Tips for Successful Delegation of

Connection Design

by Clifford Schwinger, P.E.The Harman Group, Structural Engineers

King of Prussia, Pa.

[email protected]

Delaware Valley Association of Structural Engineers

10/8/14 breakfast seminar

2

3

Engineers can reduce the cost of the

connections even when delegating

connection design.

A substantial percentage of structural

steel cost is related to the connections.

Why care? Why delegate?

Less work for the engineer of record

Connection design is becoming a specialty

Fabricators have different preferences

for preferred connection details

4

But there is a right way and a wrong

way to delegate connection design.

5The wrong way:

“ALL SHEAR CONNECTIONS SHALL BE

DESIGNED TO DEVELOP THE FULL SHEAR

STRENGTH OF THE MEMBER.”

“ALL MOMENT CONNECTIONS SHALL BE

DESIGNED TO DEVELOP THE FULL

PLASTIC MOMENT CAPACITY OF THE

MEMBER.”

6

Page 2: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

2

The wrong way:

“ALL SHEAR CONNECTIONS SHALL BE

DESIGNED TO DEVELOP A SHEAR

STRENGTH EQUAL TO 0.6 x Fy x d x t”

“ALL MOMENT CONNECTIONS SHALL BE

DESIGNED TO DEVELOP THE FULL

PLASTIC MOMENT CAPACITY 0.9 x Mp OF

THE MEMBER.”

7 The wrong way: 8

The right way=.

9

Follow the Code of

Standard Practice

10Rule #1

11 12

Page 3: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

3

13 14

15 16

17

From the commentary of AISC 303A10,

The EOR has ultimate “).responsibility for the

adequacy and safety of the entire structure).”

Follow Code of Standard Practice18

Section 3.1.1

Page 4: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

4

19

This is not connection design This is not connection design

20

21

Design of stiffeners is the responsibility of the

engineer of record

Show the reactions

22Rule #2

23 24

Page 5: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

5

25

Wrong way #1

“ALL SHEAR CONNECTIONS SHALL BE

DESIGNED TO DEVELOP THE FULL SHEAR

STRENGTH OF THE MEMBER.”

“ALL MOMENT CONNECTIONS SHALL BE

DESIGNED TO DEVELOP THE FULL PLASTIC

MOMENT CAPACITY OF THE MEMBER”

26

Wrong way #2

27

Do not specify

connections be

designed using

Table 3A6

Wrong way #3

28

Relying on Table 3A6 will usually result in excessively

conservative connection designs.

29

Relying on Table 3A6 will usually result in excessively

conservative connection designs.

30

But, relying on Table 3A6 can also result in connections with

insufficient strength

Page 6: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

6

31

Show member shear reactions on

framing plans, moment connection

design moments and axial loads in

brace and truss members.

(preferably factored)

The right way�.

Do not make up

connection design

requirements

32Rule #3

Do not mandate connection design

requirements more stringent than

required by the Building Code and

AISC 360

33 34

“All bolts shall be slipAcritical”

“All connections shall be designed for the

full strength of the member”

“All holes shall be standard sized holes”

“SingleAsided shear connections are

prohibited”

Examples of arbitrary (and usually

unnecessary) requirements,

Use R=3 (where

permitted)

35Rule #4

Limit “Strength Ratio” of

tension members

36Rule #5

Page 7: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

7

37Limit strength ratio

ASAGS = Available strength at the gross section

Strength ratio =ASAGS

Required strength

Members must have sufficient strength at both the gross

and net sections

38Limit strength ratio

39Limit strength ratio

40Limit strength ratio

41Limit strength ratio

42

Following this rule will reduce the likelihood that

sections will require reinforcement at the net section

Limit strength ratio

Page 8: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

8

43Limit strength ratio

44Limit strength ratio

Think about

constructability and

connection

“designability”

45Rule #6 46

Designability

The ease by which economical

connections can be designed for a

given framing configuration

47

How will the connections be designed and detailed?

Are the connections “designable”?

Designability

Will the connections be easy to fabricate?

Will they be easy to install in the field?

Constructability

48

Engineers have options during design

Engineers can configure the framing to

improve the “designability” of connections

Failure to consider “designability” during

design reduces options for the fabricator

during detailing

Designability

Page 9: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

9

49Designability

50Designability

51Designability

Head off steeply skewed connections

52Designability

53

Configure framing so that no more than one beam frames to

any one side of a column

Designability54

Configure framing so that no more than one beam frames to

any one side of a column

Designability

Page 10: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

10

55

Be aware of connection interference where beams are

slightly offset from columns.

Designability

Avoid skewed beamAtoAcolumn moment connections

56Designability

Issue complete, coordinated

and wellAdetailed contract

documents

57Rule #7 58

59 60

Show details giving concept of design.

Permit alternative details.

Page 11: Tips for Successful Delegation of Connection Designdvase.org/docs/2014 DVASE Delegating connection design.pdf · 1 Tips for Successful Delegation of Connection Design byClifford Schwinger,

11

Permit consideration of

alternative connection details

61Rule #8Summary

62

1.Understand and follow the Code of Standard Practice

2.Show the reactions

3.Do not specify requirements in excess of the building code

4.Use R = 3 for seismic design (if permitted)

5.Limit strength ratio in tension members to 0.75

6.Think about constructability and connection “designability”

7.Issue complete & coordinated contract documents with

“designable” concept connection details

8.Permit alternative connection details

Questions?

Thank you!

Clifford Schwinger, P.E.The Harman Group, Structural Engineers