Transcript

(VFD

-15

)E

(VFD

-14

)E

(VFD

-13

)E

(VFD

-12

)E

(VFD

-11

)E

(VFD

-10

)E

(VFD

-18

)E

(VFD

-19

)E

SUP

PLY

DR

OP

(T

YP

.

FOR

ALL

HR

U'S

)

(VFD

-20

)E

(VFD

-9)E

(VFD

-8)E

(VFD

-7)E

(VFD

-6)E

EXISTING SUPPLY DROP

(TYP. FOR ALL HRU'S)

D

E

F

13

121110987654321

C.7

G

40"x36"

48

"x1

8"

48

"x1

8"

44

"x4

4"

26

26

26

26

26

34"Ø 44"Ø

22"Ø

22"Ø

24"Ø

36

24"Ø

24"Ø

24

24

24"Ø26"Ø

34"Ø 30"Ø

26

26

"Ø26

44

"x4

4"

42

"x4

2"

40"Ø 24"Ø

24

24

24

24

44

"x2

6"

8"Ø

12"Ø

8"Ø8"Ø

8"Ø

8"Ø8"Ø 8"Ø

8"Ø8"Ø

14"x14"

44"x44"

32

20"Ø

20"Ø

26

20

20

26

26

40

"x3

6"

44

"x2

6"

44

"x2

6"

D1

D1

D1

D1

60

"x3

6" 40"x40"

44

"x2

6"

44

"x2

6"

18"x12"

12"x18"12"x18"

16"x12"

D8

D8

D8

D8

(TYP.)

D8

D8

D8

D8

D8D8

D7 D7

D6 (TYP. FOR

ALL VFDs)

(VFD

-17

)E

(VFD

-16

)E

D11

D11

D11

D11

D11

D14

D21D21

D21

D7

D22

D22

D22

D22

D22

D22

D22

D23

D23D23

D23

D23

D23

D23 D23

D23

D23

D23

D23

D23

D23

AREA A

AREA B

AR

EA

A

AR

EA

C

D24

D25

D22 D22

D22

D22 D22 D22

D22

D22

D22 D22 D22

D26D27

D27D27

D27

D27

D26

D26D26D26

D26

BOILER ROOM

220

D30

D29

D28

D27

D29

D29

D7

D30

D30

8

PLAN

NORTH

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHIT

EC

TS

SREE

NIG

NE

C

®

ONS

T

RU

CT

IO

NM

AN

AG

ERS

THIS ARCHITECTURAL AND

ENGINEERING DRAWING IS GIVENIN CONFIDENCE. NO USE OR

DISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 S

hake

r B

oule

vard

/ C

leve

land

, O

hio

441

20P

hone

: (21

6) 4

91-9

300

F

ax: (

216)

491

-805

3w

ww

.rlb

a.co

m

- e

mai

l@rlb

a.co

m

RIC

HA

RD

L. B

OW

EN

+ A

SS

OC

IAT

ES

INC

.

RLB NO.:

CHECKED BY:

DRAWN BY:

KEY PLAN

AREA - B

AREA - A

C

08/14/18 / SD SUBMISSION

10/31/18 / DD PREVIEW

11/28/18 / 85%DD

12/06/18 / DD SUBMISSION

02/13/19 / CD PREVIEW

02/28/19 / BID-PERMIT SET

03/15/19 / ADDENDUM #2

03/28/19 / ADDENDUM #5

04/30/19 / REBID SET

05/24/19 / REBID ADD#2

5/23

/201

9 3:

49:5

1 P

M

CO

TA

Fie

lds

Ave

Ren

ovat

ion

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

FIR

ST

FLO

OR

DE

MO

LIT

ION

PLA

N -

AR

EA

A

MF

SH

M0.11

PLAN NOTES

24 NO NEW HVAC WORK IN THIS AREA.

D1 REMOVE EXISTING RADIANT HEATER.

D6 REMOVE EXISTING VFD.

D7 REMOVE EXISTING DUCT UP TO EXHAUST FAN ON ROOF.

D8 REMOVE EXISTING EXHAUST HOSE REEL AND ASSOCIATED DUCTWORK.

D11 EXISTING MAU ON ROOF TO BE DEMOLISHED.

D14 EXISTING DOAS UNIT TO REMAIN.

D21 DEMOLISH EXISTING UNIT HEATER.

D22 REMOVE EXISTING DUCTWORK.

D23 EXISTING DUCTWORK TO REMAIN

D24 DEMOLISH EXISTING DAMPER. SEAL NEW PENETRATION AIRTIGHT PER ARCHICTECTURAL

SPECIFICATIONS AND DETAILS.

D25 EXISTING EXHAUST FAN TO REMAIN.

D26 DEMOLISH EXISTING FAN COIL.

D27 DEMOLIST EXISTING REFRIGERANT PIPING.

D28 REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED CONTROLS. REMOVE ALL

GAS PIPING BACK TO MAIN AND CAP AT MAIN INSIDE EXISTING BUILDING TO REMAIN.

D29 REMOVE EXISTING BASEBOARD HEATING AND ASSOCIATED CONTROLS.

D30 REMOVE EXISTING VRF UNIT, ALL ASSOCTIATED REFEGERANT PIPING, AND OUTDOOR UNIT.

SCALE: 1/16" = 1'-0"M0.11

1 1ST FLOOR HVAC DEMOLITION PLAN - AREA A

85

5 G

ran

dvi

ew

Ave

nu

e, 3

rd F

loo

r C

olu

mb

us,

OH

43

21

5

Ph

on

e:

(61

4)

44

3-1

17

8 F

ax:

(6

14

) 4

43

-15

94

Em

ail:

dyn

am

ix@

dy

na

mix

-ltd

.co

mD

EL

#

1800

10

GI

R

S

S

RP

FE

O

EE

T

L

IG

S

NAO N

RE

E

D

I

R

S

EN

E

HTAT

S

E OF

MACE E-50556

O

O

I

MONTGOMERY E-66852

GRIFFIN E-57049

8

jbrevick
Snapshot

D

E

F

13

121110987654321

A-3

A-5

G

3939

3939

39394040

3939

3939

3939

39396" 6"

HWS

HWR

5"5"

3"

3"6"6"

3"

3" 5"

5" 5"

5"

5"

5"

5"

5"

5"

5"

2 1/2"2 1/2"

2 1/

2"2

1/2"1

1/4" 1

1/4"

HWS

HWR

HWR

HWS3"

FC-6FC-7

HP-2

FC-8

FC-4

FC-2

FC-5

FC-1

UH-1 UH-2

UH-3

UH-4

UH-5

UH-7UH-8

TEMP LINEMANAGER

T101

FARE RECEIVING202

FACILITIES SHOP205

BUS WASHMECH.

203

STORAGE /JANITOR

311IT

312ELEC.310 LUBE ROOM

313

MAINTENANCEBAY225

DECON ROOM228

MEN'S TOILET173

OFFICE172 OFFICE

169

STOREROOM191

IT ROOMEXIST

OFFICEEXIST

STORAGEEXIST

RECYCLINGEXIST

BATTERY ROOMEXIST

RECEIVING187 TRASH

186

MECHANIC'SLUNCHROOM

215

MECH.COMPUTER

ROOM216

FACILITIESPASSAGE

217LUBE ROOM

218

CHASSIS WASHEXIST

MECHANICALEQUIPMENT

222

BOILER ROOM220

DOCKEXIST

BUS WASH201

FUEL ISLANDS320

STORAGE171

PODIUMEXIST

TRASH CARTSTORAGE

EXISTOFFICE

168

FACILITIESADMIN

206

DEFUELING303

PC #1245

BY PASS240

PC #2244

PC #3243

MEN'S238

ITS / FAREREPAIR

STAGING241

WOMEN'S232

ITS255

FARE BOXREPAIR

253IT ROOM

252

MISC. STOR.250

MISC. STOR.251

PREMIUMCLEAN

242

BOILER ROOM230

EMERGENCYGENERATOR

ROOM221

STORES ROOMVESTIBULE

210

WASTE OIL219

JAN.235

32

32

AC-1 AC-2

AC-3 AC-4

B-06

AC-5

FC-3

18

1"

D

1"

1"

1"

1"

18

1"

1"

1" 1"D

UH-16

UH-17

UH-24

UH-18 UH-18

UH-19 UH-20 UH-21 UH-22

UH-23

UH-24

UH-25UH-26

UH-27

CO

CO

CO CO

CO

CO

73

74

4" 4"

4"4"

3"3"

5" 5"

3"3"

3" 3"

PLAN NORTH

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHITEC

TS

SREE

NIG

NE

C

®

O N S T RU

CT

I ON

MA

N

AGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 Sh

aker

Bou

leva

rd /

Cle

vela

nd, O

hio

441

20Ph

one:

(216

) 491

-930

0

Fax:

(216

) 491

-805

3w

ww

.rlba

.com

- e

mai

l@rlb

a.co

m

RIC

HAR

D L

. BO

WEN

+ AS

SOC

IATE

S IN

C.

RLB NO.:

CHECKED BY:

DRAWN BY:

KEY PLAN

AREA - B

AREA - A

C

08/14/18 / SD SUBMISSION

10/31/18 / DD PREVIEW

11/28/18 / 85%DD

12/06/18 / DD SUBMISSION

02/13/19 / CD PREVIEW

02/28/19 / BID-PERMIT SET

03/15/19 / ADDENDUM #2

03/28/19 / ADDENDUM #5

04/30/19 / REBID SET

05/24/19 / REBID ADD#2

5/23

/201

9 9:

45:0

1 PM

CO

TA F

ield

s Av

e R

enov

atio

n

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

FIR

ST F

LOO

R P

IPIN

G P

LAN

- AR

EA A

MF

SH

M2.11

855

Gran

dvie

w A

venu

e, 3

rd Fl

oor C

olum

bus,

OH

4321

5Ph

one:

(614

) 443

-117

8 Fa

x: (6

14) 4

43-1

594

Emai

l: dy

nam

ix@dy

nam

ix-ltd

.com

DEL #

18

0010

SCALE: 1/16" = 1'-0"M2.11

1 1ST FLOOR PIPING PLAN - AREA A

PLAN NOTES18 DROP CONDENSATE DRAINAGE PIPING & DISCHARGE TO FLOOR DRAIN IN THIS LOCATION.32 EXTEND HWS/HWR PIPING TO UNIT HEATERS.39 HYDRONIC PIPING UP TO MAKEUP AIR UNIT.40 HYDRONIC PIPING UP TO DOAS UNIT.73 PRE-INSULATED SNOW MELT SUPPLY AND RETURN PIPING BELOW GRADE. SEE M5.3 SNOW

MELT DETAILS. COORDINATE WITH SITE UTILITIES.74 SNOW MELT MANIFOLD BOX. SEE M5.3 SNOW MELT DETAILS.

GI

R

S

S

RP

FE

O

E E

T

L

IG

S

N AO N

RE

E

D

I

R

S

EN

E

HTAT

S

E O F

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

GENERAL NOTESA. PROVIDE REFRIGERANT PIPING FOR ALL VRF, HEAT PUMPS AND DUCTLESS SPLIT SYSTEMS. SIZE PER MFR'S RECOMMENDATIONS. B. PROVIDE EXPANSION DEVICES AND ANCHORS AS REQUIRED. REFER TO SPECIFICATIONS FOR DELEGATED DESIGN REQUIREMENTS.

8

jbrevick
Snapshot

B

C

121110987654321

A

2M3.01

6"

6"

5" 5"

3"3"

2 1/

2"

2 1/

2" 2 1/

2"

2 1/

2"

2 1/

2"

2 1/

2"

5"5"

4"4"

2 1/

2"

2 1/

2"

2 1/

2"2 1/

2"

2 1/

2"

2 1/

2"

HWS

HWR

2 1/2"

2 1/2" 39

3939

39

3939

3939

39393939

3939

3939

HWSHWR

UH-9

UH-10

TEMP FACILITIESSHOPT103

TEMP FARERECEIVING

T102

TEMP LINEMANAGER

T101

CONTROLROOM

301

GARAGESTORAGE

260

3"3"

4"4"

??

2 1/2"2 1/2"

PLAN NORTH

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHITEC

TS

SREE

NIG

NE

C

®

O N S T RU

CT

I ON

MA

N

AGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 Sh

aker

Bou

leva

rd /

Cle

vela

nd, O

hio

441

20Ph

one:

(216

) 491

-930

0

Fax:

(216

) 491

-805

3w

ww

.rlba

.com

- e

mai

l@rlb

a.co

m

RIC

HAR

D L

. BO

WEN

+ AS

SOC

IATE

S IN

C.

RLB NO.:

CHECKED BY:

DRAWN BY:

KEY PLAN

AREA - B

AREA - A

C

08/14/18 / SD SUBMISSION

10/31/18 / DD PREVIEW

11/28/18 / 85%DD

12/06/18 / DD SUBMISSION

02/13/19 / CD PREVIEW

02/28/19 / BID-PERMIT SET

03/15/19 / ADDENDUM #2

03/28/19 / ADDENDUM #5

04/30/19 / REBID SET

05/24/19 / REBID ADD#2

5/23

/201

9 9:

45:2

0 PM

CO

TA F

ield

s Av

e R

enov

atio

n

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

FIR

ST F

LOO

R P

IPIN

G P

LAN

- AR

EA B

MF

SH

M2.12

855

Gran

dvie

w A

venu

e, 3

rd Fl

oor C

olum

bus,

OH

4321

5Ph

one:

(614

) 443

-117

8 Fa

x: (6

14) 4

43-1

594

Emai

l: dy

nam

ix@dy

nam

ix-ltd

.com

DEL #

18

0010

SCALE: 1/16" = 1'-0"M2.12

1 1ST FLOOR PIPING PLAN - AREA B

PLAN NOTES39 HYDRONIC PIPING UP TO MAKEUP AIR UNIT.

GI

R

S

S

RP

FE

O

E E

T

L

IG

S

N AO N

RE

E

D

I

R

S

EN

E

HTAT

S

E O F

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

GENERAL NOTESA. PROVIDE REFRIGERANT PIPING FOR ALL VRF, HEAT PUMPS AND DUCTLESS SPLIT SYSTEMS. SIZE PER MFR'S RECOMMENDATIONS. B. PROVIDE EXPANSION DEVICES AND ANCHORS AS REQUIRED. REFER TO SPECIFICATIONS FOR DELEGATED DESIGN REQUIREMENTS.

8

jbrevick
Snapshot

B-3 B-4 B-5

B-2B-1

WATER HEATER (SEE PLUMBING PLANS)

REQUIRED CLEARANCES (TYP.)

EXPANSION TANK

CHEMICAL FEED TANK

BOILER ROOM230

6"6" 6"

6"

HWS

HWR

HWP-6 HWP-7 HWP-8

HWP-1 HWP-2HWP-3 HWP-4 HWP-5

E1275 CFM

E1275 CFM

S1-8"Ø250 CFM

S1-8"Ø250 CFM

S1-8"Ø75 CFM

E350 CFM

(TYP. OF 6)

S1-8"Ø200 CFM

S1-8"Ø200 CFM

S1-8"Ø200 CFM

S1-8"Ø225 CFM

S1-8"Ø225 CFM

S1-6"Ø100 CFM

S1-6"Ø75 CFM

S1-6"Ø75 CFM

E175 CFM

S1-8"Ø300 CFM

E1300 CFM

E1450 CFM

E1450 CFM

8"Ø14"Ø

16"Ø

14"Ø 12"Ø

6"Ø

6"Ø

6"Ø

6"Ø

6"Ø

8"Ø

8"Ø

12"Ø16"Ø

18"Ø

8"Ø

8"Ø

8"Ø

14"Ø

12"Ø

12"Ø

5757

9M5.01

30"x30"

16"x16"56

56

8

5 5.45 5.4

MAKE UP AIR UNIT

LINED SUPPLY PLENUM

18' - 8 3/4"

12' -

6"

UNIT SIZE SUPPLY DUCT (LINED)

TRANSITION FROM UNIT SIZE TO 72"x72"

1' -

8"

24"x15" DRUM LOUVER WTIH DAMPER (TYP.) BALANCE FOR 1150 CFM EACH.

ROOF CURB (SEE ARCHITECTURAL

DRAWINGS)

PROVIDE STRUCTURAL STEEL SUPPORTS AND DUCT REINFORCING

AS REQUIRED. ENGAGE IN LISCENSED STRUCTURAL ENGINEER FOR STEEL

DESIGN AND SUBMIT SEALED DRAWINGS TO STATE OF OHIO

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHITEC

TS

SREE

NIG

NE

C

®

O N S T RU

CT

I ON

MA

N

AGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 Sh

aker

Bou

leva

rd /

Cle

vela

nd, O

hio

441

20Ph

one:

(216

) 491

-930

0

Fax:

(216

) 491

-805

3w

ww

.rlba

.com

- e

mai

l@rlb

a.co

m

RIC

HAR

D L

. BO

WEN

+ AS

SOC

IATE

S IN

C.

RLB NO.:

CHECKED BY:

DRAWN BY:

08/14/18 / SD SUBMISSION

10/31/18 / DD PREVIEW

11/28/18 / 85%DD

12/06/18 / DD SUBMISSION

02/13/19 / CD PREVIEW

02/28/19 / BID-PERMIT SET

03/15/19 / ADDENDUM #2

03/28/19 / ADDENDUM #5

04/30/19 / REBID SET

05/24/19 / REBID ADD#2

5/23

/201

9 9:

45:3

8 PM

CO

TA F

ield

s Av

e R

enov

atio

n

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

HVA

C E

NLA

RG

ED P

LAN

MF

SH

M3.01

855

Gran

dvie

w A

venu

e, 3

rd Fl

oor C

olum

bus,

OH

4321

5Ph

one:

(614

) 443

-117

8 Fa

x: (6

14) 4

43-1

594

Emai

l: dy

nam

ix@dy

nam

ix-ltd

.com

DEL #

18

0010

SCALE: 1/4" = 1'-0"M3.01

1 ENLARGED MECHANICAL & LOCKER ROOM

PLAN NOTES56 COVER OPENING WITH 1/4" HEAVY DUTY FRAMED BIRDSCREEN MESH.57 20" DOUBLE-ELBOWED TEE TRANSITION UP TO DOAS UNIT ON ROOF.

GI

R

S

S

RP

FE

O

E E

T

L

IG

S

N AO N

RE

E

D

I

R

S

EN

E

HTAT

S

E O F

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

SCALE: 1/4" = 1'-0"M3.01

2 SUPPLY PLENUM DETAIL

jbrevick
Snapshot

DUCTLESS SPLIT INDOOR - AIR CONDITIONING UNITS

FANS

CUSTOM ROOFTOP MAKEUP AIR UNITS

GAS FIRED BOILERS

AIR CURTAINS

PUMPS

ELECTRIC HEATING UNITS

SUSPENDED HYDRONIC HEATING UNITS

DUCTLESS SPLIT OUTDOOR CONDENSING UNITS

VEHICLE EXHAUST SYSTEMS(1) 7,500

7,500

7,500

37,750 29,000 22,500 26,500 26,000

(3) 12,584 (2) 14,500 (2) 11,250 (2) 13,250 (2) 13,00

37,750 29,000 26,50022,500 26,000

- DISCONNECT BY ELECTRICAL CONTRACTOR

REQ'D ACCESS:1. - SINGLE POINT POWER CONNECTION.2. - INSTALL UNIT ON VIBRATION ISOLATION PADS (MIN. 1/4" DEFLECTION) FURNISHED BY UNIT MANUFACTURER.2. - INCLUDE CONDENSER WALL MOUNTING BRACKET MANUFACTURED BY CONDENSER MANUFACTURER.4. - PROVIDE WIND BAFFLE FOR LOW AMBIENT (0°F) OPERATING CONDITIONS.5. - PROVIDE WITH INVERTER DUTY COMPRESSOR.

TAG REFRIG. LINE SIZESSERVICE LIQUID/SUCTION MAX MINCAPACITY (MBH) REQ'D

ACCESS.ELECTRICAL DATA

VOLTS PHASE MOCPMCA

- R-410A REFRIGERANT - COOLING CAPACITY BASED ON INDOOR CONDITIONS OF 80.0°F DB / 67.0°F WB AND OUTDOOR CONDITIONS OF 95.0°F DB

DSO-1 208 1SEE DSI-1 UNIT 12.0 5.8 1,2,3,4,52811

2. DIRECT EXPANSION COIL PACKAGE WITH FACTORY MOUNTED LINEAR EXPANSION VALVE.

- COOLING CAPACITY BASED ON INDOOR CONDITIONS OF 80.0°F DB / 67.0°F WB AND OUTDOOR CONDITIONS OF 95.0°F DB

1. ALL TEMPERATURE SENSORS AND CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER. PROVIDE REMOTE MOUNTED THERMOSTAT.

5. WASHABLE FILTER

3. R-I-S VIBRATION ISOLATORS.

REQ'D ACCESS:

TAG CFMTYPE MINMAXCAPACITY (MBH)

GASLIQUIDREFRIG. LINE SIZES

MOCPAMPPHASEVOLTELECTRICAL DATA REQ'D

ACCESSSERVES

4. UL LISTED

MODELMFR

MITSUBISHI

MFR MODEL

PUY-A12NKA7

6. INDOOR UNIT ELECTRICALLY FEED FROM OUTDOOR UNIT VIA ASSEMBLY CABLE.7. DAYLIGHT DRAINAGE TO EXTERIOR WALL OF CNG CONTROL ROOM.

IT

DS0-2 208 1SEE DSI-2 UNIT 18.0 8.0 ALL2811 MITSUBISHI PUY-A18NKA7

CNG EQUIP.RM.

6. - OUTDOOR UNIT MOUNTED ON ROOF ABOVE CONTROL ROOM.

* - INDOOR UNIT POWERED BY OUTDOOR UNIT** - REFRIGERANT LINE SIZED BY MANUFACTURER'S RECOMMENDATION

DSI-1 WALL MTD 425 12.0 5.8 ** ** 208 1 * 1,2,3,4,5,6PKA-A12HA7MITSUBISHI

SPLIT SYSTEM

*

SPLIT SYSTEM

DSI-2 CASSETTE 600 18.0 8.0 ** ** 208 1 * ALLPLA-A18EA7MITSUBISHI*

EF-1 VEHICLE WASH BAY 1200 0.5 11.6 11 1725 GREENHECK CUE-1011/4 HP 120 1UBE

REQ'D ACCY:

TYPETAG SERVICE / LOCATION VOLTAGEMOTOR DATACFM HP PHASE MODEL

US - UTILITY SETSWV - SIDEWALL VENTILATORPB - PRESSURE BLOWERUBE - UP BLAST EXHAUSTERCE - CEILING MOUNTED EXHAUST

ILD - INLINE DUCT BLOWER

PRV - POWER ROOF VENTILATORIL - INLINE CENTRIFUGAL

HPRE - HOODED PROPELLER ROOF EXHAUSTERSWP - SIDEWALL PROPELLERPF - PLENUM FANFAN TYPES:

RPM

** - REFER TO SPECIFICATIONS FOR LIST OF APPROVED MANUFACTURERS

MFR **ESP (IN)

FAN CONTROL: FAN CONTROL:

26,34,516, 7, 913,14

CNG GAS DETECTION SYSTEM:

EF's 2-7 MAINTENANCE BAY 0.5 1750 GREENHECK480 3UBE

EF's 8-14 MAINTENANCE BAY 0.5 1750 GREENHECK480 3UBE

EF's 15-30 MAINTENANCE BAY 0.5 1750 GREENHECK480 3UBE

EF-32 BUS WASH MECH. 0.5 1617 GREENHECK208 3PRV

EF-33 BOILER ROOM 0.5 1395 GREENHECK208 3PRV

EF-34 CNG ISLAND 0.5 1725 GREENHECK120 1PRV

EF-35 LUBE ROOM/FAC. PASSAGE 0.5 1520 GREENHECK208 3PRV

EF-31 NOT USED - - -- --- - - - -- --

- - - - - - - -- - --

- - - --

- - - - - - -- - --

- - - - - - - -- - --

- - - - - - - -- - --

- - - - - - -- - --

- - - - - - -- - --

6,7,913,14

6, 7, 913,146, 7, 913,146,7,9

6,7,9

6,7,9

6,7,9------

----------

-

-

-

-

18500 22 42 5 HP

18500 22 42 5 HP

19500 22 42 5 HP

2700 17.8 15 1

1400 12.1 13 1/2

1100 12.9 11 1/4

2500 16.3 15 1

- - - -- - - -

-

-

-

26, 34, 51

26, 34, 51

26, 34, 51

31

31

31

31

--

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- - - -

-

-

-

-

- -

- -

- -- -

- -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

----------

---- - -- - -

-

-

- - - - - - - -- - -- -- -

- - - - - -- - -- -

- - - - - -- - -- -

- - - - - -- - -- - -

- - - - - -- - -- -

- - - - - -- - -- -

- - - - - -- - -- - -

- - - - - -- - -- - -

-

-

-

-

-

-

-

-

-

-

-

- - - - -- -- --- - - - --

- - - - -- -- --- - - - --

-

CUBE-420-50

CUBE-420-50

CUBE-420-50

G-143

G-123

G-099

G-143

--

-

-

-

-

-

-

-

-

--

--

--

--

--

--

--

FILTERS CLN / DIRTY

FILTERS CLN / DIRTY

EFFECTIVENESS % MIN.W/BYPASS

NOTES FOR ALL UNITS:

RA F

ILTE

RS

SUMMER OA LAT

WINTER EA EAT -DB °F / %RH / LDB °F

ARI / ASHRAE(IN WC)MAX AIR PD

DB °F / WB °F

DB °F / %RH / LDB °F

DB °F / WB °F

SUMMER EA EAT -

WINTER OA EAT -

DB °F / WB °F

WINTER OA LAT -

OUTSIDE AIR (OA) CFM

DB °F / WB °FSUMMER OA EAT -EXHAUST AIR (EA) CFM

PD IN WC FNL-

PD IN WC PRE-TYPE - FINALTYPE - PRE

TEFC MOTOR - BHP/ HP (EA)WHEEL TYPE / CLASSWHEEL DIA INCHES

MAX WATER PD (FT)

NO. COILS / ROWS / FPI

WHEEL TYPE / CLASS

RETU

RN /

RELI

EF F

ANS

FPM

HOT

WAT

ER H

EATI

NG C

OIL

MAX AIR PD (IN WC)GPM

ENT AIR TEMP °F

LVG AIR TEMP °F

CFM

FAN RPM

CAPACITY MBHEWT / LWT, °F

TEFC MOTOR - BHP/HP (EA)

WHEEL DIA (IN)

SUPP

LY F

ANS EXTERNAL / TOTAL

FAN RPM

EXTERNAL / TOTALSP - INCHES WC(NO. OF FANS) CFM (EA)

(NO. OF FANS) CFM (EA)SP - INCHES WC

UNIT NUMBER

NO

76.5 / 70.7

40.4 / 28.1

55%

0.6665 / 30 / 30.7

0 / -1.5

65 / 50 / 81.7

95 / 76

0.72 / 1.61

0.72 / 1.61

MERV 14

1 / 1 / 7

600

7.1

16.0

0.13

65.1

34.3

250

190 / 158

1800

1.50 / 4.12

(1) 8,250

1800

MAINT.

MAU-7

MAINT. BUS STORAGE

MERV 8 MERV 8 MERV 8

MAU-4 - 6

8,250

- CUSTOM ROOFTOP UNIT MANUFACTURE'S: MAU BASIS OF DESIGN IS INNOVENT - SEE SPECIFICATIONS FOR EQUALS

- WATER TYPE HEATING COIL CAPACITY BASED ON 190 °F EWT / 158 °F LWT- FAN TYPE AF - ALUMINUM AIR FOIL ONLY.

AIR

TO A

IR F

LAT

PLAT

E HE

AT R

ECOV

ERY

8.6 / 10.0

AF-PLN / II20

BUS GARAGE (BG) ZONE SERVED BUS STORAGE

MAU-2

20

8.2 / 10.0

AF-PLN / II

BUS WASH

MAU-1

MERV 14 MERV 13

1.50 / 5.04

1 / 1 / 8

599

10.9

0.15

30.6

190 / 158

1 / 1 / 8

667

6.3

0.18

31.2

190 / 158

1 / 1 / 8

600

3.9

0.15

31.2

1 / 1 / 8

599

5.7

0.15

31.2

1 / 1 / 6

598

7.5

0.11

31.2

NO

76.5 / 70.7

39.8 / 27.7

55%

0.8165 / 30 / 28.2

65 / 50 / 83.7

95 / 76

NO

75.5 / 70.5

42.2 / 29.2

55%

0.7965 / 30 / 27.4

65 / 50 / 84.4

95 / 76

NO

76.8 / 70.8

39.2 / 27.3

55%

0.7165 / 30 / 28.9

65 / 50 / 83.1

95 / 76

NO

76.9 / 70.9

39.2 / 27.3

55%

0.7265 / 30 / 28.9

65 / 50 / 83.0

95 / 76

NO

76.8 / 70.8

39.2 / 27.3

55%

0.7065 / 30 / 28.9

65 / 50 / 83.1

95 / 76

0.34 / 0.67

0.24 / 0.62

1800

1.50 / 4.26

(3) 12,334

1544

13.9 / 20.0

AF-PLN / II27

24

12.0 / 15.0

AF-PLN / II

1.50 / 5.06

1800

1.50 / 3.96

(2) 14,500

1800

15.4 / 20.0

AF-PLN / II27

27

13.1 / 20.0

AF-PLN / II

1.50 / 4.77

1800

1.50 / 3.87

(2) 11,250

1800

11.8/ 15.0

AF-PLN / II24

24

9.8 / 15.0

AF-PLN / II

1.50 / 4.74

1800

1.50 / 3.88

(2) 13,250

1800

13.9 / 20.0

AF-PLN / II27

27

11.5 / 20.0

AF-PLN / II

1.50 / 4.74

1800

1.50 / 3.85

(2) 13,000

1800

13.5 / 20.0

AF-PLN / II27

27

11.2 / 20.0

AF-PLN / II

1.50 / 4.7

66.9 65.2 66.1 66.5 58.5

1,483 1,070 850 1,014 770

95.0 68.4 54.4 65.0 49.2

0 / -1.5 0 / -1.5 0 / -1.5 0 / -1.5 0 / -1.5

37,000 29,000 26,50022,500 26,000

FILTERS CLN / DIRTY

FILTERS CLN / DIRTYOA F

ILTE

RS

PD IN WC FNL-

PD IN WC PRE-TYPE - FINALTYPE - PRE

0.72 / 1.61

0.72 / 1.61

MERV 14

MERV 8 MERV 8 MERV 8

MERV 13 MERV 13

0.34 / 0.67

0.24 / 0.62

0.34 / 0.67

0.24 / 0.62

0.72 / 1.61

0.72 / 1.61

MAINT.

MAU-3

190 / 158 190 / 158 190 / 158

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

MERV 8

MERV 13

0.34 / 0.67

0.24 / 0.62

REQ'D ACCESS

TAG DESCRIPTION FLAMAKE &BLOWERMBH

INPUT OUTPUTEWT°F LWT°F GPM PD FT

B-5

B-1

B-2

B-6

-

-

B-3

B-4

CONDENSING 160 190 145 10 HYDROTHERM KN-30 ALL3000 2781 6.5 4.5" - 14"-

CONDENSING 190 10 ALL3000 2781 4.5" - 14"-

CONDENSING 190 10 ALL3000 2781 4.5" - 14"-

FIRE TUBE 190 33 ALL10,000 8510 -

FIRE TUBE 190 33 ALL10,000 8510 -

CONDENSING 120 7 -750 720 -

- - - -- - -

- - - -- - -

1 HP

MODEL NUMBERELECTRICAL

VOLTS PHASE

3

3

208/230 3

208/230 3

208/230 3

120 1

- -

- -

MOTOR

1 HP

1 HP

3 HP

3 HP

1 HP

-

-

7" - 14"

7" - 14"

7" - 14"

-

-

208/230

208/230

HYDROTHERM KN-30

MOCP

15

6.5 15

6.5 15

26.9 35

26.9 35

13 30

- -

- -

AERCO BENCHMARK 750

-

-

160

160

160

160

90

-

-

145

145

583

583

44

-

-

RBI-FUTERA XLF-10,000

RBI-FUTERA XLF-10,000

HYDROTHERM KN-30

REQ'D ACCESS.

AC-1

TAG

BUS WASH ENTRY

SERVICE HW COIL

740

(MBH)

BERNER

MANUFACTURER

ALL

MODEL

IDC16-2168W

REQ'DACCESS.

- DISCONNECT BY ELECTRICAL CONTRACTOR

HD INDUSTRIAL

TYPE MOTORS

480 3

VOLTS PHASEHP'S

AC-3 FACILITIES SHOP ENTRY ALLHD INDUSTRIAL 480 3

AC-2 BUS WASH ENTRY ALLHD INDUSTRIAL 480 3

AC-5 NW GARAGE ENTRY ALLHD INDUSTRIAL 480 3

AC-4 FACILITIES SHOP ENTRY ALLHD INDUSTRIAL 480 3

3 & 5

AC-7 NE GARAGE ENTRY ALLHD INDUSTRIAL 480 3

AC-8 SE GARAGE ENTRY ALLHD INDUSTRIAL 480 3

AC-9 SE GARAGE ENTRY ALLHD INDUSTRIAL 480 3

AC-6 (NOT USED) - -- - --

IDC16-2168W

IDC16-1108W

IDC16-1108W

IDC16-2168W

-

IDC16-2168W

IDC16-1120W

IDC16-1120W

BERNER

BERNER

BERNER

BERNER

-

BERNER

BERNER

BERNER

3 & 5

5

5

3 & 5

3 & 5

7.5

7.5

14.0

AMPS

14.0

7.9

7.9

14.0

-

14.0

11.0

11.0

HW COIL

60

GPM

740

740

740

740

740

740

740

60

37

37

60

-

60

47

47

- EWT 190°F, LWT 160°F

REQ'D ACCESS

TAG DESCRIPTIONSERVICE MODELMFR MOTOR DATAPHASEBHP/HP VOLT.FT HDGPM

CAPACITY CONN. SIZE(IN)SUCT DISCH

SMP-1 IN-LINE CENTRIFUGALSNOW MELT B&G E-90 1AAB 66.6 1,2,3348026545 3600

RPM MINEFF %

15.8

NPSHFT

- - - --

HWP-1 HOT WATER 1169

HWP-2

HWP-3

HWP-4

1,2,3

1,2,3

1.0"1.0"

1,2,3

--

CP-1 MAKEUP AIR UNIT 2,4

6.0"

12081716 1671 2.731/4

---- -

1.0"1.0"

--

6.18

51.1

- - - - - ---- -- -- ---

- -

583

HWP-5

PRIMARY

HOT WATERPRIMARY

HOT WATERPRIMARY

HOT WATERPRIMARY

HOT WATERPRIMARY

HWP-6

HWP-7

HWP-8

HOT WATERSECONDARY

HOT WATERSECONDARY

HOT WATERSECONDARY

IN-LINE CENTRIFUGAL

IN-LINE CENTRIFUGAL

IN-LINE CENTRIFUGAL

IN-LINE CENTRIFUGAL

IN-LINE CENTRIFUGAL

BASE MOUNTED

BASE MOUNTED

B&G

B&G

B&G

B&G

B&G

B&G

B&G

B&G

BASE MOUNTED

583

145

145145

3

3

3

3

3

3

3

3

E-1510-3AD

E-90 2AAC

E-90 2AAC

E-90 2AAC

40

4040

40

40

10 480

10 480

3 480

3 480

3 480

480

480

480

1169

3381

3381

3381

6.18

18.7

18.7

18.7

81.4

81.4

72.6

72.6

72.6

6.0"

2.0"

2.0"2.0"

6.0"

6.0"

2.0"

2.0"

2.0"530

530

530

110

110

110

20

20

20

3477

3477

3477

15.0

15.0

15.0

82.0

82.0

82.0

4.0" 3.0"

E-1510-3AD

E-1510-3AD

4.0" 3.0"4.0" 3.0"

CIRCULATING PUMP IN-LINE CENTRIFUGAL B&G E-90 1AAB

MAXSONES

WHEELDIA(IN)

REQ'DACCY

FANCONTROL

REQ'DACCESS

OPER GASPRESS (IN WC)

REQ'DACCESS

1.- STANDARD DISCONNECT, FACTORY MOUNTED & WIRED2.- GRAVITY BACKDRAFT DAMPER & WEATHER HOOD3.- WALL BOX, REMOVEABLE SCREEN & BIRD SCREEN4.- PROVIDE WALL BRACKET SUPPORT & MOUNTING FLANGE5.- STANDARD FINISH, COLOR BY ARCHITECT6.- SPUN ALUMINUM W/ALUMINUM BIRDSCREEN.7.- AIR DRIED EXPOXY FINISH - ENTIRE FAN INCL ACC8.- R-I-S VIBRATION ISOLATION HANGERS9.- ALUM. CANTED ROOF CURB W/INSULATION 18" H &W/WOOD NAILER10.- ALUMINUM STEEL CAP & BOLTED INSPECTION DOOR.11.- UL 762 LISTING12.- ALUMINUM BIRDSCREEN

14.- TOTALLY ENCLOSED MOTOR SHALL BE CLASS 1, DIV I,& EXPLOSION RESISTANT, AMCA SPARK PROOF B FAN.15.- THREADED PIPE DRAIN CONNECTION.16.- WEATHERHOOD.17.- SPARK RESISTANT CONSTRUCTION.18.- FACTORY MOUNTED & WIRED DISCONNECT

PROVIDED BY BAS CONTRACTOR:21.- TIME SCHEDULED DDC ON/OFF22.- WALL MOUNTED DDC SPACE SENSOR23.- WALL MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC24.- UNIT MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC25.- HARDWIRE INTERLOCK ASSOCIATEDMOTORIZED DAMPER WITH FAN26.- HARDWIRE INTERLOCK FAN TO CNG GASDETECTION SYSTEM.

PROVIDED BY HC WITH UNIT:31.- WALL MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC32.- UNIT MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC33.- INTEGRAL THERMOSTAT - FACTORYMOUNTED & WIRED.34.- PROVIDED WITH REMOTE VFD, NEMA 12ENCLOSURE.

PROVIDED BY BAS CONTRACOR:

51.- CNG GAS DETECTION SYSTEM SHALLBE HARDWIRED INTERLOCKED TO BAS.BAS TO ACTIVATE EVAUCATION MODEAND OPEN ALL GARAGE DOORS FIRSTAND THEN ENGERIZE EXHUAST FAN.

PROVIDED BY EC:41.- WALL MOUNTED ON/OFF SWITCH42.- WALL MOUNTED ELECTRONIC TIMER43.- WALL MOUNTED OCCUPANCY.

1.- FACTORY MOUNTED & WIRED SINGLE POINT CONNECTION. FACTORY MOUNTED DISCONNECT.2.- MIN. 5:1 TURNDOWN RATIO.3.- BASIS OF DESIGN RBI & HYDROTHERM KN, EQUAL MANUFACTURER'S: PATT. KELLY, AERCO, LOCHINVAR CREST, & THERMALSOLUTIONS.

NOTES:A.- MAX OUTPUT BASED ON 50°F EWTB.- MIN. OUTPUT BASED ON 140° EWTC.- BOILERS MAY BE ALL CONDENSING TYPEOR HYBRID OF CONDENSING & FIRE TUREWITH MIN. OF (2) CONDENSING BOILERS.

1.- PROVIDE VFD MOUNTED ON ADJACENT WALL. ALL VFDs TO BE BY THE SAME MFR.2.- DISCONNECT BY EC. MOTOR SHALL BE NON-OVERLOADING.3.- FACTORY MOUNTED & WIRED DISCONNECT SWITCH.

1. FACTORY WIRED SINGLE POINT CONNECTION W/ WALL MOUNTED MOTOR CONTROL PANEL NEMA 1 ENCLOSURE.2. PROVIDE WITH (2) MICROSWITCH3. ALUMINIZED STEEL, WITH EXPOXY COATING4. PROVIDE W/ EXPLOSION PROOF MOTOR, AND JUNCTION BOX.

MAU-8thru 15

4.- PROVIDE DEDICATED MAKE-UP AIR UNIT CIRCULATOR FOR EACH MAU & DOAS-1.

REQ'D ACCESS

TAG DESCRIPTION HEATINGKW (MIN)MBH KW (MAX) MFR MODELELEC SERVICE

AMP VOLT PHASESERVICE CFM

UH-9 ELECT. UNIT HEATER CNG CONTROL RM 850 HEX5 ALL25.6 7.5 7.5 9.0 480 3

- THREE (3) PHASE COIL LOADS SHALL BE DIVIDED EVENLY ACROSS EACH PHASE- ELEC SERVICE TO THREE (3) PHASE UNITS TO BE THREE (3) WIRE UNLESS NOTED

REQ'D ACCESS

- VERIFY/COORDINATE CABINET DIMENSIONS MOUNTING AND RECESSREQUIREMENTS WITH ARCHITECTURAL DWGS PRIOR TO ORDERING

MODINE

TAG

UH-03

UH-04

UH-05

UH-06

UH-07

UH-08

-

UH-01

UH-02

- HEATING CAPACITY BASED ON 60°F EAT & 180°F LWT, 200°F EWT

UH-16

UH-17

UH-18

UH-19

UH-20

UH-21

UH-22

UH-23

UH-24

UH-25

UH-26

-

-

UH-27

-

-

-

UH-10

UH-11 ELECT. UNIT HEATER STRG/JANITOR CLST 380 HER30 1,2,310.2 3.0 3.0 3.6 480 3 MODINE

UH-12 ELECT. UNIT HEATER ELECTRIC 380 HER30 1,2,310.2 3.0 3.0 3.6 480 3 MODINE

UH-13 ELECT. UNIT HEATER IT 380 HER30 1,2,310.2 3.0 3.0 3.6 480 3 MODINE

UH-14 ELECT. UNIT HEATER LUBE (CNG ISLAND) 380 HER30 1,2,310.2 3.0 3.0 3.6 480 3 MODINE

UH-15 ELECT. UNIT HEATER LUBE (CNG ISLAND) 380 HER30 1,2,310.2 3.0 3.0 3.6 480 3 MODINE

- - - - - -- - - - - - -

- - - - - -- - - - - - -

- - - - - -- - - - - - -

1.- UNIT-MOUNTED THERMOSTAT.2.- PROVIDE MOUNTING BRACKET.

4.- EXPLOSION PROOF.3.- PROVIDE FACTORY MOUNTED DISCONNECT.

VEF-1 THRU MAINT BAY 800 3.2 3173 GREENHECK *460 3

REQ'D ACCY:

TAG SERVICE /VOLTAGE

MOTOR DATACFM HP PHASE FAN MODELRPM REQ'DACCY

** - REFER TO SPECIFICATIONS FOR LIST OF APPROVED MANUFACTURERS

FAN MFR **TSP (IN)

ALL

2.- TOTALLY ENCLOSED MOTOR.3.- ALUMINUM BACKDRAFT DAMPER.4.- WEATHERHOOD FOR FAN MOTOR.5.- FAN TO HAVE AMCA SPARK B CONSTRUCTION.

6.- FAN TO HAVE STANDARD FINISH, COLOR BY ARCHITECT.7.- FAN TO BE CONTROLLED BY SWITCH IN MAINTENANCE BAY, PROVIDED BY EC.8.- PROVIDE HIGH TEMPERATURE( 800 C / 1500 F MIN. ) 8"Ø HOSE ID, 25 FOOTLONG HOSE, WITH RETRACTING HOSE REEL, AUTOMATIC RECOIL, LOCK & LATCH.9.- PROVIDE 3 TAIL PIECES/NOZZLES(STANDARD ROUND, OVAL & WHALETAIL)FOR EA HOSE REEL.

VEF-19 MONOXIVENT 7150

HOSE REEL MODELHOSE REEL MFR **LOCATION

* - MODEL NUMBER FJI-09-BI-X

REQUIRED FOR ALL FANS:PROVIDE VFD MOUNTED TO FANINSIDE NEMA 3R ENCLOSURE. ALLVFDs TO BE BY SAME MFR.

2,3

2,3

2,3

2,3

2,3

1

CP-16

CP-2 THRU 15 MAKEUP AIR UNITCIRCULATING PUMP

DOASCIRCULATING PUMP

2,412082095 1705 9.881 2.0"2.0"65.2IN-LINE CENTRIFUGAL B&G

2,4149 1669 2.72 1.0"1"38.6IN-LINE CENTRIFUGAL B&G

E-602X26.25

12081/4E-90 1AAB

E-806X6X11B

E-806X6X11B

1. PROVIDE SINGLE POINT 480-3-60 SINGLE POINT POWER CONNECTION AND A SEPARATE FEED OF 120VOLT, 1Ø CONNECTION TO UNIT FOR ALL LIGHTS AND GFI RECEPTACLES.JUNCTION BOX AND ALL ELECTRICAL CONNECTIONS INSIDE AIRSTREAMS TO BE CLASS 1, DIVISION 1.2. MAX. FILTER VELOCITY 500 FPM. PROVIDE V BLANK TYPE FILTERS.3. 2" DOUBLE WALL STEEL EXTERIOR UNIT CASING, HEAVY 18 GAUGE W/POWDER COATING.4. ALL SECTIONS WITH SHALL HAVE WASH DOWN CAPABILITIES.5. PROVIDE ALUMINUM AIR TO AIR PLATE TYPE HEAT EXCHANGER, ONLY. ALUMINUM TREAD FLOOR W/WASH DOWN CAPABILITIES.6. PROVIDE FACTORY TESTING AND AHU UNITS SHALL BE FACTORY SHRINKED WRAPPED AND SHIPPED TO SITE. COORDINATE WITH CM.7. PROVIDE TWO ROW COIL. UNIT MANUFACTURER HAS OPTION TO PROVIDE ONE ROW COIL IF HEATING LOAD IS MEET.

13.- FACTORY MOUNTED & WIRED DISCONNECT: CLASS I,DIV I CIRCUITRY, MOUNTED EXTERNALLY IN NEMA 3ROUTDOOR ENCLOSURE.

1.- FACTORY MOUNTED & WIRED DISCONNECT: CLASS I, DIV I CIRCUITRY,MOUNTED EXTERNALLY IN NEMA 3R OUTDOOR ENCLOSURE.

8. MANUFACTURER TO BE PRESENT DURING START-UP, AND PROVIDE AN OFFICIAL START-UP REPORT

REQ'DACCESS

CAP'Y(MBH)

CFMELECTRICAL DATA GPM MODELMFR.RUNOUTSIZE (IN.)

115 32401 MODINE8.61/3

45.6

130.9

1/3

1/12

1/12

1/12

730

1120

3240

1120

3240

730

4.7

13.6 1-1/2

1/3

HC 47

HC 63

HC 165

HC 47

7301/12 HC 47

7301/12 HC 47

32401/3 HC 165

11201/12 HC 63

ALL

1/12

7301/12 HC 47

REQ'D ACCESS.1. LINE VOLTAGE THERMOSTAT (HEAVY DUTY), EXPLOSION-PROOF MOTOR & THERMAL OVERLOAD2. OSHA FAN GUARD3. BAKED PHENOLIC COATING4. EXPLOSION PROOF

HC 47

1/12 730 30.9 13.2 HC 47

VOLTS PHASE HP (W)

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

115 1

- -

- -

- -

- -

- -

- -

MAXP.D.

MODINE8.6

MODINE0.6

MODINE8.6

MODINE8.6

MODINE0.6

MODINE0.4

MODINE0.6

MODINE8.6

MODINE0.4

MODINE0.4

MODINE0.4

MODINE0.4

MODINE0.4

MODINE0.4

MODINE0.4

MODINE0.4

MODINE

MODINE

MODINE0.4

MODINE0.4

--

--

--

--

--

--

130.9 13.6

130.9 13.6

45.6 4.7

30.9 3.2

45.6 4.7

130.9 13.6

30.9 3.2

30.9 3.2

30.9 3.2

30.9 3.2

1-1/2

1-1/2

1

1

1

1-1/2

1

1

1

1

ALL

1,2,3,4

1,2,3,4

ALL

1,2,3,4

1,2,3,4

1,2,3,4

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

-

-

-

-

-

-

1

130.91/3 3240 13.6 1-1/2

30.91/12 730 3.2 1

30.91/12 730 3.2 1

30.91/12 730 3.2 1

1

1/12 730 30.9 13.2 HC 47

- - - -- -

- - - -- -

- - - -- -

- - - -- -

- - - -- -

- - - -- -

-- -

-- -

-- -

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

-

-

-

-

-

HORIZONTAL PROJ.

HORIZONTAL PROJ.

HORIZONTAL PROJ.

-

-

-

- ---- - - -

- ---- - - -

- ---- - - -

HORIZONTAL PROJ.

1/12 730 30.9 3.2

HORIZONTAL PROJ. 1/12 730 30.9 3.2

1/12 730 30.9 3.2

1 0.4

1 0.4

HC 47

HC 47

HORIZONTAL PROJ.

HC 47

HC 47

HC 47

HC 165

HC 63

HC 165

HC 165

-- - - ---- - - -

-- - - ---- - - -

-- - - ---- - - -

-

-

-

TYPE

-

8

8

8

8

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHITEC

TS

SREE

NIG

NE

C

®

O N S T RU

CT

I ON

MA

N

AGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 Sh

aker

Bou

leva

rd /

Cle

vela

nd, O

hio

441

20Ph

one:

(216

) 491

-930

0

Fax:

(216

) 491

-805

3w

ww

.rlba

.com

- e

mai

l@rlb

a.co

m

RIC

HAR

D L

. BO

WEN

+ AS

SOC

IATE

S IN

C.

RLB NO.:

CHECKED BY:

DRAWN BY:

08/14/18 / SD SUBMISSION

10/31/18 / DD PREVIEW

11/28/18 / 85%DD

12/06/18 / DD SUBMISSION

02/13/19 / CD PREVIEW

02/28/19 / BID-PERMIT SET

03/15/19 / ADDENDUM #2

03/28/19 / ADDENDUM #5

04/30/19 / REBID SET

05/24/19 / REBID ADD#2

5/23

/201

9 9:

45:5

4 PM

CO

TA F

ield

s Av

e R

enov

atio

n

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

HVA

C S

CH

EDU

LES

MF

SH

M6.01

855

Gran

dvie

w A

venu

e, 3

rd Fl

oor C

olum

bus,

OH

4321

5Ph

one:

(614

) 443

-117

8 Fa

x: (6

14) 4

43-1

594

Emai

l: dy

nam

ix@dy

nam

ix-ltd

.com

DEL #

18

0010

GI

R

S

S

RP

FE

O

E E

T

L

IG

S

N AO N

RE

E

D

I

R

S

EN

E

HTAT

S

E O F

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

jbrevick
Snapshot

Top Related