Transcript
Page 1: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Technology Readiness in Michigan

Page 2: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Technology Readiness in Michigan

Technology Readiness Infrastructure Grant Overview

Page 4: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Technology Readiness Infrastructure Grant

State School Aid

Focus:

The development or improvement of a district’s technology infrastructure, including, but not

limited to, hardware and software, in preparation for the planned implementation in 2014-2015 of

online growth assessments

Page 5: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Follow us on Twitter @22itrig

Page 6: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

New videos for each activity

Page 7: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

7

• Rural Northern Michigan Consortium (Copper Country ISD)

• Intra-Michigan Consortium (Wexford-Missaukee ISD)

• Greater Michigan Educational Consortium (Genesee ISD)

• Kent ISD Consortium (Kent ISD)

• Southwest Michigan Consortium (Kalamazoo RESA)

 

Consortium Leadership

May 2014

Page 8: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Funding Breakdown

Year One Year Two Year Three (Proposed)

Funds to Local Districts and Consortia

$15,905,400 Funds to Local Districts and Consortia

$15,300,000 Funds to Local Districts and Consortia

$17,007,000

Funds to Activities $18,094,600 Funds to Activities $16,000,000 Funds to Activities $20,900,000

Funds to Connectivity $16,000,000 Funds to Connectivity $13,700,000 Funds to Connectivity $3,593,000

Whole School Technology $ 5,000,000

Total $50,000,000 Total $50,000,000 Total $41,500,000

Page 9: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Use of District Participation Funds

Page 10: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Year One Accomplishments

http://22itrig.org/downloads/documents_and_resources/trig_annual_report_1014.pdf

Page 11: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Cost Savings

Direct Indirect Designated FundsSavings Savings To Be Spent

Category One - District Participation $ 14,692,246

Category Two - Consortia 480,000

Category Three

E-Rate - 1,501,615

TRIG Operations Office 118,500

SEN Design - -

MTRAx 413,280

Classroom Readiness 1,523,674 2,509,500

Device Purchasing 5,003,590 10,247,472

Data Integration - 145,000

Assessment & Curriculum $ - 851,394

Category Four - Consortia - 733,154

Category Five - SEN Build 18,501,693

Total Categories $ 21,219,510 $ 16,999,915 $ 18,501,693

Total Savings from TRIG $ 56,721,117.66

TRIG Cost Savings Year OneAs of J une 30, 2014

Page 12: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Classroom Readiness

1673 teachers across the state completed a 30 hour course to give them the skill to create a technology rich classroom environment

Page 13: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Cost Savings Spotlight – E-Rate

Pre TRIG

After TRIG

$0  $5  $10  $15  $20  $25 

Cost per Mb

Cost per Mb

Wexford-Missaukee ISD4x bandwidth at same cost

Page 14: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Year Two – Current Work

Participation Funds have all been distributed Need to be spent by June 30, 2015 Five areas of Technology

• Network Services• Device Purchases• In-Building Wireless Connectivity• Online/Digital Assessments

Page 15: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Statewide Activities

Page 16: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Statewide Activities

Page 17: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – SEN

To have all of K-12 Buildings in the state have zero limits on bandwidth

usage and seamless access to data center services

To make sure all students in the state have the

resources needed to be technology ready for their

future

Page 18: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Current draft of the SEN Backbone

Regional meetings with K12 and vendors are underway to identify synergies between local initiatives the SEN backbone design.

Page 19: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

SEN Session

Friday 10:20 -11:20

Page 20: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

E-Rate – Major Milestones

Drive costs down as low as possible

Simplify E-Rate filing

Make sure all legal assurances are met

Maximize E-Rate benefits for schools

Page 21: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

E-Rate Current Work

RFPs for Telecommunications and Internet Services, VOIP, and Web hosting have all been posted. 

Bid development tool is getting close to completion. 

Sessions are being held to educate about the E-Rate 2.0 changes.

Page 22: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

E-Rate Session

Friday 9:00 -10:00

Page 23: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – Device Purchasing

To make instructional technology affordable for all MI K-12 districts

through a Statewide Device Purchasing Program

To ensure that all have the capability to participate in online assessments and

high quality online learning experiences

To develop a self-sustaining program by 2016

Page 24: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Device Purchasing Sales by Date

Page 25: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Sales by Device Type

Personal Learning Device Total 127,971Desktop Total 19,607Total Devices Sold 147,578

Chromebook 68,598Notebook 26,668iPad 28,511Other Tablet 4,194Desktop 19,607Total Devices Sold 147,578

Incentive per PLD $50.81Incentive per Desktop$25.40

*All data is not yet fully verified.

Page 26: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Cost Savings Spotlight – Device Purchasing

Page 27: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Savings across the state

Page 28: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Statewide Activities

Page 29: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision-Michigan Technology Readiness Tool (MTRAx)

To provide districts a method to measure their readiness for online

testing

For MTRAx to become the Technology Planning Tool Statewide• Infrastructure• Instructional and• Other data required to facilitate meaningful

technology plans

Page 30: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

MTRAx

Fall 2014 data collection• Submit/confirm your data by 11/14/2014• Development to support new MDE

requirements in progress Future enhancements – Spring 2015

• Instructional measures• Technology planning• Low effort data collection• New interface

Page 31: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – Data Integration

To streamline the use of educational

information statewide related to common data

& common solutions

Page 32: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Data Integration

Deploying 5 Regional Data Hubs Close to going live on inbound integrations

for pilot districts on the 5 identified student information systems

Phase 2 development is nearing completion, which will provide outbound integrations and reporting

Phase 3 development work has been quoted and will complete functionality needed to meet the project goals

Page 33: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Data Hub Conceptual Model

Page 34: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Statewide Activities

Page 35: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – Classroom Readiness

Prepare MI Educators to increase their technology proficiency

Plan and implement online assessments

Provide “Any Time, Any Place, Any Way, Any Pace” learning

Page 36: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Classroom Readiness

This year 7038 teachers are enrolled in the T3 course.

283 buildings and 113districts are involved in the course.

Page 37: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – Assessment and Curriculum

Provide Schools with knowledge, skills, and resources to use data from assessment to inform instructions

and support student learning.

Page 38: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Vision – Assessment and Curriculum

Development of digital textbooks for social studies courses

The textbooks will be based on the Inquiry Arc from the C3 framework and will align to

Michigan standards

In the first year, books will be created for fourth-grade United States Studies, fifth-grade

United States History, sixth-grade World Geography, and High School Economics

Page 39: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Statewide Activities

Page 40: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG Workshops

• MTRAx Focus Groupso Technology Planningo Instructional Measures

• E-Rate 2.0

• MiSEN Design

• Device Purchasing Focus Groups

• Data Services Collaborative Grant in your Region

• How to Manage the Data Hub Cockpit

Page 41: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Year Three

May 2014 41

Page 42: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 District Requirement #1

To be eligible for participation funding, districts must agree by November 14, 2014, in MEGS+ to meet the following requirements:

The district agrees to participate in one statewide or regional consortium identified through the application process and report spending estimates under the new participation requirements. The district agrees to limit participation funds spending for technology readiness efforts.

•Districts whose readiness scores in MTRAx are classified as ‘Not Ready’ as of November 14, 2014, are expected to utilize their participation funds toward expenditures which are aimed at improving those scores.

•Districts with ‘Ready’ scores in MTRAx will limit participation funds spending toward technology readiness efforts such as:

•Online/Digital Assessment, including universal diagnostic screening tools, In-building Wireless Connectivity, Network Services (e.g. additional bandwidth, content filtering), Computer/Device Purchasing, Technology Readiness for instruction and Data Collaborations that support online assessment readiness.

Page 43: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 District Requirement #2

To be eligible for participation funding, districts must agree by November 14, 2014, in MEGS+ to meet the following requirements:

The district agrees to be represented in TRIG sponsored statewide 470 bids for E-Rate funding and consider using the awarded vendors, although districts will not be bound to purchase from the bid. The district agrees to apply for all of its eligible E-Rate Priority 1 Service(s) where such participation is economically advantageous to the district.

Page 44: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 District Requirement #3

To be eligible for participation funding, districts must agree by November 14, 2014, in MEGS+ to meet the following requirements:

In instances where the ISD or district manages its own wide area networks (WANs), the ISD/district will, if requested, allow for the connection of the ISD/district WAN to the State Education Network (SEN). The ISD/district will permit installation of electronics and/or software provided by this grant required for implementing and performance monitoring of the SEN. This is with the understanding that the electronics and/or software provided by this grant will not negatively interfere with or control the ISD’s/district’s servers, routers, switches, or other WAN equipment determined necessary and installed by June 30, 2015.

Page 45: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 District Requirement #4

To be eligible for participation funding, districts must agree by November 14, 2014, in MEGS+ to meet the following requirements:

The district agrees to participate in any necessary surveys/data collection processes sent out by the MDE or the TRIG Operations Office to inform the work of the various activities (maximum of three total per fiscal year).

Page 46: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 District Requirement #5

To be eligible for participation funding, districts must agree by November 14, 2014, in MEGS+ to meet the following requirements:

The district understands that its ISD must also agree to these requirements for the district to receive participation funds.

Page 47: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

 

TRIG District Participation

Participating TRIG Districts: Non-Participating TRIG Districts: ● Overall

o Receive Participation funds ● Device Purchasing Activity

o Purchase from the TRIG bid via SPOT and

receive discount o Receive device purchasing

incentives o Eligible for value-adds such

as PD and personal purchase programs

● Classroom Readiness Activity o Participate in Classroom

Readiness T3 course o Participate in Classroom

Readiness T3 course (Non-public schools can participate at their own expense)

● Data Integration Activity o Participate in Data Hub Project o Utilize the Data Hub connectors o Access the Data Hub

dashboards and data quality reports

● Overall

● Device Purchasing Activity o Purchase from the TRIG bid via

SPOT and receiving the discount

● Classroom Readiness Activity o Participate in Classroom

Readiness T3 course (Non-public schools can participate at their own expense)

● Data Integration Activity

 

Page 48: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG District Participation (con’t.)

 

Participating TRIG Districts:  Non-Participating TRIG Districts: ● E-Rate Activity 

o Utilize Statewide E-Rate bids o Utilize Statewide bids for other 

products and services o Attend E-Rate trainings o Utilize the bid evaluation tool o State E-Rate Coordinator 

representation  

● Assessment and Curriculum o Access the recorded Webinar 

 ● MTRAx Activity 

o Complete MTRAx and print all reports 

o Utilize new tech planning process  

● Data Services Collaborative o Participate in technology 

collaboratives within your TRIG consortia 

● E-Rate Activity o State E-Rate Coordinator 

representation          

● Assessment and Curriculum o Access the recorded Webinars 

 ● MTRAx Activity 

o Complete MTRAx and print all reports 

o Utilize new tech planning process  

● Data Services Collaborative o Participate in technology 

collaboratives within your TRIG consortia 

Page 49: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

TRIG 3.0 Vision

TRIG 3.0 Executive Summary

TRIG 3.0 Vision Full Report

Located on the TRIG Website Homepage - 22itrig.org

Page 50: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Strategic Readiness Support

The TRIG Operations Office will leverage all statewide activities for the purpose of ensuring every district is “test-ready.” New

goals for Strategic Readiness Support:

Developing and implementing a process to identify the highest need districts to achieve 100 percent test readiness

Developing and implementing a plan to provide the supports needed for each district to achieve test readiness

Page 51: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Other important information

Page 52: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

District Incentives for Participation in the Michigan Interim Assessment Field Testing

Districts may have several schools participate in one or more subjects and grade levels. Each participating school must individually register. Content areas to be field tested include:

English language arts (ELA) and mathematics for grades K, 1, and 2

High school science courses (Earth Science, Biology, Chemistry, and Physics)

High school social studies courses (US History & Geography, World History & Geography, Civics, and Economics)

If Earth Science high school courses are offered to 8th grade students, schools may consider offering the Earth Science interim assessment to these  8th grade students

Page 53: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

District Incentives for Participation in the Michigan Interim Assessment Field Testing

School Districts will earn a $3.00 minimum participation incentive per completed test for the Fall 2014 Interim Assessment Field Test

NEW - MDE is also seeking schools to administer the field tests on iPads and Chromebooks. This separate window encompasses only these devices and runs from October 20 -  November 14, 2014.  Tests completed as a part of this separate window will also qualify for the TRIG participation incentive as well.

Page 54: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Upcoming Deadlines

November 7• Paper – Pencil Waiver Due

November 14• MTRAx Submission Due• MEGS+ TRIG Applications due (level 5)

• District Participation • Consortium membership

Checklist is available here

Page 55: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Questions?

Page 56: Technology Readiness in Michigan. Technology Readiness Infrastructure Grant Overview

Contact Information:

Tim HallTechnology Readiness Infrastructure Grant

Project Director

thall@ gomasa.org


Top Related