• 21.5% Savings on Energy Use

• 31.8% Savings on Potable Water Use

• 30 KW on-grid Solar PV system

• 3.91% Offset by On-Site Renewable Energy

• 91.7% Diversion from Landfill of Construction Waste

• 30.6% Use of Materials with Recycled Content

• 45.2% Use of Materials Regionally Available

LG Green Building

Jebel Ali - Dubai

3/60

Page 4: VRF system presentation !

Global Sales LGE Consolidated Basis, IFRS

Unit : USD Billion

Total does not equal 100 percent as divisional sales pertain solely to LG Electronics Korea and overseas

subsidiaries and include internal transactions, other subsidiaries’ earnings, etc.

2006 2007 2008 2009 2010 2011

USD 39

USD 44

USD 45

USD 43.4

USD 48.2

USD 48.97

AE 8%

HA 20%

MC 22%

HE 41%

Page 5: VRF system presentation !

AE Company (Air Conditioning & Energy Solution)

Residential

Manufactured Korea’s

1st air conditioner 1st company to sell

100 million units

World’s Top selling air conditioning manufacture for

8years

Air Conditioning &

Energy Solution

Page 6: VRF system presentation !

AE Company (Air Conditioning & Energy Solution)

Full line-up of comprehensive air conditioning solutions LG VRF

Multi V Systems (VRF) Heating(Residential)

Indoor Units

Single Systems Multi Split Systems Rooftop

Heating(Commercial)

HVAC Solution

Page 7: VRF system presentation !

AE Company (Air Conditioning & Energy Solution)

Full line-up of comprehensive air conditioning solutions LG Chiller

Chiller System

AHU CTHU NPP(Nuclear Power Plant) Ventilation Systems

Control Systems Building Management Systems

HVAC Solution

Page 8: VRF system presentation !
Page 9: VRF system presentation !

AE Company (Air Conditioning & Energy Solution)

Vertical Solution

Multi V III Multi V Water II DX AHU Multi V Space III

eco V

Low Static Duct

Low Static Duct

Art-1 Way

LED

PLS

DX AHU

Chiller

eco V

Multi V Water

BMS Multi V Geo

Chiller

ART COOL

Home Energy Management System

Office Buildings Hotels High-Rise Buildings

Hotel Solutions

Page 10: VRF system presentation !

AE Company (Air Conditioning & Energy Solution)

Vertical Solution

Hospitals Shopping Malls

4-Way Cassette

1-Way Cassette Multi V Water

Multi V Geo

Chiller

BMS

DX AHU

BMS

Page 11: VRF system presentation !

LG Multi V System

Page 12: VRF system presentation !

Contents

What is VRF System ?

Variable Refrigerant Flow

The Variable Refrigerant Flow System has the ability to control the

amount of refrigerant flowing through the system

Simply, each FCU/AHU unit receives only the required amount of

refrigerant in order to meet the cooling load of the conditioned space

The Inverter Unit will Gradually Increases or Decreases its Capacity

based on the load by increasing or decreasing the rotation speed of

the motor.

Page 13: VRF system presentation !

World Best COP Tech.

V Scroll Inverter compressor

Sine wave inverter control

Cyclone sub-cooling circuit

High static propeller fan

BLDC Inverter Fan Motor

Uniform (refrigerant) distributor

Wide Louver fin in Heat Exchanger

Ventilation with AHU

- No individual control

- Freeze & burst

(chilled & hot water type)

- Big energy consumption

(pump & fan)

- Low air volume, static

- No ventilation & humidification

- Low installation space

- Inverter compressor

Low energy consumption

(Inverter compressor)

Big air volume,

high static pressure

Ventilation & humidification

IAQ control

Easy Installation

Features

Convectional AHU VRF Indoor Unit

Page 14: VRF system presentation !

Contents

14/60

How it works?

Control of the refrigerant flow by inverter compressor

INV ST1 INV ST1

INV

INV

ST1

14%

100%

100%

Comp. capacity control

Load

10%

P

Indoor

Units

Page 15: VRF system presentation !

Contents

15/60

Technical Innovation

V Scroll inverter compressor is LG Compressor Brand name. The compressor

is manufactured by LG Korean factory using state of the art techniques. The

adoption of the BLDC motor makes the system more efficient and powerful.

Innovation 1 – V scroll

V Scroll inverter compressor

BLDC motor

More efficient

Scroll type

Bigger performance

Rotor

Steel Plates

ND Magnetic

Reluctance torque

Magnetic torque

Inverter driver

i T N

S

※ Multi V is made in Korean factory as well major components like compressor.

Page 16: VRF system presentation !

Contents

16/60

Technical Innovation

Sub-cooling is one of the most important technologies in VRF system.

LG Multi V use more efficient cyclone type. By cyclone sub-cooling

circuit, Best effect can be achieved.

Cyclone sub-cooling circuit

Sub-cooling circuit

More efficient

Less pressure loss

Cyclone

Larger heat-

exchange area

Sub-cooling

Pre

ssu

re

Enthalpy

Condenser

Evaporator

Exp

an

sio

n

Theory and Effects

1st effect : Refrigerant pressure loss reduce Long and high rising piping 2nd effect : Cooling capacity gets improved In a thermodynamic point of view

Innovation 2 – Cyclone SCC

Page 17: VRF system presentation !

Contents

17/60

Inverter Technology of Multi V III

Inverter Technology Controls the Refrigerant Flow by Varying the

Compressor Revolution as per the Cooling load.

Micro processor

& Inverter logic

Inverter Scroll

compressor

Sensor less Control

PWM

● U

V

W

50Hz

Revolution

Low

High

Cooling load

Partial load

Full load

Variable

Refrigerant

Flow

Cooling

Capacity

Ambient Temp : 35℃

Only 1 room cooling

Ambient Temp : 46℃

All rooms cooling

EEV

EEV

Partial capacity

Full load

20Hz

120Hz

Page 18: VRF system presentation !

Contents

18/60

How it works?

Control by remote controller of users

INV ST1 INV ST1

18

CPU CPU CPU CPU

P

Page 19: VRF system presentation !

Contents

19/60

How it works?

Control of the refrigerant Flow by Electronic Expansion Valve

T1 = Set temperature from Remote controller air temperature

T2 = Suction air temperature sensor

T3 = Inlet refrigerant temperature sensor (liquid)

T4 = Outlet refrigerant temperature sensor (gas)

Suction

Dis

charg

e

Blower speed

Liquid

Gas

Electronic expansion valve

(0~1350 pulses)

T3

T2

Blower

T4

T1

Control

Box

EEV

Page 20: VRF system presentation !

Contents

20/60

How it works?

Multi V control low pressure of system in case of cooling operation

Cooling

comp

Fan SC EEV

Indoor

EEV

Component Cooling Mode

Compressor Low Pressure

Fan High Pressure

Indoor EEV Superheat control

SC EEV Superheat of Sub

Cooling

Pressure

Target low pressure

Time Start

Target high

pressure

Compressor control ( speed up by inverter )

Fan control ( speed up by inverter )

Page 21: VRF system presentation !

Contents

21/60

Owing to VRF Technology, Multi V is the Brand Name of LG.

What is LG Multi V?

Multi V is the LG VRF system: -

Compared to the Common On-Off Controlled Compressor,

the Inverter Controlled Compressor is able to run the proper

revolution (Hz) in order to provide the best efficiency (power

Consumption), Exceptional dehumidification& Temp Control.

On-Off system Inverter system

Page 22: VRF system presentation !

Contents

Multi V System Layout

Combination of Maximum 64 Indoor Units

Console

ARTCOOL

Gallery

ARTCOOL

Mirror High static

duct

2Way

CST

4Way

CST

Max. 48HP

Low static

duct

1Way

CST

Refrigerant Pipes

Y Branch

IDU combination Rate

Multi V III : 130 % ■ Multi V III – Tropical Model

22/60

Page 23: VRF system presentation !

Contents

Product Roadmap – Multi V Outdoor

23/60

Single unit max 16Hp, 3 Unit combination is possible (Max 48Hp)

Single unit max 16Hp

8 &10HP Medium 12 , 14 & 16HP Large

Combination 48Hp

48HP Max

Page 24: VRF system presentation !

7k 9k 12k 15k 18k 24k 28k 36k 42k 48k

2.2 2.8 3.6 4.2 5.6 7.1 8.2 10.6 12.3 14.1

5k

1.6

Btu/h

kW

ART COOL Series

SRAC

Ceiling Cassette

Ceiling Concealed Duct

Floor Standing

Mirror

Ceiling & Floor

Ceiling Suspended

Wall Mounted

1Way (Art)

2Way

4Way

High Static

Low Static

Built-in

With Case

Without Case

Gallery

Console

Fresh air Intake

76k 96k

23.9 30.2

Product Roadmap – Multi V Indoor

Page 25: VRF system presentation !

Multi V & AHU

Large capacity with No BMS)

Control Kit

Temp. Senor / RA, SA(essential), OA, Mix(optional)

Humid. Senor / RA, SA, OA(optional)

Damper Actuator / EA, OA, Mix(optional)

Differential Pressure switch(optional)

Valve for Humidifier(optional)

CO2 Sensor(optional)

Smoke Detector(optional)

Optional

RA EA OA SA

Expansion Kit AHU

Outdoor Unit

Wired

remote controller

Communication wire

Connection Pipe Thermistor

Signal (On/Off)

Signal (DC0~10V)

Expansion Kit

Page 26: VRF system presentation !

Multi V & AHU

Large capacity with Communication Kit & BMS

Room air

Temp Sensor

(should be

installed into

the return air part)

Expansion Kit

Outdoor Unit

Comm. Kit

Optional

Wired

remote controller

Connection Pipe

Communication wire

Thermistor

Signal(On/Off)

AHU

RA EA OA SA

Expansion Kit

Page 27: VRF system presentation !

Contents

27/60

Introduction of Multi V III Tropical

LG Multi V is the most strong VRF system.

TUV certification for continuous operation under 54℃ during 24 hours.

Outstanding Performance

Page 28: VRF system presentation !

Contents

28/60

Introduction of Multi V III Tropical

LG Multi V is the most efficient VRF system. COP Max 4.3 at rated

condition

BLDC

inverter compressor

New refrigerant

distributor

Sine wave

inverter control

Cyclone

sub-cool circuit

High static

propeller fan

BLDC

Inverter Fan Motor

Wide Louver fin in

Heat Exchanger

Heat pump model (8HP), T1 condition

Coefficient of Performance (COP) = Cooling capability

Energy consumption

3.4

4.3

conventional

26%

COP comparison

[ Average value]

-. kW / Ton = 0.87 @ T1

-. kW / Ton = 1.10 @ T3

COP data

Outstanding Performance

Page 29: VRF system presentation !

Contents

31/60

Introduction of Multi V III Tropical

Extending pipe length and elevation

Total piping length

Actual longest Piping length (Eqvlnt)

Longest piping length after 1st branch

(Conditional application)

Level difference between ODU and IDU

Level difference between IDU and IDU

Level difference between ODU and ODU

1000m

200m

(225m)

40m

(90m)

110m

15m

5m

Project R&D Center Building

Const. Dim 5,619.14 m²

Type R&D Building

Location Seoul. Korea

TTL Dim. 84,307.09 m²

Scale 5F ~ 20F

Test building

Level Difference

Between ODU and IDU

Max110m

Longest piping

length

Max 225m

Outstanding Performance

Page 30: VRF system presentation !

Contents

32/60

Introduction of Multi V III Tropical

Design & installation degree of freedom increase

( Fan External static pressure - Max 8mmAq)

Conventional

Outstanding Performance

Page 31: VRF system presentation !

Contents

33/60

Introduction of Multi V III Tropical

8 Stages of night silence operation are possible during the night time.

It can give comfort to owner and a neighbor.

Night silence operation

100 Capacity

Sound level

Load

night day

day

8:00 12:00 4:00 8:00 Time (am)

8:00 12:00 4:00

Mode end Mode start

Ambient temp ↓

Smart Functions

Page 32: VRF system presentation !

Contents

35/60

Introduction of Multi V III Tropical

Minimizing any inconvenience that may occur in an emergency

situation

Back-up operation _Compressor

Malfunction

Back-up operation

Back-up operation _Unit

All single unit of Multi V III tropical has more 2 compressors.

Malfunction

Back-up operation

Smart Functions

Page 33: VRF system presentation !

Contents

36/60

Introduction of Multi V III Tropical

To make life span of compressor even, alternative operation is

possible.

Alternative operation

ON OFF

Smart Functions

Page 34: VRF system presentation !

Contents

37/60

Introduction of Multi V III Tropical

Automatic test run, refrigerant amount check, real-time inspection

and back-up operation for parts and sensors, maximizing reliability of the

product & minimizing installation and maintenance time.

Fault Detection and Diagnosis (FDD)

01 Automatic test run

02 Refrigerant amount check

03 Real time diagnosis (refrigerant and parts)

04 Real time back-up (compressor and sensors)

05 Refrigerant recovery function

Smart Functions

Page 35: VRF system presentation !

Contents

38/60

Introduction of Multi V III Tropical

Easy and fast test run. Auto test run function help you to save the

checking time during the final stage of installation

Automatic test run _ FDD

Conventional

test run

Auto Test Run

Setting LGMV PC 100% operation

1Unit operation

Report

Report Start

Sensors

Operating cycle

Electric status

Refrigerant amount

Auto test run check list

60% Time Save

Report by HTLM

Smart Functions

Page 36: VRF system presentation !

Contents

39/60

Introduction of Multi V III Tropical

This kind of mistake can happen in site. However problem is that it is

very hard to find the reason because it is not commonsense mistake. But

Multi V can check it automatically for the best installation.

Incorrect piping notice _ FDD

Incorrect piping

(liquid line + gas line)

Incorrect communication line notice _ FDD

Incorrect communication line

communication line

Refrigerant piping

Smart Functions

Page 37: VRF system presentation !

Contents

40/60

Introduction of Multi V III Tropical

Real-time automatic fault prediction function

Multi V III allows you to check the current status for the sensors and the EEV,

which are the major components for system control, through a test run

Sensor

EEV

Sensor

Outdoor unit Indoor unit

Temperature sensor

Pressure sensor

8

2

3

0

Smart Functions

Page 38: VRF system presentation !

Contents

41/60

Introduction of Multi V III Tropical

Pump down and out function can reduce the refrigerant discharge.

Pump down When an indoor unit malfunctions, this function collects the refrigerant remaining in

the piping line or that unit to an outdoor unit

When an outdoor unit malfunctions, this function collects the refrigerant in another

indoor unit or a piping line

Transfers refrigerant

Transfers refrigerant

Malfunction

Malfunction

Pump out

Smart Functions

Page 39: VRF system presentation !

Contents

42/60

Introduction of Multi V III Tropical

4way piping provides a different installation method. So It can reduce

installation cost.

4way piping

Installation of bottom piping is available.

LG provide accessory for easy installation.

Left

Front

Bottom

Right

Bottom direction

Piping cover needed

Not good looking

Smart Functions

Page 40: VRF system presentation !

Contents

43/60

Introduction of Multi V III Tropical

Easy to install refrigerant pipe & Easy maintenance (Standing SVC)

Service area reduction and Easy standing service and maintenance

Conventional

Front SVC Area

900 C/Box Open area

500 SVC Area

Standing service

available

50%

Smart Functions

Page 41: VRF system presentation !

Contents

44/60

Introduction of Multi V III Tropical

Quick and right service is necessary. Black Box built in Multi V

records operation data for 3 minutes. SVC engineer can analysis

the problem and take quick and right action owing to operation

history.

Black Box for data acquisition

③ Error

occurred

• Ambient temp.

• High pressure

• Low pressure

• Sensor status

• Operation data etc.

④ SVC

-. Analysis with recorded data &

-. Quick and right service

② Record operation data

※ SD memory module

: 3 months data recording

① 3 minutes

Smart Functions

Page 42: VRF system presentation !
Page 43: VRF system presentation !

Green Building Initiative LEED Regulations

The LEED® green building certification program is an initiative by The U.S. Green Building Council, Inc. (USGBC®) to positively impact our natural environment, economy, health, and productivity through well designed buildings, energy efficient equipment, and high quality material. Today, there are many breakthroughs in building science, technology, and operations that are available for designers and building owners to maximize both economic and environmental performance of their buildings. The green building movement offers an unprecedented opportunity to respond to the most important challenges of our time, including global climate change, dependence on non sustainable and expensive sources of energy.

LEED 2009 for New Construction and Major Renovations

100 base points; 6 possible Innovation in Design and 4 Regional Priority points

• Certified 40–49 points

• Silver 50–59 points

• Gold 60–79 points

• Platinum 80 points and above

Page 44: VRF system presentation !

Green Building Initiative LEED Regulations

1. Sustainable site (26 Pts)

2. Water Efficiency (10 Pts)

3. Energy & Atmosphere (35 Pts) 31 Pts LG can address

4. Material & Resources (14 Pts)

5. Indoor Environmental Quality (15 Pts) 4 Pts LG can address

6. Innovation in Design (6 Pts) 5 Pts LG can address

Page 45: VRF system presentation !
Page 46: VRF system presentation !

Project Name Brighton College

Building Type School

Project owner Bloom Properties

Consultant Name Implement Consultant

Contractor Name Emirates Link Maltauro

Place/ City UAE – Abu Dhabi

Completion Date September 2011

Type Of Units Multi V& AHU Units

Total Capacity 1,200_Ton

Total Project Value 1,100,000_$

49

Land Mark Multi V Project

Important requirement of the client

• BMS compatible AC system

• The minimum Operating cost

• Higher emphasis on Indoor air quality (IAQ)

• Reliable operation, at 54 deg C Ambient

Educational

Page 47: VRF system presentation !

50

Project Name GEMS American Academy

Building Type School

Project owner GEMS Education

Consultant Name National Engineering Bearu

Contractor Name Trinity Engineering Services

Place/ City UAE – Abu Dhabi

Completion Date September 2011

Type Of Units Multi V& AHU Units.

Total Capacity 1,112_Ton.

Total PJT Value 1,136,000_$.

Important requirement of the client

• BMS compatible AC system.

• The minimum Operating cost.

• Higher emphasis on Indoor air quality (IAQ).

• Reliable operation, at 54 deg C Ambient.

• Note: LG award extended to other Products.

Land Mark Multi V Project Educational

Page 48: VRF system presentation !

Project Name Refurbishment of 8 Schools

Building Type School

Project owner Abu Dhabi Education Council

Consultant Name Conseco International

Contractor Name Different Contractors

Place/ City UAE – Abu Dhabi

Completion Date September 2010

Type Of Units Multi V

Total Capacity 2,105_Ton

Total Project Value 2,000,000_$

Notes

• 3 Schools Awarded to LG out of 8.

• Electricity Bill is a Major Concern of Government, as

such they remove old units and adopt the VRF system

Land Mark Multi V Project Educational

Page 49: VRF system presentation !

Project Name Refurbishment of 10 Schools

Building Type School

Project owner Abu Dhabi Education Council

Consultant Name Ian Banham and Associates

Contractor Name Different Contractors

Place/ City UAE – Abu Dhabi

Completion Date September 2011

Type Of Units Multi V & FAHU/ AHU Units

Total Capacity 2,500_Ton

Total Project Value 2,500,000_$

Notes

• LG for the 2nd Year in a row awarded a part of these

Schools ( Five Schools Awarded to LG out of 10)

• LG delivered 26 FAHU/ AHU along with the Multi V

• Electricity Bill is a Major Concern of Government, as

such they remove old units and adopt the VRF system

Land Mark Multi V Project Educational

Page 50: VRF system presentation !

53

Project Name Khaitan Police HQ

Building Type Government

Project owner Ministry of Public Works

No Of Floors G+M+2 Building

Consultant Name Ministry of Public Works

Contractor Name

Place/ City Kuwait

Completion Date November 2011

Type Of Units Multi V

Total Capacity 200_Ton

Total Project Value 240,000_$

Client requirements

• Centrally control the AC units from one location,

• MEW (Ministry of Electricity & Water) Approval

• Capability of Working in ambient temperature of 54 °C

without tripping.

Land Mark Multi V Project Government

Page 51: VRF system presentation !

54

Project Name Korean Embassy

Building Type Government

Project owner South Korea

No Of Floors G+6 Building

Consultant Name Ministry Of Interior

Contractor Name M/s Imtiyaz

Place/ City Kuwait

Completion Date October 2011

Type Of Units Multi V

Total Capacity 250_Ton

Total Project Value 375,000_$

Client requirements

• Centrally control the AC units from one location,

• Group control multiple units serving the same zone.

• Capability of Working in ambient temperature of 54 °C

without tripping.

Land Mark Multi V Project Government

Page 52: VRF system presentation !

Project Name Oman Botanic Garden

Building Type Commercial Building

Project owner OBG

No Of Floors G+1 Building

Consultant Name ALATAC

Contractor Name Mercury

Place/ City Oman Muscat

Completion Date June, 2012

Type Of Units Multi V

Total Capacity 520_Ton

Total Project Value 550,000_$

Notes

•Project for cultivating rare plants.

•Client insisted for eco friendly and energy saving techn

ology.

Land Mark Multi V Project Government

Page 53: VRF system presentation !

56

Project Name Arabian Horse Stud

Building Type Lab & Care Center - 10 Horse Stable to His Highness

Project owner Sheikh Mohammed Bin Rashid Al Maktoum

Consultant Name Engineer’s Office

Place/ City UAE – Dubai

Completion Date December 2009

Type Of Units Multi V, (40 ODU, 400 FCU)

Total Capacity 800_Ton

Total Project Value 1,120,000_$

Client requirements

• Sustainable design with green Refrigerant.

• The lesser the better power consumption.

• Capability of Monitoring& Controlling the AC units, and

auto back up operation.

Land Mark Multi V Project Government

Page 54: VRF system presentation !

Project Name Al Gurum Resort

Building Type Residential Development

Project owner Al Dar Properties

No Of Villas 70 Villas – Phase I

Contractor Name Six Construct

Place/ City UAE – Abu Dhabi

Completion Date October 2008

Type Of Units Multi V

Total Capacity 1,750_Ton

Total Project Value 2,400,000_$

Notes:

• Super Premium Villas, the Selling price of each villa

is around 25 Million AED

• BMS compatible AC system.

• Compatible to Home Net.

• Reliable operation, at 54 deg C Ambient

Land Mark Multi V Project Residential

Page 55: VRF system presentation !

Project Name Abu Dhabi International Shooting Club

Building Type Residential Development

Project owner IMCC

No Of Villas 385 Villas

Contractor Name Fibrex, Thermo

Place/ City UAE – Abu Dhabi

Completion Date June 2011

Type Of Units Multi V, (385 ODU/ 4,000 FCU)

Total Capacity 5,361_Ton

Total PJT Value 6,800,000_$

Notes

• Estidama Compliance Pearl 1

• Electricity Bill for the owners/ Tenants of the Villa

• Reliable operation, at 54 deg C Ambient.

Land Mark Multi V Project Residential

Page 56: VRF system presentation !

Project Name Adearest Owner’s Villa

Building Type Residential

Project owner Adearest

No Of Villas 3 Big Premium Villa

Contractor Name Adearest

Place/ City UAE – Sharjah

Completion Date Aug 2008

Type Of Units Multi V

Total Capacity 173_Ton

Total PJT Value 250,000_$

Notes

• Project originally designed with Daikin VRV

• Fast delivery & Commissioning support , help LG to

win the PJT

Land Mark Multi V Project Residential

Page 57: VRF system presentation !

60

Project Name Laya Orchid Hotel

Building Type Hospitality

Project owner Laya hospitality

No Of Floors G+7 Building

Contractor Name Envicon Emirates

Place/ City UAE – Dubai

Completion Date January 2012

Type Of Units Multi V

Total Capacity 400_Ton

Total Project Value 400,000_$

Notes

• Compatibility with BMS system.

• Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the Electric power

consumption.

•LG solution extended to include HA& Hotel TV.

Land Mark Multi V Project Hospitality

Page 58: VRF system presentation !

Project Name Dhalak Resort

Building Type Resort for Qatar Emir’s Family

Project owner Qatar Dair

Consultant Name W S Atkins

Contractor Name QDVC

Place/ City Dhalak, Eritrea

Completion Date Sept 2010

Type Of Units Multi V

Total Capacity 275_Ton.

Total PJT Value 370,000_$.

Notes

• Less Outdoor space available

• LG provided full support from design, installation, SVC

Land Mark Multi V Project Hospitality

Page 59: VRF system presentation !

62

Project Name Savanah Flamingo Resort

Building Type Hospitality

Project owner TDIC (Tourism Development & Invest. Co) (Abu Dhabi Gov)

Consultant Name W.S. Atkins

Contractor Name Al Shafar Contracting

Place/ City UAE – Abu Dhabi

Completion Date June 2011

Type Of Units Multi V & AHU

Total Capacity 800_Ton

Total Project Value 1,600,000_$

Notes

• Estidama Pearl 2 Compliance.

• Electric Power source is Diesel Generator, so it’s a mus

t to reduce the power consumption ASAP.

• Capability of working up to 54 of ambient temperature

Land Mark Multi V Project Hospitality

Page 60: VRF system presentation !

63

Project Name ZUMA Restaurant

Building Type Restaurant

Project owner ZUMA/DIFC

Consultant Name Design & Build - Penguin

Contractor Name Penguin Engineering

Place/ City UAE – Dubai

Completion Date July 2008

Type Of Units Multi V

Total Capacity 150_Ton

Total Project Value 200,000_$

Notes

• District cooling connection was not enough

• Operating cost was also a concern.

• Limited condensing unit space at the parking area

Land Mark Multi V Project Hospitality

Page 61: VRF system presentation !

64

Project Name Belhoul Hospital

Building Type Hospital

Project owner Belhoul Life care

No Of Floors G+5 Building

Consultant Name Nutek

Contractor Name ARJ

Place/ City UAE – Dubai

Completion Date January 2010

Type Of Units Multi V

Total Capacity 250_Ton

Total Project Value 300,000_$

Notes

•Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the cost of Electric

Connection and Electric power consumption,

•Offered with Central Controller.

Land Mark Multi V Project Hospital

Page 62: VRF system presentation !

65

Project Name Al Jazi Tower

Building Type Commercial Offices

Project owner Al Khaliji HQ Bank

No Of Floors G+18 Building, 2nd, 3rd7 4th Floor Only

Place/ City Qatar

Completion Date December 2008

Type Of Units Multi V

Total Capacity 162_Ton

Total Project Value 200,000_$

Notes

•Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the connecting load

•Client required individual billing for the offices

• Premium AC which is capable of handling high

elevation building

Land Mark Multi V Project Commercial

Page 63: VRF system presentation !

66

Project Name Ajman Bank

Building Type Bank

Project owner EDARA

No Of Floors G+2 Building

Consultant Name Mac Nally Consultant

Contractor Name

Place/ City UAE – Ajman

Completion Date December 2008

Type Of Units Multi V

Total Capacity 220_Ton

Total Project Value 250,000_$

Notes

• Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the power consumption,

• Client required individual billing for offices.

Land Mark Multi V Project Commercial

Page 64: VRF system presentation !

67

Project Name Dubai Bank

Building Type Bank

Project owner Dubai Bank

No Of Floors G+2 Building

Consultant Name Engineer’s Office

Contractor Name SS. Lootha Constructions

Place/ City UAE – Dubai

Completion Date July 2009

Type Of Units Multi V

Total Capacity 159_Ton

Total Project Value 200,000_$

Notes

•Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the cost of

Electric Connection and Electric power consumption,

•Offered with Central Controller.

Land Mark Multi V Project Commercial

Page 65: VRF system presentation !

68

Project Name Al Meraas Sales Center

Building Type Office Bldg

Project owner Al MERAAS

No Of Floors G+M Building

Consultant Name SPW Consultant

Contractor Name

Place/ City UAE – Dubai

Completion Date Nov 2009

Type Of Units Multi V

Total Capacity 120_Ton

Total Project Value 150,000_$

Notes

• Project Demands for less operational cost, as client

need to pay the electricity bill

• Offered with Central Controller.

Land Mark Multi V Project Commercial

Page 66: VRF system presentation !

Project Name Airport Heights ECGA

Building Type Commercial Building

Project owner ECGA

No Of Floors

Consultant Name IBN Khaldoun

Contractor Name HJB

Place/ City Oman Muscat

Completion Date Under Commissioning

Type Of Units Multi V

Total Capacity 200_Ton

Total Project Value 225,000_$

Notes

• It’s a Ministry of Finance PJT

• Green Technology

• Installation Flexibility and Network solution

Land Mark Multi V Project Commercial

PROJECT UNDER COMMISSIONING

Page 67: VRF system presentation !

Project Name Yahya Group Holding Building

Building Type Office Building

Project owner Yahya Group Holding

No Of Floors G+1 Building

Consultant Name Al Abraj

Contractor Name OGE

Place/ City Oman - SOHAR

Completion Date December 2011

Type Of Units Multi V

Total Capacity 135_Ton

Total Project Value 160,000_$

Notes

•Project owner looking for energy saving technology in o

rder to reduce annual electrical cost.

•LG proposed Multi V and highlighted annual savings

Land Mark Multi V Project Commercial

Page 68: VRF system presentation !

Project Name British Council Building

Building Type Office Building

Project owner British Council

No Of Floors G+1 Building

Consultant Name Majaan

Contractor Name Cemec

Place/ City Oman - Muscat

Completion Date January 2012

Type Of Units Multi V

Total Capacity 20_Ton

Total Project Value 30,000_$

Notes

•Project originally designed with Air Cooled Chillers and

then converted to VRF to reduce the cost of Electric

Connection and Electric power consumption,

•Offered with Central Controller.

Land Mark Multi V Project Commercial

Page 69: VRF system presentation !

72

Project Name Hubara Bird Culture

Building Type Laboratory Center

Project owner Abu Dhabi Authority For Culture& Heritage (ADACH)

Consultant Name Lab Design

Contractor Name Adearest

Place/ City UAE – Al Ain

Completion Date August 2008

Type Of Units Multi V

Total Capacity 527_Ton

Total Project Value 685,000_$

Client Requirements

• Sustainable design with green Refrigerant

• The lesser the better power consumption

• Capability of Monitoring& Controlling the AC units