Page 1: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

Spill Prevention, Control, and Countermeasures Plan

Lempster Wind Energy Project Lempster, NH

Prepared for

Lempster Wind, LLC.

November 2008

Prepared by

Page 2: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC

Page 3: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

III

Oil Spill Response Flowchart Stop the spill source

Always report and clean up all spills

Clean Up

Remove all visible traces of contaminated soil and debris, plus 1 lateral foot

Containerize debris and mark barrel lid with: DRUM CONTESTS (e.g. spill debris) SPILL SOURCE (e.g. transformer ###) SPILL DATE

Clean all solid surfaces

Report

Contain the spill (absorbents, berm)

Prevent from entering a waterway (streams, storm drains are waterways)

Isolate the spill area

Report to Plant Manager or Senior Plant Technician and document in plant log

Call Lempster Wind, LLC EHS 616 283 2226 for documentation purposes and to determine if spill is

reportable to regulatory agency

Manager or Senior Plant Technician must fill out spill report form from the Lempster Wind EHS

Accident/ Incident SOP

Arrange with a hazardous waste disposal company to transport spill soils and spill debris to approved

disposal facility

Call Lempster EHS

616.283.2226 with questions

Note: Reporting information: • Time • Date • Location • Source • Amount spilled • Surfaces involved • Clean up

LARGE SPILLS (failed padmount or substation transformers) will require the use of heavy equipment, certified clean-up and disposal contractors, and consultants to perform soil

sampling to ensure clean-up meets state requirements with bills-of-lading/manifests

completed for disposal at approved disposal facilities

In NH, reportable spills include any amount of oil to ground or surface water or oil spills to land

unless they are cleaned up immediately and less than 25 gallons. Immediately report the spill or

threatened spill to NHDES Emergency Response at (603) 271-3899 (8am-4pm, Mon-Fri) or contact NHDES via the NH State Police at (800) 346-4009.

SMALL LOCALIZED SPILLS (less than 5 gallons for example)

Page 4: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 5: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

V

Facility Information Page

Facility Name Lempster Wind, LLC Lempster Wind Project

Facility Location: Sullivan County

Facility Mailing Address: 106 Bean Mountain Road (PO Box 231) Lempster, NH 03605

Facility Contact Phone Numbers: Brian Goodwin: (616) 283-2226

Operations and Maintenance Manager

SPCC Program Coordinator Brian Goodwin

Corporate Office 1125 NW Couch, Suite 600 Portland, OR 97209

Owner/Operator Name: Lempster Wind LLC.

Owner/Operator Address: 106 Bean Mountain Road (PO Box 231) Lempster, NH 03605

Type of Facility: Wind Power Facilty

Latitude/Longitude: 43° 13’ 37.5” N 72° 9’ 6.3” W

River Drainage Basin: Sugar River

Nearest Surface Water Body: See Site Map

Distance: See Site Map

Page 6: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 7: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPCC Plan Certification Page

Management ApprovalThis Spill Prevention, Control, and Countermeasure Plan for Iberdrola USA's LempsterWind Project is fully supported by the management of lberdrola USA. Lempster Wind, LLCwill implement this Plan and amend it as needed as a result of expansions, modifications,and improvements at the Lempster Wind, LLC facility. In addition, the managementLempster Wind, LLC commits the manpower, equipment, and materials required toexpeditiously control and remove any quantity of oil discharged that may be harmful and torespond to a ~..ischargewithin an appropriate response time.

~j;) c»toPIo .JName: gric Ltlllum

Date:

Signature:

Engineer CertificationThrough this certification, I hereby attest that (1) I am familiar with the requirements of 40CFR 112; (2) my agent has visited and examined the facility; (3) the SPCC Plan has beenprepared in accordance with good engineering practices, including consideration ofapplicable industry standards, and with the requirements of the SPCC rule; (4) proceduresfor required inspections and testing have been established; and (5) the Plan is adequate forthe facility.

Signature:

Certification Date:

NH

8970

CH2M~~

II..-?-o

Certifying Engineer:

State:

William Shively

Registration Number:

Vii

Page 8: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 9: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

IX

Plan Review and Revision

Changes to Facility or Operations This SPCC Plan is to be amended whenever there is a change in facility design, construction, operation, or maintenance procedure that materially affects the potential for an oil spill. Examples of the types of changes that may require amendment of the Plan include the following:

• Commissioning or decommissioning tanks • Replacement, reconstruction, or installation of oil containers • Construction or demolition that might alter secondary containment structures • Revision of standard operating or maintenance procedures

Amendments to the plan because of these types of changes are called technical amendments, and must be certified by a Professional Engineer (PE).

Other changes are called nontechnical amendments and do not need to be certified by a PE. Nontechnical amendments include the following:

• Change in name or contact information (e.g., telephone numbers) for individuals responsible for this SPCC Plan

Both technical and nontechnical amendments must be documented in the attached SPCC Review Plan Log. All amendments to this SPCC Plan will be signed and certified by the owner/operator.

This SPCC Plan is to be amended within 6 months of a change, and implemented within 6 months following preparation of the amendment.

Routine Reviews In any case, this SPCC Plan will be reviewed and evaluated once every 5 years by the Spill Prevention Coordinator. The review will be documented and noted on the attached SPCC Review Plan Log. If required, the SPCC Plan will be amended within 6 months of the review as described above, and any changes will be implemented within 6 months of the amendment.

Page 10: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

X

SPCC Plan Review Log

Date Certification (per 40 CFR 112.5[b]) Reviewer Signature Revisions

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

I have completed review and evaluation of the SPCC Plan for Lempster Wind, LLC facility on _______ and will/will not amend the Plan as a result.

Page 11: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

Contents

XI

Section Page

Oil Spill Response Flowchart ....................................................................................................... iii

Facility Information Page.................................................................................................................v

SPCC Plan Certification Page ...................................................................................................... vii

Plan Review and Revision ..............................................................................................................ix

Introduction ......................................................................................................................... 1-1 1.1 Objectives and Scope of Plan ................................................................................... 1-1 1.2 Plan Content and Format ......................................................................................... 1-1

Facility Description ............................................................................................................ 2-1 2.1 Project Area ................................................................................................................ 2-1

2.1.1 General.............................................................................................................. 2-1 2.1.2 Topography...................................................................................................... 2-1 2.1.3 Drainage and Water Bodies ........................................................................... 2-1 2.1.4 Wind Turbine Generators .............................................................................. 2-2

2.2 Lempster Wind, LLC O&M Facility and Switchyard........................................... 2-2 2.3 Summary of Oil Containers and Equipment ......................................................... 2-2

Plan Requirements and Activities ................................................................................... 3-1 3.1 Fault Analysis and Containment Measures........................................................... 3-1

3.1.1 Overview .......................................................................................................... 3-1 3.1.2 Evaluation of Active Containment Measures for Gear Boxes................... 3-2 3.1.3 Evaluation of Active Containment Measures for Grounding Transformers 3-3

3.2 Inspections .................................................................................................................. 3-3 3.3 Spill Response ............................................................................................................ 3-3

3.3.1 Procedures........................................................................................................ 3-3 3.3.2 External Notifications ..................................................................................... 3-4 3.3.3 Spill Response Equipment ............................................................................. 3-5 3.3.4 Spill History ..................................................................................................... 3-6

3.4 Recordkeeping ........................................................................................................... 3-6 3.5 Training....................................................................................................................... 3-6 3.6 Security........................................................................................................................ 3-6

Appendixes

A – Site Map & Facility Diagrams B – Inspection Checklists C – Spill Reporting Forms D – Facility Spill Log E – Container/Equipment Data Sheets

Page 12: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

CONTENTS, CONTINUED

XII

Tables

Cross-Reference of 40 CFR Provisions and Lempster Facility SPCC Plan............................... 1-2 Summary of Oil Containers and Equipment................................................................................ 2-2 Summary of Secondary Containment Strategy ........................................................................... 3-2

Page 13: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC 1-1

SECTION 1

Introduction

1.1 Objectives and Scope of Plan This plan outlines the procedures, methods, and equipment used at the Lempster Wind, LLC (facility) to comply with the U.S. Environmental Protection Agency’s (EPA’s) oil spill prevention, control, and countermeasures standards, and to comply with inspection, reporting, training, and record keeping requirements. Pursuant to 40 Code of Federal Regulations (CFR) 112.1, a facility must prepare and maintain a Spill Prevention Control and Countermeasures (SPCC) Plan if the following conditions occur:

1. The facility has aboveground oil storage capacity of more than 1,320 gallon 2. Oil discharges could potentially reach navigable waters as defined in 40 CFR 112.2

These applicability requirements are met by the facility, and an SPCC Plan must be prepared and maintained.

The hierarchical objectives of the SPCC Plan are as follows:

• PREVENT spill from occurring. • PREPARE for a potential spill • RESPOND quickly and appropriately if a spill does occur.

1.2 Plan Content and Format This Plan does not follow the exact format specified in 40 CFR 112. Table 1-1 presents a cross-reference of 40 CFR provisions and Lempster Wind, LLC Plan sections.

This Plan is designed to be “user friendly,” easily implemented, and easily maintained. This Plan relies on “Container/Equipment Data Sheets” that provide SPCC Plan compliance requirements and activities for each oil facility (tank, container, equipment or operation) at the facility. This approach allows Lempster Wind, LLC personnel to efficiently make Plan updates and to address program requirements for their particular area(s) of responsibility.

Section 2.0 of this Plan provides a description of the regulated oil containers at the facility and the facility’s general drainage characteristics. As required by 40 CFR 112.7(a)(1), Section 3.0 provides a discussion of Lempster Wind, LLC’s conformance with the applicable SPCC regulations. Detailed technical and procedural information is referred to in the appendices. Appendix A contains site maps and facility diagrams. Appendix B contains a sample inspection checklist. Appendix C contains the New Hampshire Department of Environmental Services (NHDES) Spill Response & Complaint Investigation Section, Incident Report Form. Appendix D contains a sample facility spill log. Finally, Appendix E contains container and equipment data sheets.

Page 14: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

1-2 PDX/070950004.DOC

This Plan has been developed in accordance with the revised SPCC rules issued by EPA on July 17, 2002. The Plan was also developed taking into consideration the SPCC Guidance for Regional Inspectors dated November 28, 2005, and the SPCC rule amendments issued by EPA in the Federal Register on December 26, 2006.

TABLE 1-1 Cross-Reference of 40 CFR Provisions and Lempster Facility SPCC Plan

40 CFR Provision Provision’s Topic Plan Section Plan Page

112.3(d) Professional Engineer certification

SPCC Plan Certification Page vii

112.3(e) Location of SPCC Plan Section 3.4 Recordkeeping 3-8

112.5 Plan amendment Plan Review and Revision ix

112.7 Cross reference to rule Table 1-1, Cross-Reference with SPCC Rule 1-2

112.7(a)(1) Conformance with rule Section 3 Plan Requirements and Activities 3-1

112.7(a)(2) Equivalent environmental protection

Section 3.2 Inspections 3-5

Facility Information Page v

Section 2 Facility Description 2-1

Appendix A: Site Maps and Facility Diagrams Appendix A

112.7(a)(3) Facility diagram, facility information, spill response

Section 3.3 Spill Response 3-5

Section 3.3.2 External Notifications 3-6 112.7(a)(4) Spill reporting Appendix C – Lempster Wind, LLC Emergency Response and Evacuation Procedures

Appendix C

112.7(a)(5) Spill response Section 3.3 Spill Response 3-5

Section 3.1 Fault Analysis and Containment Measures

3-1 112.7(b), (c), and (d)

Evaluation of spill potential and secondary containment

112.7 (d)(2) Management commitment Management Approval vii

Section 3.2 Inspections 3-5

Appendix B – Inspection Checklist Appendix B 112.7(e) Inspections, tests, & records

Section 3.4 Recordkeeping 3-8

112.7(f) Personnel, training, and discharge prevention procedures

Section 3.5 Training 3-8

112.7(g) Security Section 3.6 Security 3-9

112.7(h) Tank car and tank truck loading unloading

No tank car/tank truck loading/unloading of oil occurs at this facility

112.7(i) Brittle fracture evaluation No field-constructed aboveground containers are located at this facility

112.7(j) Applicable State and local requirements

Section 3 Plan Requirements and Activities 3-1

112.8(b) Facility drainage Section 3.1 Fault Analysis and Containment Measures

3-1

112.8(c) Bulk storage containers Section 3.1 Fault Analysis and Containment 3-1

Page 15: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

PDX/ 1-3

Measures

* Only selected excerpts of relevant rule text are provided. For a complete list of SPCC requirements, refer to the full text of 40 CFR 112.

Page 16: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 17: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC 2-1

SECTION 2

Facility Description

This section describes the facility, including the project area, wind turbine generators, Lempster Wind, LLC operations and maintenance (O&M) facility and substation, and the oil containers and equipment.

2.1 Project Area 2.1.1 General The Lempster Wind Project is a planned 24 MW wind power project that will cover an approximate 60 acre area near the town of Lempster, New Hampshire, located on privately owned land in southwestern New Hampshire, approximately 20 miles north of Keene and less than 5 miles south of Mount Sunapee. The Lempster Wind Project consists of twelve turbines and will have the capacity to provide the annual electricity needs of approximately 10,500 New Hampshire homes. In general, the oil containers or oil-filled equipment covered by this SPCC Plan are as follows:

• Gear boxes located inside the wind turbine structures • Electrical transformers containing dielectric fluid • 55-gallons drum storage of oil products in the O&M building

The site map provided in Appendix A identifies the location and contents of each oil container. The container areas are described in more detail in the following sections. There are no underground storage tanks (USTs) at the facility.

At the time of initial Plan development and writing, the facility is under construction and is expected to be operational within the near future. The O&M building is complete, and switch yard is complete, however the turbines are currently being assembled, and virgin oil storage for nacelle hydraulic and gear box oil have not arrived at the site..

2.1.2 Topography The Lempster Wind, LLC facility is located along the ridgeline of Lempster Mountain, which runs from the northeast to the southwest, parallel to New Hampshire Route 10 in southwestern New Hampshire in Sullivan County. The highest point in Lempster is the summit of Bean Mountain, at 2,326 feet (709 m) above sea level. The site lies mostly within the Connecticut River watershed, with the southeastern corner lying in the Ashuelot River watershed. The surface is, in general, uneven and mountainous. The project site is located in moderately to significantly sloping in areas and is dominated by forested upland.

2.1.3 Drainage and Water Bodies The Lempster Wind site lies mostly within the Connecticut River watershed, with the southeastern corner lying in the Ashuelot River watershed. Flow at the site quickly matriculates into gravel and subsequently to the water table. Any flow that did occur near

Page 18: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

2-2 PDX/070950004.DOC

the northern portion of the site would primarily flow to the Cold River located approximately 5 miles to the east of the site. Flow from the southern portion of the site would drain to the Sugar River, which is a tributary of the Connecticut River.

2.1.4 Wind Turbine Generators Two types of oil-filled operational equipment are located at each of the 12 wind turbine generators (WTGs):

• Gear Boxes: Each WTG Meropa 320 gearbox contains 95 gallons of lubricating oil and is located at the top of the 260-foot turbine tower enclosure known as a nacelle.

• Step-up Transformer: These transformers are situated in the tower “nacelle” and are dry transformers with no oil storage capacity or oil in them at all.

• Hydraulic Units: There is also one hydraulic unit situated in each tower “nacelle” which provides secondary containment. The hydraulic unit holds 40 to 50 gallons of hydraulic fluid. These units are exempt from SPCC regulation as is below the 55 gallon threshold.

• The locations of the WTG sites are shown on Figure 1 provided in Appendix A.

2.2 Lempster Wind, LLC O&M Facility and Switchyard The O&M facility located on at the Lempster facility will house up to 6 55-gallon drums of oil products. Spill pallets are used as passive secondary containment for these drums. The site maintains a switch yard which includes three mounted grounding transformers; each transformer contains approximately 116 gallons of oil. There is no substation onsite. One spare grounding transformer is maintained at the site. The spare transformer contains no oil.

Plan drawings of the Lempster Wind, LLC O&M facility are provided in Appendix A.

2.3 Summary of Oil Containers and Equipment Table 2-1 summarizes the oil containers and equipment to be used.

TABLE 2-1 Summary of Oil Containers and Equipment

Container or Equipment ID Number of Units

Unit Capacity (Gallons)

Total Capacity (Gallons) Oil Product Stored

Oil-Filled Equipment

Grounding Transformers

3 116 348 Mineral Oil

WTG Gear Boxes 12 95 1,140 Lubricating oils

Hydraulic Units 12 50 600 Hydraulic fluid

Oil Storage Containers

55-gallon drum 6 55 330 Misc. oil products

Page 19: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

PDX/070950004.DOC 2-3

TABLE 2-1 Summary of Oil Containers and Equipment

Container or Equipment ID Number of Units

Unit Capacity (Gallons)

Total Capacity (Gallons) Oil Product Stored

storage

Total Facility Storage Capacity (gallons) 2,418

Page 20: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 21: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC 3-1

SECTION 3

Plan Requirements and Activities

This section describes the following general SPCC Plan requirements:

• Fault Analysis and Containment Measures • Inspections • Spill Response • Recordkeeping • Training • Security

This SPCC Plan conforms to SPCC rules with the exception of certain integrity testing requirements on 55-gallon drums for which environmental equivalence is demonstrated in Section 3.2.1. No additional state or local requirements pertaining to oil spill prevention were identified. Specific spill prevention control and countermeasures applicable to individual oil filled equipment or containers are provided in the “Container/Equipment Data Sheets” in Appendix E.

3.1 Fault Analysis and Containment Measures 3.1.1 Overview The development of this SPCC Plan included analyzing each oil-filled equipment or container for the following:

• A determination of the most likely spill scenario based on good engineering practice • An evaluation of the appropriateness of passive containment measures provided in the

original facility design and construction • An evaluation of the appropriateness of active containment measures for other

equipment not originally provided with passive containment measures

Table 3-1 provides a summary of the secondary containment strategy for oil-filled equipment and containers at the Lempster Wind Project facility. Additional details are provided in the Container/Equipment data sheets in Appendix E. Section 3.1.2 provides a detailed evaluation of active containment measures for the oil filled operating equipment.

Page 22: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

3-2 PDX/070950004.DOC

TABLE 3-1 Summary of Secondary Containment Strategy

Container/Equipment ID Maximum Potential Spill

(gallons) Description of Containment Measures

Oil-filled Equipment

Grounding Transformers

Up to 116

Active containment measures to control and remove spills from the large flat gravel area surrounding the grounding transformer locations.

WTG Gear Boxes

WTG Hydraulic Units

Up to 95

Up to 50

Spills inside the turbine tower will be contained by the sealed tower base. Active containment measures are appropriate and will be employed upon discovery for small spills that may occur from the nacelle and drip along the outside of the tower base. Gear boxes are equipped with low level alarms to detect leaks

Spills inside the turbine tower will be contained by the sealed tower base. Active containment measures are appropriate and will be employed upon discovery for small spills that may occur from the nacelle and drip along the outside of the tower base.

Oil Storage Containers

55 gallon drum Up to 55 Spill Pallets

3.1.2 Evaluation of Active Containment Measures for Gear Boxes As described in Section 2, the facility includes gear boxes, step-up transformers and hydraulic units at each of the 12 WTG sites. The step-up transformers are dry units with no oil storage capacity and thus not regulated by SPCC. The gear boxes contain 95 gallons of oil each. The hydraulic units are below 55 gallons and thus exempt from SPCC regulation though secondary containment is provided via the “nacelle” itself in the same way as outlined below for the gear boxes.

The set up for this site is unique in that the step-up transformers and gear boxes are located in the wind turbine nacelle itself. As such, the nacelle itself will serve as secondary containment so secondary containment around the concrete foundations or otherwise is not necessary. In the event of a spill the nacelle would contain most or all of the oil. Any oil spillage from any of the oil filled equipment or reservoirs that did escape from the nacelle would drain within the tower. The wind tower is set on concrete and tightly sealed around the pedestal and tower base with epoxy seal on the flange at the bottom of the tower.

In a worse case scenario there would potentially be an instantaneous release of 95 gallons from the gear box. In this case the spill will be contained within the sealed concrete tower floor base. Spills from nacelle will drip along the tower to the base. A minimal amount of oil, i.e. less than a gallon could potentially make it to the ground in a worst case scenario

Page 23: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

PDX/070950004.DOC 3-3

situation. Passive containment is provided by the tower nacelle and tower in combination with active measures to recover small amounts of oil that make it to the ground.

3.1.3 Evaluation of Active Containment Measures for Grounding Transformers The grounding transformers are pole mounted and away from any bodies of water. Active containment measures are used to control and remove any potential spills from the large, flat gravel area surrounding the grounding transformer location. There is a high temperature fault detection system in place which will notify wind farm technicians to investigate.

3.2 Inspections The facility includes bulk oil storage containers (55-gallon drums) and oil-filled operating equipment (electrical transformers and gear boxes). Industry standards for inspections of 55-gallon drums include the Steel Tank Institutes SP001 Standard for Inspection of Aboveground Storage Tanks, Third Edition, issued July 2005. The standard calls for owner-performed inspections conducted at least monthly. Containers will be stored so that all sides are visible (i.e., the container has no contact with the ground). If the container starts to degrade (e.g., begins to rust, or oxidize if a poly drum), the contents of the container will be transferred to a new drum compatible with the material. These controls are expected to provide environmental protection equivalent to integrity testing.

Formal monthly inspections for the transformers and gear boxes (exterior portion of nacelle and tower) have also been deemed appropriate for the facility at this time. Weekly “drive by” inspections will also be performed. A monthly inspection checklist is provided in Appendix B.

3.3 Spill Response 3.3.1 Procedures For quick reference an oil spill response flow chart has been developed and is provided in the front cover of this Plan. The procedures include internal and external notification procedures for initiating a response. For small spills (less than 5 gallons), facility personnel will promptly clean up any visible discharge. For spills greater than 5 gallons, the Lempster Wind Project Emergency Response and Evacuation Procedures must be followed. This procedure will be maintained onsite as part of standard operating procedures. The following actions are recommended to mitigate the release of oil products:

1. IF AT ALL POSSIBLE, STOP THE SOURCE OF THE SPILL IMMEDIATELY. Close the valve, shut down pumping, or take whatever actions are possible to stop any release. If conditions are hazardous (for example, fire or potential explosion), do not approach.

If safety is not an issue, call other nearby employees for assistance in stopping the release.

Page 24: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

3-4 PDX/070950004.DOC

2. The release should be confined to the smallest area possible.

− Use booms or sandbags, dig small trenches, or place absorbent pads to stop the spread.

− Take immediate action to prevent the spill from reaching off-site or surface waters.

− Place booms or pads, dig a diversion ditch, or use soil to form a berm.

− If the release reaches water, attempt to place booms to contain the release, or, if necessary, block drainage downstream of spill to prevent further discharge.

A list of emergency equipment and materials, and the locations where they are stored, is provided below.

3. Properly dispose of contaminated soils and/or equipment.

4. Perform the external notifications as outlined in Section 3.3.2.

3.3.2 External Notifications For any amount of oil that causes a sheen on “waters of the state” or that violates and applicable water quality standard, the following must be notified.

National Response Center (NRC): (800) 424-8802

New Hampshire Emergency Response Number (603) 271-3899

For additional information on spill reporting in New Hampshire, see DES’s Spill Response & Complaint Investigation Section, Incident Report Form provided in Appendix C. Spill events requiring SPCC Plan revision, submittal, and reporting are described below.

Lempster Wind, LLC will submit the SPCC Plan with all amendments to the EPA Regional Administrator within 60 days if one of the following events occurs:

(1) A discharge of more than 1,000 gallons of oil into or upon navigable waters or adjoining shorelines in a single spill event.

(2) A discharge of oil in harmful quantities (in violation of water quality standards or which have caused a sheen, film or discoloration on the surface of the waters) into or upon navigable waters or adjoining shorelines in two spill events reportable under Section 311(b) (5) of the Federal Water Pollution Control Act (FWPCA), known as the Clean Water Act, occurring within any 12-month period.

If one of the above events occurred, the following information is required to be submitted to EPA and the State:

• Name of the facility

• Name(s) of the owner/operator of the facility

• Location of the facility

Page 25: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

PDX/070950004.DOC 3-5

• Date and year of initial facility operation

• Maximum storage or handling capacity of the facility and normally daily throughput

• Description of the facility, including maps, flow diagrams, and topographical maps

• A complete copy of the SPCC Plan with all amendments

• The cause(s) of such spill, including a failure analysis of system or subsystem in which the failure occurred

• Material and quantity of such spill

• The corrective actions and/or countermeasures taken, including an adequate description of the equipment, repairs and/or replacements

• Additional preventive measures taken or contemplated to minimize the possibility of recurrence

• Such other information as the EPA Regional Administrator may reasonably require pertinent to the SPCC Plan or spill

3.3.3 Spill Response Equipment Table 3-2 identifies the recommended spill response equipment to be maintained onsite. Spill response will probably include digging up dirt and placing it in berms around the spill as well as placing absorbent mats into the spilled oil. Manufacturer information indicates the oil absorbency of the listed spill response absorbents to be approximately 114 gallons and should be adequate for initial response to spill incidents.

Table 3-2 Spill Response Equipment Equipment Quantity Location

Communications

Telephone-Cellular 2 On person – Brian Goodwin/Technician

Two-Way Radio 6 O&M Building

Personal Protective Equipment

Protective Coveralls 4 O&M Building

Hard Hats 6 O&M Building

Safety Glasses 20 O&M Building

Spill Response Equipment

95- Gallon Oil-Only Overpak Spill Kit 1 O&M Building – See Appendix A

Oil Only Pig© Mats (Item 7202) 1 O&M Building – See Appendix A

Pig© Universal Mat (Item 7230) 1 O&M Building – See Appendix A

Page 26: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

3-6 PDX/070950004.DOC

Table 3-2 Spill Response Equipment Equipment Quantity Location

Shovels 4 O&M Building

Empty Drums 4 O&M Building

NOTE: All emergency equipment will be decontaminated prior to being placed back into routine service.

3.3.4 Spill History Once active, the facility will record all oil spills over 1 gallon. A template facility spill log is provided in Appendix D.

3.4 Recordkeeping All records generated with this plan (spill notifications, inspection worksheets, integrity testing results, repair records, and training records) are maintained for a minimum of 3 years. These records are filed in the SPCC records or in the facility operating records. A copy of this SPCC Plan is kept onsite and at the Lempster Wind, LLC office in Lempster, New Hampshire.

3.5 Training Training is required for oil-handling employees and employees that perform inspections under this plan. . These personnel at the facility will be trained in the following areas:

• Laws and regulations regarding spills, releases, and pollution control • Contents of the SPCC Plan • Operation and maintenance of equipment to prevent discharges • General facility operations • Known discharges or failures and malfunctioning components • Recently developed precautionary measures

Spill prevention and response training will be conducted at least annually. This training will be documented. In addition, informal briefings will be held periodically through the year to update employees on changes in the regulations, laws, or in-house procedures (e.g., during tailgate safety briefings).

Training records will be maintained for 3 years.

3.6 Security To prevent a spill or release from being caused by accidental or unknown entry or vandalism, several security measures have been employed, as follow:

• The O&M facility and substation will be locked once completed.

Page 27: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN

PDX/070950004.DOC 3-7

• WTG towers are locked.

• Sufficient lighting and security are provided throughout the O&M facility and substation to allow for spill detection and the prevention and discovery of vandalism.

Page 28: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

APPENDIX A

Site Maps and Facility Diagrams

Page 29: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

2190

2160

1990’

2200

2170’

2150’

1900’

2140’

2250’2260’

2120

2220

’2210’

2130’

2240

2270’

2180’

1990

1940’

2230’

1900’1970’

1980

2000’

1980’

2280

1910’

2050’

1970’

1920

2290’

2080’

1890

1960’

1940

1950’

2040’

2180’

1930

2010’

2060’

1950

1930’

1910

1880

2090

1950’

1940

1890

2030’

1960’

2050

1940’

1980

1930

1950’

1950

1880’

1960’

2300

2050

1890’

1970’

2020’

2040

2070’

1930’

2010

2240’

1960

2060

2040

2000’

1980’

2230’

2020’

1920’

1990’

2030

1980’

1970’

1990’

2000

2020’

2030

2020’

1870

2010’

2040’

2080

1930

1910

1980

1860’

2000’

2100

2170’

1970’

2010’

1960’

2110’

1980

2030

1900

2080

1990

1990

2040’2020’

2090’

1950’

2050

2010’

1940’

2050’

2030

2000’

1920’

2090’

2030’

2060’

2070’

2080

1900’

2010’

2060

1930’

1860

2070’

1940’

2160’

2030’

2050’

2110

2080’

1400

2170

2060’

1890’

2040’

2010’

2000’

1910

2190’

2060

1970’

1910’

1920

2010’

1210’

2010

2020’

2200

2040

2030’

1970’

2230

1920

1990’

2040

1920’

2020

’2150’

1930’

2210

2130

1960’

2060’

1880

2000’

2060

2140’

2030’

1920’

2160

2230

2040’

2050

2220

2110’

2020

1920’

1930’

2050’

2150

1920

1980’

1880

2050

1930’

2100

2040’

2160’

2030’

2040’

2100’

1990’

1970’

1910

1420

1220’

2110

2030’

1890

1980

1400

2000

1940

2180

1430’

1870’

2210’

2100’

2200’

2050’

2040’

2170’

2030

1870

2100

1970

1870’

1940

1950’

2250’

2180’

2090

2110’

2070

1940’

1860

1210’

1950’

2010

1970

1950’

1850

2110

’20

80’

2190’

1610

1980’

2180’

2110

1960’

1600

1970’

1840’

2120’

2010’

2060’

2120

1630’

1620

1980’

1910’

2200’

1460’

2020’

2070’

2040

2120

1990

2000’

2310’

1960’

2030

2260’

2100’

2050

1990’

1960

2060’

2070’

1980’

2030’

1980

2000’

1850

1410

1860’

2320’

1960

2070

2090’

2070’

2280’

2040

1960

2280

1300’

1440

1970’

1950’

2010’

1250’

2000’

1890

1480’

1970’

2080

1490’

1320

1870’

2060

1260

1990’1980’

2300

1970’

2010’

2170’

2010

1240

1990’

1920’

1990’

2010’

1210’

1590

1330

2190’

2270

2010’

1900

1860’

1990

1970’

1500’

2060

2020’

1960’

1930’

2030

1950’

2030

2170’

1310

1370’

1890’

1980

1220

2020’

1910

’1900’

2150’2020

1910

2040’

2290

2020

2020’

1990

1390

1280’

1230

1940’

1470’

1360’

1270’

2050

1510’2100’

2210’

1840’

2060’

1770

2160’

2140’

1760

1350’

2260

1340’

1780’

1960’

1290’

1410

2250

2010’

2070’

1750

1950

1740

2130’

1730

1580

1720

2070

1640’

1660’

2120

2130

1710

2240

1930’

1650’

1980’

1830

1410

2210’

2110’

1690’

1670’

2220’

1380

1680’

1700’

2150

2040

2020’

1560

’15

70’

1790’

2000’

1550’

2080’

1940’

2000’

1520

2160’

1850’

2230’

2160’

2180’

1950’

1800’

2200’

1980’

1430

2180’

1990’

1930

1890’

1810’

2170

1540’

2150’

2060’

2050’

1530’

2210’

1820’

2250’

2110’

1910’

2080’

1420

2020

1830’

2140’

1970’

2090’

2000

2240’

1960’

2190’

2010

2100’

1840’

2090’

1960

2180’

1960’

2150’

2080

2000’

1980’

1200

1450’

1940’

1850’

2160’

2130’

2240’

2080

2120’

1860’

2120’

1850

2000’

1880

2010

1870’

2130

2050’

2200’

2210’

2180’

1400

2030’

1390

1920’

2130’

2110’

2050

1960’

2170’

1900

1960’

1980

2230’

2120’

1930’

2090

2220’

1880

2220’

2140’

1820

1930’

G-12-12

G-11-11

G-10-10

G-9-9

G-8-8

G-7-7

G-6-6

G-5-5

G-4-4

G-3-3

G-2-2

G-1-1

LEMPSTER WIND PROJECTProposed Tubine/Mets SitesNew HamphireSPCC Plan 2008

\\RDD31029198\MYSTUFF\PROJECTS\370411SPCCPLAN2008\LEMPSTER\MAPFILES\WALLMAP_LEMPSTER_ESIZE.MXD 4/16/2008 08:47:06

0 300 600150Feet

LEGENDAlternate Turbine SiteProposed Turbine SiteAccess Roads10-FOOT Contour2-FOOT Contour

Page 30: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

RE

F.

14'x

12'

14'x

12'3068

15' -

0"

5' -

0"

10' - 0"10' - 0"

3068 30683068

15' - 0"9' - 0"8' - 0"

3068 3068 3068

G44

G44G44

G44

6068

3068

3068

3068

G44

RestRoom

Utility Kitchen Scada

Hall

Office OfficePartsStorage

Maintenance

39' - 6" 40' - 6"

30' -

0"

80' - 0"

14' -

2"

14' -

2"

14' -

2"

18' - 10 5/8"

9' - 6" 16' - 0"

4' -

11"

7' - 9 3/8"

9' -

2"

9' -

2"

9' -

2"

9' -

2"

14' - 3 3/4"8' - 7 1/2"7' - 7 1/2"

Site Built

Lockers

-

---

3

A2.0D

2

A2.0D

-

---

-

---

-

---

-

---

PO

Box

267

351

Sun

apee

Str

eet

1-80

0-L

AV

AL

LE

YS

603-

863-

3964

Fax

603-

863-

1050

NE

WP

OR

T, N

H 0

3773

NO U

SE O

R RE

PROD

UCTI

ON O

F TH

ISMA

TERI

AL I

S PE

RMIT

TED

WITH

OUT

THE

WRIT

TEN

CONS

ENT

OF L

AVAL

LEY

BUIL

DING

SUP

PLY,

INC

.

Pref

abric

ated

Cus

tom

Hom

es &

Gar

ages

Not

es:

Do

Not

Sca

le D

raw

ing,

Use

Dim

ensi

ons S

how

n

Drawn By:

Revised:

Sheet Number:

Gos

hen

/ L

emps

ter

6/9/2008 10:42:44 AM

FIR

ST

FL

OO

RP

LA

NH

olm

es -

Win

dmill

A3.1D

00000

BLR

1/4" = 1'-0"1 1st Floor Plan

PDF created with pdfFactory trial version www.pdffactory.com

3229
Line
3229
Line
3229
Stamp
Page 31: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC

Page 32: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

APPENDIX B

Inspection Checklist

Page 33: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 34: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

Lempster Wind Project – SPCC Plan Monthly Inspection Form

General Inspection Information

Inspection Date: __________________ Retain Until Date:________________ (3 years from inspection date)

Prior Inspection Date: ______________ Inspectors Name:_________________________

Inspection Guidance and Instructions

This inspection form applies to the following equipment: o Switchyard Grounding Transformers (4 total) o All WTG Gear Boxes (visual inspection of Nacelle exterior only – 12 total) o 55-gallon Drum Storage at O&M Building

Each piece of equipment shall be inspected monthly taking into consideration the following

as appropriate: o Equipment surfaces free from leakage? o Seams are not damaged? o Free from rust, corrosion, or pitting? o Equipment foundation condition satisfactory? o Containment system condition satisfactory?

Maintain records in the field office for three years to meet SPCC recordkeeping

requirements. This visual inspection does not require a certified inspector and can be performed by an

owner’s inspector who is familiar with the site and can identify and correct developing problems. For non-conforming equipment complete the table below. Use additional sheets as necessary. If all equipment is in satisfactory condition or corrective actions have been implemented, sign and date the form as indicated below.

Equipment Identification

Describe Unsatisfactory

Condition Describe Corrective

Action Date Corrective

Action Completed

No Unsatisfactory Conditions Identified or Corrective Actions Completed:

Signature________________________ Date:____/____/_____

Page 35: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC

APPENDIX C

Spill Reporting Form

Page 36: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

NHDES WASTE MANAGEMENT DIVISION SPILL RESPONSE & COMPLAINT INVESTIGATION SECTION

INCIDENT REPORT FORM

Date Incident Reported to DES: _________; Time: ________; Rec’d By: Location of Incident Site Name: _______________________________ Street Address/Location: ____________________________________________________ Town: _________________________ Incident Type [ ] Petroleum Spill to Ground [ ] Petroleum Spill to Surfacewater [ ] Hazardous Substance Spill to Ground [ ] Hazardous Substance Spill to Surfacewater [ ] Motor Vehicle Accident [ ] Roadside Dumping [ ] Air Release [ ] Release Inside of Building [ ] Other (Specify: ____________________________________________________) Party Reporting Incident Name: __________________________________ Phone No.: _______________ Date of Incident: _______________ Time: ________ Was Fire Department Notified: [ ] Yes [ ] No Was Cleanup Contractor Hired: [ ] Yes, name: ____________________ [ ] No Other Agencies/Officials Responding To Incident: ____________________________ NHDES Responder Name: _____________________________________ Actions Taken: [ ] No Action Necessary [ ] Referred to Other Agency/Division: Agency/Division Name: ____________________; Person:__________; Date:_______; Time:_____ [ ] Responded (describe what actions were taken: ___________________________________________________________________________________ __ ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __ _ _ __

Page 37: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC

APPENDIX D

Facility Spill Log

Page 38: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the
Page 39: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC H-1

Summarize any spill over 1 gallon on this log.

SPILL LOG

Date Material Spill

Amount (Gallons)

Cause Reportable Y/N *

*See Plan Review and Revision section and Section 3.3.3 for reporting requirement.

Page 40: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

APPENDIX E

Container/Equipment Data Sheets

Page 41: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC I-1

CONTAINER/EQUIPMENT ID: Oil Container Storage in O&M Building

Location: O & M Building

Contents: Various petroleum & waste oil products

Capacity: 55 Gallons

Type: Steel Drums

Secondary Containment: Spill Pallets

Description of Drainage from Secondary Containment: N/A – Located indoors, no drains in storage area

Fault Analysis Failure of the primary containment will flow to the spill pallets.

Engineering Controls: N/A

Corrosion Protection: N/A – Container inside building with concrete floor

Inspections: Monthly – See Appendix B

Security: Located inside a locked building.

Other Applicable Spill Prevention Measures: None

Page 42: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

I-2

CONTAINER/EQUIPMENT ID: Lempster Wind Project Switchyard Grounding Transformers

Location: Switchyard

Contents: II Mineral Oil

Capacity: 116 Gallons

Type: Oil Filled Operational Equipment

Secondary Containment: Active containment measures to control and remove spills from the large flat gravel area surrounding the grounding transformer locations.

Description of Drainage from Secondary Containment: Suspended from Pole away from any bodies of water.

Fault Analysis Spill would be contained within the vicinity of the large flat gravel area surrounding the grounding transformer locations. Transformer high temperature fault detection system will notify wind farm technicians to investigate.

Engineering Controls: N/A – Oil machinery, not storage

Corrosion Protection: N/A

Integrity Testing: N/A – Oil machinery, not storage

Inspections: Monthly – see Appendix B

Security: Locked

Other Applicable Spill Prevention Measures: None

Page 43: Spill Prevention, Control, and Countermeasures Plan · SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN 1-2 PDX/070950004.DOC This Plan has been developed in accordance with the

PDX/070950004.DOC I-3

CONTAINER/EQUIPMENT ID: All Wind Turbine Generator (WTG) Sites – Gear Boxes

Location: Wind Turbine Towers

Contents: Lubricating Fluid

Capacity: 12 gear boxes @ 95 gallons each

Type: Oil-Filled Operational Equipment

Secondary Containment: Housed within WTG tower or active containment measures

Description of Drainage from Secondary Containment: N/A, located indoors

Fault Analysis Instantaneous release of 100 gallons. Spill will be contained within the sealed concrete tower floor base. Spills from nacelle will drip along tower to base. Turbine low level and low pressure fault detection system will notify wind farm technicians to investigate.

Engineering Controls: N/A – Oil machinery, not storage

Corrosion Protection: N/A

Integrity Testing: N/A – Oil machinery, not storage

Inspections: Monthly – see Appendix B

Security: WTG towers are locked.

Other Applicable Spill Prevention Measures: Place Oil Only Pig© Mats between tower and tower tie down bolts to collect material dripping along tower base.