Transcript
Page 1: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

EUROPEAN FUNDS

European CommissionRepresentation in Bulgaria

Sofia, 30.11.2015

Page 2: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

Priority Axis 1 Water1. Construction of WSS infrastructure

2. Extension/optimization of quantitative monitoring networks and further development/optimization of the networks for control and operational monitoring of the groundwater chemical status

3. Development of new and update of existing strategic documents for the implementation of the Water Framework Directive and the Marine Strategy Framework Directive – River Basin Management Plans 2022-2027

Page 3: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

Priority Axis 2 Waste

Measures in accordance with the waste management hierarchy for municipal waste and for implementation of legislative requirements :

• Centers for re-use, repair and preparation for re-use;• Installations for preliminary treatment of municipal waste; • Anaerobic and/or composting installations;• Installation for waste recovery –Third phase of the integrated Sofia Municipality’sproject for municipal waste treatment;• Demonstration/Pilot projects.

Page 4: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

Priority Axis 3 Natura 2000 and Biodiversity

Implementation of measures of the National Prioritized Action Framework for Natura 2000

• Development and implementation of management approach for NATURA 2000 sites;

• Conservation measures for Natura 2000 species and natural habitats under the Habitats and Bird Directives;

• Development of Natura 2000 sites management plans;• Complementing the establishment of Natura 2000; • Information measures for NATURA 2000 network.

Page 5: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

Priority Axis 4 Flood and Landslides Risk Prevention and Management

1. Establishment of National Real Time Water Management System2. Studies and assessments related to the preparation of the Flood Risk

Management Plans for the period 2022 – 20273. Establishment of six centers to increase the preparedness of the population for

an adequate response to floods4. Measures related to flood risk prevention and management solutions,

including ecosystem-based approach - restoration of floodplains; improvement of water retentions; biological fortification of the river banks; protection infrastructure/water retention

facilities/hydro-technical solutions5. Measures for landslides risk prevention and management6. Demonstration/Pilot projects

Page 6: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

Priority Axis 5 Improvement of Ambient Air Quality Measures addressing air pollution from domestic heating and public transport, for example:• Replacement of stationary individual and multi-family domestic combustion installations/

boilers on solid fuel; • Installation of PM filters on individual domestic combustion installations; • Measures for alternative heating, serving residential areas which consist of individual

houses and/or small multi - family buildings using solid fuel for heating;• Measures to reduce emissions from public transport vehicles including reduction of the

use of conventional fuel in public transport; • Replacement of the public transport vehiclesexhaust systems (retrofitting).

Page 7: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

FINANCIAL PLAN

Priority axis Fund EU support and national co-financing (in Euro)

Share of OPE

(%)

Water CF 1 196 318 599 67,57%

Waste ERDF 287 784 390 16,26%

Natura 2000 and biodiversity ERDF 101 390 000 5,73%

Flood and landslides risk prevention and management

CF 78 528 323 4,44%

Improvement of the ambient air quality CF 58 823 530 3,32%

Technical assistance ERDF 47 536 503 2,69%

Total amount 1 770 381 345 EUR

Page 8: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

PROCEDURES 2015/1

Page 9: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

PROCEDURES 2015/2

OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

Page 10: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

PROCEDURES 2016/1OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

Page 11: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

PROCEDURES 2016/2

OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

Page 12: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020

POSSIBILITIES for the BUSINESS

1. Beneficiaries – contracting the implementation of the project

2. Business – implementing activities under a contract with the beneficiary; beneficiaries for waste management measures and under “air” priority

3. Bulgarian Public Procurement Act

• Public Procurement Agency – www.aop.bg or

• Beneficiary’s website

4. Ministry of Environment and Water – managing the Operational Programme Environment and providing the funding to the beneficiaries.

Page 13: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

THANK YOU FOR YOUR ATTENTION

[email protected]

OPERATIONAL PROGRAMMEENVIRONMENT 2014-2020


Top Related