PROJECT SCOPE

The project comprised design

and build of an insulated

aluminium rainscreen covering

9,800m2 and replacement of

2,000 windows.

REFERENCE CONTACTAndrew DuncanDirector of Property ManagementUniversity of StirlingStirling FK9 4LAT: 01786 467096E: [email protected]

TYPE OF CONTRACTThe Scottish Building Contract withContractors Design + SectionalCompletion May 1999 Edition (January2004 Revision)

CONTRACT VALUE £3.9m

PROJECT DURATION 72 weeks2007/08

The Cottrell Building, University of Stirling before

The Cottrell Building, University of Stirling after

Client Testimonial

The Cottrell Building operatednormally throughout the contractperiod. This was very much downto the flexibility of d+b facadesand to its noise managementprocedures. Their site managementworked closely with the Universityin programming and managing theproject to ensure minimumdisruption. The company personnelat all levels were found to besolution-oriented and positive indealing with all the challengessuch a project presents.

The contract was completed withinbudget more than 3 months aheadof programme and is atremendous success. We are savingenergy cost and have significantlyreduced our carbon emissions; theproject will pay for itself in energysavings alone in the coming years.The building has been trulyregenerated and the deliveryprocess was refreshingly smoothand professional. I have nohesitation in recommending d+bfacades as a company thoroughlycompetent in the design andinstallation of cladding systems.

Andrew A. Duncan,Director of Property Management

Page 3: The Cottrell Building, University of Stirling - dbfacades.com · The Cottrell Building, University of Stirling + PROJECT SCOPE The project comprised design and build of an insulated

+T h e C o t t r e l l B u i l d i n g , U n i v e r s i t y o f S t i r l i n g

The Cottrell Building, University of Stirling before

The Cottrell Building, University of Stirling before

The Cottrell Building, University of Stirling after

The Cottrell Building, University of Stirling after

Page 4: The Cottrell Building, University of Stirling - dbfacades.com · The Cottrell Building, University of Stirling + PROJECT SCOPE The project comprised design and build of an insulated

+T h e C o t t r e l l B u i l d i n g , U n i v e r s i t y o f S t i r l i n g

The Cottrell Building, University of Stirling after

The Cottrell Building, University of Stirling before The Cottrell Building, University of Stirling after


Top Related