Safety Month Inauguration – January 2017
Name of the project: Lambir 275/33kV Substation Establishment
Date of inauguration & flag hoisted by: 16.01.2017 Mr.Sia -SEB Asset owner
& Mr. Albert - SEB Project Team
Special invitees: Mr. KP Law – Project Manager & Project execution team Mr. Slyvestwr – T&C Manager & their Team
Significant events planned for the month: First Aid, Emergency Evacuation,
Gas cutting, welding, grinding & drilling, Electrical safety, MSDS and Material
handling safety training program, Mock Drill, competition like safety slogan &
safety quiz and Tree Plantation
Safety Month Inauguration – January 2017
Name of the project: Samalaju-2 Substation Establishment Project
Date of inauguration & flag hoisted by: 17.01.2017
Special invitees:
Mr Albert Bong Chong, Sr. Project Manager – Sarawak Energy Berhad Ir Khiew Ai Lin, Project Manager – Sarawak Energy Berhad
Mr Sylvester Chew, Commissioning Manager – Sarawak Energy Berhad Mr Nipo Rok, Sr. HSE Manager – Sarawak Energy Berhad Mr Gregory Chan, Sr. Project Engineer – Sarawak Energy Berhad
Mr. Kelvin – Konsortium Malaysia
Significant events planned for the month: First Aid, Emergency Evacuation,
Gas cutting, welding, grinding & drilling, Electrical safety, MSDS and Material
handling safety training program, Mock Drill, competition like safety slogan &
safety quiz and Tree Plantation
Safety Month Inauguration – January 2017
Name of the project: 500KV THAI/LAOS BORDER – THA LI
Date of inauguration & flag hoisted by: 17.01.2017 Mr. Thienthass
Chanterrawattana, Chief 500kV Transmission System - EGAT
Special invitees:
Mr. Bonthej, Head Supervisor – EGAT
Mr. Satawat, Site Engineer and Team members and workmen (JV Partner)
Significant events planned for the month: MSDS and Material handling
safety, First Aid, Emergency Evacuation, Gas cutting, welding, grinding &
drilling, Electrical safety training program and Tree Plantation
Safety Month Inauguration – January 2017
Name of the project: 500KV OVERHEAD TRANSMISSION LINE PROJECT
Date of inauguration & flag hoisted by: 17.01.2017 -R. Sarvanan Rajagopal,
Project Manager - TNB
Special invitees:
Mr. Ahmed Syukry b. Ab Rahman, Project Engineer – TNB Mr. Mohd Hanif B. Senmuin, Site Supervisor - TNB
Significant events planned for the month: Safety slogan & safety quiz
competitions and Tree Plantation, MSDS and Material handling safety, Electrical
safety training program.
Safety Month Inauguration – January 2017
Name of the project: TLT Works, Pithampur
Date of inauguration & flag hoisted by: 03/01/2017 & inaugurated by
Mr. S.Chockalingam (HOU)
Special invitees: - -
Significant events planned for the month: First Aid, Emergency Evacuation,
Gas cutting, welding, grinding & drilling, Electrical safety, MSDS and Material
handling safety training program, Health Camp, Pollution Emission checks for all
P&M Vehicles, Mock Drill, competition like safety slogan,essay,drawing & safety
quiz and Tree Plantation
Safety Month Inauguration – January 2017
BLOOD DONATION CAMPAIGN
Shedgum & Uthmaniyah transmission line Project, Larsen & Toubro (L&T) Saudi
Arabia LLC organized Two days blood donation camp, in association with Al-Hasa
Hospital, Al-Hasa city, KSA, on Jan. 23 & 24, as part of its Safety month
celebration. 24 persons from L & T, NGSA, and subcontractors volunteered
themselves for the noble cause. The Al-Hasa Hospital management lauded L&T
for its efforts and appreciated initiative.