dr. bernhard sünder ams gmbh, flöha 4. october 2002 uic-518 testing and evaluation according to...
TRANSCRIPT
![Page 1: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/1.jpg)
Dr. Bernhard SünderDr. Bernhard Sünder
AMS GmbH, FlöhaAMS GmbH, Flöha
4. October 20024. October 2002www.AMSonline.dewww.AMSonline.de
UIC-518UIC-518
Testing and EvaluationTesting and Evaluationaccording to UIC-518according to UIC-518Project RoLa, Austria 2002Project RoLa, Austria 2002
![Page 2: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/2.jpg)
2AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
PrefacePreface
This document describes the tests and evaluations made in Austria in summer 2002 on freight wagons of Greenbrier Europe.
Test and evaluation were made to achieve an official license. The intend of this document is not to give constructive details of
freight wagons. No real results are presented which are from, or representative for the wagons under test.
The data acquisition as well as the evaluation is described from the view of a test and evaluation engineer.
![Page 3: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/3.jpg)
3AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Project PartnerProject Partner
Leadership: HBM Ges.m.b.H. AustriaDipl.Ing. W. Weilinger
Customer: Greenbrier EuropeGreenbrier USA
Expert: Dipl.Ing. J. Stephanidis
Measurements: TU GrazDipl.Ing. M. Joch
Software: AMS GmbH, Floeha Dr.-Ing. B. Sünder
Greenbrier
![Page 4: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/4.jpg)
4AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
UIC UIC – International Union of Railways– International Union of Railways
“UIC is the worldwide organization for railway cooperation. It is active in all the fields involved in developing rail transport.”
UIC publishes leaflets, the UIC Codes UIC Code 518:
– Testing and approval of railway vehicles from the point of view of their dynamic behavior - Safety - Track fatigue - Ride quality
UIC on the web: www.uic.asso.fr
![Page 5: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/5.jpg)
5AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
OverviewOverview
1. Data Acquisition– 64 dynamic channels:
• 8 Spider8 (HBM)
– GPS:• Garmin
– Software• BEAM (AMS)
2. Evaluation– Software
• jBEAM (AMS)
![Page 6: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/6.jpg)
6AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Data Acquisition (I)Data Acquisition (I)
64 synchronous analog channelsGPS (Garmin)1200 values per channel per second76,800 values per second in totalUp to 1 hour per runData Files up to 1 Giga Byte
![Page 7: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/7.jpg)
7AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Data Acquisition (II)Data Acquisition (II)
Datatransfer Spider – PC:Centronics EPP-Mode
Realtime Dataprocessing by BEAM:– Reading the data from interface– Conversion binary values ⇒ eng. units– Realtime display of groups of 18 channels
in an oscilograph type chart
![Page 8: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/8.jpg)
8AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Data EvaluationData Evaluation
Using the software jBEAM from AMS Platform independent, Java-based
1. Generating a section list of the route2. Detecting the offsets for different runs3. Analyzing data of the runs for each route
All runs of one route are analyzed All runs of one route are analyzed automatically with one mouse click!automatically with one mouse click!
![Page 9: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/9.jpg)
9AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Generating the Section-List (a)Generating the Section-List (a)
Manually defining curves with 2 cursors
Auto calculating the radius of curves
On click appending curve start, end and radius to the curve-list
Data EvaluationData Evaluation
![Page 10: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/10.jpg)
10AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Generating the Section-List (b)Generating the Section-List (b)
Specials: Extracting only GPS data
from 1GB data file xy-chart with a map as a
scaled background image and GPS positions on top.
Correct distance calculation by converting GPS to metric UTM coordinates.
Data EvaluationData Evaluation
![Page 11: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/11.jpg)
11AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Generating the Section-List (c)Generating the Section-List (c)Data EvaluationData Evaluation
Auto generation of UIC-conform section list from curve list.
Auto generation of section list for reverse direction.
Export of section list for manual changes.
Comparison with official route data. Adding additional information.
![Page 12: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/12.jpg)
12AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Offset Detection for each Data fileOffset Detection for each Data fileData EvaluationData Evaluation
GPS-data of two runs are loaded and displayed on top of map.
Detecting the 1st run offset according to the section list.
Load GPS data for each run and run’s offsets are calculated automatically.
![Page 13: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/13.jpg)
13AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Analyzing Data for Route (I)Analyzing Data for Route (I)
Finish preparation by setting all parameters
Include all files for this route and direction
Enter/load list of sensor distances to GPS for auto correction
Data EvaluationData Evaluation
![Page 14: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/14.jpg)
14AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Analyzing Data for Route (II)
Parameter dialog for running UIC-analysis as an auto sequence
Data EvaluationData Evaluation
![Page 15: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/15.jpg)
15AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Analyzing Data for Route (III)
For each sensor define the type of Analysis
List of calculations is defined by UIC-518.
More than one calculation may be defined for sensors.
Data EvaluationData Evaluation
![Page 16: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/16.jpg)
16AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Analyzing Data for Route (IV)
Click on start buttonClick on start button View the processView the process
– Detecting sectionDetecting section– Determine location of data in fileDetermine location of data in file– Loading dataLoading data– Auto AnalyzeAuto Analyze– See section position with markers See section position with markers
on mapon map
Data EvaluationData Evaluation
![Page 17: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/17.jpg)
17AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
Analyzing Data for Route (V)
Final Step: With one mouse
click generate one page of protocol per defined calculation.
40 pages are created in less than a second!
Data EvaluationData Evaluation
![Page 18: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/18.jpg)
18AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
InternationalizationInternationalization
The UIC-518 Analysis is implemented in the jBEAM The UIC-518 Analysis is implemented in the jBEAM software multilingual:software multilingual:At present German and English is available.At present German and English is available.
![Page 19: Dr. Bernhard Sünder AMS GmbH, Flöha 4. October 2002 UIC-518 Testing and Evaluation according to UIC-518 Project RoLa, Austria 2002](https://reader035.vdocuments.mx/reader035/viewer/2022062404/5516b3c6550346f0208b539b/html5/thumbnails/19.jpg)
19AMS Test & Evaluation UIC 518, 4. October 2002AMS Test & Evaluation UIC 518, 4. October 2002
ConclusionConclusion
With the described equipment the measurement and analysis tasks were solved in a tremendous short time.
Specially the new developed UIC-components in the standard evaluation software jBEAM made available a fast and easy way of UIC-518 conform analysis.
It was a pleasure for all persons involved in this project to work with the described equipment!