Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU)

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Overview

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Mankind’s Curiosity…

"CM

B T

imelin

e300 n

o W

MA

P"

by N

AS

A/W

MA

P S

cie

nce T

eam

- O

rigin

al v

ers

ion: N

AS

A;

modifie

d b

y R

yan K

ald

ari

. Lic

ensed u

nder

Public D

om

ain

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Mankind. Literally.

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Creating Big Bang Conditions

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Controlling a JediTM Lightsaber

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) The Large Hadron Collider (LHC)

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) The ATLAS “camera” (open)

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) 3D “Photo” of a LHC Collision

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Return on Investment

François Englert Peter W. Higgs

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) More than the LHC…

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) AMS: A Detector in Space

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Overview

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Computer Security: Sectors of Operation

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) CERN: 100+ of (commercial) ICSes

Experiments: ALICE, ATLAS,

CMS, LHCb,

LHCf, Moedal,

TOTEM

Alfa, AMS,

Asacusa, Atrap,

Cast, Collaps,

Compass, Dirac,

GIF, ISOLTRAP,

MICE, Miniball,

Mistral, NA49,

NA60, NA62,

nTOF, Witch, …

GCS, MCS,

MSS, Cryo

Accelerator Infrastructure: ACS, ADT, APWL, BCTDC, BCTF, BDI,

BQE, BQS, BQK, BPAWT, BIC, BLM,

BOF, BPL, BPM, BOB, BRA, BSRT, BTV,

BWS, Cryo, CWAT, FGC, LEIR LLRF, LHC

Beam Control, LBDS, LHC Logging

Service, LTI, MKQA, OASIS, PIC,

QDS/QPS, SPS BT, Vacuum, WIC

Accelerators: AD, AWAKE, CLIC3,

Elena, FCC, ILC,

ISOLDE, LEIR, LHC,

Linac 2/3/4, PS, PS

Booster, SPS

Safety: ACIS, AC PS1, AC PS2, AC SPS1, AC SPS2, ADS, Alarm

Repeater, ARCON, CCTV, CESAR, CSA, CSAM, DSS, LACS, LASER,

LASS, MSAT, RAMSES, Radio Protection Service, SFDIN, SGGAZ, Sniffer,

SUSI, TIM

Infrastructure: CV, DBR, ENS, FM, Gamma Spectroscopy, Moni, Moon,

Spectrum, TS/CSE, YAMS

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) CERN: Examples of ICS Devices

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) The Problem 2.0

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) WE. ARE. TARGET.

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Overview

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) No impact, no risk

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Train Security at Plant Floor

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Inventories & Life-cycles

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Merge ICS and IT Worlds

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) One CERT for all

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Same S/W Development

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Control Remote Access

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) One-Time Prototype

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) We need Incentives!

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) The Problem 2.0: CERNs Approach

Bridging the Gap…

Dr. [email protected]

CRITIS, September 24-26th 2018, Kaunas (LU) Thank you… Questions?