Page 1: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN UNIVERSITY OF CALIFORNIA SAN DIEGO LA JOLLA, CALIFORNIA

for

University of California San Diego La Jolla, California

Effective March 2018

Page 2: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TABLE OF CONTENTS Page

LIST OF TABLES iii LIST OF FIGURES iii

1. INTRODUCTION 1

1.1 Plan Organization 1 1.2 Plan Applicability 2 1.3 SPCC Plan/Program Administration 2

1.3.1 Plan Coordinators and Emergency Contacts 2 1.3.2 Plan Amendments 2 1.3.3 Review and Re-certification of Plan 3 1.3.4 Location of SPCC Plan 3

1.4 Conformance to Applicable Standards 3 1.5 Plan Certifications 4

1.5.1 Professional Engineer Certification 4 1.5.2 Facility Certification 5 1.5.3 Certification of the Applicability of the Substantial Harm Criteria Checklist 5

2. CAMPUS BACKGROUND 6

2.1 UC San Diego Main Campus Description 6 2.1.1 Location and Activities 6 2.1.2 Campus Layout and Site Plan 6

2.2 Campus Drainage 7 2.3 Campus Storage Capacity 7

2.3.1 Aboveground Storage Tanks (ASTs) 7 2.3.2 55-Gallon Drums 8 2.3.3 Elevators and Transformers 8 2.3.4 Emergency Generators (EGs) 8 2.3.5 Oil Water Separators 8 2.3.6 Underground Storage Tanks 8 2.3.7 Motive Power Containers 8 2.3.8 Cooking Oil ASTs 8

2.4 Oil Handling Activities 9 2.4.1 Piping 9 2.4.2 Fuel Loading/Unloading 9

2.5 Spill Containment Measures 10 2.5.1 Passive Secondary Containment 10 2.5.2 Active Secondary Containment 11

2.6 SPILL/RELEASE POTENTIAL AND DIRECTION OF FLOW 12 2.6.1 Fuel Loading/Unloading 12 2.6.2 Leaky Valves or Piping 12 2.6.3 Tank Failure, Rupture or Puncture 12 2.6.4 Mishandling of Drums 12 2.6.5 Hydraulic Systems at Powell Complex 12

2.7 Security 13 2.8 Spill History 13 2.9 Equipment Not Yet Fully Operational 13

Page 3: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

3. DISCHARGE PREVENTION 14

3.1 Inspections 14 3.1.1 ASTs, Drums, Generators, Mobile Equipment, and Associated Piping 14 3.1.2 Transformers 14 3.1.3 Elevators 14 3.1.4 Spill Kits 15

3.2 Integrity Testing 15 3.3 Loading and Unloading Best Management Practices 15 3.4 Discharge of Stormwater from Diked Areas 15 3.5 SPCC Education and Awareness 16

4. DISCHARGE RESPONSE 17

4.1 Small, Incidental Releases 17 4.2 Large Spills (Releases of Oil Greater Than 42 Gallons) 17

4.2.1 Oil Spill Contingency Plan 17 4.3 Equipment for Spill Response and Personal Protection 17 4.4 Spill Response Contractor 18

5. DISCHARGE REPORTING 19

5.1 University Reporting 19 5.2 Federal Reporting 19 5.3 State & Local Reporting 21

REFERENCES 23 TABLES FIGURES APPENDIX A - Re-Certification of the SPCC Plan APPENDIX B - Certification of the Applicability of the Substantial Harm Criteria Checklist APPENDIX C - SPCC Rule Compliance Cross-Walk APPENDIX D - Loading and Unloading Procedures APPENDIX E – Drainage Log APPENDIX F - Spill Report Form APPENDIX G - SPCC Compliance Schedule APPENDIX H – Industry Inspection Guidelines APPENDIX I – Transformer Inspection Guidelines APPENDIX J – Spill Response Contact List

Page 4: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

LIST OF TABLES Table No. Title I Summary of Storage, Use, Prediction of Oil Flow and Direction During Release LIST OF FIGURES Figure No. Title 1 Site Locus 2 General Site Map 3 Site Map – AST’s and Drum Containers 4 Site Map – Emergency Generators & Mobiles 5 Site Map – Transformers

Page 5: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

1

1. INTRODUCTION This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego (UC San Diego) because the volume of aboveground oil storage at the campus is greater than the applicability threshold under the federal SPCC regulations (40 CFR 112). A SPCC Plan is required for facilities which have an aggregate aboveground storage capacity of oil greater than 1,320 gallons in containers greater than 55-gallons in capacity. As of the preparation date of this SPCC Plan, UC San Diego’s aboveground oil storage capacity is approximately 200,000 gallons. UC San Diego operates underground storage tanks (USTs) containing petroleum products, however, the USTs are subject to the technical requirements of 40 CFR, Part 280, as well as the state analogue to these federal regulations. Consequently, the USTs are exempt from SPCC plan requirements except for identification of their locations on the Site Plan. This SPCC Plan has been prepared in accordance with good engineering practices. This SPCC Plan has the full approval of UC San Diego management to commit the necessary resources for implementation. 1.1 Plan Organization This SPCC Plan is divided into the following five sections: Introduction Section 1 presents the administrative elements of the SPCC Plan including the Plan’s overall conformance with State and Federal SPCC regulations, where the Plan is located, who maintains control over the Plan, the process and requirements for updating/modifying the Plan, and certifications. Campus Background Section 2 provides a physical description of UC San Diego’s’ campus and its oil storage locations, in-place containment measures, and potential release scenarios. Section 2 provides an overview of UC San Diego’s’ campus, discusses oil storage/handling locations and practices, and provides details about where and how a release would impact the Site. The Section specifically discusses oil storage inventory, active and passive spill containment, facility drainage, release scenarios, and historical spill events. Discharge Prevention Section 3 begins the active portion of this SPCC Plan. This section discusses requirements for inspections, integrity testing, best management practices, personnel training, plan amendment, plan review, and recordkeeping. These are actions that must be performed by UC San Diego personnel on a continual basis to prevent oil discharges from occurring. Discharge Response Section 4 describes the response actions and activities that will lead UC San Diego personnel in the event oil is discharged to the environment. A discussion of discharge event sizes, discharge notification procedures, and spill response activities are provided. Discharge Reporting Section 5 describes the verbal and written requirements associated with a discharge event. Federal and State reporting is discussed as well as recordkeeping requirements.

Page 6: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

2

1.2 Plan Applicability This SPCC Plan was written specifically for UC San Diego’s main campus located on Gilman Drive, in La Jolla, California (Figure 1). The campus is generally bounded by Genesee Ave. to the north, Torrey Pines Road and La Jolla Village Drive to the south, Regents Road to the east, and Torrey Pines Road and the Pacific Ocean to the west. Interstate Highway 5 (I-5) passes through the eastern portion of the campus, separating the main campus from the UC San Diego Medical Center and Mesa Housing. The Scripps Institute of Oceanography (SIO), located to the southwest of the main campus, is included as part of the main campus for purposes of this SPCC Plan. 1.3 SPCC Plan/Program Administration The Campus SPCC Coordinator will maintain control over the SPCC Plan/SPCC Program and will engage UC San Diego Departments: Resource Management & Planning (RMP), Housing, Dining & Hospitality (HDH), UC Health Systems, and Student Affairs (SA) for management of containers and oil handling activities, as necessary. 1.3.1 Plan Coordinators and Emergency Contacts

The Campus SPCC Coordinator is: Name: Tod Ferguson Title: Hazardous Materials Business Plan Manager 9500 Gilman Drive #0089 La Jolla, CA 92093-0089 Office Phone: 858.534.9745 Office Fax: 858.534-1564 The Campus SPCC Coordinator is responsible for overall administration of this SPCC Plan, including amendments, certifications, reporting, record-keeping, education, and spill response. In addition, the Campus SPCC Coordinator is responsible for coordinating inspections and maintaining records of inspections and spill incidents.

1.3.2 Plan Amendments

This SPCC Plan must be amended whenever there is a change in campus design, construction, operation or maintenance which materially affects the campus’ potential for the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines. Such changes may include, but are not limited to: Addition to or reduction of oil storage capacity; Types of oil materials stored, used or generated; Modifications to containment areas; Drainage system modifications; and Changes in SPCC Plan coordination and/or emergency contact numbers. A registered Professional Engineer (P.E.) must certify all non-administrative amendments to the SPCC Plan.

Page 7: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

3

1.3.3 Review and Re-certification of Plan

Regardless of whether changes have occurred at the campus, this SPCC Plan must also be reviewed and evaluated at least once every five years. If the review identifies an increased potential for a release, the SPCC Plan will be amended within six months to include more effective prevention and control technology if such technology will significantly reduce the likelihood of a spill event at the campus, as long as such technology has been field-proven at the time of the review. The SPCC Plan may be periodically amended to reflect changes in the campus. Any technical amendments to the SPCC Plan must be re-certified by a P.E. The five-year SPCC Plan review and evaluation will be documented by signing a statement as to whether the Plan will be amended. The following statement will suffice: “I have completed review and evaluation of the SPCC Plan for University of California San Diego on (date), and will (will not) amend the Plan as a result.” This statement must be included in the Plan (Appendix A).

1.3.4 Location of SPCC Plan

This SPCC Plan will be maintained at UC San Diego’s Environment, Health and Safety Department located at 9500 Gilman Drive, La Jolla, California and shall be made available to the Local Agencies and the United States Environmental Protection Agency (EPA) Regional Administrator, if so requested.

Hard copies of the SPCC Plan may be distributed to RMP, HDH, UC Health Systems, and SA, as requested. An electronic copy of the SPCC Plan is also available online at the Environment, Health & Safety Department’s Blink webpage.

1.4 Conformance to Applicable Standards This SPCC Plan is in conformance with the most current SPCC regulations, which were last amended on 5 November 2009. In complying with the applicable requirements of the SPCC regulations, 40 CFR 112, no deviations were employed or claimed in this SPCC Plan. This facility has met the general requirements for this SPCC Plan listed under 40 CFR 112.7 and the specific discharge prevention and containment procedures listed in 40 CFR 112.8. The required Substantial Harm Criteria screening for exemption from developing a facility response plan has been completed and is found in Appendix B. A cross-reference guide is provided in Appendix C which demonstrates this SPCC Plan’s compliance with SPCC rule requirements. In addition to conformance with the federal SPCC rules, this facility is in conformance with the following California State requirements: Hazardous Materials Release Reporting - 19 CCR, Section 2703 (Hazardous Materials Business Plan); California H&SC Division 20, Chapter 6.67 (Aboveground Petroleum Storage Act) The Aboveground Petroleum Storage Act (APSA) requires owners and operators of tank facilities to prepare and implement a SPCC plan in accordance with part 112 of Title 40 of the federal Code of Regulations. Pursuant to H&SC 22507(a) and 19 California Code of Regulations 2703: A handler must, upon discovery, immediately report to the Certified Unified Public Agency (CUPA) and California Emergency Management Agency (EMA) any release or threatened release of a hazardous material if there is a reasonable belief that the release or threatened release poses a significant present of potential hazard

Page 8: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego
Page 9: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego
Page 10: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

6

2. CAMPUS BACKGROUND This section provides a description of SPCC-related features and activities at UC San Diego’s main campus. It provides essential details of the oil storage capacity, passive secondary containment structures, active secondary containment measures, potential discharge volumes of onsite containers, and the discharge direction. This section forms the baseline background information for this SPCC Plan. 2.1 UC San Diego Main Campus Description 2.1.1 Location and Activities

UC San Diego operates under the University of California System of the State of California. The UC San Diego main campus comprises over 500 buildings including: administrative, academic, residential, and maintenance buildings, playing fields and gymnasiums, located on approximately 1,200 acres in La Jolla, California. The campus is generally bounded by Genesee Ave. to the north, Torrey Pines Road and La Jolla Village Drive to the south, Regents Road to the east, and Torrey Pines Road and the Pacific Ocean to the west (Figure 1). I-5 passes through the eastern portion of the campus, separating the main campus from the UC San Diego Medical Center and Mesa Housing. SIO is located to the southwest of the main campus and is bounded on the west by the Pacific Ocean. The campus is primarily used for student housing, academic buildings, athletics, administrative offices, research, and maintenance services. UC San Diego operates on a year round basis with student related activities operated on a quarter basis, with the first quarter beginning in September and ending in December, the second quarter beginning in January and ending in March, and the third quarter beginning in April and ending in June. During the summer months, the campus is used for summer camps and a limited summer class schedule. Site activities related to the storage and handling of oil in containers equal to or larger than 55 gallons (SPCC covered) include: Motor vehicles, maintenance vehicles (trucks, lawn mowers, etc.), public transportation

(buses) - gasoline and diesel fuel storage and dispensing;

Emergency generators - diesel fuel storage;

Electrical transformers – transformer oil storage;

Vehicle maintenance – storage of virgin motor oil and collection of used motor oil;

Elevators and hydraulics lift systems – hydraulic oil storage; and

Drum and aboveground storage tank (AST) storage of petroleum hydrocarbons.

2.1.2 Campus Layout and Site Plan

The General Site Map (Figure 2) presents a layout of the campus. The Site Plans (Figures 3-5) present the location and contents of aboveground storage tanks (ASTs), drums, emergency generators, mobile generators and refuelers, and transformers. Pursuant to SPCC Rule requirements for a facility diagram outlined in CFR 112.7(a)(3), the following items are identified in the Site Plan:

Page 11: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

7

ASTs and USTs (including content and capacity);

Mobile portable containers (including content and capacity);

Hydraulic operating systems or equipment;

Oil-filled electrical transformers (including content and capacity);

Oil/water separators (OWS); and

Oil transfer areas and unloading areas.

2.2 Campus Drainage Storm water from paved drives, parking areas, and loading docks throughout the campus is directed to a series of catch basins which drain to a storm drain system. Depending on location, UC San Diego storm drains discharge to the City of San Diego storm drain system flowing north towards Sorrento Valley, south towards Rose Creek, and west towards the Pacific Ocean. UC San Diego storm drains in the vicinity of SIO also discharge directly to the Pacific Ocean. Near the Central Garage and the CSC Grounds Shop two OWS separate oil from vehicle wash rack and grounds maintenance wash rack operations prior to discharge to the sanitary sewer system. Floor drains located inside buildings connect to the sanitary sewer system. All 55-gallon drums either have or are planned to have secondary containment provided by spill pallets or by the room itself which limits offsite drainage pathways to the drains only. There are several outdoor oil storage and oil-containing equipment areas that have secondary containment that require the management and discharge of accumulated storm water. These areas of secondary containment are subject to storm water accumulation, which must be released in accordance with CFR 112.8(b)(1-2) and 112.8(c)(3), as discussed in Section 3.5. 2.3 Campus Storage Capacity A list of oil storage containers regulated under this SPCC plan and their locations within the UC San Diego campus is provided in Table I and depicted on Figures 3 through 5. All containers with a capacity equal to or greater than 55 gallons are included as part of this SPCC Plan. As of the preparation date of this SPCC Plan, UC San Diego’s aboveground oil storage capacity is approximately 200,000 gallons. Passive and active controls implemented to prevent and contain spills of these materials are described in Section 3 of this plan. A description of the locations of oil stored at the campus is provided in the following sections. 2.3.1 Aboveground Storage Tanks (ASTs)

Diesel fuel, hydraulic oil, and waste oil are stored throughout the UC San Diego main campus, with the largest stores being located at: the Campus Services Complex (CSC), Powell Structural Laboratory, High Bay Physics, Central Utilities Plant (CUP), East Campus Utility Plant, and Scripps Institution of Oceanography (SIO) areas.

Page 12: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

8

UC San Diego also has mobile fuel bowsers which are used to refuel emergency generators and provide emergency fueling, as necessary. The mobile fuel bowsers are trailer-mounted tanks which are parked at the CSC, when not in operation.

2.3.2 55-Gallon Drums

Fifty-five gallon drums store petroleum hydrocarbons, diesel fuel, and waste oil at various locations across the campus. Most of these drums are stored inside buildings. The total capacity of 55-gallon storage is based on a combination of observed conditions and maximum storage capacity given existing secondary containment pads.

2.3.3 Elevators and Transformers

The UC San Diego’s main campus has passenger elevators with hydraulic storage capacities ranging from 80 to 150 gallons. The UC San Diego main campus has electrical transformers with oil storage capacities ranging from 100 to 5,160 gallons.

2.3.4 Emergency Generators (EGs)

The UC San Diego main campus currently owns and operates stationary and mobile EGs. Most EGs have double-walled belly tanks ranging from 55 gallons to 7,500 gallons. Others have double-walled day tanks ranging from 250 to 1,000 gallons.

2.3.5 Oil Water Separators

Both OWS are exempt from all SPCC requirements in accordance with Section 112.1(d)(6) and do not count toward facility storage capacity. Two OWSs are located at the CSC near the PPS Grounds and the Central Garage buildings. One OWS captures oil associated with washing the street sweeper and the other captures car/bus wash water.

2.3.6 Underground Storage Tanks

All USTs are exempt from all SPCC requirements in accordance with Section 112.1(d)(4) and do not count toward facility storage capacity. These USTs are regulated under 40 CFR 280 and Title 23 California Code of Regulations (CCR) Sections 2632(d)(2), 2632(e)(2) and 2641(h). UC San Diego monitors USTs according to its UST Monitoring Plan.

2.3.7 Motive Power Containers

The fuel stored by motive power containers will not be added to the cumulative campus storage capacity because of exemption under 40 CFR 112.1(d). Fleet vehicles are considered by the EPA to be motive power containers because the fuel they carry is for self-propulsion (EPA 2008).

2.3.8 Cooking Oil ASTs

All aboveground cooking oil/grease tanks located at UC San Diego store less than 55-gallons therefore are not covered as part of this SPCC Plan.

Page 13: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

9

2.4 Oil Handling Activities 2.4.1 Piping

Piping transfers of oil at the UC San Diego campus include: Diesel or gasoline transfer to various sites across campus using the fueling truck;

CSC Fueling Island;

Central Utilities Plant;

Thornton Hospital;

EGs with day tanks:

– Pacific Hall

– EBU-1

– EBU-2

– ECUP (two EGs)

– Geisel Library

– CUP (four EGs)

– Natural Sciences

– Recreation, Intramural, and Athletics Complex (RIMAC)

– Sanford Consortium for Regenerative Medicine

– SIO T-43;

– Stein;

– Thornton Hospital;

– Warren College Canyon Vista; check

Powell Complex – transfer of hydraulic oil to Powell Composites Laboratory and between buildings at High Bay Physics Lab.

The piping used for all these transfers is properly supported to minimize abrasion and corrosion and allow for expansion and contraction in accordance with CFR 112.8(d)(3).

2.4.2 Fuel Loading/Unloading

Fuel loading (adding fuel or oil to ASTs, USTs, mobile generators, mobile fuel bowsers, or fleet vehicle) occurs at the following locations: CSC Fueling Island;

EGs (belly tanks);

CUP;

Thornton Hospital;

Re-used 55-gallon drums or 330-gallon totes; and

Page 14: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

10

ASTs (day tanks for EGs).

Fuel delivery schedules vary, depending on usage, and all deliveries of fuel are not overseen by USCD personnel. When USCD personnel are not available to oversee the fueling activities, spill prevention activities are the responsibility of the fueling contractor, pursuant to conditions of their contract with UC San Diego. UC San Diego-approved fueling procedures, at a minimum, must be implemented by all USCD personnel when undergoing fueling activities and by all UC San Diego contractors during fuel loading or unloading. Complete fueling procedures are provided in Appendix D and are summarize as: 1. Check the level in the receiving tank for adequate capacity. Chock the wheels of the truck

before transfer lines are connected.

2. Check the transfer hose(s) for leaks, wear, or potentially faulty valves.

3. Open the storage tank fill pipe and connect the transfer hose from the tank truck.

4. Monitor the level in the tank during fuel transfer.

5. After completion of fuel transfer, disconnect the hose from the fill pipe and secure the fill pipe cover. Place the transfer hose(s) back onto the tank truck in its normal storage position.

6. Remove the wheel chocks.

7. Inspect the fueling area for any minor or major leaks. If a leak has occurred, follow appropriate reporting and notification procedures. Clean-up minor spilled amounts (less than one gallon) with appropriate equipment (absorbent pads, speedy dry, etc.)

2.5 Spill Containment Measures The material and construction of oil storage containers present at the campus are compatible with the material stored and conditions of storage such as pressure and temperature. Secondary containment can be provided through passive or active measures. Passive measures are permanent installations that do not require deployment or action by the owner/operator. Conversely, active measures are those that require deployment or other specific action by the owner/operator. Both passive and active secondary containment measures are implemented at UC San Diego’s main campus. 2.5.1 Passive Secondary Containment

The following are passive secondary containment methods that are implemented for bulk storage containers at UC San Diego. They provide a means of containment for the largest single container and sufficient freeboard to contain precipitation.

Diking Dikes provide secondary containment, or tertiary containment, for many AST and generators as identified on Table I. In order to provide adequate secondary containment, diked areas must be able to hold 110% capacity of the storage container including calculations for precipitation (standard calculations include precipitation values for a 24-hour, 25-year storm event).

55- Gallon Drums

Page 15: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

11

All 55-gallon drums have, or are planned to have, secondary containment provided by spill pallets or covered spill pallets. Secondary Containment Provided by Building/Room All elevator hydraulic reservoirs are located in buildings with equipment rooms, which provide secondary containment. The majority of 55-gallon drums located at UC San Diego’s main campus have secondary containment provide by spill pallets but otherwise all indoor drums have secondary containment provided through the room in which they are stored. The hydraulic oil tank (7,500-gallon), the “junior” shaker table tank, and each of the three 500-gallon pump tanks in the High Bay Physics facility are single-walled steel tanks. The two 330-gallon totes are polyethylene and the 2-inch diameter transfer piping is a fiber composite suitable for high pressure liquid transfer. All are within secondary sized containment structures.

2.5.2 Active Secondary Containment

The SPCC rule allows for the use of sorbent materials and drip pans to function as active secondary containment measures for other than bulk storage containers (Section 112.7 [c]). These measures may be deployed either before an activity involving the handling of oil starts, or in reaction to a discharge. Spill kits can be used as an active measure during oil transfer operations. Active Measures in Unloading, Loading, and Mobile Refueling Areas Loading/unloading of petroleum products occurs at UC San Diego’s main campus as discussed in Section 2.4.2 (adding fuel or oil to ASTs, USTs, mobile generators, mobile fuel bowsers, or fleet vehicle). The CSC Fueling Island piping consists of two dispensers with flexible hoses and metal nozzles. The nozzles and rubber hose materials are compatible with both gasoline and diesel fuels. The operating system, associated with the dispensing nozzles, disconnects the pump power if the dispenser is not activated within 5 seconds of its removal from the cradle. This system must be reset before fuel can be pumped at that dispenser. The hose and nozzle dispensers are also equipped with standard break-away fittings to prevent damage to the dispenser and island if a vehicle drives away with the nozzle attached to the fuel tank. Fuel delivery trucks and mobile refuelers use a single hose connection to unload fuel to ASTs, USTs, EGs, or vehicles at fueling areas designated on the Site Plan (Figures 3 through 6). Active measures during unloading operations include, but are not limited to, using spill kits to contain a discharge, placing a drain cover over a sewer drain prior to or in response to a discharge, and placing drip pans under mechanical piping connections to contain small leaks and spills.

Page 16: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

12

Active Measures for Transformers With few exceptions, oil-filled transformers have singled-walled steel tanks and do not have sized secondary containment provided by dikes. As a result, spill kits will be made available during maintenance activities and during inspections to provide an active form of spill countermeasure. The transformer inspection schedule is discussed in Section 3.1.2.

2.6 SPILL/RELEASE POTENTIAL AND DIRECTION OF FLOW The sources of potential oil releases at the UC San Diego campus are listed below. This section is intended to provide the information required in section 112.7 (b) of the SPCC Regulations. Controls and countermeasures implemented by UC San Diego to mitigate or respond to potential releases to the environment are described in Sections 3 and 4, respectively. Potential release volumes, direction of flow, and ultimate discharge locations are presented in Table I. 2.6.1 Fuel Loading/Unloading

A release could occur at the AST or UST locations if the delivery truck’s hoses are not properly connected, if hoses or valves fail, if disconnection is not properly performed (i.e., still pumping when hose is disconnected), or if the tank is overfilled.

2.6.2 Leaky Valves or Piping

Valves may leak if they are not entirely closed or may leak if they are old and/or corroded. Piping may leak due to corrosion or through fittings. Generally, leaks of these types are slow and will likely be mitigated through regular monthly inspections conducted for the associated container, as discussed in Section 3.1.1. As discussed in Section 2.6.5, the only underground piping at UC San Diego’s main campus is the hydraulic system at the Powell Complex.

2.6.3 Tank Failure, Rupture or Puncture

A release from an AST (including EGs and transformers) may occur if the tank integrity is weak (e.g., slow leak through a weld seam in a tank), or if the tank ruptures due to an outside force (e.g., vehicle hitting a tank). These scenarios are unlikely, but deserve attention due to the proximity of the tanks to vehicular traffic and the Pacific Ocean.

2.6.4 Mishandling of Drums

Drums are located at various locations across the campus. A release of oil could occur if a drum is knocked over during transport, or inadvertently drained or punctured. If a release occurred many drums are located in buildings and all drum storage locations have spill kits located nearby.

2.6.5 Hydraulic Systems at Powell Complex It is possible that a release of hydraulic oil from the pumps or the piping at the Powell Complex could occur if a transfer hose failed. The hydraulic oil from pumps or piping would flow in the concrete-lined trenches until it reached the closed sump in the Powell Composites building. From there it would be pumped out and disposed of off-site.

Page 17: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

13

A release to the environment from the hydraulic oil AST (7,500-gallon) in the High Bay Physics building is unlikely because the tank is located inside the building with adequate epoxy-coated concrete secondary containment. A release from the two 330-gallon totes or the “junior” shaker table tank would be contained by the building, therefore a release to the environment is unlikely. A third tote located outside is typically empty and adequate sized temporary secondary containment is provided when in use.

2.7 Security The following is a list of site security measures used to mitigate potential releases of oil: A dedicated staff of security personnel monitors the general security for the UC San Diego main

campus 24-hours per day. Campus security personnel are cognizant of oil storage locations;

Adequate lighting is provided at areas where oil is stored;

Many oil storage and oil-containing equipment locations are fenced and locked or are located in restricted access areas; and

The fueling equipment can be powered off when the campus is closed. 2.8 Spill History There have been no reportable releases of oil or oil-containing materials at UC San Diego in the last five years. In the event a reportable release of such materials occurs in the future, this plan will be amended to describe the incident(s), the clean-up procedures, and the structural and/or non-structural controls subsequently implemented to minimize the potential for additional releases. Copies of all spill reports must be appended to this plan (Appendix F).

2.9 Equipment Not Yet Fully Operational This SPCC Plan meets the requirements of the SPCC Rules. Any compliance issues and their subsequent corrective actions are listed in Appendix G.

Page 18: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

14

3. DISCHARGE PREVENTION This Discharge Prevention section begins the active portion of this SPCC Plan. This section discusses requirements for inspections, integrity testing, best management practices, personnel training, plan amendment, plan review, and recordkeeping. These are actions that must be performed by UC San Diego personnel on a continual basis to prevent oil discharges from occurring. 3.1 Inspections 40 CFR 112.7(e) requires routine inspections, tests, and recordkeeping for oil storage tanks, piping and equipment as follows: Inspections and tests must be conducted in accordance with written procedures developed for the campus (by the campus). Written procedures and a record of the inspections and tests must be kept and signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years. Records of inspections and tests kept under usual and customary business practices will suffice. Inspection forms for all equipment are provided in Appendices H through L. 3.1.1 ASTs, Drums, Generators, Mobile Equipment, and Associated Piping

All ASTs, drums, generators, mobile generators/refuelers, and associated piping must be inspected on a monthly and annual basis in accordance with the Steel Tank Institute SP001 Standard Inspection Schedule (industry guidance) as noted in Appendix H. Retain the inspection records for at least 3 years. Inspections are carried out by both UC San Diego EH&S and Facilities Management personnel. Maintenance and testing activates are also conducted by an outside vendor for certain objects. A small number of drums (see Table 1) store waste oil and must be inspected on a weekly basis pursuant to requirements of 22 CCR 66265.

3.1.2 Transformers

The SPCC rule requires inspections be performed in accordance with industry standards; no industry standards are published specific to transformer inspections relative to spill prevention. The SPCC rule does provide flexibility in implementation as long as it is consistent with good engineering practices. Inspection guidelines can be found in Appendix I. Manufacturers recommend inspecting a transformer operating normally (as defined in ANSI/IEEE C57.12.00) at an annual frequency. Current university and SPCC policy has transformers inspected on an annual basis. Should a transformer be observed to not be operating normally; then a more frequent inspection schedule will be implemented by UC San Diego until normal operating conditions are restored; the interim inspection schedule will be determined on a case-by-case basis.

3.1.3 Elevators

All elevators are inspected on a monthly basis; UC San Diego elevator maintenance activities are conducted by an outside vendor. The inspections criteria and inspection program is administered by UC San Diego’s Facility Management Department.

Page 19: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

15

For the recordkeeping requirements of this SPCC Plan, all elevator inspection records must be retained for at least 3 years commensurate with standard recordkeeping procedures.

3.1.4 Spill Kits

Inspection personnel should check the inventory of spill kit materials on a monthly basis and restock as needed. A complete list of spill kit inventory items is provided in Section 4.3.

3.2 Integrity Testing The SPCC rule requires that oil containers be tested for integrity on a regular schedule. The type and frequency of integrity testing varies depending on the size and design of the container. The EPA allows visual inspection as an equivalent measure for integrity testing if the design of the container allows for visual inspection of all sides of the container, including the bottom. The majority of oil storage containers at UC San Diego fit these inspection criteria although all ASTs are part of an integrity testing program. Due to specific size and design parameters, select containers at UC San Diego have integrity testing frequencies assigned by the Stell Tank Institute (STI); these containers are identified in Table 1. In addition to integrity testing, UC San Diego must ensure that all containers are inspected according to Section 3.1 of this SPCC Plan. However, if during visual inspections, the condition of a container is suspected or observed to cause failure and discharge of product, integrity testing must be performed unless the container is taken out of service. Also, integrity tests must be performed whenever material repairs are made. Integrity testing must be performed by a “Qualified AST Inspector” who is accredited by the American Petroleum Institute (API) or certified by the STI, a P.E. experienced in AST design, or a tank manufacturer’s representative. Retain any integrity testing results for the duration of the life of the container. 3.3 Loading and Unloading Best Management Practices Loading and unloading of oils is discussed in Section 2.5.2 and active measures are implemented during all activities. Active measures during loading/unloading activities include, but are not limited to, ensuring that loading/unloading vehicles have wheel locks and the area is cordoned off to prevent unauthorized entry of personnel or equipment, ensuring that the lowest drain and all outlets are inspected for leaks and corrected, if necessary, prior to truck departure, ensuring all loading/unloading connections at the ASTs are securely capped or blank-flanged when not in service or when in standby for an extended period of time, using spill kits to contain a discharge, placing a drain cover over a sewer drain prior to or in response to a discharge, and placing drip pans under mechanical piping connections to contain small leaks and spills. Specific loading/unloading procedures provided in Appendix D must be met, or exceeded, by all UC San Diego personnel or contractors. 3.4 Discharge of Stormwater from Diked Areas Diking around select ASTs and generators have manual control valves that function to restrain drainage (Table I). The bypass valve must remain in the closed position when not in use. Rainwater will accumulate in the diked area and it must be inspected for oil prior to discharge. If it is determined that oil is present in retained stormwater, then discharge to the stormwater system is not allowed pursuant to 40 CFR 112.8(c)(3). Oil present in rainwater must be removed, stored, and disposed of in compliance with

Page 20: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

16

hazardous waste regulations. Uncontaminated rainwater can be discharged by opening the bypass valve or using a pump or ejector; both must be manually activated under responsible supervision (Campus SPCC Coordinator or appointee). The drainage log template is located in Appendix E; retain the completed log for at least 3 years. 3.5 SPCC Education and Awareness Education, for the purposes of this SPCC Plan, is provided to all new employees with responsibilities for the handling or storage of oil or for emergency/spill response within one month of hire. Training is provided through UC San Diego’s online training programs: “Annual Shop and Studio Environmental Compliance and Hazards Training”. In general, employees handling over five gallons of oil will undergo training. Education is provided to the appropriate employees on an annual basis, or when changes in oil storage/handling are such that additional education is appropriate. The Campus SPCC Coordinator is responsible for assuring that the appropriate personnel complete the education requirements presented below. The education program includes the following topics: Location, requirements, and contents of this SPCC Plan;

Proper oil unloading and transfer procedures;

Inspection and documentation responsibilities;

Oil spill response techniques and notification procedures;

Spill incident reporting and documentation;

Security issues; and

A review of any recent spill incidents, equipment malfunctions, procedural or organizational revisions, or any other related changes to the oil pollution prevention program.

All education modules and education records will be maintained by the Campus SPCC Coordinator for at least three years.

Page 21: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

17

4. DISCHARGE RESPONSE Most oils and petroleum products are classified and regulated as Hazardous Materials in California and any release must be addressed accordingly. Spill countermeasures are required for all spills ranging from small, incidental spills to large, catastrophic releases. Section 4.1 describes procedures to follow for small incidental spills that do not require reporting to regulatory agencies (spills less than 42 gallons that are completely contained). Section 4.2 includes procedures developed to respond to large spills which require notification to regulatory agencies. 4.1 Small, Incidental Releases Visible discharges which result in a loss of oil (less than 42 gallons) from a container, including, but not limited to, seams, gaskets, piping, pumps, valves, rivets, and bolts, must be promptly cleaned up. The source of the discharge must be determined and addressed in a manner which reduces or eliminates further discharges of oil. Contaminated materials resulting from the discharge (e.g., soil, speedy-dry, absorbent pads, etc.) must be managed, stored and disposed of appropriately. 4.2 Large Spills (Releases of Oil Greater Than 42 Gallons) One release of greater than 1,000 gallons or two releases of oil greater than 42 gallons within a 12-month period require notification to the EPA Regional Administrator. If a release of 42 gallons or more of oil is discovered, the Oil Spill Contingency Plan (below) must be followed. The procedures in the Oil Spill Contingency Plan may be adjusted based on the severity of the release. 4.2.1 Oil Spill Contingency Plan

If an imminent or actual situation exists with respect to a release of a large quantity of oil, the Campus SPCC Coordinator or his designee will be contacted immediately and will coordinate with the emergency response incident commander. The Incident Commander is responsible for coordinating all emergency response measures and has the authority to commit all resources required to implement the emergency response procedures.

4.3 Equipment for Spill Response and Personal Protection Oil spill containment and cleanup kits are maintained throughout the campus. These kits allow a prompt response to an oil spill. Each kit includes one or more items of the equipment listed below: Tools (e.g., shovels, brooms);

Absorbent pillows;

Absorbent sheets;

20 pound bag or 5 gallon bucket of loose absorbent;

Storm drain/catch basin covers; and

PPE – (gloves, Tyvek suits, over-boots, safety glasses). Note: The equipment listed above is intended to provide only minimal initial containment of a release from a tank truck.

Page 22: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

18

Oil spill containment and cleanup kits are located around the campus in areas of potential oil release. In the event of a “major” or “large quantity” release, appropriate containment and cleanup equipment will be provided by the Police Department until the arrival of the spill response contractor (see Section 4.4). 4.4 Spill Response Contractor UC San Diego maintains an active contract for emergency response to oil spills. A current list of spill response contractors is provided in Appendix J.

Page 23: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

19

5. DISCHARGE REPORTING All significant releases or threatened releases of hazardous material, including oil, require immediate emergency notification to campus personnel and to government agencies, as discussed below. Oil means oil of any kind or in any form, including, but not limited to: fats, oils or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil (40 CFR §112.2). 5.1 University Reporting If a reportable discharge of oil has occurred at the campus, UC San Diego personnel must: Dial (858) 534-4357 to notify the University Police Department; they will text and email EH&S. EH&S will notify on-campus SPCC coordinators, as necessary. UC San Diego maintains active contracts for emergency response to oil spills and appropriate contractors will be notified in the event of a release, as necessary. A current list of SPCC coordinators and spill response contractors is provided in Appendix J. In addition, and as necessary, EH&S will notify the Federal, State and/or Local agencies as discussed in Section 5.2 and 5.3, respectively. 5.2 Federal Reporting National Response Center (NRC) As soon as knowledge of a Prohibited Discharge that violates 40 CFR 110.6 is available, the Campus SPCC Coordinator, or appointee, must “immediately” notify the NRC in Washington, DC. A prohibited discharge to the waters of the United States or its adjoining shoreline is defined to be a discharge in harmful quantities. Harmful quantities is defined at 40 CFR Part 110.3, to include discharges that:

Violate water quality standards; or

Cause a film or sheen upon or discoloration of the surface of the water or adjoining shorelines or cause a sludge or emulsion to be deposited beneath the surface of the water or upon the adjoining shoreline.

Report discharges via phone to the National Response Center (NRC) at 1-800-424-8802 or 1-202-426-2675. The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. NRC will ask a caller to provide as much information about the incident as possible including: Name, organization, and telephone number;

Name and address of the party responsible for the incident;

Date and time of the incident;

Page 24: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

20

Location of the incident;

Source and cause of the discharge;

Types of material(s) discharged;

Quantity of materials discharged;

Danger or threat posed by the discharge;

Number and types of injuries (if any);

Weather conditions at the incident location; and

Other information to help emergency personnel respond to the incident U.S. EPA If the campus has a discharge of more than 1,000 gallons in a single discharge or two discharges of more than 42 gallons of oil within twelve months of each other, a written report of discharge must be submitted to the EPA Regional Administrator within 60 days. The following information represents the minimum detail that must be included in the report: Name of the facility;

Your name;

Location of the facility;

Maximum storage or handling capacity of the facility and normal daily throughput;

Corrective action and countermeasures you have taken, including a description of equipment repairs and replacements;

An adequate description of the facility, including maps, flow diagrams, and topographical maps, as necessary;

The cause of such discharge as described in 40 CFR §112.1(b), including a failure analysis of the system or subsystem in which the failure occurred;

Additional preventive measures you have taken or contemplated to minimize the possibility of recurrence; and

Such other information as the Regional Administrator may reasonably require pertinent to the Plan or discharge.

Reports should be addressed to: SPCC Regional Administrator EPA Region IX 75 Hawthorne Street San Francisco, CA 94105 If, after review by the agency, the SPCC Plan is required to be amended, such amendments to the Plan must be made within 30 days of notification of such. Amendments shall be implemented as soon as possible, but not later than six months after the amendments become part of the Plan (unless other dates are specified in the notice).

Page 25: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

21

Note: Additional details regarding the requirements and deadlines for Plan submittal are located in 40 CFR 112.4 (a) through (f). In addition, for a release to a waterway notification to the following agencies is appropriate: United States Coast Guard 415.399.3300 California Department of Fish and Wildlife 888.334.2258 5.3 State & Local Reporting The following California-specific notification, containment, and discharge prevention procedures are required beyond those required by Federal regulation. San Diego County Department of Environmental Health (DEH), Hazardous Materials Division (CUPA) & California Emergency Management Agency (EMA) Without regard to the quantity being released, an immediate, verbal report of any release or threatened release of a hazardous material must be made to the San Diego County Department of Environmental Health (DEH) (i.e., the CUPA) and the California EMA for any hazardous materials identified in the campus’s Hazardous Materials Business Plan. Call California Emergency Management Agency (Cal/EMA), 800-852-7550, 916-845-8991.

Call the local CUPA at 858-505-6880. Other Notifications For serious injuries or harmful exposures to workers notify California Occupational Safety and Health Administration (Cal/OSHA) at 415.557.0100. For releases from hazardous waste tank systems or secondary containment releases notify the Department of Toxic Substances Control (DTSC) at 510.540.2122. When notifying the agency(s) provide as much of the following information as is available: Name of the facility;

Your name;

Location and phone number of the facility;

Date and time of the discharge;

Type of material discharged;

Estimated quantity of the discharge;

Source of the discharge;

Any damages or injuries caused by the discharge;

Corrective action and countermeasures you have taken, including a description of equipment repairs and replacements;

Page 26: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

22

Cause(s) of the discharge;

Whether an evacuation may be needed; and

Names of individuals and/or organizations who have also been contacted.

After a spill or release of oil, immediate verbal emergency notification should be followed up as soon as possible with a written report to the following agencies: San Diego CUPA (use form in Appendix F);

Department of Toxic Substances Control; and

Cal/OSHA, serious injury or harmful exposure to workers. G:\31259_UCSD\Final\2013_0510_HAI_UCSD_SPCCPlan_F.docx

Page 27: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

23

REFERENCES 1. California Code of Regulations, Title 19, Division 2, Chapter 4, Section 2703.

2. California Health and Safety Code, Division 20, Chapter 6.67 [http://www.leagle.com/statutes.aspx?xmldoc=CAST%2010142011479.xml&docbase=Statutes].

3. California Water Code Section 13271 [http://law.onecle.com/california/water/13271.html].

4. California Water Code Section 13272 [http://law.onecle.com/california/water/13272.html].

5. Code of Federal Regulations (CFR) 40 Section 112 [www.epa.gov/osweroe1/docs/oil/cfr/0703_40cfr112.pdf].

Page 28: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TABLES

Page 29: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 1

. AST

s AN

D A

ST T

OTE

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

1AS

TD

iese

l15

000

Yes

Yes

Tank

leak

or

rupt

ure

Yes

Cen

tral U

tiliti

es

Plan

t15

000

To a

spha

lt an

d su

bseq

uent

ly s

torm

dr

ain

Faci

litie

s M

anag

emen

t

2AS

TW

aste

Oil

500

No

Yes

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Flee

t Se

rvic

es B

uild

ing

500

To a

spha

lt an

d th

en

to s

torm

dra

inFa

cilit

ies

Man

agem

ent

3AS

TD

iese

l20

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oC

entra

l Util

ities

Pl

ant

200

To c

oncr

ete

floor

then

st

orm

dra

inFa

cilit

ies

Man

agem

ent

4AS

TD

iese

l10

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oC

entra

l Util

ities

Pl

ant

100

To c

oncr

ete

floor

then

st

orm

dra

inFa

cilit

ies

Man

agem

ent

5AS

TD

iese

l10

00Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sC

ampu

s Se

rvic

es

Com

plex

- Fl

eet

Serv

ices

Bui

ldin

g

1000

To s

torm

dra

inFa

cilit

ies

Man

agem

ent

6AS

TD

iese

l10

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oC

entra

l Util

ities

Pl

ant

100

To c

oncr

ete

berm

ar

ound

tank

Faci

litie

s M

anag

emen

t7

AST

Die

sel

600

No

Yes

Tank

leak

or

rupt

ure

Yes

Paci

fic H

all

600

To c

oncr

ete

floor

and

th

en to

sto

rm d

rain

EH&S

8AS

TD

iese

l20

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sEa

st C

ampu

s U

tiliti

es P

lant

200

Con

cret

e be

rm a

nd

pad

arou

nd ta

nks

EH&S

9AS

TD

iese

l20

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sEa

st C

ampu

s U

tiliti

es P

lant

200

Con

cret

e be

rm a

nd

pad

arou

nd ta

nks

EH&S

13AS

TD

iese

l10

0N

oYe

sTa

nk le

ak o

r ru

ptur

eYe

sG

eise

l Lib

rary

100

To c

oncr

ete

floor

or

asph

alt l

oadi

ng a

rea

and

to s

torm

dra

in

EH&S

14AS

TD

iese

l20

0N

oN

oTa

nk le

ak o

r ru

ptur

eN

oEn

gine

erin

g Bu

ildin

g U

nit I

(J

acob

s H

all)

200

To c

oncr

ete

floor

, co

ntai

ned

in

base

men

t roo

m

EH&S

Page 30: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 1

. AST

s AN

D A

ST T

OTE

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

15AS

TH

ydra

ulic

O

il60

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sR

IMAC

600

To c

oncr

ete

seco

ndar

y th

en s

torm

dr

ain

EH&S

16AS

TD

iese

l86

No

No

Tank

leak

or

rupt

ure

Yes

Engi

neer

ing

Build

ing

Uni

t II

86To

con

cret

e flo

or o

r as

phal

t loa

ding

are

a an

d to

sto

rm d

rain

EH&S

17AS

TD

iese

l15

00N

oN

oTa

nk le

ak o

r ru

ptur

eN

oSa

nfor

d C

onso

rtium

for

Reg

ener

ativ

e M

edic

ine

1500

To c

oncr

ete

floor

or

asph

alt l

oadi

ng a

rea

and

to s

torm

dra

in

EH&S

18AS

TD

iese

l20

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sEa

st C

ampu

s U

tiliti

es P

lant

200

Con

cret

e be

rm a

nd

pad

arou

nd ta

nks

EH&S

19AS

TD

iese

l20

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sEa

st C

ampu

s U

tiliti

es P

lant

200

Con

cret

e be

rm a

nd

pad

arou

nd ta

nks

EH&S

22AS

TD

iese

l85

Yes

Yes

Tank

leak

or

rupt

ure

No

SIO

85To

con

cret

e se

cond

ary

EH&S

23AS

TD

iese

l60

Yes

Yes

Tank

leak

or

rupt

ure

No

Sanf

ord

Con

sorti

um fo

r R

egen

erat

ive

Med

icin

e

60To

con

cret

e flo

or,

wou

ld fl

ood

room

EH&S

24AS

TD

iese

l25

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

anyo

n Vi

sta

Adm

inis

tratio

n Bu

ildin

g

250

To c

oncr

ete

floor

and

th

en o

utsi

de s

torm

dr

ain

EH&S

25AS

TD

iese

l25

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

anyo

n Vi

sta

Adm

inis

tratio

n Bu

ildin

g

250

To c

oncr

ete

floor

and

th

en o

utsi

de s

torm

dr

ain

EH&S

27AS

TH

ydra

ulic

O

il15

000

Yes

Yes

Tank

leak

or

rupt

ure

No

Hig

h Ba

y Ph

ysic

s La

bora

tory

1500

0To

und

ergr

ound

co

ntai

nmen

t sto

rage

, m

ust b

e pu

mpe

d

EH&S

Page 31: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 1

. AST

s AN

D A

ST T

OTE

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

28AS

TD

iese

l10

00Ye

sYe

sTa

nk le

ak o

r ru

ptur

eYe

sN

atur

al S

cien

ces

Build

ing

1000

To c

oncr

ete

seco

ndar

y th

en

near

by s

hubb

ery

or

stor

m d

rain

EH&S

29AS

TH

ydra

ulic

O

il50

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry

500

To c

oncr

ete

trenc

hes

and

ultim

atel

y to

se

wer

sum

p (p

lugg

ed

drai

n)

Faci

litie

s M

anag

emen

t

30AS

TH

ydra

ulic

O

il50

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry

500

To c

oncr

ete

trenc

hes

and

ultim

atel

y to

se

wer

sum

p (p

lugg

ed

drai

n)

Faci

litie

s M

anag

emen

t

31AS

TH

ydra

ulic

O

il50

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry

500

To c

oncr

ete

trenc

hes

and

ultim

atel

y to

se

wer

sum

p (p

lugg

ed

drai

n)

Faci

litie

s M

anag

emen

t

32AS

TD

iese

l50

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oEa

st C

ampu

s M

edic

al C

ente

r C

entra

l Pla

nt

500

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

33AS

TD

iese

l50

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oEa

st C

ampu

s M

edic

al C

ente

r C

entra

l Pla

nt

500

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

34AS

TD

iese

l50

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oEa

st C

ampu

s M

edic

al C

ente

r C

entra

l Pla

nt

500

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

35AS

TD

iese

l50

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oEa

st C

ampu

s M

edic

al C

ente

r C

entra

l Pla

nt

500

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

Page 32: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 1

. AST

s AN

D A

ST T

OTE

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

36AS

TD

iese

l50

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oEa

st C

ampu

s M

edic

al C

ente

r C

entra

l Pla

nt

500

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

3AS

T To

teH

ydra

ulic

O

il30

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oH

igh

Bay

Phys

ics

Labo

rato

ry30

0To

und

ergr

ound

co

ntai

nmen

t sto

rage

, m

ust b

e pu

mpe

d

EH&S

4AS

T To

teH

ydra

ulic

O

il30

0Ye

sYe

sTa

nk le

ak o

r ru

ptur

eN

oH

igh

Bay

Phys

ics

Labo

rato

ry30

0To

und

ergr

ound

co

ntai

nmen

t sto

rage

, m

ust b

e pu

mpe

d

EH&S

Page 33: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 2

. DR

UM

STO

RAG

ESU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge T

ype

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

1Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sYe

sD

rum

leak

or

rupt

ure

No

Envi

ronm

enta

l M

anag

emen

t Fac

ility

55To

tren

ch s

yste

m a

nd

to s

ump

(plu

gged

)Fa

cilit

ies

Man

agem

ent

5Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Engi

neer

ing

Build

ing

Uni

t I55

To s

econ

dary

dru

m

pale

tteEH

&S

6Pe

trole

um

Hyd

ro-

carb

ons

55N

oYe

sD

rum

leak

or

rupt

ure

No

Pow

ell S

truct

ural

Sy

stem

s La

bora

tory

55To

con

cret

e flo

or th

en

to s

ewer

dra

inEH

&S

7H

ydra

ulic

O

il55

No

Yes

Dru

m le

ak o

r ru

ptur

eN

oPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry55

To c

oncr

ete

floor

then

to

sew

er d

rain

EH&S

9H

ydra

ulic

O

il55

Yes

Yes

Dru

m le

ak o

r ru

ptur

eYe

sPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry55

To s

econ

dary

dru

m

pale

tteEH

&S

10Pe

trole

um

Hyd

ro-

carb

ons

55N

oN

oD

rum

leak

or

rupt

ure

No

Cel

lula

r and

M

olec

ular

Med

icin

e Ea

st

55To

con

cret

e flo

or a

nd

then

sto

rm d

rain

EH&S

11W

aste

Oil

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Leic

htag

Fam

ily

Foun

datio

n Bi

omed

ical

Bui

ldin

g

55To

upr

ight

pla

stic

se

cond

ary

EH&S

12W

aste

Oil

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Med

ical

Tea

chin

g Fa

cilit

y55

To s

econ

dary

dru

m

pale

tteEH

&S

13Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Med

ical

Tea

chin

g Fa

cilit

y55

To s

econ

dary

dru

m

pale

tteEH

&S

14Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

55To

con

cret

e flo

or

Faci

litie

s M

anag

emen

t

15Pe

trole

um

Hyd

ro-

carb

ons

55N

oN

oD

rum

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

55To

con

cret

e flo

or

Faci

litie

s M

anag

emen

t

16Pe

trole

um

Hyd

ro-

carb

ons

55N

oN

oD

rum

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

55To

con

cret

e flo

or

Faci

litie

s M

anag

emen

t

Page 34: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 2

. DR

UM

STO

RAG

ESU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge T

ype

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

17Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Soci

al S

cien

ces

Res

earc

h Bu

ildin

g55

To c

oncr

ete

seco

ndar

yEH

&S

21Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

Yes

Seaw

eed

Can

yon

Stor

age

Faci

lity

55To

sec

onda

ry d

rum

pa

lette

EH&S

22H

ydra

ulic

O

il55

Yes

No

Dru

m le

ak o

r ru

ptur

eN

oSo

cial

Sci

ence

s R

esea

rch

Build

ing

55To

con

cret

e se

cond

ary

EH&S

24H

ydra

ulic

O

il55

Yes

Yes

Dru

m le

ak o

r ru

ptur

eN

oPo

wel

l-Foc

ht

Bioe

ngin

eerin

g H

all

55To

sec

onda

ry d

rum

pa

lette

EH&S

25Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Leic

htag

Fam

ily

Foun

datio

n Bi

omed

ical

Bui

ldin

g

55To

sec

onda

ry d

rum

pa

lette

EH&S

26Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Leic

htag

Fam

ily

Foun

datio

n Bi

omed

ical

Bui

ldin

g

55To

dep

ress

ed

cont

ainm

ent s

pace

EH

&S

27Pe

trole

um

Hyd

ro-

carb

ons

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Med

ical

Tea

chin

g Fa

cilit

y55

To s

econ

dary

dru

m

pale

tteEH

&S

33W

aste

Oil

55Ye

sN

oD

rum

leak

or

rupt

ure

No

Med

ical

Tea

chin

g Fa

cilit

y55

To s

econ

dary

dru

m

pale

tteEH

&S

34W

aste

Oil

55Ye

sYe

sD

rum

leak

or

rupt

ure

No

Pow

ell S

truct

ural

Sy

stem

s La

bora

tory

55To

met

al c

abin

et

seco

ndar

yEH

&S

35W

aste

Oil

55Ye

sYe

sD

rum

leak

or

rupt

ure

No

Pow

ell S

truct

ural

Sy

stem

s La

bora

tory

55To

met

al c

abin

et

seco

ndar

yEH

&S

68W

aste

Oil

55N

oN

oD

rum

leak

or

rupt

ure

No

Cam

pus

Serv

ices

C

ompl

ex F

leet

Se

rvic

es B

uild

ing

55To

con

cret

e flo

or o

r as

phal

t and

then

to

stor

m d

rain

Faci

litie

s M

anag

emen

t

69H

ydra

ulic

O

il55

Yes

Yes

Dru

m le

ak o

r ru

ptur

eN

oH

igh

Bay

Phys

ics

Labo

rato

ry55

To s

econ

dary

co

ntai

nmen

tEH

&S

Page 35: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

1H

ydra

ulic

Oil

150

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Basi

c Sc

ienc

e Bu

ildin

g (P

ass

#6)

150

To e

leva

tor v

ault

2H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Biom

ed L

ibra

ry16

5To

ele

vato

r vau

lt

3H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Biom

ed L

ibra

ry27

5To

ele

vato

r vau

lt

4H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Brai

n Im

agin

g16

5To

ele

vato

r vau

lt

5H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

RR

(Pas

s #1

)16

5To

ele

vato

r vau

lt

6H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

RR

(Ser

vice

#2)

275

To e

leva

tor v

ault

7H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CAL

-IT2

(Pas

s #1

Hyd

ro)

NA

To e

leva

tor v

ault

8H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Car

diov

ascu

lar P

arki

ng (P

ass

#1)

NA

To e

leva

tor v

ault

9H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Car

diov

ascu

lar P

arki

ng (P

ass

#2)

NA

To e

leva

tor v

ault

10H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Car

eer P

lann

ing

165

To e

leva

tor v

ault

11H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Cen

ter H

all (

Pass

#1)

220

To e

leva

tor v

ault

12H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Cen

ter H

all (

Pass

#2)

220

To e

leva

tor v

ault

13H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Che

mis

try R

esea

rch

3B16

5To

ele

vato

r vau

lt

14H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

G (P

ass

#1)

165

To e

leva

tor v

ault

15H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

G (P

ass-

Ser

v)16

5To

ele

vato

r vau

lt

16H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

M E

ast (

Pass

#1)

220

To e

leva

tor v

ault

17H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

M E

ast (

Pass

#2)

165

To e

leva

tor v

ault

18H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

M W

est (

Pass

#1)

165

To e

leva

tor v

ault

Page 36: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

19H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

CM

M W

est (

Pass

#2)

165

To e

leva

tor v

ault

20H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Cog

nitiv

e Sc

ienc

e 3C

165

To e

leva

tor v

ault

21H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

East

Cam

pus

Offi

ce B

uild

ing

(Pas

s #1

)N

ATo

ele

vato

r vau

lt

22H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

East

Cam

pus

Offi

ce B

uild

ing

(Pas

s #2

)N

ATo

ele

vato

r vau

lt

23H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Ecka

rdt L

ibra

ry (P

asse

nger

)16

5To

ele

vato

r vau

lt

24H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Ecka

rdt L

ibra

ry (P

ass-

Staf

f)16

5To

ele

vato

r vau

lt

25H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Econ

omic

s16

5To

ele

vato

r vau

lt

26H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 1 (P

ass

#4)

220

To e

leva

tor v

ault

27H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 2 (F

reig

ht

#2)

275

To e

leva

tor v

ault

28H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 3A

(Pas

s #2

)27

5To

ele

vato

r vau

lt

29H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 3A

(Pas

s #3

)27

5To

ele

vato

r vau

lt

30H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 3A

(Pas

s)27

5To

ele

vato

r vau

lt

31H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

ERC

5.1

(Pas

s)N

ATo

ele

vato

r vau

lt

32H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gal

brai

th H

all (

Pass

#1)

220

To e

leva

tor v

ault

33H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gal

brai

th H

all (

Pass

#2)

220

To e

leva

tor v

ault

34H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gei

sel L

ibra

ry (P

ass

#5)

165

To e

leva

tor v

ault

35H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gei

sel L

ibra

ry (P

ass

#6)

165

To e

leva

tor v

ault

Page 37: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

36H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gilm

an D

r. Pr

kg S

truct

ure

(Pas

s #1

)27

5To

ele

vato

r vau

lt

37H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Gilm

an D

r. Pr

kg S

truct

ure

(Pas

s #2

)22

0To

ele

vato

r vau

lt

38H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

I&R

200

0 W

arre

n Le

ctur

e (P

ass

#1)

165

To e

leva

tor v

ault

39H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

I&R

200

0 W

arre

n Le

ctur

e (P

ass

#2)

165

To e

leva

tor v

ault

40H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

I&R

300

0 Li

tera

ture

(Pas

s #3

)22

0To

ele

vato

r vau

lt

41H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

I&R

300

0 Li

tera

ture

(Pas

s #4

)22

0To

ele

vato

r vau

lt

42H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IOA

Inst

itute

of A

mer

icas

165

To e

leva

tor v

ault

43H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IRPS

(Lib

rary

Bld

g.)

165

To e

leva

tor v

ault

44H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IRPS

(Rob

inso

n Bl

dg.)

Adm

in.

220

To e

leva

tor v

ault

45H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IGPP

-I (P

ass)

220

To e

leva

tor v

ault

46H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IGPP

-II (E

ast)

220

To e

leva

tor v

ault

47H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

IGPP

-II (W

est)

165

To e

leva

tor v

ault

48H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Isaa

cs H

all (

NO

RPA

X)

165

To e

leva

tor v

ault

49H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

MTF

(Pas

s #1

)27

5To

ele

vato

r vau

lt

50H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

MTF

(Pas

s #2

)27

5To

ele

vato

r vau

lt

51H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Mai

n G

ym16

5To

ele

vato

r vau

lt

52H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Man

dell

Wei

ss (P

ass)

165

To e

leva

tor v

ault

Page 38: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

53H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Man

devi

lle C

ente

r (Fr

eigh

t)N

ATo

ele

vato

r vau

lt

54H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Man

devi

lle C

ente

r (Pa

ss)

220

To e

leva

tor v

ault

55H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

May

er H

all

330

To e

leva

tor v

ault

56H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Med

ia C

ente

r 3F

165

To e

leva

tor v

ault

57H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

MES

OM

NA

To e

leva

tor v

ault

58H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Mus

ic B

uild

ing

165

To e

leva

tor v

ault

59H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Mus

ic B

uild

ing

165

To e

leva

tor v

ault

60H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Nat

ural

Sci

ence

s Bl

dg. (

2nd

Floo

r El

ev. N

o Ac

cess

)16

5To

ele

vato

r vau

lt

61H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Nie

renb

erg

Hal

l (Pa

ss #

1)22

0To

ele

vato

r vau

lt

62H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Nie

renb

erg

Hal

l (Pa

ss #

2)22

0To

ele

vato

r vau

lt

63H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

OAR

/NTV

Com

plex

(Mid

dle

Park

ing

Lot)

275

To e

leva

tor v

ault

64H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

OAR

/NTV

Com

plex

(Nor

th)

275

To e

leva

tor v

ault

65H

ydra

ulic

Oil

NA

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

OAR

/NTV

Com

plex

(Obs

erva

tion)

NA

To e

leva

tor v

ault

66H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Old

Pric

e C

tr. F

reig

ht #

2 D

e-C

omm

issi

oned

220

To e

leva

tor v

ault

67H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Pang

ea P

arki

ng S

truct

ure

330

To e

leva

tor v

ault

68H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Pang

ea P

arki

ng S

truct

ure

330

To e

leva

tor v

ault

69H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Payn

e C

ente

r SIO

165

To e

leva

tor v

ault

70H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Pepp

er C

anyo

n H

all (

Pass

#1)

275

To e

leva

tor v

ault

Page 39: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

71H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Pepp

er C

anyo

n H

all (

Pass

#2)

275

To e

leva

tor v

ault

72H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Potik

er T

heat

er16

5To

ele

vato

r vau

lt

73H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Potik

er T

heat

er (S

cene

ry L

ift)

165

To e

leva

tor v

ault

74H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Preu

ss S

choo

l16

5To

ele

vato

r vau

lt

75H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Rad

y Sc

hool

of M

gmt.

East

(Pas

s #1

)22

0To

ele

vato

r vau

lt

76H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Rad

y Sc

hool

of M

gmt.

East

(Pas

s #2

)22

0To

ele

vato

r vau

lt

77H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Rad

y Sc

hool

of M

gmt.

Wes

t (Pa

ss

#1)

220

To e

leva

tor v

ault

78H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Rad

y Sc

hool

of M

gmt.

Wes

t (Pa

ss

#2)

220

To e

leva

tor v

ault

79H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Ritt

er H

all (

New

)22

0To

ele

vato

r vau

lt

80H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Scho

land

er H

all

165

To e

leva

tor v

ault

81H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

SER

F Bu

ildin

g (P

ass

#1)

220

To e

leva

tor v

ault

82H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

SKAG

GS

Scho

ol o

f Pha

rmac

y (F

reig

ht #

3)33

0To

ele

vato

r vau

lt

83H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

SKAG

GS

Scho

ol o

f Pha

rmac

y (P

ass

#1)

275

To e

leva

tor v

ault

84H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

SKAG

GS

Scho

ol o

f Pha

rmac

y (P

ass

#2)

275

To e

leva

tor v

ault

85H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Soci

al S

cien

ces

Build

ing

(Pas

s #1

)27

5To

ele

vato

r vau

lt

86H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Soci

al S

cien

ces

Build

ing

(Pas

s #2

)22

0To

ele

vato

r vau

lt

87H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Soci

al S

cien

ces

Build

ing

(Pas

s #3

)22

0To

ele

vato

r vau

lt

88H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Step

hen

Birc

h Aq

uariu

m16

5To

ele

vato

r vau

lt

Page 40: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

89H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Stud

ent A

cade

mic

Ser

vice

s33

0To

ele

vato

r vau

lt

90H

ydra

ulic

Oil

330

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Stud

ent A

cade

mic

Ser

vice

s33

0To

ele

vato

r vau

lt

91H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Stud

ent C

ente

r A (P

ass

#2) N

orth

165

To e

leva

tor v

ault

92H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Stud

ent H

ealth

Cen

ter

165

To e

leva

tor v

ault

93H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Supe

rcom

pute

r Add

ition

165

To e

leva

tor v

ault

94H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Supe

rcom

pute

r Bui

ldin

g (F

reig

ht #

4)27

5To

ele

vato

r vau

lt

95H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Supe

rcom

pute

r Bui

ldin

g (P

ass

#1)

275

To e

leva

tor v

ault

96H

ydra

ulic

Oil

275

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Supe

rcom

pute

r Bui

ldin

g (P

ass

#2)

275

To e

leva

tor v

ault

97H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Supe

rcom

pute

r Bui

ldin

g (P

ass

#3)

220

To e

leva

tor v

ault

98H

ydra

ulic

Oil

220

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

Sver

drup

Hal

l22

0To

ele

vato

r vau

lt

99H

ydra

ulic

Oil

165

Hyd

ro-E

lect

ricH

ydra

ulic

line

rupt

ure

TPC

N (G

arag

e)16

5To

ele

vato

r vau

lt

100

Hyd

raul

ic O

il22

0H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTP

CN

(Pas

s #1

)22

0To

ele

vato

r vau

lt

101

Hyd

raul

ic O

il22

0H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTP

CN

(Pas

s #2

)22

0To

ele

vato

r vau

lt

102

Hyd

raul

ic O

il22

0H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTe

lem

edic

ine

Bldg

(Fre

ight

#4)

220

To e

leva

tor v

ault

103

Hyd

raul

ic O

il16

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTe

lem

edic

ine

Bldg

(Pas

s #3

) Sou

th

Car

165

To e

leva

tor v

ault

104

Hyd

raul

ic O

il27

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTe

lem

edic

ine

Bldg

(Pas

s #1

) Lob

by

Wes

t Car

275

To e

leva

tor v

ault

105

Hyd

raul

ic O

il27

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eTe

lem

edic

ine

Bldg

(Pas

s #2

) Lob

by

East

Car

275

To e

leva

tor v

ault

Page 41: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 3

. ELE

VATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

*Ele

vato

r lis

t pro

vide

d by

Fac

ilitie

s M

anag

emen

t, th

e re

spon

sibl

e pa

rty fo

r ins

pect

ions

Num

ber

Con

tent

sC

apac

ity

(gal

)Eq

uipm

ent

Type

Poss

ible

Dis

char

ge

Type

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

n

106

Hyd

raul

ic O

il27

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eVa

ughn

Hal

l Rep

lace

men

t (E

ndur

ance

Hal

l)27

5To

ele

vato

r vau

lt

107

Hyd

raul

ic O

il16

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eVi

sual

Arts

Bui

ldin

g (S

ervi

ce)

165

To e

leva

tor v

ault

108

Hyd

raul

ic O

il16

5H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eVi

sual

Arts

Bui

ldin

g (P

ass)

165

To e

leva

tor v

ault

109

Hyd

raul

ic O

il22

0H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eYo

rk H

all (

Pass

Nor

th)

220

To e

leva

tor v

ault

110

Hyd

raul

ic O

il22

0H

ydro

-Ele

ctric

Hyd

raul

ic li

ne ru

ptur

eYo

rk H

all (

Pass

Sou

th)

220

To e

leva

tor v

ault

111

Hyd

raul

ic O

ilN

AH

ydro

-Cha

inH

ydra

ulic

line

rupt

ure

Man

dell

Wei

ss (W

ardr

obe)

NA

To e

leva

tor v

ault

112

Hyd

raul

ic O

il16

5H

ydro

-Hol

eles

sH

ydra

ulic

line

rupt

ure

Gal

brai

th H

all (

Pass

#3)

165

To e

leva

tor v

ault

113

Hyd

raul

ic O

il22

0R

oped

Hyd

roH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 3B

(Pas

s #1

)22

0To

ele

vato

r vau

lt

114

Hyd

raul

ic O

il22

0R

oped

Hyd

roH

ydra

ulic

line

rupt

ure

Engi

neer

ing

Build

ing,

Uni

t 3B

(Pas

s #2

)22

0To

ele

vato

r vau

lt

Page 42: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 4

. EM

ERG

ENC

Y G

ENER

ATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

1D

iese

l45

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sEn

viro

nmen

tal

Man

agem

ent F

acilit

y45

0To

inte

rstit

ial s

pace

Faci

litie

s M

anag

emen

t2

Die

sel

100

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

Yes

Biol

ogy

Fiel

d St

atio

n -

Labo

rato

ry10

0To

inte

rstit

ial s

pace

EH&S

3D

iese

l10

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ampu

s Se

rvic

es

Com

plex

- Bu

ildin

g B

1000

To in

ters

titia

l spa

ceEH

&S

4D

iese

l10

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ampu

s Se

rvic

es

Com

plex

- El

ectri

c Sh

op10

0To

inte

rstit

ial s

pace

Faci

litie

s M

anag

emen

t

5D

iese

l50

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

anyo

n Vi

sta

Adm

inis

trativ

e an

d D

inin

g Fa

cilit

y

500

To c

oncr

ete

floor

and

th

en o

utsi

de s

torm

dr

ain

EH&S

6D

iese

l10

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sAt

kins

on H

all

1000

To in

ters

titia

l spa

ceEH

&S

7D

iese

l35

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sPo

wel

l-Foc

ht

Bioe

ngin

eerin

g H

all

350

To in

ters

titia

l spa

ceEH

&S

8D

iese

l50

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEn

gine

erin

g Bu

ildin

g U

nit I

500

Sew

er fl

oor d

rain

Fa

cilit

ies

Man

agem

ent

9D

iese

l11

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ompu

ter S

cien

ce a

nd

Engi

neer

ing

(EBU

3B)

1100

To in

ters

titia

l spa

ceEH

&S

10D

iese

l60

0N

oN

oTa

nk o

r pip

ing

leak

or r

uptu

reYe

sEn

gine

erin

g Bu

ildin

g U

nit I

I60

0To

a c

oncr

ete

pad

then

to

sto

rm d

rain

EH&S

11D

iese

l75

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sSc

ienc

e an

d En

gine

erin

g R

esea

rch

Faci

lity

750

To in

ters

titia

l spa

ceEH

&S

12D

iese

l20

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sG

ilman

Par

king

St

ruct

ure

200

To in

ters

titia

l spa

ceEH

&S

13D

iese

l15

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sPa

ngea

Par

king

St

ruct

ure

150

To in

ters

titia

l spa

ceEH

&S

14D

iese

l25

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTh

e Vi

llage

at T

orre

y Pi

nes

#525

0To

con

cret

e flo

or a

nd

then

und

ergr

ound

co

ntai

nmen

t, m

ust b

e pu

mpe

d

EH&S

15D

iese

l25

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

afe

Vent

anas

250

To in

ters

titia

l spa

ceEH

&S

Page 43: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 4

. EM

ERG

ENC

Y G

ENER

ATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

16D

iese

l60

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sR

IMAC

600

To in

ters

titia

l spa

ce

from

day

tank

or

conc

rete

pad

EH&S

17D

iese

l10

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sN

atur

al S

cien

ces

Build

ing

1000

Berm

ed c

oncr

ete

cont

ainm

ent

EH&S

18D

iese

l60

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

Yes

Man

dell

Wei

ss F

orum

60To

inte

rstit

ial s

pace

EH&S

19D

iese

l10

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sPh

arm

aceu

tical

Sc

ienc

es B

uild

ing

1000

To c

oncr

ete

seco

ndar

y th

en s

torm

dra

inEH

&S

20D

iese

l35

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sG

eorg

e Pa

lade

La

bora

torie

s fo

r Cel

lula

r an

d M

olec

ular

Med

icin

e

350

To c

oncr

ete

floor

EH&S

21D

iese

l35

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sG

eorg

e Pa

lade

La

bora

torie

s fo

r Cel

lula

r &

Mol

ecul

ar M

edic

ine

350

To c

oncr

ete

floor

EH&S

22D

iese

l35

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oSt

ein

Clin

ical

Res

earc

h Bu

ildin

g35

0C

onta

ined

insi

de

seal

ed c

oncr

ete

base

men

t, no

floo

r dr

ains

EH&S

23D

iese

l25

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sVa

ugha

n H

all,

T.

Way

land

250

To in

ters

titia

l spa

ceEH

&S

24D

iese

l20

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sBi

rch

Aqua

rium

at

Scrip

ps20

0To

inte

rstit

ial s

pace

EH&S

25D

iese

l30

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oSu

ppor

t Sho

p - M

etal

Sh

op (T

-43)

300

To c

oncr

ete

seco

ndar

yEH

&S

26D

iese

l40

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTh

ornt

on H

ospi

tal

400

To in

ters

titia

l spa

ceFa

cilit

ies

Man

agem

ent

27D

iese

l75

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTh

ornt

on H

ospi

tal

7500

To in

ters

titia

l spa

ceFa

cilit

ies

Man

agem

ent

28D

iese

l60

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ardi

ovas

cula

r Cen

ter

600

To c

oncr

ete

seco

ndar

y th

en s

urro

undi

ng

shru

bber

y

Faci

litie

s M

anag

emen

t

Page 44: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 4

. EM

ERG

ENC

Y G

ENER

ATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

29D

iese

l20

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s U

tiliti

es

Plan

t20

0To

con

cret

e flo

orEH

&S

30D

iese

l86

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

No

East

Cam

pus

Util

ities

Pl

ant

86To

con

cret

e flo

orEH

&S

31D

iese

l25

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sH

opki

ns P

arki

ng

Stru

ctur

e25

00To

inte

rstit

ial s

pace

EH&S

32D

iese

l50

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sPa

cific

Hal

l50

0To

inte

rstit

ial s

pace

fro

m b

elly

tank

or t

o flo

or d

rain

EH&S

33D

iese

l40

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTo

rrey

Pin

es C

ente

r N

orth

400

To c

oncr

ete

floor

and

th

en s

urro

undi

ng

shru

bber

y

EH&S

34D

iese

l40

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sPo

wel

l Stru

ctur

al

Syst

ems

Labo

rato

ry40

0To

inte

rstit

ial s

pace

EH&S

35D

iese

l17

50Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sSt

ruct

ural

and

Mat

eria

ls

Engi

neer

ing

Build

ing

1750

Berm

ed c

oncr

ete

cont

ainm

ent

EH&S

36Lu

be O

il10

6Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

entra

l Util

ities

Pla

nt10

6To

con

cret

e flo

orFa

cilit

ies

Man

agem

ent

37Lu

be O

il10

6Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

entra

l Util

ities

Pla

nt10

6To

con

cret

e flo

orFa

cilit

ies

Man

agem

ent

38Lu

be O

il10

6Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oC

entra

l Util

ities

Pla

nt10

6To

con

cret

e flo

orFa

cilit

ies

Man

agem

ent

39D

iese

l30

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ente

r for

Neu

ral

Circ

uits

and

Beh

avio

r30

0To

inte

rstit

ial s

pace

EH&S

40D

iese

l86

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

No

East

Cam

pus

Util

ities

Pl

ant

86To

con

cret

e flo

orEH

&S

41N

atur

al

Gas

(S

PCC

Ex

empt

)

100

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

Yes

303

Uni

vers

ity C

ente

r10

0<N

ull>

EH&S

42D

iese

l20

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s U

tiliti

es

Plan

t20

0To

con

cret

e flo

orEH

&S

43D

iese

l40

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sR

ita A

tkin

son

Res

iden

ces

400

To in

ters

titia

l spa

ceEH

&S

Page 45: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 4

. EM

ERG

ENC

Y G

ENER

ATO

RS

SUM

MAR

Y O

F ST

OR

AGE,

USE

, PR

EDIC

TIO

N O

F O

IL F

LOW

AN

D D

IREC

TIO

N D

UR

ING

REL

EASE

Uni

vers

ity o

f Cal

iforn

ia, S

an D

iego

La J

olla

, Cal

iforn

ia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)

Dis

char

ge D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

44D

iese

l50

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

ampu

s Po

int P

arki

ng

Stru

ctur

e 50

0To

con

cret

e flo

orEH

&S

45D

iese

l35

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTh

e Vi

llage

at T

orre

y Pi

nes

Wes

t #2

350

To c

oncr

ete

floor

then

to

nea

rby

gras

s an

d st

orm

dra

in

EH&S

46D

iese

l35

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTh

e Vi

llage

at T

orre

y Pi

nes

East

#1

350

To in

ters

titia

l spa

ceEH

&S

47D

iese

l10

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

entra

l Util

ities

Pla

nt10

0To

con

cret

e flo

orFa

cilit

ies

Man

agem

ent

48D

iese

l75

No

Yes

Tank

or p

ipin

g le

ak o

r rup

ture

Yes

Gei

sel L

ibra

ry75

To in

ters

titia

l spa

ceEH

&S

49D

iese

l40

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sO

tters

on H

all

400

To in

ters

titia

l spa

ceEH

&S

50D

iese

l15

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sSo

cial

Sci

ence

s R

esea

rch

Build

ing

150

To c

oncr

ete

floor

EH&S

51D

iese

l20

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sC

hanc

ello

r's C

ompl

ex20

0To

con

cret

e flo

or th

en

to n

earb

y sh

rubb

ery

EH&S

52D

iese

l15

00Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sTo

rrey

Pin

es C

ente

r So

uth

1500

To in

ters

titia

l spa

ceEH

&S

54D

iese

l25

0N

oYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sM

edic

al G

enet

ics

Build

ing

250

To g

rave

l the

n to

su

rrou

ndin

g sh

rubb

ery

and

then

sto

rm d

rain

EH&S

55D

iese

l15

00N

oYe

sH

ydra

ulic

line

ru

ptur

eN

oSa

nfor

d C

onso

rtium

for

Reg

ener

ativ

e M

edic

ine

1500

To c

oncr

ete

floor

, w

ould

floo

d ro

omEH

&S

56D

iese

l47

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reYe

sAt

lant

is H

all

470

To u

nder

grou

nd

seco

ndar

y co

ntai

nmen

tEH

&S

58D

iese

l10

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s M

edic

al

Cen

ter C

entra

l Pla

nt10

0To

con

cret

e be

rmed

flo

orFa

cilit

ies

Man

agem

ent

59D

iese

l10

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s M

edic

al

Cen

ter C

entra

l Pla

nt10

0To

con

cret

e be

rmed

flo

orFa

cilit

ies

Man

agem

ent

60D

iese

l10

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s M

edic

al

Cen

ter C

entra

l Pla

nt10

0To

con

cret

e be

rmed

flo

orFa

cilit

ies

Man

agem

ent

61D

iese

l10

0Ye

sYe

sTa

nk o

r pip

ing

leak

or r

uptu

reN

oEa

st C

ampu

s M

edic

al

Cen

ter C

entra

l Pla

nt10

0To

con

cret

e be

rmed

flo

orFa

cilit

ies

Man

agem

ent

Page 46: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 5

. MO

BIL

E FU

ELER

S AN

D M

OB

ILE

GEN

ERAT

OR

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

nIn

spec

tion

Res

pons

ible

Pa

rty

2M

obile

Fu

eler

Die

sel

200

No

Yes

Tank

leak

or

rupt

ure

Yes

East

Cam

pus

Subs

tatio

n20

0To

con

cret

e/as

phal

t ar

ea a

nd th

en s

torm

dr

ain

EH&S

8M

obile

Fu

eler

Die

sel

140

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

9M

obile

Fu

eler

Die

sel

140

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

12M

obile

Fu

eler

Die

sel

200

No

Yes

Tank

leak

or

rupt

ure

Yes

Seaw

eed

Can

yon

Stor

age

Faci

lity

200

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

2M

obile

G

ener

ator

Die

sel

140

No

No

Tank

leak

or

rupt

ure

Yes

Endu

ranc

e H

all

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

Faci

litie

s M

anag

emen

t

3M

obile

G

ener

ator

Die

sel

140

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

4M

obile

G

ener

ator

Die

sel

100

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

100

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

5M

obile

G

ener

ator

Die

sel

200

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

200

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

6M

obile

G

ener

ator

Die

sel

140

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

7M

obile

G

ener

ator

Die

sel

500

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

500

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

8M

obile

G

ener

ator

Die

sel

500

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

500

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

Page 47: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 5

. MO

BIL

E FU

ELER

S AN

D M

OB

ILE

GEN

ERAT

OR

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tain

er

Type

Con

tent

sC

apac

ity

(gal

)2n

dary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

Dire

ctio

nIn

spec

tion

Res

pons

ible

Pa

rty

9M

obile

G

ener

ator

Die

sel

140

Yes

No

Tank

leak

or

rupt

ure

Yes

Cam

pus

Serv

ices

C

ompl

ex -

Elec

tric

Shop

140

To c

oncr

ete/

asph

alt

area

and

then

sto

rm

drai

n

EH&S

10M

obile

G

ener

ator

Die

sel

140

No

Yes

Tank

leak

or

rupt

ure

Yes

East

Cam

pus

Subs

tatio

n14

0To

con

cret

e/as

phal

t ar

ea a

nd th

en s

torm

dr

ain

EH&S

Page 48: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

1D

iele

ctric

O

il16

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eN

oU

rey

Hal

l16

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

2D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

19 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

3D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

27 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

4D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

51 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

5D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

59 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

6D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

75 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

7D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s38

83 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

8D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

03 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

9D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

43 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

10D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

51 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

11D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

59 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

12D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

99 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

13D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eN

o39

91 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

14D

iele

ctric

O

il19

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s39

99 N

orth

Mes

a Ap

artm

ents

190

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

15D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s40

59 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

16D

iele

ctric

O

il14

3N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s40

75 N

orth

Mes

a Ap

artm

ents

143

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

17D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s40

75 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

Page 49: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

18D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s40

83 N

orth

Mes

a Ap

artm

ents

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

19D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sSi

xth

Col

lege

413

A20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

20D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

21D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

22D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

23D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

24D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

25D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

26D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

27D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

28D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

EH&S

29D

iele

ctric

O

il20

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sC

onra

d Pr

ebys

Mus

ic

Cen

ter

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

30D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

oast

Apa

rtmen

ts B

-420

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

31D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eN

oC

oast

Apa

rtmen

ts B

-620

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

32D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

oast

Apa

rtmen

ts B

-220

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

33D

iele

ctric

O

il12

9Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sBi

rch

Aqua

rium

at

Scrip

ps12

9To

con

cret

e sl

ab

and

then

to s

oil

EH&S

34D

iele

ctric

O

il35

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sIG

PP -

Mun

k La

bora

tory

350

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

Page 50: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

35D

iele

ctric

O

il19

0N

oYe

sTa

nk le

ak o

r ru

ptur

eYe

sSe

awee

d C

anyo

n W

areh

ouse

190

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

36D

iele

ctric

O

il26

8N

oN

oTa

nk le

ak o

r ru

ptur

eN

oC

entra

l Util

ities

Pla

nt26

8To

con

cret

e sl

ab

and

then

to s

oil

Faci

litie

s M

anag

emen

t37

Die

lect

ric

Oil

362

No

No

Tank

leak

or

rupt

ure

Yes

Cen

tral U

tiliti

es P

lant

362

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

38D

iele

ctric

O

il27

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

entra

l Util

ities

Pla

nt27

5To

con

cret

e sl

ab

and

then

to s

oil

Faci

litie

s M

anag

emen

t39

Die

lect

ric

Oil

275

No

No

Tank

leak

or

rupt

ure

Yes

Cen

tral U

tiliti

es P

lant

275

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

40D

iele

ctric

O

il28

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sJa

i28

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

41D

iele

ctric

O

il23

7N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

ande

ll W

eiss

The

atre

237

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

42D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eN

oC

uzco

Hou

se20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

43D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eN

oO

cean

Vie

w T

erra

ce16

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

44D

iele

ctric

O

il11

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

edia

Cen

ter a

nd

Com

mun

icat

ion

115

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

45D

iele

ctric

O

il15

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sG

ildre

d La

tin A

mer

ican

St

udie

s Bu

ildin

g15

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

46D

iele

ctric

O

il21

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sR

obin

son

Build

ing

3 -

Libr

ary

210

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

47D

iele

ctric

O

il21

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sSp

anos

Ath

letic

Tr

aini

ng F

acilit

y21

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

48Pe

trole

um

Hyd

ro-

carb

ons

250

No

No

Tank

leak

or

rupt

ure

Yes

Tena

ya H

all

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

49D

iele

ctric

O

il24

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

anyo

nvie

w A

quat

ic

and

Clim

bing

Fac

ility

240

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

50D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

ente

r for

Neu

ral

Circ

uits

and

Beh

avio

r20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

51D

iele

ctric

O

il40

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

hanc

ello

r's C

ompl

ex40

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

Page 51: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

52D

iele

ctric

O

il14

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sBa

ttery

Sto

rage

#2

140

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

53D

iele

ctric

O

il18

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

ompr

esse

d N

atur

al

Gas

Fue

ling

180

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

54D

iele

ctric

O

il10

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sId

a an

d C

ecil

Gre

en

Facu

lty C

lub

100

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

55D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sSi

xth

Col

lege

Ap

artm

ents

180

016

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

58D

iele

ctric

O

il14

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sW

arre

n Ap

artm

ents

- G

oldb

erg

145

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

59D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sW

arre

n Ap

artm

ents

- Br

enna

n16

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

60D

iele

ctric

O

il17

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sW

arre

n Ap

artm

ents

- Bl

ack

170

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

61D

iele

ctric

O

il22

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sIs

aacs

Hal

l22

5To

con

cret

e sl

ab

and

then

to s

oil

EH&S

63D

iele

ctric

O

il17

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

ardi

ovas

cula

r Cen

ter

175

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

64D

iele

ctric

O

il24

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s78

9 Si

xth

Col

lege

240

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

65D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sG

ilman

Par

king

St

ruct

ure

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

66D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

SDG

&E

67D

iele

ctric

O

il49

15N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s69

KV/1

2KV

Switc

hing

St

atio

n49

15To

con

cret

e sl

ab

and

then

to s

oil

SDG

&E

68D

iele

ctric

O

il17

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sBi

olog

y Fi

eld

Stat

ion-

Stor

age

170

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

69D

iele

ctric

O

il38

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sN

iere

nber

g H

all

385

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

71D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sO

ld D

irect

or's

Hou

se20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

72D

iele

ctric

O

il27

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

entra

l Util

ities

Pla

nt27

5To

con

cret

e sl

ab

and

then

to s

oil

Faci

litie

s M

anag

emen

t

Page 52: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

73D

iele

ctric

O

il28

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

entra

l Util

ities

Pla

nt28

0To

con

cret

e sl

ab

and

then

to s

oil

Faci

litie

s M

anag

emen

t74

Die

lect

ric

Oil

438

No

No

Tank

leak

or

rupt

ure

Yes

Cen

tral U

tiliti

es P

lant

438

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

75D

iele

ctric

O

il18

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

ande

ll W

eiss

For

um18

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

76D

iele

ctric

O

il44

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sPo

tiker

The

ater

440

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

77D

iele

ctric

O

il50

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

iddl

e Ea

st H

all

500

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

78D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sLa

tin A

mer

ica

Hal

l20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

79D

iele

ctric

O

il38

5Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sH

opki

ns P

arki

ng

Stru

ctur

e38

5To

con

cret

e sl

ab

and

then

to s

oil

EH&S

80D

iele

ctric

O

il28

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sSe

quoy

ah H

all

280

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

81D

iese

l25

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sSa

n D

iego

Su

perc

ompu

ter C

ente

r25

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

82D

iele

ctric

O

il38

5Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sH

opki

ns P

arki

ng

Stru

ctur

e38

5To

con

cret

e sl

ab

and

then

to s

oil

EH&S

83D

iele

ctric

O

il28

5N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sR

IMAC

285

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

84D

iele

ctric

O

il25

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sU

CSD

Ext

ensi

on -

Build

ing

X25

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

85D

iele

ctric

O

il18

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

ampu

s Se

rvic

es

Com

plex

- Bu

ildin

g A

180

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

86D

iele

ctric

O

il20

5N

oYe

sTa

nk le

ak o

r ru

ptur

eYe

sC

ampu

s Se

rvic

es

Com

plex

- El

ectri

c Sh

op

205

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

87D

iele

ctric

O

il19

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sC

aree

r Ser

vice

s C

ente

r19

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

88D

iele

ctric

O

il10

0Ye

sN

oTa

nk le

ak o

r ru

ptur

eYe

sC

ente

r for

NM

R

Spec

trosc

opy

and

Imag

ing

of P

rote

ins

100

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

Page 53: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

89D

iele

ctric

O

il20

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

s20

2 U

nive

rsity

Cen

ter

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

90D

iele

ctric

O

il35

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sEn

gine

erin

g Bu

ildin

g U

nit I

I35

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

91D

iele

ctric

O

il38

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sEn

viro

nmen

tal

Man

agem

ent F

acilit

y38

0To

con

cret

e sl

ab

and

then

to s

oil

Faci

litie

s M

anag

emen

t92

Die

lect

ric

Oil

100

No

No

Tank

leak

or

rupt

ure

Yes

Ida

and

Cec

il G

reen

Fa

culty

Clu

b10

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

93D

iele

ctric

O

il25

0N

oYe

sTa

nk le

ak o

r ru

ptur

eYe

sSc

hool

of M

edic

ine

Build

ing

325

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

94D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

atth

ews

Apar

tmen

ts B

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

95D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sM

atth

ews

Apar

tmen

ts D

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

96D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sSi

xth

Col

lege

Ap

artm

ents

100

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

97D

iele

ctric

O

il50

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sW

arre

n Le

ctur

e H

all

500

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

98D

iele

ctric

O

il19

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sEa

st C

ampu

s Su

bsta

tion

190

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

99D

iele

ctric

O

il16

0N

oN

oTa

nk le

ak o

r ru

ptur

eYe

sVi

sual

Arts

Fac

ility:

Bu

ildin

g 6

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

100

Die

lect

ric

Oil

225

No

No

Tank

leak

or

rupt

ure

Yes

SIO

Lib

rary

225

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

102

Die

lect

ric

Oil

150

No

No

Tank

leak

or

rupt

ure

Yes

Oce

an V

iew

Ter

race

150

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

103

Die

lect

ric

Oil

160

No

No

Tank

leak

or

rupt

ure

Yes

Mar

shal

l Upp

er

Apar

tmen

ts K

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

104

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Nor

th A

mer

ica

Hal

l20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

105

Die

lect

ric

Oil

200

Yes

No

Tank

leak

or

rupt

ure

Yes

Nor

th C

ampu

s R

estro

oms

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

106

Die

lect

ric

Oil

240

No

No

Tank

leak

or

rupt

ure

Yes

Tiog

a H

all

240

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

Page 54: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

107

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Gen

eva

Hal

l Wes

t20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

108

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Nor

th A

mer

ica

Hal

l20

0To

con

cret

e sl

ab

and

then

to s

oil

SDG

&E

110

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Latin

Am

eric

a H

all

200

To c

oncr

ete

slab

an

d th

en to

soi

lSD

G&E

111

Die

lect

ric

Oil

268

No

No

Tank

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

268

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

112

Die

lect

ric

Oil

280

No

No

Tank

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

280

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

113

Die

lect

ric

Oil

200

Yes

No

Tank

leak

or

rupt

ure

Yes

Hum

aniti

es a

nd S

ocia

l Sc

ienc

es20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

114

Die

lect

ric

Oil

250

Yes

No

Tank

leak

or

rupt

ure

Yes

Nor

th C

ampu

s H

ousi

ng

Phas

e II

#225

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

115

Die

lect

ric

Oil

250

Yes

No

Tank

leak

or

rupt

ure

Yes

Nor

th C

ampu

s H

ousi

ng

Phas

e II

#425

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

116

Die

lect

ric

Oil

250

Yes

No

Tank

leak

or

rupt

ure

Yes

The

Villa

ge a

t Tor

rey

Pine

s #3

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

117

Die

lect

ric

Oil

300

Yes

No

Tank

leak

or

rupt

ure

Yes

Mar

shal

l Upp

er

Apar

tmen

ts J

300

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

118

Die

lect

ric

Oil

280

No

No

Tank

leak

or

rupt

ure

Yes

Sanf

ord

Con

sorti

um fo

r R

egen

erat

ive

Med

icin

e28

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

119

Die

lect

ric

Oil

280

No

No

Tank

leak

or

rupt

ure

Yes

Sanf

ord

Con

sorti

um fo

r R

egen

erat

ive

Med

icin

e28

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

120

Die

lect

ric

Oil

250

Yes

Yes

Tank

leak

or

rupt

ure

Yes

East

Cam

pus

Park

ing

Stru

ctur

e 2

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

121

Die

lect

ric

Oil

669

No

No

Tank

leak

or

rupt

ure

No

Cen

tral U

tiliti

es P

lant

669

To c

oncr

ete

slab

an

d th

en to

soi

lFa

cilit

ies

Man

agem

ent

122

Die

lect

ric

Oil

260

Yes

No

Tank

leak

or

rupt

ure

Yes

Hou

sing

, Din

ing

and

Hos

pita

lity

Serv

ices

260

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

123

Die

lect

ric

Oil

280

Yes

No

Tank

leak

or

rupt

ure

Yes

Cha

rles

Dav

id K

eelin

g Ap

artm

ents

128

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

124

Die

lect

ric

Oil

280

Yes

No

Tank

leak

or

rupt

ure

Yes

Nor

th C

ampu

s H

ousi

ng

Phas

e II

#528

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

Page 55: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

125

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

East

Cam

pus

Offi

ce

Build

ing

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

126

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Rad

iatio

n O

ncol

ogy

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

127

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Com

pres

sed

Nat

ural

G

as F

uelin

g25

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

128

Die

lect

ric

Oil

250

Yes

No

Tank

leak

or

rupt

ure

Yes

The

Villa

ge a

t Tor

rey

Pine

s #2

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

129

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Inst

itute

of t

he

Amer

icas

Bui

ldin

g25

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

130

Cas

t Coi

l D

ry T

ype

360

No

No

Tank

leak

or

rupt

ure

Yes

RIM

AC36

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

131

Die

lect

ric

Oil

360

Yes

No

Tank

leak

or

rupt

ure

Yes

Mar

shal

l Low

er

Apar

tmen

ts D

360

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

132

Die

lect

ric

Oil

360

Yes

No

Tank

leak

or

rupt

ure

Yes

Mar

shal

l Low

er

Apar

tmen

ts B

360

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

133

Die

lect

ric

Oil

250

Yes

No

Tank

leak

or

rupt

ure

Yes

The

Villa

ge a

t Tor

rey

Pine

s #8

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

134

Die

lect

ric

Oil

360

Yes

No

Tank

leak

or

rupt

ure

Yes

Mar

shal

l Low

er

Apar

tmen

ts A

360

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

135

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Tiog

a H

all

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

136

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Keck

Oce

anog

raph

ic

and

Atm

osph

eric

R

esea

rch

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

137

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Bonn

er H

all

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

138

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Cen

ter H

all

200

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

139

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

Atla

ntis

Hal

l20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

140

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Wag

ner D

ance

Bu

ildin

g, M

olli

and

Arth

ur

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

Page 56: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

141

Die

lect

ric

Oil

200

No

No

Tank

leak

or

rupt

ure

Yes

965

Uni

vers

ity C

ente

r20

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

142

Die

lect

ric

Oil

455

No

No

Tank

leak

or

rupt

ure

Yes

301

Uni

vers

ity C

ente

r45

5To

con

cret

e sl

ab

and

then

to s

oil

EH&S

143

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

Cen

tral R

esea

rch

Serv

ices

Fac

ility

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

146

Die

lect

ric

Oil

160

No

No

Tank

leak

or

rupt

ure

Yes

Pow

ell S

truct

ural

Sy

stem

s La

bora

tory

160

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

147

Die

lect

ric

Oil

300

No

No

Tank

leak

or

rupt

ure

Yes

East

Cam

pus

Park

ing

Stru

ctur

e30

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

148

Die

lect

ric

Oil

451

No

No

Tank

leak

or

rupt

ure

Yes

Batte

ry S

tora

ge #

545

1To

con

cret

e sl

ab

and

then

to s

oil

EH&S

149

Die

lect

ric

Oil

308

No

No

Tank

leak

or

rupt

ure

Yes

Batte

ry S

tora

ge #

330

8To

con

cret

e sl

ab

and

then

to s

oil

EH&S

150

Die

lect

ric

Oil

451

No

No

Tank

leak

or

rupt

ure

Yes

Batte

ry S

tora

ge #

245

1To

con

cret

e sl

ab

and

then

to s

oil

EH&S

151

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

La J

olla

Inst

itute

for

Alle

rgy

and

Imm

unol

ogy

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

152

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

La J

olla

Inst

itute

for

Alle

rgy

and

Imm

unol

ogy

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

153

Die

lect

ric

Oil

250

No

No

Tank

leak

or

rupt

ure

Yes

La J

olla

Inst

itute

for

Alle

rgy

and

Imm

unol

ogy

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

155

Die

lect

ric

Oil

280

No

No

Tank

leak

or

rupt

ure

Yes

Torr

ey P

ines

Cen

ter

Nor

th28

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

156

Die

lect

ric

Oil

280

No

No

Tank

leak

or

rupt

ure

Yes

Torr

ey P

ines

Cen

ter

Nor

th28

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

157

Hyd

raul

ic

Oil

300

No

No

Tank

leak

or

rupt

ure

Yes

Rita

Atk

inso

n R

esid

ence

s30

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

158

Hyd

raul

ic

Oil

300

No

No

Tank

leak

or

rupt

ure

Yes

Rita

Atk

inso

n R

esid

ence

s30

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

Page 57: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

TAB

LE 6

. TR

ANSF

OR

MER

SSU

MM

ARY

OF

STO

RAG

E, U

SE, P

RED

ICTI

ON

OF

OIL

FLO

W A

ND

DIR

ECTI

ON

DU

RIN

G R

ELEA

SEU

nive

rsity

of C

alifo

rnia

, San

Die

goLa

Jol

la, C

alifo

rnia

OB

JEC

T ID

Con

tent

sC

apac

ity

(gal

)Se

cond

ary

Spill

K

itPo

ssib

le

Dis

char

ge

Type

Exte

rior

Loca

tion

Dis

char

ge

Volu

me

(gal

)D

isch

arge

D

irect

ion

Insp

ectio

n R

espo

nsib

le

Part

y

159

Die

lect

ric

Oil

250

Yes

No

Tank

or

pipi

ng le

ak

or ru

ptur

e

Yes

Mat

hew

s Ap

partm

ents

250

To c

oncr

ete

slab

an

d th

en to

soi

lEH

&S

161

Die

lect

ric

Oil

300

No

No

Tank

or

pipi

ng le

ak

or ru

ptur

e

Yes

64 D

egre

es30

0To

con

cret

e sl

ab

and

then

to s

oil

EH&S

162

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

163

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

164

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

165

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

166

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

167

Die

lect

ric

Oil

688

Yes

Yes

Tank

leak

or

rupt

ure

No

Altm

an C

linic

al

Tran

slat

iona

l Res

earc

h In

stitu

te (A

CTR

I)

688

To c

oncr

ete

berm

ed

floor

Faci

litie

s M

anag

emen

t

Page 58: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

FIGURES

Page 59: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

UNIVERSITY OF CALIFORNIA, SAN DIEGO9500 GILMAN DRIVE

LA JOLLA, CALIFORNIA

SITE LOCUS

Ü

0 1 20.5 Miles FIGURE: 1July 2017

Page 60: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Mesa HousingRevelle College

Muir College

North Campus

School of Medicine

Warren College

Scripps Institute of Oceanography

University Center

East Campus Health Sciences

Roosevelt College

East Campus (Academic/ Recreation)

Science Research Park

North Torrey Pines and Gliderport

Theatre District

Campus Services Complex

Scripps Institute of Oceanography

Sixth College

Marshall College

Eucalyptus Grove

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity

Ü

0 0.25 0.50.125 Miles

UNIVERSITY OF CALIFORNIA, SAN DIEGO9500 GILMAN DRIVE

LA JOLLA, CALIFORNIA

GENERAL SITE MAP

FIGURE: 2July 2017

Page 61: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

XW

XW

XWXWXW

XWXW

XWXW

XWXW

XW

XW

XW

XW

XW

XW

XWXW

XWXW

XWXW

XW

XW

XW

#*#*

!(!(!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(!(

!(

!(

!(!(!(

!(!(!(!(!(

5

168

3327

2625

24

22

21

19

17

1312

1110

5002

Mesa Housing

Eucalyptus Grove

Marshall College Warren College

Sixth College

Revelle College

North Campus

Muir College

School of Medicine

Scripps Institute of Oceanography

University Center

East Campus Health Sciences

Science Research Park

East Campus (Academic/ Recreation)

Roosevelt College

Theatre District

North Torrey Pines and Gliderport

Campus Services Complex

60

85

86

500500

250

200

600

200

100

200

600

1000

1500

1000250

200200

500

98

7

5

363534 33

32

28

2524

23

22

1918

17

16

15

1413

Legend!( AST

#* AST Tote

XW AST (Waste)

XW Drum

Building Footprint

Parking Lot Area

©#*

#*

XWXWXW

XWXW

XW!(

!(!(!(500 500 500

15000

31

30

29

27

97

6

69

3534

43300

300

XW

XW

XW

!(

!(!(!(100 100 200

15000

16

15

14

6 4 3

1

2,000 0 2,0001,000 Feet

SITE MAP - ASTs, AST TOTES, & DRUMS

UNIVERSITY OF CALIFORNIA, SAN DIEGO9500 GILMAN DRIVELA JOLLA, CALIFORNIA

JULY 2017FIGURE 3

OBJECT ID

Container Type

Contents Capacity (gal)

Location

1 AST Diesel 15000 Central Utilities Plant2 AST Waste Oil 500 Campus Services Complex -

Fleet Services Building3 AST Diesel 200 Central Utilities Plant4 AST Diesel 100 Central Utilities Plant5 AST Diesel 1000 Campus Services Complex -

Fleet Services6 AST Diesel 100 Central Utilities Plant7 AST Diesel 600 Pacific Hall8 AST Diesel 200 East Campus Central Utility

Plant9 AST Diesel 200 East Campus Central Utility

Plant13 AST Diesel 100 Geisel Library14 AST Diesel 200 Engineering Building Unit I

(Jacobs Hall)15 AST Hydraulic

Oil600 RIMAC

16 AST Diesel 86 Engineering Building Unit II17 AST Diesel 1500 Sanford Consortium for

Regenerative Medicine18 AST Diesel 200 East Campus Central Utility

Plant19 AST Diesel 200 East Campus Central Utility

Plant22 AST Diesel 85 SIO23 AST Diesel 60 Sanford Consortium for

Regenerative Medicine24 AST Diesel 250 Canyon Vista Administration

Building 25 AST Diesel 250 Canyon Vista Administration

Building 27 AST Hydraulic

Oil15000 High Bay Physics Laboratory

28 AST Diesel 1000 Natural Sciences Building29 AST Hydraulic

Oil500 Powell Structural Laboratory

30 AST Hydraulic Oil

500 Powell Structural Laboratory

31 AST Hydraulic Oil

500 Powell Structural Laboratory

32 AST Diesel 500 East Campus Medical Center Central Plant

33 AST Diesel 500 East Campus Medical Center Central Plant

34 AST Diesel 500 East Campus Medical Center Central Plant

35 AST Diesel 500 East Campus Medical Center Central Plant

36 AST Diesel 500 East Campus Medical Center Central Plant

OBJECT ID

Container Type

Contents Capacity (gal)

Location

3 AST Tote Hydraulic Oil

300 High Bay Physics Laboratory

4 AST Tote Hydraulic Oil

300 High Bay Physics Laboratory

OBJECT ID

Container Type

Contents Capacity (gal)

Location

1 Drum Storage

Petroleum Hydro-carbons

55 Environmental Management Facility

5 Drum Storage

Petroleum Hydro-carbons

55 Engineering Building Unit I

6 Drum Storage

Petroleum Hydro-carbons

55 Powell Structural Systems Laboratory

7 Drum Storage

Hydraulic Oil

55 Powell Structural Systems Laboratory

9 Drum Storage

Hydraulic Oil

55 Powell Structural Systems Laboratory

10 Drum Storage

Petroleum Hydro-carbons

55 Cellular and Molecular Medicine East

11 Drum Storage

Waste Oil 55 Leichtag Family Foundation Biomedical Building

12 Drum Storage

Waste Oil 55 Medical Teaching Facility

13 Drum Storage

Petroleum Hydro-carbons

55 Medical Teaching Facility

14 Drum Storage

Petroleum Hydro-carbons

55 Central Utilities Plant

15 Drum Storage

Petroleum Hydro-carbons

55 Central Utilities Plant

16 Drum Storage

Petroleum Hydro-carbons

55 Central Utilities Plant

17 Drum Storage

Petroleum Hydro-carbons

55 Social Sciences Research Building

21 Drum Storage

Petroleum Hydro-carbons

55 Seaweed Canyon Storage Facility

22 Drum Storage

Hydraulic Oil

55 Social Sciences Research Building

24 Drum Storage

Hydraulic Oil

55 Powell-Focht Bioengineering Hall

25 Drum Storage

Petroleum Hydro-carbons

55 Leichtag Family Foundation Biomedical Building

26 Drum Storage

Petroleum Hydro-carbons

55 Leichtag Family Foundation Biomedical Building

27 Drum Storage

Petroleum Hydro-carbons

55 Medical Teaching Facility

33 Drum Storage

Waste Oil 55 Medical Teaching Facility

34 Drum Storage

Waste Oil 55 Powell Structural Systems Laboratory

35 Drum Storage

Waste Oil 55 Powell Structural Systems Laboratory

68 Drum Storage

Waste Oil 55 Campus Services Complex Fleet Services Building

69 Drum Storage

Hydraulic Oil

55 High Bay Physics Laboratory

OBJECT ID

Container Type

Contents Capacity (gal)

Location

OBJECT ID

Container Type

Contents Capacity (gal)

Location

OBJECT ID

Container Type

Contents Capacity (gal)

Location

Page 62: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

")

")

")

")

")

") ")

")")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")")

")")

")

")")

")

")

")

")")

")")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")")")")

_̂_̂

_̂_̂_̂

#*

#*#*#*#*#*#*#*

#*")

")")

")

2

10

2

12

9

8

7

6 5

32

1

12

11

10

Mesa Housing

Eucalyptus Grove

Marshall CollegeWarren College

Sixth College

Revelle College

North Campus

Muir College

School of Medicine

Scripps Institute of Oceanography

University Center

East Campus Health Sciences

Science Research Park

East Campus (Academic/ Recreation)

Roosevelt College

North Torrey Pines and Gliderport

Campus Services Complex

Theatre District

98

76

5

2

1

61 60 5958

56

55

54

52

51

50

49

48

47

46

45

44

43

42

41

40

39

38

3736

3534

33

32

31

30

28

2726

2524

23

22

2120

19

18

17

16

1514

13

12

11

10

29

Legend") Mobile Fueler

#* Mobile Generator

_̂ Large Spill Kit

") Emergency Generator

Hazmat Emergency Truck

Building Footprint

Parking Lot Area

©")

")

")

")

#*#* #*

#*#*

#*#*

4

39

8

9 8

76

54 3

2,000 0 2,0001,000 Feet

SITE MAP - MOBILE FUELERS,MOBILE GENERATORS &

EMERGENCY GENERATORS

FIGURE 4

UNIVERSITY OF CALIFORNIA, SAN DIEGO9500 GILMAN DRIVELA JOLLA, CALIFORNIA

JULY 2017

OBJECT ID

Container Type Contents Capacity (gal)

Location

2 Mobile Fueler Diesel 200 East Campus Substation

8 Mobile Fueler Diesel 140 Campus Services Complex - Electric Shop

9 Mobile Fueler Diesel 140 Campus Services Complex - Electric Shop

12 Mobile Fueler Diesel 200 Seaweed Canyon Storage Facility

OBJECT ID

Container Type Contents Capacity (gal)

Location

2 Mobile Generator Diesel 140 Endurance Hall

3 Mobile Generator Diesel 140 Campus Services Complex - Electric Shop

4 Mobile Generator Diesel 100 Campus Services Complex - Electric Shop

5 Mobile Generator Diesel 200 Campus Services Complex - Electric Shop

6 Mobile Generator Diesel 140 Campus Services Complex - Electric Shop

7 Mobile Generator Diesel 500 Campus Services Complex - Electric Shop

8 Mobile Generator Diesel 500 Campus Services Complex - Electric Shop

9 Mobile Generator Diesel 140 Campus Services Complex - Electric Shop

10 Mobile Generator Diesel 140 East Campus Substation

OBJECT ID

Container Type Contents Capacity (gal)

Location

1 Emergency Generator Diesel 450 Environmental Management Facility

2 Emergency Generator Diesel 100 Biology Field Station - Laboratory

3 Emergency Generator Diesel 1000 Campus Services Complex - Building B

4 Emergency Generator Diesel 100 Campus Services Complex - Electric Shop

5 Emergency Generator Diesel 500 Canyon Vista Administrative and Dining Facility

6 Emergency Generator Diesel 1000 Atkinson Hall

7 Emergency Generator Diesel 350 Powell-Focht Bioengineering Hall

8 Emergency Generator Diesel 500 Engineering Building Unit I

9 Emergency Generator Diesel 1100 Computer Science and Engineering (EBU 3B)

10 Emergency Generator Diesel 600 Engineering Building Unit II

11 Emergency Generator Diesel 750 Science and Engineering Research Facility

12 Emergency Generator Diesel 200 Gilman Parking Structure

13 Emergency Generator Diesel 150 Pangea Parking Structure

14 Emergency Generator Diesel 250 The Village at Torrey Pines #5

15 Emergency Generator Diesel 250 Cafe Ventanas

16 Emergency Generator Diesel 600 RIMAC

17 Emergency Generator Diesel 1000 Natural Sciences Building

18 Emergency Generator Diesel 60 Mandell Weiss Forum

19 Emergency Generator Diesel 1000 Pharmaceutical Sciences Building

20 Emergency Generator Diesel 350 George Palade Laboratories for Cellular and Molecular Medicine

21 Emergency Generator Diesel 350 George Palade Laboratories for Cellular & Molecular Medicine

22 Emergency Generator Diesel 350 Stein Clinical Research Building

23 Emergency Generator Diesel 250 Vaughan Hall, T. Wayland

24 Emergency Generator Diesel 200 Birch Aquarium at Scripps

25 Emergency Generator Diesel 300 Support Shop - Metal Shop (T-43)

26 Emergency Generator Diesel 400 Thornton Hospital

27 Emergency Generator Diesel 7500 Thornton Hospital

28 Emergency Generator Diesel 600 Cardiovascular Center

29 Emergency Generator Diesel 200 East Campus Utilities Plant

30 Emergency Generator Diesel 86 East Campus Utilities Plant

31 Emergency Generator Diesel 2500 Hopkins Parking Structure

32 Emergency Generator Diesel 500 Pacific Hall

33 Emergency Generator Diesel 400 Torrey Pines Center North

34 Emergency Generator Diesel 400 Powell Structural Systems Laboratory

35 Emergency Generator Diesel 1750 Structural and Materials Engineering Building

36 Emergency Generator Lube Oil 106 Central Utilities Plant

37 Emergency Generator Lube Oil 106 Central Utilities Plant

38 Emergency Generator Lube Oil 106 Central Utilities Plant

39 Emergency Generator Diesel 300 Center for Neural Circuits and Behavior

40 Emergency Generator Diesel 86 East Campus Utilities Plant

41 Emergency Generator Natural Gas (SPCC Exempt)

100 303 University Center

42 Emergency Generator Diesel 200 East Campus Utilities Plant

43 Emergency Generator Diesel 400 Rita Atkinson Residences

44 Emergency Generator Diesel 500 Campus Point Parking Structure

45 Emergency Generator Diesel 350 The Village at Torrey Pines West #2

46 Emergency Generator Diesel 350 The Village at Torrey Pines East #1

47 Emergency Generator Diesel 100 Central Utilities Plant

48 Emergency Generator Diesel 75 Geisel Library

49 Emergency Generator Diesel 400 Otterson Hall

50 Emergency Generator Diesel 150 Social Sciences Research Building

51 Emergency Generator Diesel 200 Chancellor's Complex

52 Emergency Generator Diesel 1500 Torrey Pines Center South

54 Emergency Generator Diesel 250 Medical Genetics Building

55 Emergency Generator Diesel 1500 Sanford Consortium for Regenerative Medicine

56 Emergency Generator Diesel 470 Atlantis Hall

58 Emergency Generator Diesel 100 East Campus Medical Center Central Plant

59 Emergency Generator Diesel 100 East Campus Medical Center Central Plant

60 Emergency Generator Diesel 100 East Campus Medical Center Central Plant

61 Emergency Generator Diesel 100 East Campus Medical Center Central Plant

OBJECT ID

Container Type Contents Capacity (gal)

Location

OBJECT ID

Container Type Contents Capacity (gal)

Location

OBJECT ID

Container Type Contents Capacity (gal)

Location

Page 63: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

#*

#*#*#*#*

#*

#* #*#*#*#*#*

#*#*#*#*

#*#*

#*

#*#*#*#*#*#*#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#*

#* #*

#*

#*

#*

#*#*

#*#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#* #*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#* #*

#*

#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*#*#*

#*#*

#*

#*#*

#*#*

#*

#*

#*#*#*#*#*#*

#*

#*#*#*#*

#*

#* #*#*#*#*#*

#*#*#*#*

#*#*

#*

#*#*#*#*#*#*#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#*

#* #*

#*

#*

#*

#*#*

#*#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#* #*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#* #*

#*

#*

#*

#*

#*

#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*#*#*

#*#*

#*

#*#*

#*#*

#*

#*

#*#*#*#*#*#*

9

876

54

3

21

99

97

96

95

94

93

92

91

90

89

88

87

86

8584

83

8281

80

7978

77

7675

74

73 72

71

69

68

6564

63

61

60

5958

55

54

5352

51

50

49

48

47

46

45

44

43

42

41

40

39

3837

36

35

34

33

323130

29

19

1817

1615

1413

1211

10161

159

158157

156155

153

152

151

150149148

147

146

143

142

141

140

139

138

137

136

135

134

133

132131

130129

128

127 126

125

124

123

122

121

120

119118

117

116115

114

113

112111

110108

107

106

105

104

103

102

100

Mesa Housing

Eucalyptus Grove

Marshall College

Warren College

Sixth College

Revelle College

North Campus

Muir College

School of Medicine

University Center

East Campus Health Sciences

Science Research Park

East Campus (Academic/ Recreation)

Scripps Institute of Oceanography

Roosevelt College

North Torrey Pines and Gliderport

Campus Services Complex

Theatre District

98

167166

165

164163

162

Legend#* Transformer

Building Footprint

Parking Lot Area

© #*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*67

66

2827

26

25

24

23

22

21

20

2,000 0 2,0001,000 Feet

SITE MAP - TRANSFORMERSUNIVERSITY OF CALIFORNIA, SAN DIEGO9500 GILMAN DRIVELA JOLLA, CALIFORNIA

JULY 2017FIGURE 5

OBJECT ID

Container Type

Contents Capacity (gal)

Location

1 Transformer Dielectric Oil 160 Urey Hall2 Transformer Dielectric Oil 160 3819 North Mesa Apartments3 Transformer Dielectric Oil 160 3827 North Mesa Apartments4 Transformer Dielectric Oil 160 3851 North Mesa Apartments5 Transformer Dielectric Oil 160 3859 North Mesa Apartments6 Transformer Dielectric Oil 160 3875 North Mesa Apartments7 Transformer Dielectric Oil 160 3883 North Mesa Apartments8 Transformer Dielectric Oil 160 3903 North Mesa Apartments9 Transformer Dielectric Oil 160 3943 North Mesa Apartments10 Transformer Dielectric Oil 160 3951 North Mesa Apartments11 Transformer Dielectric Oil 160 3959 North Mesa Apartments12 Transformer Dielectric Oil 160 3999 North Mesa Apartments13 Transformer Dielectric Oil 160 3991 North Mesa Apartments14 Transformer Dielectric Oil 190 3999 North Mesa Apartments15 Transformer Dielectric Oil 160 4059 North Mesa Apartments16 Transformer Dielectric Oil 143 4075 North Mesa Apartments17 Transformer Dielectric Oil 160 4075 North Mesa Apartments18 Transformer Dielectric Oil 160 4083 North Mesa Apartments19 Transformer Dielectric Oil 200 Sixth College 413A20 Transformer Dielectric Oil 4270 69KV/12KV Switching Station21 Transformer Dielectric Oil 370 69KV/12KV Switching Station22 Transformer Dielectric Oil 370 69KV/12KV Switching Station23 Transformer Dielectric Oil 350 69KV/12KV Switching Station24 Transformer Dielectric Oil 550 69KV/12KV Switching Station25 Transformer Dielectric Oil 200 69KV/12KV Switching Station26 Transformer Dielectric Oil 200 69KV/12KV Switching Station27 Transformer Dielectric Oil 5160 69KV/12KV Switching Station28 Transformer Dielectric Oil 5160 69KV/12KV Switching Station29 Transformer Dielectric Oil 200 Conrad Prebys Music Center30 Transformer Dielectric Oil 200 Coast Apartments B-431 Transformer Dielectric Oil 200 Coast Apartments B-632 Transformer Dielectric Oil 200 Coast Apartments B-233 Transformer Dielectric Oil 129 Birch Aquarium at Scripps34 Transformer Dielectric Oil 350 IGPP - Munk Laboratory35 Transformer Dielectric Oil 190 Seaweed Canyon Warehouse36 Transformer Dielectric Oil 268 Central Utilities Plant37 Transformer Dielectric Oil 362 Central Utilities Plant38 Transformer Dielectric Oil 275 Central Utilities Plant39 Transformer Dielectric Oil 275 Central Utilities Plant40 Transformer Dielectric Oil 280 Jai41 Transformer Dielectric Oil 237 Mandell Weiss Theatre42 Transformer Dielectric Oil 200 Cuzco House43 Transformer Dielectric Oil 160 Ocean View Terrace44 Transformer Dielectric Oil 115 Media Center and Communication45 Transformer Dielectric Oil 150 Gildred Latin American Studies Building46 Transformer Dielectric Oil 210 Robinson Building 3 - Library47 Transformer Dielectric Oil 210 Spanos Athletic Training Facility48 Transformer Petroleum

Hydrocarbons250 Tenaya Hall

49 Transformer Dielectric Oil 240 Canyonview Aquatic and Climbing Facility50 Transformer Dielectric Oil 200 Center for Neural Circuits and Behavior51 Transformer Dielectric Oil 400 Chancellor's Complex52 Transformer Dielectric Oil 140 Battery Storage #253 Transformer Dielectric Oil 180 Compressed Natural Gas Fueling54 Transformer Dielectric Oil 100 Ida and Cecil Green Faculty Club55 Transformer Dielectric Oil 160 Sixth College Apartments 180058 Transformer Dielectric Oil 145 Warren Apartments - Goldberg59 Transformer Dielectric Oil 160 Warren Apartments - Brennan60 Transformer Dielectric Oil 170 Warren Apartments - Black61 Transformer Dielectric Oil 225 Isaacs Hall63 Transformer Dielectric Oil 175 Cardiovascular Center64 Transformer Dielectric Oil 240 789 Sixth College65 Transformer Dielectric Oil 200 Gilman Parking Structure66 Transformer Dielectric Oil 4270 69KV/12KV Switching Station67 Transformer Dielectric Oil 5160 69KV/12KV Switching Station68 Transformer Dielectric Oil 170 Biology Field Station-Storage69 Transformer Dielectric Oil 385 Nierenberg Hall71 Transformer Dielectric Oil 200 Old Director's House72 Transformer Dielectric Oil 275 Central Utilities Plant73 Transformer Dielectric Oil 280 Central Utilities Plant74 Transformer Dielectric Oil 438 Central Utilities Plant75 Transformer Dielectric Oil 180 Mandell Weiss Forum76 Transformer Dielectric Oil 440 Potiker Theater77 Transformer Dielectric Oil 500 Middle East Hall78 Transformer Dielectric Oil 200 Latin America Hall79 Transformer Dielectric Oil 385 Hopkins Parking Structure80 Transformer Dielectric Oil 280 Sequoyah Hall81 Transformer Diesel 250 San Diego Supercomputer Center82 Transformer Dielectric Oil 385 Hopkins Parking Structure83 Transformer Dielectric Oil 285 RIMAC84 Transformer Dielectric Oil 250 UCSD Extension - Building X85 Transformer Dielectric Oil 180 Campus Services Complex - Building A86 Transformer Dielectric Oil 205 Campus Services Complex - Electric Shop87 Transformer Dielectric Oil 190 Career Services Center88 Transformer Dielectric Oil 100 Center for NMR Spectroscopy and Imaging of Proteins89 Transformer Dielectric Oil 200 202 University Center90 Transformer Dielectric Oil 350 Engineering Building Unit II91 Transformer Dielectric Oil 380 Environmental Management Facility92 Transformer Dielectric Oil 100 Ida and Cecil Green Faculty Club93 Transformer Dielectric Oil 250 School of Medicine Building 394 Transformer Dielectric Oil 160 Matthews Apartments B95 Transformer Dielectric Oil 160 Matthews Apartments D96 Transformer Dielectric Oil 160 Sixth College Apartments 10097 Transformer Dielectric Oil 500 Warren Lecture Hall98 Transformer Dielectric Oil 190 East Campus Substation99 Transformer Dielectric Oil 160 Visual Arts Facility: Building 6100 Transformer Dielectric Oil 225 SIO Library102 Transformer Dielectric Oil 150 Ocean View Terrace103 Transformer Dielectric Oil 160 Marshall Upper Apartments K104 Transformer Dielectric Oil 200 North America Hall105 Transformer Dielectric Oil 200 North Campus Restrooms106 Transformer Dielectric Oil 240 Tioga Hall107 Transformer Dielectric Oil 200 Geneva Hall West108 Transformer Dielectric Oil 200 North America Hall110 Transformer Dielectric Oil 200 Latin America Hall111 Transformer Dielectric Oil 268 Central Utilities Plant112 Transformer Dielectric Oil 280 Central Utilities Plant113 Transformer Dielectric Oil 200 Humanities and Social Sciences114 Transformer Dielectric Oil 250 North Campus Housing Phase II #2115 Transformer Dielectric Oil 250 North Campus Housing Phase II #4116 Transformer Dielectric Oil 250 The Village at Torrey Pines #3117 Transformer Dielectric Oil 300 Marshall Upper Apartments J118 Transformer Dielectric Oil 280 Sanford Consortium for Regenerative Medicine119 Transformer Dielectric Oil 280 Sanford Consortium for Regenerative Medicine120 Transformer Dielectric Oil 250 East Campus Parking Structure 2121 Transformer Dielectric Oil 669 Central Utilities Plant122 Transformer Dielectric Oil 260 Housing, Dining and Hospitality Services123 Transformer Dielectric Oil 280 Charles David Keeling Apartments 1124 Transformer Dielectric Oil 280 North Campus Housing Phase II #5125 Transformer Dielectric Oil 250 East Campus Office Building126 Transformer Dielectric Oil 250 Radiation Oncology127 Transformer Dielectric Oil 250 Compressed Natural Gas Fueling128 Transformer Dielectric Oil 250 The Village at Torrey Pines #2129 Transformer Dielectric Oil 250 Institute of the Americas Building130 Transformer Cast Coil Dry Type 360 RIMAC131 Transformer Dielectric Oil 360 Marshall Lower Apartments D132 Transformer Dielectric Oil 360 Marshall Lower Apartments B133 Transformer Dielectric Oil 360 The Village at Torrey Pines #8134 Transformer Dielectric Oil 360 Marshall Lower Apartments A135 Transformer Dielectric Oil 250 Tioga Hall136 Transformer Dielectric Oil 200 Keck Oceanographic and Atmospheric Research137 Transformer Dielectric Oil 250 Bonner Hall138 Transformer Dielectric Oil 200 Center Hall139 Transformer Dielectric Oil 200 Atlantis Hall140 Transformer Dielectric Oil 250 Wagner Dance Building, Molli and Arthur141 Transformer Dielectric Oil 200 965 University Center142 Transformer Dielectric Oil 455 301 University Center143 Transformer Dielectric Oil 250 Central Research Services Facility146 Transformer Dielectric Oil 160 Powell Structural Systems Laboratory147 Transformer Dielectric Oil 300 East Campus Parking Structure148 Transformer Dielectric Oil 451 Battery Storage #5149 Transformer Dielectric Oil 308 Battery Storage #3150 Transformer Dielectric Oil 451 Battery Storage #2151 Transformer Dielectric Oil 250 La Jolla Institute for Allergy and Immunology152 Transformer Dielectric Oil 250 La Jolla Institute for Allergy and Immunology153 Transformer Dielectric Oil 250 La Jolla Institute for Allergy and Immunology155 Transformer Dielectric Oil 280 Torrey Pines Center North156 Transformer Dielectric Oil 280 Torrey Pines Center North157 Transformer Hydraulic Oil 300 Rita Atkinson Residences158 Transformer Hydraulic Oil 300 Rita Atkinson Residences159 Transformer Dielectric Oil 250 Mathews appartments161 Transformer Dielectric Oil 300 64 Degrees162 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)163 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)164 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)165 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)166 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)167 Transformer Dielectric Oil 688 Altman Clinical Translational Research Institute (ACTRI)

OBJECT ID

Container Type

Contents Capacity (gal)

Location

Page 64: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX A

Re-Certification of the SPCC Plan

Page 65: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

SPCC PLAN REVIEW In accordance with 40 CFR 112.5, this SPCC Plan must be amended whenever there is a change in campus design, construction, operation or maintenance which materially affects the campus’s potential for the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines. Such changes may include, but are not limited to:

Addition to or reduction of oil storage capacity; Types of oil materials stored, used or generated; Modifications to containment areas; Drainage system modifications; and Changes in SPCC Plan coordination and/or emergency contact numbers.

A registered Professional Engineer must certify all non-administrative amendments to the Plan. In addition, the SPCC Plan must be reviewed at least once every five years. A list of SPCC Plan reviews and amendments, and a documentation of five-year reviews, are provided below. LIST OF SPCC PLAN REVIEWS AND AMENDMENTS

Date Reason for Review/Amendment UCSD Personnel Name and Initials

Certifying Professional

Engineer’s Name and License No.

Page 66: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Date Reason for Review/Amendment UCSD Personnel Name and Initials

Certifying Professional

Engineer’s Name and License No.

FIVE-YEAR SPCC PLAN REVIEW DOCUMENTATION The five-year SPCC Plan review and evaluation will be documented by signing a statement as to whether the Plan will be amended. The following statement will suffice: “I have completed review and evaluation of the SPCC Plan for UCSD on _________ (date), and _________ (will/will not) amend the Plan as a result.” Print name: __________________________ Signature: _____________________________ “I have completed review and evaluation of the SPCC Plan for UCSD on _________ (date), and _________ (will/will not) amend the Plan as a result.” Print name: __________________________ Signature: _____________________________

Page 67: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX B

Certification of the Applicability of the Substantial Harm Criteria Checklist

Page 68: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Certification of the Applicability of the Substantial Harm Criteria Checklist Facility Name: University of California, San Diego Facility Address: 9500 Gilman Drive, La Jolla, California 92093

1. Does the facility transfer oil over water to or from vessels and does the facility have a total oil storage capacity greater than or equal to 42,000 gallons?

Yes ___ No __X_

2. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and does the facility lack secondary containment that is sufficiently large to contain the capacity of the largest aboveground oil storage tank plus sufficient freeboard to allow for precipitation within any aboveground oil storage tank area?

Yes ___ No __X _

3. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance (as calculated using the appropriate formula in Attachment C–III to this appendix or a comparable formula 1) such that a discharge from the facility could cause injury to fish and wildlife and sensitive environments? For further description of fish and wildlife and sensitive environments, see Appendices I, II, and III to DOC/NOAA's “Guidance for Facility and Vessel Response Plans: Fish and Wildlife and Sensitive Environments” (see Appendix E to this part, section 13, for availability) and the applicable Area Contingency Plan.

Yes ___ No __X_

4. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance (as calculated using the appropriate formula in Attachment C-III to this appendix or a comparable formula 1 ) such that a discharge from the facility would shut down a public drinking water intake 2 ?

1. If a comparable formula is used, documentation of the reliability and analytical soundness of the comparable formula must be attached to this form.

2. For the purposes of 40 CFR part 112, public drinking water intakes are analogous to public water systems as described at 40 CFR 143.2(c).

Yes ___ No _X__

5. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and has the facility experienced a reportable oil discharge in an amount greater than or equal to 10,000 gallons within the last 5 years?

Yes ___ No __X_

Page 69: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Certification

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document, and that based on my inquiry of those individuals responsible for obtaining this information, I believe that the submitted information is true, accurate, and complete.

Signature: ______________________________________________________

Name (please type or print): ________________________________________

Title: __________________________________________________________

Date : __________________________________________________________

Page 70: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX C

SPCC Rule Compliance Cross-Walk

Page 71: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

SPCC RULE COMPLIANCE CROSS-WALK Provision Description Location in Plan

112.3(d) Professional Engineer Certification Section 1.5.1

112.3(e) Location of SPCC Plan Section 1.3.4

112.5 Plan Review Section 1.3.3 Appendix A

112.7 Management Approval Section 1.5.2

112.7 Cross-Reference with SPCC Rule Appendix C

112.7(a)(3) General Facility Information Site Plan and Facility Diagram

Section 2 Figures 2 through 6

112.7(a)(4) Discharge Notification Section 5 Appendix F

112.7(a)(5) Discharge Response Section 4

112.7(b) Potential Discharge Volumes and Direction of Flow Section 2.6

112.7(c) Containment and Diversionary Structures Section 2.5

112.7(d) Practicability of Secondary Containment Section 2.5

112.7(e) Inspections, Tests, and Records

Section 3 Appendix D through I

112.7(f) Personnel, Training and Discharge Prevention Procedures Section 3.5

112.7(g) Security Section 2.7

112.7(h) Tank Truck Loading/Unloading Section 3.3 Appendix D

112.7(j) Conformance with Applicable State and Local Requirements Section 1.4

112.7(k) Qualified oil-filled equipment Section 2

112.8(b) Facility Drainage Section 2.2

112.8(c)(1) Container Construction Section 2.3

112.8(c)(2) Secondary Containment Section 2.5

112.8(c)(3) Drainage of Diked Areas Section 3.4 Appendix I

112.8(c)(4) Corrosion Protection Section 3.2

112.8(c)(5) Partially Buried and Bunkered Storage Tanks Section 2.3.6

112.8(c)(6) Inspections Facility Inspection Checklists

Section 3.1 Appendix E through I

112.8(c)(8) Overfill Prevention System Section 2.3

112.8(c)(10) Visible Discharges Appendix F through I

112.8(c)(11) Mobile and Portable Containers Section 2.5.2

112.8(d) Transfer Operations, Pumping and In-Plant Processes Section 2.4

112.20(e) Certification of Substantial Harm Determination Appendix B

* Only selected excerpts of relevant rule text are provided. For a complete list of SPCC requirements, refer to the full text of 40 CFR part 112.

Page 72: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX D

Loading and Unloading Procedures

Page 73: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

UCSD Loading and Unloading Procedures*

*Loading and unloading procedures excerpted from 49 CFR Part 177, Subpart B. General requirements applicable to UCSD activities are presented; Class 3 material requirements are presented because diesel, gasoline, and hydraulic oil fit this classification and are the materials that UCSD loads/unloads. 177.834 GENERAL REQUIREMENTS

(c) No smoking while loading or unloading. Smoking on or about any motor vehicle while loading or unloading any Class 1 (explosive), Class 3 (flammable liquid), Class 4 (flammable solid), Class 5 (oxidizing), or Division 2.1 (flammable gas) materials is forbidden.

(d) Keep fire away, loading and unloading. Extreme care shall be taken in the loading or unloading of Class 3 (flammable liquid) materials into or from any motor vehicle to keep fire away and to prevent persons in the vicinity from smoking, lighting matches, or carrying any flame or lighted cigar, pipe, or cigarette.

(e) Handbrake set while loading and unloading. No hazardous material shall be loaded into or on, or unloaded from, any motor vehicle unless the handbrake be securely set and all other reasonable precautions be taken to prevent motion of the motor vehicle during such loading or unloading process.

(h) Precautions concerning containers in transit; fueling road units. Reasonable care should be taken to prevent undue rise in temperature of containers and their contents during transit. There must be no tampering with such container or the contents thereof nor any discharge of the contents of any container between point of origin and point of billed destination. Discharge of contents of any container, other than a cargo tank or IM portable tank, must not be made prior to removal from the motor vehicle. Nothing contained in this paragraph shall be so construed as to prohibit the fueling of machinery or vehicles used in road construction or maintenance.

(i) Attendance requirements —(1) Loading. A cargo tank must be attended by a qualified person at all times when it is being loaded. The person who is responsible for loading the cargo tank is also responsible for ensuring that it is so attended.

(2) Unloading. A motor carrier who transports hazardous materials by a cargo tank must ensure that the cargo tank is attended by a qualified person at all times during unloading. However, the carrier's obligation to ensure attendance during unloading ceases when:

(i) The carrier's obligation for transporting the materials is fulfilled;

(ii) The cargo tank has been placed upon the consignee's premises; and

(iii) The motive power has been removed from the cargo tank and removed from the premises.

(3) Except for unloading operations subject to §§ 177.837(d), 177.840(p), and 177.840(q), a qualified person “attends” the loading or unloading of a cargo tank if, throughout the process, he is alert and is within 7.62 m (25 feet) of the cargo tank. The qualified person attending the unloading of a cargo tank

Page 74: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

must have an unobstructed view of the cargo tank and delivery hose to the maximum extent practicable during the unloading operation.

(4) A person is “qualified” if he has been made aware of the nature of the hazardous material which is to be loaded or unloaded, he has been instructed on the procedures to be followed in emergencies, he is authorized to move the cargo tank, and he has the means to do so.

(j) Except for a cargo tank conforming to § 173.29(b)(2) of this subchapter, a person may not drive a cargo tank motor vehicle containing a hazardous material regardless of quantity unless:

(1) All manhole closures are closed and secured; and

(2) All valves and other closures in liquid discharge systems are closed and free of leaks, except external emergency self-closing valves on MC 338 cargo tanks containing the residue of cryogenic liquids may remain either open or closed during transit.

177.837 CLASS 3 MATERIALS.

(a) Engine stopped. Unless the engine of a cargo tank motor vehicle is to be used for the operation of a pump, Class 3 material may not be loaded into, or on, or unloaded from any cargo tank motor vehicle while the engine is running. The diesel engine of a cargo tank motor vehicle may be left running during the loading and unloading of a Class 3 material if the ambient atmospheric temperature is at or below −12 °C (10 °F).

(b) Bonding and grounding containers other than cargo tanks prior to and during transfer of lading. For containers which are not in metallic contact with each other, either metallic bonds or ground conductors shall be provided for the neutralization of possible static charges prior to and during transfers of Class 3 (flammable liquid) materials between such containers. Such bonding shall be made by first connecting an electric conductor to the container to be filled and subsequently connecting the conductor to the container from which the liquid is to come, and not in any other order. To provide against ignition of vapors by discharge of static electricity, the latter connection shall be made at a point well removed from the opening from which the Class 3 (flammable liquid) material is to be discharged.

(c) Bonding and grounding cargo tanks before and during transfer of lading. (1) When a cargo tank is loaded through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or integrally connected steel framing, and the other end to the shell of the cargo tank to provide a continuous electrical connection. (If bonding is to the framing, it is essential that piping and framing be electrically interconnected.) This connection must be made before any filling hole is opened, and must remain in place until after the last filling hole has been closed. Additional bond wires are not needed around All-Metal flexible or swivel joints, but are required for nonmetallic flexible connections in the stationary system piping. When a cargo tank is unloaded by a suction-piping system through an open filling hole of the cargo tank, electrical continuity shall be maintained from cargo tank to receiving tank.

(2) When a cargo tank is loaded or unloaded through a vapor-tight (not open hole) top or bottom connection, so that there is no release of vapor at a point where a spark could occur, bonding or grounding is not required. Contact of the closed connection must be made before flow starts and must not be broken until after the flow is completed.

Page 75: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

(3) Bonding or grounding is not required when a cargo tank is unloaded through a nonvapor-tight connection into a stationary tank provided the metallic filling connection is maintained in contact with the filling hole.

(d) Unloading combustible liquids. For a cargo tank unloading a material meeting the definition for combustible liquid in § 173.150(f) of this subchapter, the qualified person attending the unloading operation must remain within 45.72 meters (150 feet) of the cargo tank and 7.62 meters (25 feet) of the delivery hose and must observe both the cargo tank and the receiving container at least once every five minutes during unloading operations that take more than five minutes to complete.

Page 76: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX E

Drainage Log

Page 77: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Seco

nd

ary

Co

nta

inm

ent

Dra

inag

e Lo

g

Dat

eO

bje

ct T

ype

OB

JEC

T ID

Loca

tio

nD

rain

ed B

yO

ily S

hee

n V

isib

le

on

Wat

er?

Dra

in C

om

ple

te a

nd

Val

ve C

lose

d?

Page 78: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX F

Spill Report Form

Page 79: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

SPILL INCIDENT REPORT

University of California, San Diego9500 Gilman Drive #0089La Jolla, California 92093-0089

Date of spill incident:

Time of spill incident:

Location of spill incident:

Estimated quantity spilled:

Material spilled:

Which tank/equipment was the source?Ultimate discharge location (sewer, surface soil, sump, etc.):

Cause of the spill incident:

Describe cleanup actions:

Describe corrective actions taken to prevent future spill incident:

Property damage?

Injuries?

Was evacuation required?

Which agencies were notified?

Who responded to the spill incident?

Your name:

Your title:

Your phone number:

Page 80: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX G

SPCC Compliance Schedule

Page 81: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

SPC

C C

itatio

nD

ate

Com

plia

nce

Area

Area

(s) o

f Non

-Com

plia

nce

Cor

rect

ive

Actio

nSc

hedu

led

Com

plet

eion

Dat

eAc

tual

Com

plet

ion

Dat

e

SPC

C C

ompl

ianc

e Is

sues

Page 82: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX H

Industry Inspection Guidelines

Page 83: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Appendix H

INDUSTRY INSPECTION GUIDELINES

Inspections for ASTs, drums, generators, mobile generators/refuelers, and associated piping are to be inspected in accordance with the Steel Tank Institute SP001 Standard Inspection Schedule. Various inspection criteria for the different objects are listed below:

• Monthly visual inspections are intended for monitoring external conditions and containment structure. The visual inspection does not require a certified inspector. It is to be by someone who is familiar with the site and can identify changes and developing problems

• Upon discovery of water in the primary object tank or secondary containment, remove promptly or take other corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and dispose of properly

• Non-conforming issues important to object or containment integrity, and cannot be addressed during the visual inspection, require evaluation by an engineer experienced in the object design, a certified inspector, or a tank manufacturer

• In the event of severe weather (snow, ice, wind storms, heavy rain) or maintenance that could affect the operation of critical components (normal and emergency vents, valves), an inspection of these components is required immediately following the event.

• Records are to be kept on file for 36 months

Page 84: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX I

Transformer Inspection Guidelines

Page 85: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

Appendix I

TRANSFORMER INSPECTION GUIDELINES

Below are a number of items which are a part of the transformer visual inspection. This inspection list was compiled from the manufacturer’s guidance.

• Evidence of leaking of transformer tank, radiators, and bushings • Evidence of compromised enclosure integrity (hinges, locking provisions, corrosion, etc.) • Evidence of small pin-hole leaks • Tank and coils in good condition (No evidence of drip marks, discoloration, released material,

corrosion, cracks, etc.) • Containment basins (if present) free of standing fluid? (No evidence of cracks, discoloration,

debris, etc.) • No evidence of spilled fluids, metal shavings, and used absorbent on outdoor surfaces in order to

prevent contamination of storm water

Page 86: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

APPENDIX J

Spill Response

Page 87: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN ... · This Spill Prevention Control and Countermeasures (SPCC) Plan (Plan) is required for the University of California San Diego

UC San Diego Spill Response Contact List

UC SAN DIEGO SPCC-COORDINATORS

SPILL RESPONSE CONTRACTORS

1. NRC Environmental Services (800) 337-7455;

2. Asbury Environmental Services (800) 347-2574; and

3. Clean Harbors Environmental Services (800) 347-2574.

Division Contact Emergency Phone NumberRMP Rich Cota 858.534.2930Housing, Dining & Hospitality Melisa Plaskonos 858.534.2600 Student Affairs John Payne 858.534.8986UC Health Systems Karl Burns 858.857.6400


Top Related