Download - Technical Implementation & Achievements
![Page 1: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/1.jpg)
This project is co-funded by the European Union under the Horizon 2020 (H2020) Research and Innovation Programme (grant agreement No 769115)
Dehlia Willemsen (TNO), September 23, 2021
Technical Implementation & Achievements
![Page 2: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/2.jpg)
Table of Content
Technical implementation
➢ Objectives
➢Approach
Achievements➢ Development
➢Testing
➢Feedback on Specifications and Requirements
➢Technical Evaluation
2
![Page 3: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/3.jpg)
Technical Implementation
![Page 4: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/4.jpg)
Objectives
• Design and implementation of a platooning system according to the specifications
• The Platooning Support Function is implemented
• Technical evaluation of the generic multi-brand platooning solution
• Validation of the implementations via physical tests on test track
• Multi-brand platooning testing on public roads
• Demonstration of the multi-brand platoon solution on public roads
![Page 5: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/5.jpg)
Approach (1)
• Reference implementation
– Common functionality only
• Tactical Layer: available to the partners
• Real-time implementation in HIL simulator
– Verify Specifications and Requirements
• Review
• Issue list for details of implementation
• Change request list for Specs and Reqs
→ WP2 feedback
5
![Page 6: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/6.jpg)
Approach (2)
• OEM specific implementations
– Equipping the trucks
– Design the functionality
– Mono-brand testing
• Dual/triple/quadruple-brand testing
• Multi-brand testing
6
![Page 7: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/7.jpg)
Achievements
![Page 8: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/8.jpg)
Development
• Each OEM had a specific task in the project
• A common communication device was provided
– reference implementation of communication messages
– basic protocol in a test tool
• Examples of items we discussed about:
– Join at large distances
– Leave by braking
– What to put in ‘PlatoonID’ field?
– Join timeout: how long to wait for the join response and
starting receiving the PCM message?
8
![Page 9: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/9.jpg)
Dual / Triple / Quadruple testing
9
9-12 March 2020 AstaZero,
Sweden
Volvo group, Scania, MAN
14-16 September,
2020
Helmond,
Netherlands
DAF, Daimler, ZF/Wabco
23-25 March, 2021 Aldenhoven,
Germany
DAF, IVECO, MAN (comm. only)
14 – 18 June, 2021 AstaZero,
Sweden
Scania, Volvo group
21-25 June, 2021 Papenburg,
Germany
DAF, Daimler, IVECO, MAN
20 – 22 July, 2021 Helmond,
Netherlands
DAF, Daimler
16 – 20 August, 2021 AstaZero,
Sweden
Scania, Volvo group
23 – 27 August, 2021 Jeversen,
Germany
Daimler, IVECO
06-23 September
2021
IDIADA, Spain DAF, Daimler, IVECO, MAN, Scania, Volvo Group
![Page 10: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/10.jpg)
Testing
• Functionality first
• Signing & Verification and Encryption ‘optional’/’later’
• Tests performed– Join from behind and leave: different combinations
– Steady state platooning with speed variations
– Emergency braking
– Cut in
– Receiving I2V message
• Some of the issues encountered:– Alignment of time and matching platooning partner
– Load of communication box with Signing & Verification andlogging ‘on’
10
![Page 11: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/11.jpg)
Early feedback on Specs & Reqs
• This was actually an ongoing process during the development and testing of the platooning systems
• Examples:
– KeyUpdate sequences: key management function necessary
– When to stop sending PCM in leave sequence:after receiving ‘preparing’ or ‘prepared’?
– When to update certain data fields duringjoining / platoon merge
11
![Page 12: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/12.jpg)
Technical Evaluation
• Next months
• Gather all the experiences from 2.5 weeks of testing
• Gather data
• Evaluate data and conclude on the results
• To be presented at the final event next year
12
![Page 13: Technical Implementation & Achievements](https://reader031.vdocuments.mx/reader031/viewer/2022012016/61dab78e114b1034b37ca709/html5/thumbnails/13.jpg)
This project is co-funded by the European Union under the Horizon 2020 (H2020) Research and Innovation Programme (grant agreement No 769115)
Thank you for your attention
platooningensemble.eu
Consortium leader