascot; Ashby; Benson; Berwick; Bixby; Bradford; Brand; Bridge; Buckingham; Buckley; Cabrillo; Cardiff

Construction 03/2019 12/2020 20-25 17 35

San Luis Obispo 18/19 In-Progress Road Maintenance & Rehabilitation

2018-19 AC Overlay Various North County Roads (Re-Listed)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work includes resurfacing approx. 16.1 miles of various north San Luis Obispo County roads. Note this project is a carryover from 2018-19 to 2019-20.

River Road; Arbor Road; Estrella Road; Linne Road; W inery Road; Geneseo Road; Las Tablas Road; Santa Rita Road; Gahan Place; Rainbow Court Construction 03/2018 12/2019 20-25 17 35

San Luis Obispo 18/19 In-Progress Road Maintenance & Rehabilitation

2018-19 AC Overlay Various South County Roads (Re-Listed)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The scope of work includes resurfacing approx. 2.8 miles of various south San Luis Obispo County roads. Note this project is a carryover from 2018-19 to 2019-20.

Air Park Drive; Dewey Road; Norswing Drive; Railroad Street; Mendel Drive; Pershing Drive; Truman Drive; 22nd Street; 24th Street Construction 03/2019 12/2020 20-25 17 35

San Mateo 17/18 In-Progress Road Maintenance & Rehabilitation

Reconstruction and Cape Seal of Madrid, Sevilla, and Sonora

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a depth of approximately 1 foot. Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

El Granada Area of Unincorporated San Mateo County Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 15-20 13 24

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 72: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Mateo 18/19 In-Progress Road Maintenance & Rehabilitation

Reconstruction of Roads in the Colma Area (2nd and A Street)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing

Colma Area of Unincorporated San Mateo County Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 20-25 11 19

cement into the existing structural section to a depth of approximately 1 foot. Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

San Mateo 18/19 In-Progress Road Maintenance & Rehabilitation

Overlay Project in Road Maintenance District 4 and Palomar Park Area (formerly in Road Maintenance Districts 3, 9, and 10; El Granada, San Mateo Highlands, and West Menlo Park Areas in FY 2018-2019)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Bicycle Lane (New), Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | An overlay or resurfacing project involves the application of approximately 2 inches of asphalt concrete to the existing surface or pavement of the road to help prolong the life of the road. Overlay or resurface treated roads might undergo repairs to fix cracks and potholes. These repairs are performed before the overlay or resurfacing and won’t be visible after.

Road Maintenance District 4 and Palomar Park Area of Unincorporated San Mateo County.

Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 10-15 13 24

San Mateo 18/19 In-Progress Other

Culvert Improvement Project in Road Maintenance Districts 8 and 9 (formerly in La Honda, Road Maintenance Districts 8 and 10 in FY 2018-2019)

This project will include: Cost Estimating, Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and minimize damage to the road system caused by storm water erosion.

La Honda, Road Maintenance Districts 8 and 9 in Unincorporated San Mateo County

Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 20-25 13 22, 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Mirada Road Bridge and Bank Stabilization Project

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This Project consists of replacing the existing bridge with a prefabricated aluminum bridge and stabilizing the banks adjacent to the bridge with bank protection (soil nail walls and rock slope protection).

Miramar Beach, Half Moon Bay Pre-Construction and Construction

07/2018 07/2020

06/2020 12/2020 50-75 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Scenic Drive Repair and Reconstruction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This Project consists of installing a concrete pile wall with a subsurface soil drainage system and reconstructing the damaged road portion of Scenic Drive.

Scenic Drive, La Honda Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 20-25 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Madera Bridge Rehabilitation Project (Bridge Preventative Maintenance Program)

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development | This project consists of bridge rehabilitation work on Madera Lane Bridge over El Corte de Madera Creek.

Madera Lane Bridge over El Corte de Madera Creek, San Gregorio, Ca. Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 20-30 13 24

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 73: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Mateo 19/20 New Road Maintenance & Rehabilitation

Cape Seal Project in the Broadmoor Village, Burlingame Hills, Harbor/Industrial, Menlo Oaks, North Fair Oaks, San Mateo Highlands, and W est Menlo Park Areas (OBAG Cape Seal)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Unincorporated San Mateo County. Broadmoor Village, Burlingame Hills, Harbor/Industrial, Menlo Oaks, North Fair Oaks, San Mateo Highlands, and W est Menlo Park Areas.

Pre-Construction and Construction

07/2018 07/2020

06/2020 12/2020 5-10 11, 13 19, 22, 24

San Mateo 19/20 New Complete Streets Components

Pedestrian Improvements on El Camino Real/Mission Road

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | This Project is a joint project with City of Daly City to install concrete sidewalks and access ramps along a portion of El Camino Real/Mission Road.

Daly City along a portion of El Camino Real and Mission Rd. Construction 07/2019 12/2019 20-25 11 19

San Mateo 19/20 New Other Crystal Springs Dam Bridge Closeout

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Document Preparation, Bridge Structure Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Bicycle Lane (New), Preliminary Design, Project Scope Development | This Project consists of replacing the seismically deficient structure with a new and modern post tensioned concrete box girder bridge. The structure is 626 feet in length and about 51.5 feet in width. The closeout phase of this project will resolve and complete all outstanding change orders and finalize the as-builts for this Project.

Skyline Blvd at Crystal Springs Road west of highway 280. Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 50-75 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Cloverdale Bridge Scour Counter Measures

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of removing failed concrete slope protection and coarse woody debris adjacent to the bents of the bridge and constructing permanent scour countermeasures to stabilize the bents from further scour due to creek bed degradation. Some emergency debris removal occurred in Winter 2018.

Cloverdale Road Bridge is located approximately 3 miles south of the intersection of Pescadero Creek Road and Cloverdale Road, just south of Eden W est Road.

Pre-Construction and Construction

01/2019 07/2020

06/2020 12/2020 50-75 13 24

San Mateo 19/20 New Other Bridge Preventative Maintenance Project (BPMP Phase 2)

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This Project consists of performing bridge preventative maintenance rehabilitation work on nine existing bridges within the County of San Mateo, such as treating bridge decks with methacrylate, repairing concrete spalling, and repairing scour protection at existing slope protection.

9 bridges located in the unincorporated areas of San Mateo County.; Pescadero Creek Road Bridge at Cloverdale Road; Pescadero Road [Anderson Bridge]; Pescadero Road Bridge at Alpine Creek; Sand Hill Road Bridge; Lobitos Creek Road ; Butano Cut-Off Bridge ; Wurr Road Bridge ; Entrada W ay Bridge ; Gazos Creek Road Bridge;

Pre-Construction and Construction

07/2018 07/2020

06/2020 12/2020 20-30 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Chip Seal Project in the Road Maintenance District 10, Loma Mar, Pescadero, and Rural Areas

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Road Maintenance District 10, Loma Mar, Pescadero areas. Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 5-10 13 24

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 74: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Mateo 19/20 New Road Maintenance & Rehabilitation

Butano Cut-off Cold in Place Recycling

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Cold-in-Place (CIR) recycling is a method of pavement rehabilitation that consists of milling the existing asphalt concrete pavement to a depth between 2 to 5 inches; mixing the cold milled crushed asphalt with an asphalt recycling agent and other additives as needed; spreading and compacting the recycled mixture; and overlaying the recycled surface with a new layer of hot mix asphalt or seal.

Butano Cutoff, Pescadero. Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 20-25 13 24

San Mateo 19/20 New Other Old La Honda Slipout Permanent Repairs

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Feasibility Study, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of conducting a feasibility analysis and constructing improvements to rebuild the road and stabilize the road embankment.

Old La Honda Rd. Unincorporated San Mateo County. Pre-Construction and Construction

07/2018 06/2019

06/2019 10/2019 30-50 13 24

San Mateo 19/20 New Other Higgins Canyon Road Slipout

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Feasibility Study, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of conducting a feasibility analysis and constructing improvements to rebuild the road and stabilize the road embankment.

Higgins Canyon Road Unincorporated San Mateo County Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 30-50 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Concrete Repairs (North Fairs Oaks Area)

This project will include: Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing) | This Project consists of repairing and installing concrete infrastructure such as sidewalk, curbs and gutters, valley gutters and access ramps.

North Fair Oaks Area Pre-Construction and Construction

07/2018 06/2019

06/2019 12/2019 20-25 13 24

San Mateo 19/20 New Traffic Control Devices

Street and Regulatory Sign Replacement (Country Club, Burlingame Hills and San Mateo Highlands)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Design, Project Scope Development | This Project consists of replacing existing street and regulatory signs to meet reflectivity and sizing requirements.

Country Club, Burlingame Hills and San Mateo Highlands Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 20-25 13 22

San Mateo 19/20 New Road Maintenance & Rehabilitation

Harkins Avenue and Bellair W ay Resurfacing

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety) | An overlay or resurfacing project involves the application of approximately 2 inches of asphalt concrete to the existing surface or pavement of the road to help prolong the life of the road. Overlaid or resurfaced roads may include repairs to fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment.

Harkins Ave, Menlo Park Bellair W ay, Menlo Park Construction 07/2019 12/2019 10-15 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Reconstruction of Roads in the W est Menlo Area

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a

Roads in the W est Menlo Park Area Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 20-25 13 24

depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 75: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Mateo 19/20 New Road Maintenance & Rehabilitation

Reconstruction of Roads in the North Fair Oaks Area

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a

Roads in the North Fair Oaks Area Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 20-25 13 24

depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

San Mateo 19/20 New Road Maintenance & Rehabilitation

Overlay Project in Road Maintenance Districts 3, El Granada, Emerald Lake Hills, Moss Beach, Palomar Park, Princeton By The Sea, San Mateo Highlands, and W est Menlo Park Areas

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | An overlay or resurfacing project involves the application of approximately 2 inches of asphalt concrete to the existing surface or pavement of the road to help prolong the life of the road. Overlaid or resurfaced roads may include repairs to fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment.

El Granada, Emerald Lake Hills, Moss Beach, Palomar Park, Princeton By The Sea, San Mateo Highlands, and W est Menlo Park Areas

Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 10-15 13 22, 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Cape and Slurry Seal Project in the El Granada, Ladera, Los Trancos W oods, Montara, Moss Beach, and Skylonda Areas

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

El Granada, Ladera, Los Trancos W oods, Montara, Moss Beach, and Skylonda Areas

Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 5-10 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation

Chip Seal Project in the Road Maintenance Districts 8, 9, and Skylonda Areas

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety) | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Road Maintenance Districts 8, 9, and Skylonda Areas Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 5-10 13 24

San Mateo 19/20 New Other Storm Damage Improvement Project in La Honda, Road Maintenance Districts 8 and 9

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and constructing improvements to rebuild the damaged roads caused by storm water erosion.

La Honda, Road Maintenance Districts 8 and 9. Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 20-25 13 24

San Mateo 19/20 New Road Maintenance & Rehabilitation Bridge Decks Rehabilitation Project

This project will include: Cost Estimating, Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development | This project consists of performing bridge deck treatments for short span bridges throughout the San Mateo County. The deck treatment shall consist of a methacrylate or concrete polyester overlay.

San Mateo County wide Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 20-30 11, 13 19, 22, 24

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 76: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

San Mateo 19/20 New Other Lerida Court and Garbada W ay Retaining W all Project

This project will include: Cost Estimating, Document Preparation, Feasibility Study, Landscape Safety Rehab/Repair (Existing), Preliminary Design, Project Scope Development | This project consists of conducting a feasibility analysis and constructing improvements, including retaining walls to stabilize hillside slopes along Lerida Court and Garbada W ay in the Ladera Area.

Ladera/Portola Valley Pre-Construction and Construction

07/2019 07/2020

06/2020 12/2020 50-75 13 24

San Mateo 18/19 In-Progress Road Maintenance & Rehabilitation

Cape and Slurry Seal Project in Emerald Lake Hills, North Fair Oaks, and Sequoia Tract Areas (formerly in the Burlingame Hills, Emerald Lake Hills, North Fair Oaks, Sequoia Tract, and W est Menlo Park Areas in FY 2018-2019)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Emerald Lake Hills, North Fair Oaks, and Sequoia Tract Areas (formerly in the Burlingame Hills, Emerald Lake Hills, North Fair Oaks, Sequoia Tract, and W est Menlo Park Areas)

Pre-Construction and Construction

07/2018 07/2019

06/2019 12/2019 5-10 13 22, 24

Santa Barbara 19/20 New Other Countywide Bridge Deck Maintenance

This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge deck sealing with methacrylate treatment.

Bridge 51C-016 on Jalama Rd, 7.7 mi West of SR 1. Bridge 51C-019 on Jalama Rd, 12.13 mi West of SR 1. Bridge 51C-095 on Santa Maria Mesa Rd, 0.6 mi East of SR 166. Bridge 51C-162 on Via Real Rd, 0.1 mi West of Toro Canyon Rd. Bridge 51C-203 on Mountain Dr. at Riven Rock Rd.

Construction 04/2020 06/2020 10-15 19 35, 37

Santa Barbara 19/20 New Road Maintenance & Rehabilitation Countywide Paving This project will include: Pavement Rehab/Repair (Existing) | The application of up to 1.5"

of asphalt concrete to the roadway.

Various locations on: Via Piccoli, Holiday Hill Rd, Fairview Av, Glenn Annie Rd, Refugio Rd, Bell Rd, Ray Rd, Cat Canyon Rd, Santa Maria Mesa Rd, Bonita School Rd, Cottonwood Canyon Rd, Alisos Canyon Rd, Ballard Canyon Rd, Figueroa Mountain Rd, Santa Rosa Rd, Jalama Rd, Calzada Av, Foxen Canyon Rd, Happy Canyon Rd, Zaca Station Rd, Hapgood Rd, Sweeney Rd.

Construction 04/2020 07/2020 10-15 19 35, 37

Santa Barbara 19/20 New Road Maintenance & Rehabilitation

Ortega Ridge Road Maintenance and Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing) | Repair slide, construct a long-term solution to differential settlement and roadway surface cracking.

Ortega Ridge Road 850 feet north of Greenwell Av. Construction 07/2019 09/2019 10-15 19 37

Santa Barbara 19/20 New Road Maintenance & Rehabilitation

County Road Rehabilitation for Pavement Deficiencies

This project will include: Pavement Rehab/Repair (Existing) | The application of 1.5" - 3" of asphalt concrete to the roadway.

Various locations on: Olive Mill Rd, Channel Dr, Hill Rd, Spring Rd, Santa Susana Av, San Julio Av, Vista Bahia, Calle Anzuello, Calle Aparejo, Calle Asilo, Parejo Dr, Ashton St, Inwood Dr, Mayrum St, Via Merano, Camino Cascada, Calle Morelia, Caire Circle Farren Rd, Refugio Rd, Alamo Pintado Rd, Steele St,Ballard Canyon Rd,Jonata St,San Marcos Av,Olive St,Madera St,Meadow Vale Ln,Numancia St,Zaca Station Rd,Ross Ln,Dancer Av,Sunview Dr,Hummel Dr,Mooncrest Ln,Brown Rd,Purisima Rd,Foxen Canyon Rd

Construction 05/2020 07/2020 10-15 19 35, 37

Santa Barbara 19/20 New Traffic Control Devices Signal Improvements and Upgrades This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) The intersection of Hollister Avenue and Puente Drive. Construction 04/2020 06/2020 10-15 19 37

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 77: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Barbara 19/20 New Traffic Control Devices Countywide Road Sign Installation This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Various locations throughout the county installed on approximately 100 rural and urban roads.

Puesta Del Sol Rd, Rincon Hill Rd, Gobernador Canyon Rd, Toro Canyon Rd, Padaro Ln, Cheltenham Rd, Greenwell Av, Romero Canyon Rd, Mountain Dr East, Las Tunas Rd, Mission Canyon Rd, Las Canoas Rd, Tunnel Rd, Barker Pass Rd, Eucalyptus Hill Rd, Alston Rd, Middle Rd, Sheffield Dr, School House Rd, Jameson Ln North, Danielson Rd, S. Jameson Ln, Camino Majorca, Vereda Leyenda, Naples Access Rd, Refugio Rd, Sterrett Av, Via Los Santos, El Sueno Rd, Oak Glen Dr, along with 115 additional locations.

Construction 04/2020 01/2022 15-20 19 35, 37

Santa Barbara 19/20 New Safety Guardrail Replacement This project will include: Replacing approximately 3,000 linear feet of non-standard Tuthill guardrail with current standard guardrail systems.

Various sections on: Calle Real, El Sueno Rd, S Jameson Ln, Mission Canyon Rd, Roble Dr, Via Real, W hitney Av, Avenue of Flags, Tepusquet Rd.

Construction 09/2020 06/2022 15-20 19 35, 37

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Repairing or Santa Barbara 19/20 New Safety Countywide Drainage Improvements replacing culverts to improve roadway drainage and future or sustained water damage to Various sections on: Jalama Rd, Del Playa Dr, Bradley Rd. Construction 04/2019 07/2020 15-20 19 35, 37

pavement and sub-grade.

Santa Barbara 19/20 New Safety Countywide Sidewalk and Hardscape Improvements

This project will include: ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Various sections on: Payton St, Santa Maria W ay NB, Patterson Rd, Orcutt Rd, Rice Ranch Rd, Hillview Rd, Cherry Av, Waller Ln. Construction 04/2020 07/2020 45-50 19 35, 37

Santa Clara 18/19 In-Progress Safety Pedestrian Sensor Installation on Foothill Expressway

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Improve pedestrian safety Foothill Expressway Construction 08/2018 09/2020 30-50 15 27, 28

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

McKean Road Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement rehabilitation and provide better access for bicyclists

McKean Road Construction 05/2019 10/2020 30-50 17 25

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation Shannon Road Repair Project This project will include: Pavement Rehab/Repair (Existing), Landscape Safety

Rehab/Repair (Existing) | Repair slope and roadway damage. Shannon Road Construction 04/2018 12/2020 30-50 15 28

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Alum Rock Falls Rd Storm Damage (Site 1)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair slope and roadway damage. Preliminary design - soil nailing repair process.

Alum Rock Falls Rd Pre-Construction and Construction

10/2017 10/2018

11/2018 10/2019 30-50 15 25

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 78: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Alum Rock Falls Rd Storm Damage (Site 2)

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing) | Repair slope and roadway damage. Preliminary design -soil nailing repair process.

Alum Rock Falls Rd Pre-Construction and Construction

10/2017 10/2018

11/2018 10/2019 30-50 15 25

Santa Clara 18/19 In-Progress Complete Streets Components

Interim Bicycle Improvement I-280/Page Mill

This project will include: ADA Curb Ramp Installation (New), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing) | Provide safety enhancement for bicyclists through this section of Page Mill Rd/280 overpass.

Page Mill Expressway and I-280 Overpass Construction 04/2019 06/2020 30-50 10, 15 25, 27

Santa Clara 18/19 In-Progress Complete Streets Components Alum Rock Ave Multimodal Trail

This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of W ay, Active Transportation Plan, Project Scope Development | Construct new bike/ped trail to connect City of San Jose's, Caltrans', and County's ROW along Alum Rock Rd from White Rd to Alum Rock City Park. SB1 funds to be used for staff cost to initiate project and for contract administration. Construction, Construction Engineering, and inspection costs to come from Measure B.

Alum Rock Ave Pre-Construction 02/2019 01/2020 30-50 15 25

Santa Clara 18/19 Forecasted Complete Streets Components

Capitol Expressway Sidewalk and Soundwall Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New) | Project will provide new sidewalks and replace damaged soundwalls along certain sections of Capitol Expressway. Phase I & II completed. Phase III on hold due to LRT extension project and Expressway Program Widening. May incorporate Phase III Soundwall Project into Expressway W idening Project once LRT project is completed.

Capitol Expressway Construction 06/2024 03/2025 30-50 15 27, 28

Santa Clara 18/19 Forecasted Complete Streets Components

Intersection Improvements Stevens Creek @ San Tomas

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Project will provide 2nd left turn lane at intersection of Stevens Creek and San Tomas Expressway.

Stevens Creek Blvd at San Tomas Expressway Construction 08/2022 01/2023 30-50 17 28

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety),

Santa Clara 18/19 In-Progress Complete Streets Components

Capitol Expressway ITS Infrastructure and Sidewalk Project

Sidewalk and/or Crosswalk Installation (New) | Project will provide fiber optics to provide intelligent connectivity to County-wide fiber optics hub. Project will also add new sidewalks Capitol Expressway Construction 04/2018 12/2019 30-50 15 27, 28

along sections of Capitol Expressway where sidewalk gaps exist.

Santa Clara 18/19 Carried Over Road Maintenance & Rehabilitation Uvas Creek Bridge @ Uvas Rd This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement

and realign roadway. Uvas Rd Construction 06/2020 10/2022 30-50 17 29

Santa Clara 18/19 Carried Over Road Maintenance & Rehabilitation

Aldercroft Creek Bridge @ Old Santa Cruz Hwy(37C0823)-Phase 2 This project will include: Evaluate bridge replacement. Old Santa Cruz Hwy Pre-Construction 08/2018 10/2019 30-50 15 28

Santa Clara 18/19 Forecasted Road Maintenance & Rehabilitation

Replacement of Hooker Creek Bridge @ Aldercroft Heights Road (37C0506)

This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 08/2020 11/2027 30-50 15 28

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 79: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Clara 18/19 Forecasted Road Maintenance & Rehabilitation

Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road (37C0507)

This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 08/2020 11/2027 30-50 15 28

Santa Clara 18/19 Forecasted Road Maintenance & Rehabilitation

Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road (37C0508)

This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 08/2020 11/2027 30-50 15 28

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Mitigation & Monitoring of Stevens Canyon Bridges 37C0604 & 605 (Old 37C0574 & 575)

This project will include: Bridge Structure Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

Stevens Canyon Construction 02/2017 12/2028 30-50 13, 15 28

Santa Clara 18/19 Forecasted Safety Red Fox Creek Bridge @ New Ave. 37C-172 This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. New Ave Construction 08/2020 11/2027 30-50 17 30

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Cochrane Bridge Monitoring Program 37C-166 This project will include: Continuous seismic monitoring of bridge over Anderson Lake. Cochrane bridge at Anderson Lake Pre-Construction and

Construction 09/2003 06/2018

06/2018 06/2028 30-50 17 25, 30

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

BPMP - Alamitos Creek Bridge @ Alamitos Road 37C0160

This project will include: Bridge Structure Rehab/Repair (Existing) | Preventative maintenance program until bridge could be replaced. Alamitos Road Construction 06/2018 06/2022 30-50 15 29

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Santa Clara County Bridge Inspection & Load Rating Program

This project will include: Maintenance Program Plan Development | Bridge inspection program.

County Bridges on Uvas Rd, Santa Teresa Blvd, Oak Glen Ave, Edmundson Ave, Bowden Ct, Croy Rd, Edmundson Ave, Almaden Expwy, Mckean Rd, Hicks Rd, Alamitos Rd, Almaden W ay, Alum Rock Ave, Alum Rock Falls Rd, Arroyo Hondo Rd, Bertram Rd, Casa Loma Rd, Fortini Rd, Graystone Ln, Hellyer Ave, Laguna Ave, Schillingsburg Ave, Leavesley Rd, Bloomfield Ave, East Dunne Ave, San Martin Ave, Masten Ave, New Ave, San Martin Ave, Monterey Rd, Day Rd, Kern Ave, W Middle Ave, along with 52 additional locations

Pre-Construction and Construction

07/2013 06/2018

06/2018 06/2028 30-50 13, 15, 17 24, 25, 27,

28, 30

Santa Clara 18/19 Carried Over Road Maintenance & Rehabilitation

Environmental Mitigation, Monitoring & Reporting-Scour G I - 37C0103 (ON SYSTEM)

This project will include: Landscape Safety Rehab/Repair (Existing) | Once bridge is constructed, plantings have to be done as mitigation. 10-yr monitor and reporting to regulatory agencies are conditions of permits.

Carnadero Creek Bridge at Bloomfield Avenue Construction 07/2019 06/2028 30-50 17 30

Santa Clara 18/19 Carried Over Safety Alma Pump Station Upgrades This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Safety and electrical improvements Alma Street and Oregon Expressway Construction 08/2019 08/2020 30-50 13 24

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 80: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing County Expressways

Santa Clara 18/19 Carried Over Traffic Control Devices Front Loops Replacement at Various Locations

Safety) | Replace front vehicle detector loops at signalized intersections to promote efficiency of signals. Works in conjunctions with the County's Intelligent Transportation

Central, Lawrence, Foothill, Page Mill-Oregon, San Tomas, Montague, Almaden, and Capitol (all locations are yet to be finalized and are determined Construction 07/2019 06/2023 30-50 13, 15, 17 24, 25, 27,

28, 30 System network. based on priority need, resources, and funding throughout the year)

Santa Clara 18/19 Carried Over Traffic Control Devices

Signalized intersection Safety Improvement - New Signal Mast Arms @ Foothill Expressway & Edith

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Install new mast arms to provide enhanced visibility of signal heads at intersection.

W Edith Ave Construction 12/2019 01/2020 30-50 13 24

Santa Clara 18/19 In-Progress Road Maintenance & Rehabilitation

Capitol Expressway Pavement Rehabilitation

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Project Scope Development | Pavement rehabilitation of Capitol Expressway. W ill evaluate CIR and HMA to promote longevity and cost effectiveness over mill/fill process.

Capitol Expressway Pre-Construction and Construction

06/2018 07/2019

05/2019 10/2020 30-50 13, 15 24, 28

County Expressways; Central, Lawrence, Foothill, Page Mill-Oregon, San

Santa Clara 19/20 New Road Maintenance & Rehabilitation Soundwall Replacement Project This project will include: Landscape Safety Rehab/Repair (Existing) | The project will repair

or replace existing damaged sound walls along the County Expressway system. Tomas, Montague, Almaden, and Capitol. All locations are yet to be finalized and are determined based on priority need, resources, and funding Construction 07/2019 06/2020 50-50 10, 13, 15,

17 24, 25, 27,

28, 29 throughout the year.

Santa Clara 19/20 New Road Maintenance & Rehabilitation Trash Capture Systems

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project enables the County to meet on-going trash reduction mandates by retrofitting existing storm drain inlets with trash capturing screens.

County Expressways Construction 07/2019 06/2020 50-50 10, 13, 15, 17

24, 25, 27, 28, 29

This project will include: Public Works Staffing, Procurement of Public Works Equipment,

Santa Clara 19/20 New Road Maintenance & Rehabilitation

Pavement and Other General Road Maintenance

Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials | Annual Maintenance activities such as patching, chip seal, crack seal, overlay, striping and other general road and roadside maintenance as needed throughout

County W ide all locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year.

Procurement / Operational Needs 07/2019 06/2020 7-10 10, 13, 15,

17 24, 25, 27, 28, 29, 30

the county.

Santa Clara 19/20 New Road Maintenance & Rehabilitation

Metal Beam Guard Rail Improvements

This project will include: The project will repair or replace existing damaged Guard Rails along the County roads and add additional Guard Rails where warranted for safety.

Hicks Road, Alum Rock Avenue, Leavesley Road, Page Mill Road, Mines Road, Moody Road, Canon Vista, Monterey Road, Almaden Expressway, Henwood Road

Construction 08/2019 05/2020 25-50 10, 13, 15, 17

24, 25, 27, 28, 29, 30

This project will include: Landscape Safety Installation (New), Environmental

Santa Clara 19/20 New Road Maintenance & Rehabilitation Soda Springs Road Soil Stabilization Study/Documents | Due to soil instability roads are too narrow for safety. Soil stabilization

will allow the road to be widened to allow for safe passage and for the use of first Soda Springs Road Pre-Construction and Construction

07/2019 08/2019

08/2019 10/2019 10-10 15 28

responders in emergency situations.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 81: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tallent Avenue, Freeman Avenue, Ridgetop Drive, McKee Road, Fairway

Santa Clara 19/20 New Complete Streets Components ADA Pedestrian Ramps This project will include: ADA Curb Ramp Installation (New) Drive, Alum Rock Avenue, Gion Avenue, Ridgeview Avenue, Piazza W ay,

Porter Lane, McVay Avenue, W oodhaven Drive, Tunis Avenue, San Martin Construction 04/2020 06/2020 25-50 15, 17 27, 30

Avenue, Lawrence Expressway

Santa Clara 19/20 New Traffic Control Devices Leavesley Road at New Avenue -New Traffic Signal Installation This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Leavesley Road at New Avenue Construction 07/2020 08/2020 10-10 17 30

Santa Clara 19/20 New Road Maintenance & Rehabilitation

Almaden Expressway Pavement Rehabilitaiton This project will include: Pavement Rehab/Repair (Existing) Almaden Expressway Construction 06/2020 12/2020 30-50 15 25

Santa Clara 18/19 Carried Over Road Maintenance & Rehabilitation

Mitigation and Monitoring of Isabel Creek Bridge (37C0089) at San Antonio Valley Road (10Yr)

This project will include: Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New) | Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

San Antonio Valley Road Construction 06/2019 08/2029 30-50 15 25, 30

Santa Clara 17/18 In-Progress Other Uvas Road Safety Improvements HSIP5-04-021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement rehabilitation and provide better access for bicyclists.

Uvas Road Pre-Construction and Construction

07/2017 05/2019

10/2018 10/2020 30-50 17 29

Santa Clara 17/18 In-Progress Other San Tomas Pedestrian/Bicycle Trail improvements

This project will include: Right of Way Acquisition, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Bicycle Lane (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Construct new bike/pedestrian trail and sidewalk between Homestead and El Camino Real.

El Camino Real to Homestead Road Construction 06/2018 07/2019 30-30 10 25

Santa Cruz 18/19 Carried Over Other Alba Road This project will include: Retaining Wall PM 0.73 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Bear Creek Rd PM 4.99 This project will include: Roadway/Embankment Settling (70' L) - Recommend WB

Traveled W ay and Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 4.99 Construction 05/2019 12/2019 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 82: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Bear Creek Rd PM 7.0 This project will include: Slipout (25' L) - Recommend EB Travelled Way and Shoulder

Reconstruction and Retaining W all (Soldier Pile) Installation PM 7.0 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Branciforte Dr PM 2.22 This project will include: Slipout (15' W x 75' L) - Recommend SB Shoulder

Reconstruction, Creek Bank Armoring and Retaining W all (Soldier Pile) Installation PM 2.22 Construction 05/2019 12/2020 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Glen Haven Road PM0.81 This project will include: Slipout (40' W x 35' L) - Recommend SB Traveled Way and

Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation PM 0.81 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Glen Haven Road PM 2.27 This project will include: Slipout (19' W x 100' L) - Recommend NB Traveled Way and

Shoulder Reconstruction, New Culvert and Retaining W all (Soldier Pile) Installation PM 2.27 Construction 05/2019 12/2020 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Lompico Road PM 0.22 This project will include: Slipout (40' W x 100' L) - Recommend SB Travelled Way and

Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 0.22 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Lompico Road PM 2.38 This project will include: Slipout (10' W x 25' L) - Recommend NB Travelled Way and

Shoulder Reconstruction and Installation of Retaining Wall (Crib) PM 2.38 Construction 05/2019 12/2020 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Redwood Lodge Road PM 2.02 This project will include: Large Slipout (30' W x 120' L) and Landslide - Recommend

Roadway Reconstruction and Retaining W all (Stitch Pile) Installation PM 2.02 Construction 03/2019 12/2019 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Soquel San Jose Road PM 5.91 This project will include: Large Slipout (24' W x 115' L) - Recommend Roadway

Reconstruction and Retaining W all (TBD) Installation PM 5.91 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Stetson Road PM 1.20 This project will include: Slipout (60' L x 15' D) - Recommend EB Traveled Way and

Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 1.20 Construction 05/2019 12/2019 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 83: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 17/18 In-Progress Road Maintenance & Rehabilitation Swanton Road PM 0.72

This project will include: 8' Concrete Arch Culvert Failure and Slipout (54' L) - Recommend Temporary Creek Diversion System, SB Travelled W ay and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 0.72 Construction 05/2019 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Alba Road This project will include: Slipout (75' L) - Recommend Travelled Way and Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 1.58 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Branciforte Drive This project will include: Slipout (15' W x 75' L) - Recommend SB Shoulder Reconstruction, Retaining W all (Soldier Pile) Installation PM 1.77 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Large Slipout/ landslide 85' long x 10' deep, slip potential -Retaining Wall Installation PM 2.00 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Large Slipout, Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (TBD) Installation PM 2.08 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Slipout - 30' wide by 10' deep, Recommend Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 2.13 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Settling Roadway 85' long, possible cross culvert damage, Recommend Culvert Replacement, Roadway and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 2.16 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Failing Crib Wall - 50' long x 12' tall, Recommend Shoulder Reconstruction and Retaining Wall Structure PM 2.21 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Slipout with Embankment Settlement, Recommend Shoulder Reconstruction and Retaining Wall PM 2.37 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 84: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 18/19 Carried Over Other Hazel Dell Road This project will include: Failed Crib W all, Reconstruct Damaged Shoulder and Roadway, Retaining Wall (Soldier Pile) Installation PM 2.58 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Jamison Creek Road This project will include: Slipout - 55'L x 15'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile W all PM 0.70 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Jamison Creek Road This project will include: Slipout - 80'L x 8'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile W all PM 0.80 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Jamison Creek Road This project will include: Slipout - 30'L x 10'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile W all PM 1.44 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Mt. Charlie Road This project will include: 85' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 0.26 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Mt. Charlie Road This project will include: 50' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 2.47 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Rider Road This project will include: 35' L slipout, Recommend Installing Retaining Wall (TBD), Pavement and Shoulder Reconstruction PM 0.07 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Rider Road This project will include: 80' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 0.80 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 18/19 Carried Over Other Schulties Road This project will include: Large Slipout and roadway failure - Recommend Roadway and Shoulder Reconstruction and Retaining W all Installation PM 2.05 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 85: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 18/19 Carried Over Other Stetson Road This project will include: Slipout (55' L x 18' D) - Recommend EB Traveled Way and Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 1.08 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Swanton Road This project will include: 60' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 3.00 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Alta Via Rd This project will include: Roadway Failure (12' W x 50' L)- Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 0.42 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Bean Creek Rd This project will include: Slipout (25+/-' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 2.10 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Bear Creek Rd This project will include: Slipout (40' W x 20+/-' L) - Recommend NB/EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 2.12 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Bear Creek Rd This project will include: Slipout (40' L) - Recommend SB/WB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 7.26 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Blue Ridge Dr This project will include: Slipout (20' W x 40+/-' L) -Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 0.49 Construction 11/2018 07/2019 50-75 17 29

Santa Cruz 19/20 New Other Browns Valley Rd This project will include: Existing Retaining W all Damaged - Recommend W B/SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and 18" Culvert and Repair of Existing Retaining Wall (Crib)

PM 2.14 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Browns Valley Rd This project will include: Slipout (10' L) - Recommend NB Shoulder Reconstruction, RSP and Drainage Improvements PM 2.93 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 86: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Casserly Rd This project will include: Slipout (20' W x 80' L) - Recommend EB/SB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 2.93 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 30

Santa Cruz 19/20 New Other Casserly Rd This project will include: Slipout (20' W x 20' L) - Recommend EB/SB Shoulder Reconstruction and Drainage Improvements PM 3.39 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 30

Santa Cruz 19/20 New Other Cathedral Dr This project will include: Slipout (10+/-' W x 60' L) and Roadway/Embankment Settling (60' L) - Recommend SB Traveled W ay and Shoulder Reconstruction, , Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.21 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Cox Rd This project will include: Slipout (40' L) - Recommend WB Shoulder Reconstruction, Drainage Improvements (New Storm Drain Through W all) and Retaining W all (Soldier Pile) Installation

PM 1.93 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Cox Rd This project will include: Slipout (60'W x 100' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements, RSP and Retaining W all (Soldier Pile) PM 2.03 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other East Cliff Dr This project will include: Damage to Roadway Caused By W ave Runup - Recommend NB and SB Shoulder Reconstruction, Clearing and Grubbing, and Placement of RSP @Corcoran Lagoon Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other East Zayante Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.59 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Eureka Canyon Rd This project will include: Culvert Failure and Slipout (12' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements including 36" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 3.16 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Eureka Canyon Rd This project will include: Major Slipout (20+/-' W x 70' L) with Potential Deep Seated Landslide - Recommend NB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 3.36 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 87: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Eureka Canyon Rd

This project will include: Roadway/Embankment Settling (20' L) Caused by Fallen Trees and Near Existing Retaining W all (Crib) - Recommend NB and SB Traveled W ay and Shoulder Reconstruction, Drainage Improvements including RSP and Retaining Wall (Soldier Pile) Installation

PM 4.67 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Eureka Canyon Rd This project will include: Slipout (25' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining W all (Soldier Pile) Installation PM 5.05 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Eureka Canyon Rd This project will include: Slipout (25' L) - Recommend NB Shoulder Reconstruction, RSP and Retaining Wall (Soldier Pile) Installation PM 5.31 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Eureka Canyon Rd This project will include: Slipout (50' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining W all (Soldier Pile) Installation PM 8.39 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Felton Empire Rd This project will include: Roadway/Embankment Settling (60' L) - Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.40 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Felton Empire Rd This project will include: Roadway/Embankment Settling (36' L) Near Existing Crib Wall -Recommend W B Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation

PM 1.62 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Felton Empire Rd This project will include: Slipout (70' L) Near Existing Retaining Wall (Crib) - Recommend W B Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 2.62 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Gaffey Rd This project will include: Slipout (20' L) - Recommend EB (Outboard) Embankment Reconstruction, RSP and Drainage Improvements PM 0.03, 0.04, 0.08 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 30

Santa Cruz 19/20 New Other Glenwood Cutoff This project will include: Slipout (4' W x 35' L) - Recommend WB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 0.02 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 88: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Glenwood Dr This project will include: Erosion Under Existing Retaining Wall (Soldier Pile) -Recommend Backfill of Eroded Slope, Drainage Improvements and Erosion Control PM 2.02 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Glenwood Dr This project will include: Retaining Wall Failure Caused by Erosion Under Footing, Adjacent to Existing Retaining W alls (Crib) - Recommend Backfill Eroded Footing, Install Drainage Improvements and Retaining W all (Crib)

PM 2.60 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Glenwood Dr This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 4.27 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Granite Creek Rd This project will include: Slipout (50' L) - Recommend NB Shoulder Reconstruction, RSP and Overside Drain Replacement PM 0.47 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Granite Creek Rd This project will include: Slipout (3'+/- W x 10' L) - Recommend SB Traveled Way and Shoulder Reconstruction and Placement of RSP PM 2.10 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Green Valley Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 1.85 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Highland Way This project will include: Culvert Failure/Slipout (15' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements including 36" Culvert, and Retaining Wall (Soldier Pile) Installation

@ Spanish Ranch Rd Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Highland Way This project will include: Large Slipout (200' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 3.19 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Highland Way This project will include: Landslide Caused Damage to Existing Downdrain and Retaining W all - Recommend Removal of Debris, Installation of Inlet Debris Protection W all and New Overside Drain

PM 3.24 Construction 05/2019 12/2019 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 89: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Highland Way This project will include: Slipout (8' W x 36' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 3.74 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Highland Way This project will include: Slipout (10+/-' W x 25' L) - Recommend SB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 3.91 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Highland Way This project will include: Slipout (70' L) - Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert and Retaining W all (Soldier Pile) Installation PM 5.45 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Hubbard Gulch Rd This project will include: Slipout (50' W x 40' L) - Recommend EB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.80 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Ice Cream Grade Rd This project will include: Road/Embankment Settling (65' L) - Recommend EB Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.36 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Ice Cream Grade Rd This project will include: Slipout (37' L) Due to Downed Tree - Recommend WB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Geogrid Reinforced MSE) Installation

PM 1.55 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Ice Cream Grade Rd This project will include: Road/Embankment Settling (12' W x 100' L) - Recommend EB Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.60 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Jarvis Rd This project will include: Slipout (6' W x 20+/-') - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Earth backfill and Downdrain PM 0.64 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Jarvis Rd

This project will include: Culvert Failure & Roadway/Embankment Settling - Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation,

PM 0.68 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 90: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Jarvis Rd

This project will include: PM 1.02 - Slipout (20+/-' W x 60' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation, PM 1.04 - Slipout (6' W x 40' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation

PM 1.02, 1.04, 1.07 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Jarvis Rd This project will include: Culvert Failure & Roadway/Embankment Settling - Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls PM 1.66 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Kings Creek Rd This project will include: Slipout and Damaged Downdrain - Recommend Installation of Gabion Baskets or RSP, Backfill and Reinstall Culvert PM 1.65 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Kings Creek Rd This project will include: Slipout (40' L) and Landslide - Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 3.03 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Kings Creek Rd This project will include: Slipout and Roadway/Embankment Settling - Recommend Roadway Reconstruction, Drainage Improvements, and Retaining W all (Stitch Pile) Installation

PM 3.16 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Laurel Glen Rd This project will include: Slipout (25' L) - Recommend NB/WB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) PM 1.97 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Laurel Rd This project will include: Slipout (15'+/- W x 50' L) - Recommend NB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.97 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Little Basin Rd This project will include: Slipout (35' L) - Recommend EB (Outboard) Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 0.64 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Little Basin Rd This project will include: Slipout (80' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.85 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 91: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Lockhart Gulch Rd This project will include: Slipout (55'L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, and Retaining W all (Crib) Installation PM 0.24 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Loma Prieta Av This project will include: Slipout (20'L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, and Retaining W all (Soldier Pile) Installation PM 2.82 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Loma Prieta W ay This project will include: Slipout (60' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 3.33 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Lompico Rd This project will include: Slipout (45' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining W all (Crib) Installation PM 1.22 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Lorenzo Av This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Address 12415 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Lower Highland Way This project will include: Slipout (18' W x 65'L) - Recommend Traveled Way and Shoulder Reconstruction, RSP, and Retaining W all (Soldier Pile) Installation PM 0.34 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other McGregor Dr This project will include: Slipout (15' L) - Recommend SB Shoulder Reconstruction and Drainage Improvements PM 1.35 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Merk Rd This project will include: Slipout (15' W x 25' L) - Recommend NB (Outboard) Shoulder Reconstruction, RSP and Drainage Improvements PM 1.10 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Morrell Rd This project will include: Slipout and Culvert Failure- Recommend Roadway Reconstruction, 18" and 24" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 0.15 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 92: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Miller Cutoff Rd This project will include: Slipout (15' W x 85'L) Adjacent to Existing Crib Wall (Installed 2016) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.49 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Morrell Rd This project will include: Slipout (15' W x 25' L) - Recommend Roadway Reconstruction, Drainage Improvements and Installation of Geogrid Reinforced Earth Retaining Structure PM 0.50 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Mountain St This project will include: Roadway Failure Due to Flooding - Recommend New Roadway Structural Section E/O Hwy 9 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Mt. Bache Rd This project will include: Slipout (13' W x 40' L) - Recommend EB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.14 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Mountain Charlie Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.54 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 45'L) - Recommend New Roadway Structural Section and Drainage Improvements PM 1.35 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 40'L) - Recommend New Roadway Structural Section and Drainage Improvements PM 1.89 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Mt. Madonna Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.96 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Nelson Rd This project will include: 3 Slipouts (Varying 30 to 50' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.43 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 93: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Nelson Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.44 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other North Rodeo Gulch Rd This project will include: Slipout (50'+/- W x 66' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 0.92 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other North Rodeo Gulch Rd This project will include: Slipout (6' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 3.82 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other North Rodeo Gulch Rd This project will include: Slipout (30'+/- W x 40' L) -Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 4.31 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other North Rodeo Gulch Rd This project will include: Slipout (48' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 4.94 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Old Bear Creek Rd This project will include: Slipout (20' W x 36' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.01 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Old Santa Cruz Hwy This project will include: Slipout (50'L) - Recommend NB/EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.01 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Old Santa Cruz Hwy This project will include: Slipout - Recommend NB/EB Traveled Way and Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 1.06 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Old Santa Cruz Hwy This project will include: Slipout (10' W x 50' L) - Recommend NB/EB Traveled Way, Drainage Improvements and Shoulder Reconstruction and Retaining Wall (Crib) Installation

PM 1.20 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 94: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Old Santa Cruz Hwy This project will include: Slipout (12' W x 90' L) - Recommend NB/EB (Outboard) Traveled W ay and Shoulder Reconstruction and Retaining W all (Soldier Pile) Installation PM 1.36 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Paper Mill Rd This project will include: Slipout (20' W x 30' L) - Recommend NB Shoulder Reconstruction and Retaining W all (Soldier Pile) Address 3559 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Paulsen Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.43 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Porter Gulch Rd This project will include: Slipout (8' W x 35' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.33 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Prescott Rd This project will include: Slipout - Recommend NB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation PM 0.52 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Redwood Lodge Rd This project will include: Slipout (50' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.50 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Redwood Lodge Rd This project will include: Slipout Along Existing Stitch Pile Wall (65' L) - Recommend Replace Damaged Guardrail and Backfill Eroded Slope PM 1.65 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Redwood Rd This project will include: Slipout (50' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.15 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Redwood Lodge Rd This project will include: Culvert Failure - Recommend embankment reconstruction, excavation and backfill, concrete headwall, 120'' culvert, erosion control and revegetation. PM 1.80 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Redwood Rd This project will include: Slipout (18' W x 35' L) - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation PM 0.23 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 95: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Redwood Rd

This project will include: PM 0.29 Roadway/Embankment Settling (120' L) Near Existing Retaining Wall - Recommend NB (Outboard) Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation, PM 0.31 Slipout (40' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP and Retaining Wall (Soldier Pile) Installation, PM 0.33 Culvert Failure & Slipout (30' L) - NB (Outboard) Shoulder Reconstruction, Drainage Improvements including 18" Culvert

PM 0.29, 0.31, 0.33 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Redwood Rd

This project will include: PM 0.38 Slipout (50' L) - Recommend NB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation, PM 0.40 ULTRABLOCK Retaining Wall Failure - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile)

PM 0.38, 0.40 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other San Andreas Rd This project will include: Slipout (20' W x 40' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 1.24 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other San Andreas Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 1.30 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Schulties Rd This project will include: Large Slipout (17' W x 100' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 0.51 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Seacliff Dr This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.56 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Siesta Rd This project will include: Slipout (20' L) - Recommend EB Embankment Reconstruction and Erosion Control PM 0.04 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Smith Grade Rd This project will include: slipout/settlement pavement separation PM 0.43 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Smith Grade Rd This project will include: Road slump. Slurry and earth backfill repair PM 1.38 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Smith Grade Rd This project will include: 3' diameter sinkhole PM 1.90 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 96: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Smith Grade Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 2.83 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Smith Grade Rd This project will include: Slipout (25' W x 12' L) - Recommend EB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 4.06 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Soquel Dr This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) @ Aptos Creek Rd. Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Soquel Dr This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) @ Robertson St. Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Soquel San Jose Rd This project will include: 2 slipouts, 20x50x10 & 50x150x10 PM 3.97 Pre-Construction and Construction

07/2019 05/2022

05/2022 12/2022 50-75 17 29

Santa Cruz 19/20 New Other Soquel San Jose Rd This project will include: Slipout (39' L) - Recommend Roadway Reconstruction, Drainage Improvements, RSP and Retaining W all (Soldier Pile) Installation PM 5.67 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Spanish Ranch Rd This project will include: Slipout (30' L) Located Adjacent to Existing Crib wall Installed 2002 - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.20 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Spanish Ranch Rd This project will include: Slipout (70' L) - Recommend Roadway Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation PM 0.37 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Slipout (20' W x 40' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.16 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Culvert Failure and Slipout (18' W x 25' L) - Recommend NB Traveled Way and Shoulder Reconstruction and 18" Culvert and Retaining Wall (Soldier Pile) Installation

PM 1.18 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Slipout (20+/-' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, RSP. and Retaining W all (Soldier Pile) Installation PM 1.85 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 97: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Large Slipout (40+/-' L) Near Existing Cross Culvert -Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP, and Retaining Wall (Soldier Pile) Installation

PM 1.90 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Slipout (20' W x 20' L) Due to Fallen Tree - Recommend SB Traveled W ay and Shoulder Reconstruction and Drainage Improvements PM 2.36 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Trout Gulch Rd This project will include: Slipout (15+/-' W x 20' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Crib) Installation PM 3.05 Pre-Construction and

Construction 07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Two Bar Rd This project will include: Slipout (40' W x 65' L) - Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 1.13 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Upper East Zayante Rd This project will include: Slipout (45' L) Near Existing Retaining Wall (Crib) and Landslide -Recommend SB Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.68 Pre-Construction and Construction

07/2019 05/2021

05/2021 12/2021 50-75 17 29

Santa Cruz 19/20 New Other Valencia Rd This project will include: Slipout (12' W x 60' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.34 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 19/20 New Other Valencia Rd This project will include: Slipout (90' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 2.43 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Valencia School Rd This project will include: Slipout (10+/-' W x 60' L) - Recommend WB (Outboard) Traveled W ay and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation

PM 0.35 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Vine Hill Rd This project will include: Slipout 30' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 1.18 Pre-Construction and

Construction 07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other Vine Hill Rd This project will include: Slipout (20' W x 50' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements including 24" Culvert and Retaining Wall (Soldier Pile) Installation

PM 1.27 Pre-Construction and Construction

07/2019 05/2020

05/2020 12/2020 50-75 17 29

Santa Cruz 19/20 New Other West Park Av This project will include: Slipout (15' L) - Recommend SB Roadway Reconstruction, Drainage Improvements and Retaining W all (Soldier Pile) Installation PM 0.80 Pre-Construction and

Construction 07/2019 05/2022

05/2022 12/2022 50-75 17 29

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 98: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Santa Cruz 19/20 New Other Grove St This project will include: Roadway Failure Due to Flooding and Subsurface W ater -Recommend New Roadway Structural Section @ SR-9 Construction 05/2019 12/2019 50-75 17 29

Santa Cruz 18/19 Carried Over Other Jamison Creek Rd This project will include: Slipout - 49'L x 8'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile W all PM 1.09 Construction 05/2019 12/2019 50-75 17 29

Shasta 19/20 New Traffic Control Devices DESCHUTES ROAD AT CEDRO LANE This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Deschutes Road At Cedro Lane Construction 06/2020 10/2020 50-50 1 1

Shasta 19/20 New Road Maintenance & Rehabilitation

GAS POINT ROAD AT NO NAME DITCH BOX CULVERT REPLACEMENT BRLS-5906(119)

This project will include: Pavement Rehab/Repair (Existing) | Replace box culvert and widen road. GAS POINT ROAD between Anthony St and Charles St Construction 06/2020 10/2020 50-50 1 1

Shasta 19/20 New Safety OLINDA ROAD CYCLE 5 WIDENING PROJECT HRRRL-5906(115)

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Highway Safety Improvement Project (HSIP) to widen shoulders.

OLINDA ROAD from Sammy Ln to Green Leaf Construction 06/2019 10/2019 20-20 1 1

Shasta 18/19 Forecasted Safety RIVERLAND DRIVE WIDENING PROJECT HSIPL-5906(128)

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Highway Safety Improvement Project (HSIP) to widen roadway shoulders. W iden shoulders to improve safety for motorized and non-motorized users.

RIVERLAND DRIVE from Knighton Rd to 2 miles south of Knighton Rd Construction 06/2020 10/2020 20-20 1 1

Shasta 18/19 In-Progress Road Maintenance & Rehabilitation 2019 SB-1 Pavement Rehabilitation This project will include: Paving and/or Striping Installation (New Safety) | New asphalt

concrete overlay of the roadway, restripe, and replacing pavement markers.

CANYON ROAD from Redding City Limit to Happy Valley Rd; CASSEL FALL RIVER ROAD from Nez Perce Ct to 2.1 miles north; LAKE BOULEVARD from Redding City Limit to the City of Shasta Lake; LAKESHORE DRIVE from the Charlie Creek Bridge to 1.15 miles south.

Construction 06/2019 10/2019 10-10 1 1

Shasta 18/19 Forecasted Road Maintenance & Rehabilitation

Overlay Various Roadways in Shasta County

This project will include: Paving and/or Striping Installation (New Safety) | New asphalt concrete overlay of roadway, restripe, and replace pavement markers

China Gulch Drive, Dee Knoch Road, Gas Point Road, Meadowview Drive, Oak Run Road, Oasis Road, Old Oregon Trail, Palm Avenue, Swede Creek Road

Construction 06/2020 10/2020 10-10 1 1

Sierra 19/20 In-Progress Road Maintenance & Rehabilitation

Countywide Road Maintenance Program

This project will include: Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public W orks Equipment, Repair and Servicing of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public W orks Systems/Databases, Procurement of Public W orks Safety Materials and Gear | This project will include all aspects of maintaining county roadways including regarding roadway surface, reforming drainages to protect the road and storm runoff, removing vegetation to improve visual clearances and safety. Repair or replace damaged signs and guardrail. Costs included in this project are the purchase of materials and equipment to support this work and force account labor costs of the road department.

Countywide Procurement / Operational Needs 07/2019 06/2020 1-5 1 1

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 99: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Siskiyou 19/20 New Road Maintenance & Rehabilitation

Roadway Striping and Pavement Markings This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) All paved Siskiyou County Roads that currently have pavement striping,

stenciling or thermoplastic delineation. Construction 07/2019 06/2020 1-2 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation

Road Sign Upgrade and Maintenance

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Location will be determined by priority based on routine Retroreflecivity study. Locations subject to change based upon needs and available resources throughout the year.

Construction 07/2019 06/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation

Vegetation Management - Including tree trimming, mowing and noxious weed control.

This project will include: This project consists of hazard tree removal, tree trimming, mowing, road side grass and noxious weed control.

Various location throughout Siskiyou County based on need. Planed areas include Shasta Acres, Shasta Uplands and the Happy Camp Area. Construction 07/2019 06/2020 1-2 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Gravel Road Maintenance This project will include: This routine maintenance item includes grading and re-contouring

of gravel roads, this process will include application of crushed aggregate where required. Various location though out Siskiyou County's unpaved road system. Construction 06/2019 07/2020 1-5 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Crushed Aggregate Production This project will include: Procurement of Road Maintenance and Rehab Materials Mine site operated by Siskiyou County Road Department. Located within

Siskiyou County. Procurement / Operational Needs 11/2019 02/2020 1-3 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Roadside Shoulder Maintenance This project will include: Pavement Rehab/Repair (Existing) Locations will be prioritized by current conditions. Construction 06/2019 07/2019 1-3 1 1

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project

Siskiyou 19/20 New Road Maintenance & Rehabilitation Ditch and Culvet Maintenance will consist of debris removal from flow lines, drainage ditches and culverts, reestablishing

ditch lines in an effort to maintain flow lines and reduce the potential for flooding and Various locations though out the Siskiyou County road system. Construction 06/2019 07/2020 1-3 1 1

sediment disbursement into waterways.

Siskiyou 19/20 New Road Maintenance & Rehabilitation Pavement Patching This project will include: Pavement Rehab/Repair (Existing) This is a Countywide project. Priority will be dictated by need and roadway

safety. Construction 06/2019 07/2020 1-5 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal Program - District 1 This project will include: Pavement Rehab/Repair (Existing) | These projects consists of

asphalt repair with follow-up 3/8" chip seal. Foothill Drive, milepost 0 - 5.25;Hawkinsville Humbug Road, milepost 0 -1.23. Construction 06/2020 10/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal Program - District 2 This project will include: Pavement Rehab/Repair (Existing) | These projects consists of

asphalt repair with follow-up 3/8" chip seal. McCloud - Broadway Ave, Orange Ave, Beaumont Ave Mt. Shasta - Dogwood Drive, Twin Hills, Linville Dr. Sunset Drive Construction 06/2020 10/2020 5-7 1 1

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 100: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Siskiyou 19/20 New Road Maintenance & Rehabilitation Asphalt Leveling Course - District 3 This project will include: Pavement Rehab/Repair (Existing) | This projects consists of

asphalt repair(thin overlay). Lake Shastina Area - Jackson Ranch Road, milepost 3.8 - 5 Construction 06/2020 10/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal Program - District 4 This project will include: Pavement Rehab/Repair (Existing) | This projects consists of

asphalt repair with 3/8" chip seal. Rattlesnake Road Construction 06/2020 10/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal Program - District 5 This project will include: Pavement Rehab/Repair (Existing) | This projects consists of

asphalt repair with 3/8" chip seal. Eller Lane, from milepost 0 - 3.6 Construction 06/2020 10/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Chip Seal Program - District 6 This project will include: Pavement Rehab/Repair (Existing) | This project will consist of

asphalt repair with follow-up 3/8" chip seal. Meiss Lake Road from milepost 0 - 2.75 Construction 06/2020 10/2020 5-7 1 1

Siskiyou 19/20 New Road Maintenance & Rehabilitation Crack Seal Program - District 6 This project will include: Pavement Rehab/Repair (Existing) | This project will consist of

asphalt repair and crack sealing in preparation chip seal in subsequent year. Shady Dell Road from mile post 0 - 3.2 Construction 06/2020 10/2020 5-7 1 1

Solano 19/20 New Complete Streets Components Abernathy Road This project will include: Bicycle Lane (New), Preliminary Design, Paving and/or Striping

Rehab/Repair (Existing Safety) Abernathy Road-Rockville Road to Mankas Corner Road Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4

Solano 19/20 New Safety Azevedo Road This project will include: Paving and/or Striping Installation (New Safety) Azevedo Road-SR 12 to Emigh Road Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 11

Solano 19/20 New Safety Campbell Road This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Campbell Road-Putah Creek Road to Stevenson Bridge Road Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4

Solano 19/20 New Safety Cantelow Culvert Replacements This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design

Both Culverts are on Cantelow Road-one is approximately 2237 feet west of Steiger Hill Road and the other is approximately 1459 feet east of Steiger Hill Road.

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 50-99 3 4

Solano 19/20 New Complete Streets Components Mankas Corner Road This project will include: Bicycle Lane (New), Preliminary Design, Paving and/or Striping

Rehab/Repair (Existing Safety) Mankas Corner Road-Abernathy Road to Fairfield City Limit. Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4

Solano 19/20 New Safety McCormack Road Phase 1 This project will include: Pavement Improvement (New), Preliminary Design McCormack Road-Canright Road to Rio Vista city limits Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 11

Solano 19/20 New Complete Streets Components Suisun Valley Road This project will include: Bicycle Lane (New), Preliminary Design, Paving and/or Striping

Rehab/Repair (Existing Safety) Suisun Valley Road-Fairfield city limit to Rockville Road Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 101: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Solano 19/20 New Safety McCormack Road This project will include: Right of Way McCormack Road-Rio Vista city limits to SR 113 Pre-Construction 07/2019 06/2020 50-99 3 11

Solano 19/20 New Complete Streets Components Putah Creek Road This project will include: Right of Way Putah Creek Road-500 feet east of W inters Road Bridge to 9,820 feet east of

Boyce Road Pre-Construction 07/2019 06/2020 50-99 3 4

Solano 19/20 New Safety Overlay project 2019 Midway Road This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Midway Road-I-80 to the RR Tracks at Porter Road. Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4, 11

Solano 19/20 New Complete Streets Components Rockville Road This project will include: Bicycle Lane (New), Preliminary Design, Paving and/or Striping

Rehab/Repair (Existing Safety) Rockville Road-Suisun Valley Road to Abernathy Road. Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 20-30 3 4, 11

Solano 19/20 New Road Maintenance & Rehabilitation

Rubberized Chip Seal W/Microsurfacing This project will include: Pavement Rehab/Repair (Existing) Beach St; Benicia Rd; Carlson St; Carquinez St; Cypress Ave; Creed Rd;

Evans Ave; Flannery Rd; Goose Haven Rd; Kildeer Rd; Lambie Rd; Peabody Rd; Phillip St; Reis Ave; Scally Rd; Sperry Ave; Starr Ave; Thomas Ave

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 10-10 3, 5 4, 11, 14

Clayton Rd; Cordelia Rd; Doyle Ln;Gilcrest Ave; Gilcrest Ave; Hargus

Solano 19/20 New Road Maintenance & Rehabilitation Microsurfacing This project will include: Pavement Rehab/Repair (Existing), Preliminary Design

Ave;Idora Ave;Lopes Rd; Noble Ct; Orchard Ave; Pennsylvania Ave; Ridge Ave; Ritchie(Cordelia-Central)Rockville Rd; Sievers Rd; Tremont Rd; W alters; W eber(Lewis-Fox)W est Cordelia(End-FF C/L)W oodrow Ave(Lemon-

Pre-Construction and Construction

07/2019 12/2019

12/2019 06/2020 6-6 3, 5 4, 11, 14

Pine)

Solano 19/20 New Road Maintenance & Rehabilitation Chip Seals This project will include: Pavement Rehab/Repair (Existing)

All Locations at http://www.solanocounty.com/depts/rm/public_works/default.asp Capital Improvement Plan. Bowman,Bucktown Ln,Caligiuri Canyon,Crampton Ln,Forbes Ct,Fruitvale,Gaddini Rd,Gates Cyn,Gibson Cyn,Halley Rd,Jenny Ln,Ledgewood,Leisure Town Rd,Lewis Rd,Maine Prairie Rd,Mankas Corner Rd,Maple Rd,Meridian Rd N.,Midway Rd,Mix Canyon Rd,Oakwood Dr,Olmo Ln,Pamela Ln,Pedrick Rd,Pitt School,Pleasants Valley Rd,Poplar Rd,Russell Rd,Rustic Ln,Store Rd,Sun Ct,Tremont,Vaughn,West Chiles,Willow

Construction 07/2019 06/2020 10-10 3 4, 11

Solano 18/19 Carried Over Safety Timm Road Improvements This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Right of W ay | Collection of topographic features for design and construction purposes.

Timm Road from Shawn Lane to the North at the end of gravel section. Unincorporated Solano County, Vacaville CA

Pre-Construction and Construction

03/2018 07/2019

06/2019 12/2020 20-30 3 4

Arnold Drive, Franz Valley Road, Hunter Lane, Moscow Road, Ross Road,

Sonoma 19/20 New Road Maintenance & Rehabilitation

19/20 Pavement Preservation Program

This project will include: Pavement Rehab/Repair (Existing) | Chip Seal, Overlay, Fog Seal and Microsurfacing

Thompson Lane, Todd Road, W estside Road, Yoakim Bridge Road, Petaluma Hill Road, Guerneville Road, Alexander Valley Road, Armstrong Construction 07/2019 10/2019 5-7 2, 3 2, 4, 10

W oods Road, Fifth Street East.

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 102: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Sonoma 19/20 New Road Maintenance & Rehabilitation

Culvert and Viaduct Replacement Projects

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Includes repair of damage culverts and viaducts, cleaning and repair of road signs, removal of roadside vegetation, and repair of slip outs and landslides.

Neeley Road, Calistoga Road, Cazadero Highway, Furlong Road, Kruse Ranch Road, Armstrong W oods Road, Piner Road, Lawndale Road, Salmon Creek Road, Liberty Road, Furlong Road, Irwin Road.

Construction 06/2019 11/2019 20-40 2, 3 2, 4, 10

Sonoma 19/20 New Road Maintenance & Rehabilitation

Maintenance Grind, Patch Pave and Striping

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Grind/Patch: Porter Creek Rd, River Rd, W est Railroad Ave, Stony Point Rd, Occidental Rd, Bohemian Hwy, Jewett Rd, Rainsville Rd. Striping: Freestone/Bodega, Valley Ford/Bloomfield, Two Rock, Penngrove/Liberty, Petaluma, Kenwood, Glen Ellen/Eldridge, Sonoma/Boyes Hot Springs, Sonoma, Forestville, Graton, Occidental, Guerneville/Monte Rio/Rio Nido, Cazadero, Jenner/Bodega Bay, W indsor, Healdsburg, Lytton, Annapolis/Myers Grade All locations listed are an estimate and have yet to be finalized.

Construction 07/2019 09/2019 5-10 2, 3 2, 4, 10

Sonoma 19/20 New Road Maintenance & Rehabilitation

Maintenance Heavy Equipment Fleet Procurement This project will include: Procurement of Public Works Equipment Santa Rosa, Cotati, Sonoma, Guerneville, Healdsburg Road Yards Procurement /

Operational Needs 07/2019 06/2020 10-15 2, 3 2, 4, 10

This project will include: Bridge Structure Rehab/Repair (Existing), Pavement Stanislaus 18/19 Carried Over Other Keyes Road Bridge over TID Canal Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Replace Keyes Rd between Moffett and Esmar Road Construction 07/2020 12/2020 75-75 12 21

Keyes Rd Bridge over TID canal

Stanislaus 18/19 Carried Over Other Quincy Road Bridge This project will include: Replace Bridge over TID Lateral No. 3 Quincy Road @ E Taylor Road Construction 07/2020 12/2020 75-75 8 12

Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Mitchell Rd Repavement This project will include: Pavement Rehab/Repair (Existing) | Mitchell Rd Pavement

Rehabilitation from SR 132 to the Bridge Mitchell Rd from SR 132 to the Bridge Construction 07/2019 12/2019 20-20 8 21

Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation 9th Street Repavement This project will include: Pavement Rehab/Repair (Existing) | 9th Street Pavement

Rehabilitation 9th Street from Pecos Avenue to Tuolumne River Bridge Construction 07/2019 12/2019 20-20 12 21

Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation

Crows Landing Road Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) | Crows Landing Road Pavement Rehabilitation from Hatch Road to W hitmore Avenue Crows Landing Road from Hatch Road to W hitmore Avenue Construction 07/2019 12/2019 20-20 12 21

Stanislaus 18/19 Carried Over Road Maintenance & Rehabilitation Sisk Road Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Sisk Road Pavement

Rehabilitation from Green Leaf Court to Kiernan Avenue Sisk Road from Green Leaf Court to Kiernan Avenue Construction 07/2019 12/2019 20-20 5 12

Stanislaus 18/19 Carried Over Safety County Wide Center and Edge-Line Striping

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | County Wide Center and Edge-Line Striping for added Safety throughout the County. Zone 1 (East of McHenry Avenue North of Tuolumne River) will have 28 Roads Striped, Zone 2 (South of Tuolumne River East of Central Avenue) has 179 Roads to be striped, Zone 3 (W est of McHenry Avenue North of Grayson Road) has 23 Roads and Zone 4 (South of Grayson W est of Central Avenue ) will have 180 Roads striped.

Zone 1 (East of McHenry Avenue North of Tuolumne River) will have 28 Roads Striped, Zone 2 (South of Tuolumne River East of Central Avenue) has 179 Roads to be striped, Zone 3 (W est of McHenry Avenue North of Grayson Road) has 23 Roads and Zone 4 (South of Grayson W est of Central Avenue ) will have 180 Roads striped.

Construction 07/2019 06/2020 2-2 12 21

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 103: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Stanislaus 17/18 Carried Over Road Maintenance & Rehabilitation Albers Road Repavement This project will include: Pavement Rehab/Repair (Existing) | Albers Road Pavement

Rehabilitation Albers Road from Claribel Rd to the City of Oakdale Construction 07/2019 12/2019 10-10 8 12

Stanislaus 19/20 New Other Schell Road Bridge over SSJIID Canal This project will include: Bridge Structure Rehab/Repair (Existing) Schell Road off Sonora Road North of Knights Ferry Construction 07/2019 12/2019 50-75 12 12

Stanislaus 19/20 New Road Maintenance & Rehabilitation 2019 Chip Seal Preparation This project will include: Pavement Rehab/Repair (Existing)

Jantzen Rd., W eyer Rd, Roscoe Rd, Hopper Rd, Indianca Ave., Pennsylvania Rd, Harding Rd., Mart Ave., Priscilla Lane, Blossom Rd, Pellerin Rd., McEwen Rd, Missouri Ave., Canal Dr., Eucalyptus Ave, Reinway Ave., El Polmar Ave., Helena Ave., Ellenwood Rd., Alvardo Rd., Stoddard Rd., Bond Rd., Smith Rd., Rice Rd., Workman Rd., Crow Rd., Milnes Rd., Old Tim Bell Rd., Lone Oak Rd., Beard Rd., Pleasant, Tim Bell Rd., Hazeldean Rd., Crabtree Rd., Roberts Ferry Rd., Lake Rd., Los Cerritos Rd., Davis Rd.

Construction 07/2019 12/2019 5-5 8 12

Stanislaus 19/20 New Safety Crows Landing Road Two W ay Left Turn

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Two Way Turn Lane on Crows Landing Rd

Crows Landing Rd Construction 07/2019 12/2019 20-20 12 21

Sutter 18/19 Carried Over Road Maintenance & Rehabilitation

Truck Route Intersection Improvements

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | The project will widen three intersections with the addition of asphalt and base rock to allow for large trucks to make the turns without conflict with other motorists. In addition new striping will be provided to make the intersection movements clear to all drivers. (This project is only partly funded by SB1)

The Project will take place at the following intersections:; Intersection of Reed Road and Muir Road; Intersection of Muir Road and Barry Road; Intersection of Railroad Avenue and Barry Road

Construction 04/2020 10/2020 10-20 4 3

Sutter 19/20 New Road Maintenance & Rehabilitation FY2019-20 Road Seals Project This project will include: Pavement Rehab/Repair (Existing)

Bogue Road from Township Road to Clements Road; Clark Road from Broadway to East Butte Road; Clements Road from Bogue Road to Franklin Road; Butte House Road from Township Road to Acacia Avenue; Eager Road from Live Oak Blvd to Tierra Buena Road; Live Oak Blvd from Yuba City Limits to SR99;

Construction 03/2020 10/2020 7-15 4 3

Sutter 19/20 New Road Maintenance & Rehabilitation FY2019-20 Road Overlay Project This project will include: Pavement Rehab/Repair (Existing)

Ensley Road from Knights Road to Reclamation Road; Karnak Road from Ensley Road to Reclamation Road; Bear River Drive from Brewer Road to Placer Road; Placer Road from Bear River Drive to Riosa Road;

Construction 03/2020 10/2020 10-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Lake California Drive

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Environmental Study/Documents, Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Feasibility Study, Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development

Northern Tehama County Pre-Construction and Construction

07/2019 07/2020

07/2020 09/2020 5-7 4 3

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 104: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tehama 19/20 New Road Maintenance & Rehabilitation Paskenta Road

This project will include: Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety)

Eastern Tehama County Construction 05/2020 07/2020 15-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Ohm Road

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Storm Drain/Culvert Installation (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

In the vicinity of Red Bluff within the boundaries of Tehama County Pre-Construction and Construction

05/2019 05/2020

05/2020 07/2020 15-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Dusty W ay

This project will include: Cost Estimating, Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

South of Red Bluff within the boundaries of Tehama County Pre-Construction and Construction

07/2019 09/2019

09/2019 11/2019 12-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Rawson Road

This project will include: Cost Estimating, Maintenance Program Plan Development, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Project Scope Development

South of Red Bluff within the boundaries of Tehama County Pre-Construction and Construction

07/2019 09/2019

09/2019 11/2019 15-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Baker Road

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety)

North of Red Bluff and south of State Route 36 W est Pre-Construction and Construction

07/2019 04/2020

04/2020 06/2020 10-15 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation Plymire Road

This project will include: Cost Estimating, Maintenance Program Plan Development, Pavement Rehab/Repair (Existing), Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Storm Drain/Culvert Installation (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety)

North and west of Red Bluff city limits Pre-Construction and Construction

04/2019 04/2020

04/2020 06/2020 10-15 4 3

Tehama 19/20 New Other 45,000 Lbs Class Excavator This project will include: Procurement of Public Works Equipment Procurement Procurement / Operational Needs 06/2019 12/2019 10-20 4 3

Tehama 19/20 New Road Maintenance & Rehabilitation 10-Wheel Dump (2) This project will include: Procurement of Public Works Equipment Procurement Procurement /

Operational Needs 07/2019 12/2019 10-20 4 3

Tehama 18/19 Carried Over Road Maintenance & Rehabilitation

Chip Seal Overlay of Various County Roads

This project will include: Approximately 20 miles of roadway have been identified to benefit from a chip seal overlay that will extend the roadway wear surface another 15-20 years. Lassen, Leininger, Hall & Kirkwood Roads. Shasta Blvd. Pre-Construction 06/2020 09/2020 15-20 4 3

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 105: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Trinity 19/20 New Road Maintenance & Rehabilitation Trinity Dam Boulevard This project will include: Pavement Rehab/Repair (Existing) | 2" Overlay with 10% Digouts Trinity Dam Boulevard from its meeting point with Highway 299 to 200 feet

north of the intersection Construction 08/2019 09/2019 20-20 2 2

Trinity 19/20 New Road Maintenance & Rehabilitation Big Creek Road This project will include: Pavement Rehab/Repair (Existing) | Single Chip Big Creek Road, from PM 3 to the End of the Pavement (five miles total) Construction 05/2020 06/2020 15-15 2 2

Trinity 19/20 New Road Maintenance & Rehabilitation Van Duzen Road This project will include: Pavement Rehab/Repair (Existing) | Double Chip Van Duzen Road from PM 7.2 to PM 8, a total of roughly one mile Construction 05/2020 06/2020 15-15 2 2

Trinity 19/20 New Road Maintenance & Rehabilitation Slurry Seal Program This project will include: Pavement Improvement (New)

Slurry Seal will be conducted on roughly 10 miles of road segments throughout the County based on priority need. Final locations will be reported on upon completion in the applicable fiscal year expenditure report.

Construction 09/2019 10/2019 7-7 2 2

Trinity 18/19 Carried Over Road Maintenance & Rehabilitation Zenia Mountain Lake Road This project will include: Pavement Rehab/Repair (Existing) | Full depth reclamation with

double chip seal Zenia Mountain Lake Road (Road number 503), PM 1-2 Construction 07/2019 08/2019 15-15 2 2

Trinity 19/20 New Road Maintenance & Rehabilitation

Roadway Embankement and Surface Repair - FEMA Designated Sites, 2017 Storm Event 17-2

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Single Chip Seal; Double Chip Seal with 5% dig outs; Storm Repair

Denny Road(P.M. 3.7, 7.6,7.9,8.1,8.2,8.5,9.0,9.8,9.9, 12.5) Underwood Mountain Rd (PM 1.95), Trinity Alps Rd (PM 1.0), Salyer Loop Rd (PM.9) Coffee Creek Rd (PM 4.2); Ruth Zenia Rd (PM 3.2, 6.7); Lower South Fork Rd (PM 10.5); Hyampom Airport Rd (PM 0.2)

Construction 10/2019 06/2020 2-2 7 25

The proposed project locations are: Road 140 between Avenue 256 and

Tulare 19/20 New Road Maintenance & Rehabilitation 2020 RRAA Project 1

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay.

Avenue 280 (Caldwell); Road 156 (Mariposa) between Avenue 288 (Walnut) and Avenue 296 (Noble); Avenue 288 (Walnut) between Road 148 and Road 160; Avenue 288 between Road 68 and Road 75; Avenue 304 between Road

Construction 05/2020 10/2020 10-15 14, 16 26

44 and Road 64; and Road 132 between Avenue 336 and Avenue 352

Tulare 19/20 New Road Maintenance & Rehabilitation 2020 RRAA Project 2

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay

The proposed project locations are: Avenue 184 between Road 80 and Road 112; D122 (Turner) between Road 124 and Road 118; Road 192 between Avenue 96 (Terra Bella) and Avenue 120; Avenue 56 between Road 96 and Road 112; Avenue 56 Between D135 (Front) and D136A (State); D192 (Lessley) between Road 192 and Avenue 96; Avenue 96 between Road 122 and D126B (Park); Avenue 96 between D192 (Lessley) and Road 208; Road 208 between Avenue 88 and Avenue 96; D238 (Main) between Avenue 112 and Avenue 120

Construction 05/2020 10/2020 10-15 14, 16 26

The proposed project list is: Avenue 216 (Paige) between Road 92 (W est)

Tulare 19/20 New Road Maintenance & Rehabilitation 2020 RRAA Project 3

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay

and Road 96 (Pratt); D109A (Hosfield) between D113B (Laspina) and Avenue 200; Avenue 200 between D109A (Hosfield) and D134 (Spacer); Road 140 between Avenue 344 and Avenue 352; Avenue 352 between Road 132 and Road 140; Road 128 (Santa Fe) between Avenue 272 and Avenue 275; Avenue 266 between LR114C (Harrison) and Road 116; LR114C

Construction 05/2020 10/2020 10-15 14, 16 26

(Harrison) between Avenue 264 and Avenue 266

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 106: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tuolumne 18/19 In-Progress Road Maintenance & Rehabilitation

Tuolumne Road North Surface Treatment

This project will include: Pavement Rehab/Repair (Existing) | Surface treatment on Tuolumne Road North Located on Tuolumne Road North from Ponderosa W ay to SR108 Construction 06/2019 06/2020 7-10 8 5

Tuolumne 19/20 New Other Employees-Road W orker This project will include: Public Works Staffing Countywide Procurement / Operational Needs 07/2019 06/2020 1-1 8 5

Tuolumne 19/20 New Other Employee-Engineering Technician This project will include: Public Works Staffing Countywide Procurement / Operational Needs 07/2019 06/2020 1-1 8 5

Tuolumne 19/20 New Other SDE-Streetsaver Software This project will include: Procurement of Public W orks Systems/Databases | Public W orks Engineering Countywide Procurement /

Operational Needs 07/2019 06/2020 1-1 8 5

Tuolumne 19/20 New Road Maintenance & Rehabilitation

Routine Maintenance-Spray Program

This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials Countywide Procurement /

Operational Needs 07/2019 06/2020 1-1 8 5

Tuolumne 19/20 New Other Vehicles-Pick up trucks This project will include: Procurement of Public Works Equipment | Public Works Fleet -East/W est crew Countywide Procurement /

Operational Needs 07/2019 06/2020 10-10 8 5

Tuolumne 19/20 New Other Vehicles-Service Trucks This project will include: Procurement of Public Works Equipment | Public Works Fleet -Construction Services Countywide Procurement /

Operational Needs 07/2019 06/2020 10-10 8 5

Tuolumne 19/20 New Other Vehicles-Self-propelled Broom This project will include: Procurement of Public Works Equipment Countywide Procurement / Operational Needs 07/2019 06/2020 10-10 8 5

Tuolumne 19/20 New Other Misc./Specialized Equipment

This project will include: Procurement of Public Works Equipment, Procurement of Public W orks Safety Materials and Gear | Public W orks-East/W est/South crews. Includes purchase of post-hole driver, k-rail picker, k-rail/barricades and sleds and a Fuel tender for reducing trips to supply gas in high country when filling up snow plow equipment.

Countywide Procurement / Operational Needs 07/2019 06/2020 10-15 8 5

Tuolumne 19/20 New Other Facilities Housing Equipment

This project will include: Repair and Servicing of Public Works Equipment | This is a facility to store snow equipment and graders in the high country keeping it out of the elements in order to extend the life of the equipment. It provides a location to work on the equipment without having to hall the 38 miles away to the Columbia yard. It had severe structural damage due to snow loads causing columns to buckle.

Pinecrest yard Procurement / Operational Needs 07/2019 06/2021 40-100 8 5

Tuolumne 19/20 New Traffic Control Devices Traffic and Signal Maintenance This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Annual service contract for maintenance.

13 signal locations: Greenley Rd. Sonora Elementary, Greenley Rd. Cabezut, Greenley Rd. Delnero Rd., Hess Ave. Phoenix Lake Rd., Mono W ay Tuolumne Rd., Mono Way Junction Shopping Center, Mono Way Hess Ave, Mono W ay Peaceful Oak Rd./Standard Rd., Mono W ay Fir Dr./Sanguinetti Rd., Tuolumne Rd. Junction Shopping Center, Tuolumne Rd. Standard Rd., Tuolumne Rd. Cherry Valley Blvd/Tuolumne Rd. N.

Construction 07/2019 06/2020 1-1 8 5

Tuolumne 19/20 New Road Maintenance & Rehabilitation

Capital-Tuolumne Road Surface Treatment Project

This project will include: Preliminary Design | Preliminary Engineering performed in 19/20 and looking at 20/21 for construction. Tuolumne Road from Mono W ay to Tuolumne Road North Pre-Construction 07/2019 06/2020 7-12 8 5

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 107: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Tuolumne 19/20 New Road Maintenance & Rehabilitation

Capital-Standard Road Rehabilitation Project

This project will include: Preliminary Design | Preliminary Engineering performed in 19/20 and looking at 20/21 for construction. Standard Road from Mono W ay to Camage Ave. Pre-Construction 07/2019 06/2020 7-12 8 5

Tuolumne 18/19 Carried Over Road Maintenance & Rehabilitation Kewin Mill Road Reconstruction This project will include: Preliminary Design | Preliminary Engineering partially performed

in 18/19 and carry over into 19/20. Construction to begin in 20/21. Kewin Mill Road from Broken Pine Road to Highgrade Road. Pre-Construction 07/2019 06/2020 20-20 8 5

Ventura 19/20 New Road Maintenance & Rehabilitation Pavement Resurfacing - El Rio Area This project will include: Pavement Rehab/Repair (Existing) Various roads within Rancho Santa Clara Del Norte neighborhood from

Montgomery Ave to Lambert St. Construction 04/2021 06/2021 7-20 19 44

Ventura 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing - Ventura Area This project will include: Pavement Rehab/Repair (Existing) Various roads within the Barnard Park neighborhood Construction 04/2021 06/2021 7-20 19 37

Ventura 19/20 New Road Maintenance & Rehabilitation Pavement Resurfacing - Lewis Road This project will include: Pavement Rehab/Repair (Existing) Lewis Road from Laguna Rd to Pleasant Valley Rd Construction 04/2021 06/2021 7-8 19 44

Ventura 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing - Las Posas Area This project will include: Pavement Rehab/Repair (Existing) Various roads within Las Posas Estates and Las Posas Country Club

neighborhood Construction 04/2021 06/2021 7-8 19 44

Ventura 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing - Lockwood Valley Are This project will include: Pavement Rehab/Repair (Existing) Lockwood Valley Road from Mutua Road to Kern County Line and Boy Scout

Camp Road from Lockwood Valley Rd to End Construction 07/2021 09/2021 15-20 19 37

Ventura 19/20 New Road Maintenance & Rehabilitation

Pavement Resurfacing - Simi and Santa Susana Area This project will include: Pavement Rehab/Repair (Existing) Various roads within the Tapo Ranch and Santa Susana Valley neighborhood

including Reservoir Dr from 25' n/o Avenida Simi to 1287' n/o Avenida Simi Construction 04/2021 06/2021 7-8 27 38

Ventura 19/20 New Road Maintenance & Rehabilitation

Road Maintenance Activities Countywide

This project will include: Maintenance/rehabilitation of existing unpaved shoulders, ditches, culverts, catch basins, re-striping, sign replacement/maintenance, pavement markings, and tree trimming.

West County areas including Ojai, Ventura, Oxnard, Limonira, and Yerba Buena. East County areas including Moorpark, Somis, Piru, Camarillo, and Simi

Construction 07/2019 06/2020 1-2 19, 27 37, 38, 44

Yolo 18/19 Carried Over Road Maintenance & Rehabilitation Old River Rd (CR22) Seal Coat

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design, Paving and/or Striping Rehab/Repair (Existing Safety) | Perform base repair digouts, chip seal, restriping, and marking on 3.3 miles of road.

Old River Rd (CR22) from CR118 to Helvetia Pre-Construction and Construction

03/2019 06/2020

04/2020 12/2020 7-10 3 4

Yolo 19/20 New Road Maintenance & Rehabilitation

2020 Pavement Preservation -Zamora

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design | Base repair digouts, surface seal, restriping, and marking in the unincorporated Town of Zamora

In town of Zamora: 1st St from CR 93B to Blacks St; 2nd St from CR 93B to End; Blacks St from 2nd St to End

Pre-Construction and Construction

03/2019 07/2020

04/2020 12/2020 7-10 3 4

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.

Page 108: Draft County Project List FY 19...Zumi Ct, Cheyenne Dr, Cheyenne Ct, Coyote Ct, Roadrunner Dr, Roadrunner Ct, along with 65 other streets within the County Construction : 07/2019 :

DRAFT

"DRAFT County Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1).

June 14, 2019

County Fiscal Year Intially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est

Useful Life Senate District

Assembly District

Yolo 19/20 New Road Maintenance & Rehabilitation

2020 Pavement Preservation - North Davis Meadows

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design | Base repair digouts, surface seal, restriping, and marking in the unincorporated community of North Davis Meadows

Community of North Davis Meadows: Fairway Dr; Covey Ct; Northstar Pl; Larkspur Pl; Lupine Ct; Morning Dove Pl; Primrose Pl; Silverado Dr; Granite Bay Pl; Blackhawk Pl; Spyglass Pl; Spanish Bay Pl

Pre-Construction and Construction

03/2019 07/2020

04/2020 12/2020 7-10 3 4

Town of Yolo: Jackson St from 2nd St to CR 98; Washington St from 5th St

Yolo 19/20 New Road Maintenance & Rehabilitation

2020 Pavement Preservation - Town of Yolo

This project will include: Cost Estimating, Document Preparation, Pavement Rehab/Repair (Existing), Environmental Study/Documents, Preliminary Design | Base repair digouts, surface seal, restriping, and marking in the unincorporated Town of Yolo

to 1st St; Sacramento St from CR 17 to 1st St; Clay St from 5th St to 1st St; 1st St from Jackson to Clay; 2nd St from Jackson to CR 99W; 3rd St from Sacramento to Clay; 4th St from Sacramento to Clay; 5th St from CR 17 to

Pre-Construction and Construction

03/2019 07/2020

04/2020 12/2020 7-10 3 4

End.

Yolo 19/20 New Road Maintenance & Rehabilitation South River Road Reconstruction

This project will include: Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Environmental Study/Documents, Preliminary Design | Full Reconstruction, shoulder backing, restriping, and pavement marking of 5.2 miles of road.

South River Road from the City of W est Sacramento to the Freeport Bridge Pre-Construction and Construction

11/2019 05/2022

02/2022 12/2022 15-20 3 4

Yuba 19/20 New Road Maintenance & Rehabilitation 2019 Overlay Phase 1 (Valley) This project will include: Pavement Rehab/Repair (Existing)

Third, Fifth, Seventh, Eighth, Ninth, Tenth, Eleventh, Thirteenth, Arboga, Ardmore, Avondale, Bald Mnt, Baugh, Beverly, Blue Gravel, Bomann, Broadway, Browns Valley School, Canal, Church, College, Cottonwood, Country Club, Dantoni, Diggings, Dunning, Ella, Erle, Fleming, Georgina, Griffith, H-S, Joines, Laurel, McGanney, McGowan, Meadow, O'Brien, Old St Hwy, Pacific, Plumas Arboga, Silva, Smartsville, Spring Valley, Sunrise, Sunset, Sunshine, Thome, W arehouse, and W estern

Construction 06/2019 10/2019 10-20 4 3

Yuba 19/20 New Road Maintenance & Rehabilitation 2019 Overlay Phase 2 (Hills) This project will include: Pavement Rehab/Repair (Existing)

Dolan Harding, Frenchtown, Fruitland, Honcut, Hoover, Indiana Ranch, Iowa City, Krosens, Lambert, Littlefield, Loop, Redhill, Smith, Township, Vicki, Neil, Judy, Pat, Colleen, and Virginia

Construction 06/2019 10/2019 10-20 4 3

*This list is subject to change and will be finalized upon the adoption of any city or county meeting subsequent eligibility at the August 2019 Commission Meeting.