Download - Mobinil Power Roadmap
![Page 1: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/1.jpg)
1The Egyptian Company for Mobile Services (Mobinil) - Restricted
Mobinil Power Roadmap
The Egyptian Company for Mobile Services (Mobinil)Mar 15th, 2011
![Page 2: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/2.jpg)
2The Egyptian Company for Mobile Services (Mobinil) - Restricted
Agenda
Green Power 1
Energy Saving2
3 Carbon Credit & LEED Building
![Page 3: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/3.jpg)
3The Egyptian Company for Mobile Services (Mobinil) - Restricted
Green Power
1. Current Solar Project
2. GSMA assessment pure solar site
3. Hybrid sites
![Page 4: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/4.jpg)
4The Egyptian Company for Mobile Services (Mobinil) - Restricted
Objective• To study opportunities to transfer network sites in off grid areas
powered by diesel generator to renewable green power (Solar System)
Why?• Noticeable reduction in solar system prices, that will leads to achieve better
ROI & payback period• Fuel trend price is unpredictable, we do expect Sharpe increase in the coming
5 years reference to the below trend
175% increase Y03 to Y10 one liter =0.2$
Y03 Y05 Y07 Y09 Y10 Y11 Y150
0.20.40.60.8
11.21.41.61.8
Fuel Price L/EGP
![Page 5: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/5.jpg)
5The Egyptian Company for Mobile Services (Mobinil) - Restricted
Solar Map for the achieved sites (100)
![Page 6: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/6.jpg)
6The Egyptian Company for Mobile Services (Mobinil) - Restricted
Green Power
1. Current Solar Project
2. GSMA assessment pure solar site
3. Hybrid sites
![Page 7: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/7.jpg)
7The Egyptian Company for Mobile Services (Mobinil) - Restricted
GSMA assessment • In progress:
– 40 road sites planned to be launched during 2011
• Future extensions:• 150 sites have been initially identified as being most suitable for the use of
renewable energy• These 98 sites consume a total of 2,189,214 Litres of fuel per year at a current
cost of $634,845 and is likely to increase significantly in the coming years– 98 sites Ready potential for solar power deployment– Releasing 145 genset– Net savings of 12.6 M$ after 10 years– Accordingly reducing carbon footprint (7,250 Ton)– Payback for these 98 sites is as below:
Site power watt No. of sites Payback500 13 1.7
600 4 2.7
700 47 2.9
800 15 3.7
900 19 4
![Page 8: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/8.jpg)
8The Egyptian Company for Mobile Services (Mobinil) - Restricted
Solar Design – 20 Years Model-900W
![Page 9: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/9.jpg)
9The Egyptian Company for Mobile Services (Mobinil) - Restricted
Solar Design – 20 Years Model-900W
![Page 10: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/10.jpg)
10The Egyptian Company for Mobile Services (Mobinil) - Restricted
Potential solar sites
Priority 1 Sites
Priority 2 Sites Priority 3 Sites
![Page 11: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/11.jpg)
11The Egyptian Company for Mobile Services (Mobinil) - Restricted
Green Power
1. Current Solar Project
2. GSMA assessment pure solar site
3. Hybrid (wind + batteries) sites
![Page 12: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/12.jpg)
12The Egyptian Company for Mobile Services (Mobinil) - Restricted
![Page 13: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/13.jpg)
13The Egyptian Company for Mobile Services (Mobinil) - Restricted
Wind + Batteries trial candidates
• payback is 2.7 years for 750 watt site
![Page 14: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/14.jpg)
14The Egyptian Company for Mobile Services (Mobinil) - Restricted
Agenda
Green Power 1
Energy Saving2
3 Carbon Credit & LEED Building
![Page 15: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/15.jpg)
15The Egyptian Company for Mobile Services (Mobinil) - Restricted
1. Objective & Methodology
2. Saving opportunities3. Cooling solutions trials4. New technology/products
Energy Saving
![Page 16: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/16.jpg)
16The Egyptian Company for Mobile Services (Mobinil) - Restricted
Overview on Telecom site Energy Consumption
BSS60%
A/Cs40%
% Energy Consumption in BTS Site
40% of the site consumption will be almost eliminated if A/Cs are replaced with an alternative cooling solution.
![Page 17: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/17.jpg)
17The Egyptian Company for Mobile Services (Mobinil) - Restricted
Objectives:
• Reducing Energy OPEX by using energy efficient solutions.• Moving towards Green solutions.• Smart energy management.
Methodology:• Tackling new and innovative solutions to reduce the energy consumption (applying on the highest sources of consumption first).• Taking advantage of the BSS Swap to modify the power design to be more efficient.
![Page 18: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/18.jpg)
18The Egyptian Company for Mobile Services (Mobinil) - Restricted
1. Objective & Methodology
2. Saving opportunities
3. Cooling solutions trials4. New technology/products
Energy Saving
![Page 19: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/19.jpg)
19The Egyptian Company for Mobile Services (Mobinil) - Restricted
Saving Opportunities Box (Cooling):
Cooling Solutions
Shelter
Traditional A/Cs
1- Downgrade A/Cs (after BSS
Swap)2- Daikin A/C
Saving solutions
3- Raising site temp, setting
4- Free Cooling
Outdoor
Outdoor Enclosure with
indoor BTS
5- Replace A/Cs with HEX or ventilation
Outdoor BTS
![Page 20: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/20.jpg)
20The Egyptian Company for Mobile Services (Mobinil) - Restricted
Cooling Solutions Savings Vs. existing:
I-Traditional A/Cs:
1- Downgrading A/Cs after the BSS Swap:
• A/Cs can be downgraded to 2 HP instead of 3HP due to lower equipment dissipation.
• 30% saving in A/C cons., i.e.: 12% in total site cons.
2- DAIKIN A/Cs:
• Trial has been conducted • 50% saving in A/C cons., i.e.: 20 % in total site cons.• Almost no starting current, more efficient , uses eco-friendly Ferion.
![Page 21: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/21.jpg)
21The Egyptian Company for Mobile Services (Mobinil) - Restricted
Cooling Solutions Savings Vs. existing:
II-Saving Solutions:
3- Raising shelter temperature to 32 C:
• A trial has been conducted (batteries inside NSN cabinet).• 62% saving in A/C cons., i.e.: 25 % in total site cons.
4- Free Cooling Solution:
• A trial will be conducted.• Can be used with high temp setting (with battery cooler) or low setting (without
battery cooler).• 80% expected saving in A/C cons., i.e.: 32 % in total site cons.
![Page 22: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/22.jpg)
22The Egyptian Company for Mobile Services (Mobinil) - Restricted
Cooling Solutions Savings Vs. existing:
III-Outdoor Solutions:
5- Outdoor Enclosures:
• The A/C on the enclosure to be replaced with HEX or ventilation system.• 80% expected saving in A/C cons., i.e.: 32 % in total site cons.• Can be used on new enclosures or to replace for old enclosure doors
![Page 23: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/23.jpg)
23The Egyptian Company for Mobile Services (Mobinil) - Restricted
1. Objective & Methodology
2. Saving opportunities
3. Cooling solutions trials
4. New technology/products
Energy Saving
![Page 24: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/24.jpg)
24The Egyptian Company for Mobile Services (Mobinil) - Restricted
Ventilation system trial (Shram-Dahab 4)• Due to stock limitation of OD BTS for solar project
• Indoor BTS installed in outdoor enclosure after the following preparation:-
Disconnect A/CReplace existing DC fans (2 X 8Watt) with
higher power (air flow) (2 X 60Watt)
•Trial started during June 2010
•Results was as follow:- no high temperature was received during June Measurement duration July 1st till July 13th Max. high Temp. was 46Cº Min. high temp was 31CºConclusion: indoor BTs can safely operate up to 45Cº with ventilation system (same concept of MBO & CBO with HEX)
![Page 25: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/25.jpg)
25The Egyptian Company for Mobile Services (Mobinil) - Restricted
NSN- Site star cabinet trial• Actual specifications for the site-star cabinet (battery cooling cabinet)
• Reduction in energy consumption
• Cabinet application:
1. Using the site star as the battery cabinet instead of the existing battery enclosures which will consume 160 W instead of 940W (less CAPEX/OPEX)
2. Using the site star cabinet in sites with high electricity fees, such as Telecom Egypt (TE) sites. Below, the expected savings (OPEX) from the application of the site star in Telecom Egypt sites.
Ambient Temp. °C Inside temp. °C Max. ΔT obtained Cabinet consumption (W)
Actual measurements 38.89 23.89 15 158
NSN's presented figures 35 20 15 4055 20 35 158
Case Energy consumed in 18 days (kVAh)Trial site (NSN’s solution) 1457 Dummy site (Existing condition 2 A/Cs working) 1978Percent decrease 26.5%
![Page 26: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/26.jpg)
26The Egyptian Company for Mobile Services (Mobinil) - Restricted
1. Objective & Methodology
2. Saving opportunities
3. Cooling solutions trials
4. New technology/products
Energy Saving
![Page 27: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/27.jpg)
27The Egyptian Company for Mobile Services (Mobinil) - Restricted
Smart Site Monitoring
Problem Definition:
• Only 4 alarm records are currently available in Mobinil OMC (Power , Rectifier, High temp, Fire alarm) which leads to the following issues.
Trouble shooting & Diagnosing problems:• The alarms are not sufficient to diagnose the problems and define adequate
solution.• Power logging should be performed manually on site.
Data base & Planning problems:• There is no data base for the power (equipment or history).• Data base is collected via the L1 maintenance subcontractors are usually not
updated or accurate.
![Page 28: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/28.jpg)
28The Egyptian Company for Mobile Services (Mobinil) - Restricted
Smart Site Monitoring
“If you can’t measure it, you can’t manage it.”
Objectives:
• Provide easy and fast tool to trouble shoot power problems and enhance NUR.
• Build a data base for sites equipment & measurements and hence:
Diagnose the root cause of the problem & solve it (ex: stabilizers, cyclic batteries, generator, enhance battery backup.
Optimize the power designs based on actual readings. Explore opportunities for green solutions.
![Page 29: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/29.jpg)
29The Egyptian Company for Mobile Services (Mobinil) - Restricted
Smart Site MonitoringMethodology:
• Installing monitoring system to collect power & environmental data from each site.
• Data will be sent via GPRS (USB modem) to a centralized server.• The available data will be used for analysis and network enhancement.Progress:• Free trial will be conducted with NSN.• 30 Solar sites will be installed with Alcatel monitoring systems.
![Page 30: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/30.jpg)
30The Egyptian Company for Mobile Services (Mobinil) - Restricted
Fuel Cell
Why Fuel Cells?
• Green Solution (fueled by methanol).• Produces DC current (-48 volt).• Can replace backup generator, rectifier and batteries.• 250 Liter tank can operate a 5 KW site (24TRX,3G) for
2 days.
Application:
• Can replace the generators installed in hazard areas.
Action:
• Technical & commercial feasibility should be studied.
![Page 31: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/31.jpg)
31The Egyptian Company for Mobile Services (Mobinil) - Restricted
Smart GeneratorGenerator, controller & batteries in one skid
![Page 32: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/32.jpg)
32The Egyptian Company for Mobile Services (Mobinil) - Restricted
High efficiency Rectifiers
• Rectifiers efficiency is currently around 92%.
• New generations efficiency is around 97%.
• This will save 5% of the BSS power, i.e. 3% in total site cons.
![Page 33: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/33.jpg)
33The Egyptian Company for Mobile Services (Mobinil) - Restricted
Agenda
Green Power 1
Energy Saving2
Carbon Credit & LEED Building 3
![Page 34: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/34.jpg)
34The Egyptian Company for Mobile Services (Mobinil) - Restricted
Carbon Credit Transactions
Clean Development Mechanism “CDM” is simply one of the flexible mechanisms defined in the Kyoto Protocol, that allows transaction of carbon credits (CERs and VERs)* between developed and developing countries.
CERs: Certified Emission ReductionsVERs: Verified Emission Reductions
![Page 35: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/35.jpg)
35The Egyptian Company for Mobile Services (Mobinil) - Restricted
• Mobinil engaged in a CDM project at which Ernst & Young will be providing advisory services for potential Green House Gases “GHGs” abatement projects.
• The current GHGs abatement projects includes:– Energy consumption reduction projects– Alternative Energy projects
![Page 36: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/36.jpg)
36The Egyptian Company for Mobile Services (Mobinil) - Restricted
• BTSs/BSCs related:– Grid power replacing generators– Deployment of outdoor sites instead of
indoor– Fuel cells instead of standby generators– Hybrid solutions for less fuel
consumption– Solar power systems for repeaters and
BTS sites– Swapping BTS sites into Single RAN (2G
& 3G)– Cooling solutions instead of A/Cs with
much less power consumption– Monitoring system for energy
management through the network– Sharing sites with other operators to use
only one source of energy• Ex: 27 KVA genset for 2 sites
instead of 1 for each
• MSCs/Data centers:– IP/MPLS swap– Swapping to soft switches– Transcoders swapping after SingleRAN
implementation– IN swap
• Facilities:– Video Conferencing– Turning off A/Cs and fade lighting after
7:00 pm
Mobinil phase 1 potential projects
This will contribute positively in the green projects investments and will make investment in renewable and alternative energy solutions more attractive for Mobinil.
![Page 37: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/37.jpg)
37The Egyptian Company for Mobile Services (Mobinil) - Restricted
Mobinil always in the LEED
An overview about Leadership in Energy and Environmental Design
![Page 38: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/38.jpg)
38The Egyptian Company for Mobile Services (Mobinil) - Restricted
An internationally recognized set of standards aiming to maximize energy efficiency in any building.
A certificate - that a building was designed and built using these performance improving standards.
What is LEED?...
LEED is flexible enough to apply to all buildings... Commercial and residential. …
Works through the building lifecycle… from design to construction to operations and maintenance… even repairs and restoration.
It’s more of a design approach that sets the tone for what will come later on..
![Page 39: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/39.jpg)
39The Egyptian Company for Mobile Services (Mobinil) - Restricted
What does LEED measure?
1. Energy Savings.. Power consumption, insulation, lighting systems, IT and Data Center designs
2. Water Efficiency…
3. Carbon Emissions… Air-conditioning systems, cooling medium, type and source of power.
4. Indoor environmental quality… Daylight, ventilation, space, ambient temperatures, sound levels
5. Use of resources… Waste management system, nature of building materials
![Page 40: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/40.jpg)
40The Egyptian Company for Mobile Services (Mobinil) - Restricted
LEED Benefits
Substantial savings in operational costs.
Possibility to ‘cash-in’ on reduced carbon emissions
Happier employees, better morale…higher productivity
Better social image
More real estate value. LEED buildings are known to be assessed at higher prices.
![Page 41: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/41.jpg)
41The Egyptian Company for Mobile Services (Mobinil) - Restricted
About Mobinil’s new LEED building… General information Map snapshot Layout and ground floor plan
![Page 42: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/42.jpg)
42The Egyptian Company for Mobile Services (Mobinil) - Restricted
General information Complex Name: Pyramids Heights. Located along Cairo – Alexandria
desert road. 22KM from October City
Lessor: Samcrete Development. Lessee: The Egyptian Company For Mobile Services [Mobinil]
Building B[1]: Basement. Ground. First. Second and Third floors. Total lease area of 1250 ... Distributed over 5 floors:
…. To be used as offices and open work space. Plus an area of 2500M2
basement to be used as a storage and public services for the building.
Expected capacity: 1550 seats
12500 M2
![Page 43: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/43.jpg)
43The Egyptian Company for Mobile Services (Mobinil) - Restricted
Geographical snapshot
![Page 44: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/44.jpg)
44The Egyptian Company for Mobile Services (Mobinil) - Restricted
Layouts. Plans
Typical floor plan
Building layout
![Page 45: Mobinil Power Roadmap](https://reader033.vdocuments.mx/reader033/viewer/2022051423/56816968550346895de12f28/html5/thumbnails/45.jpg)
45The Egyptian Company for Mobile Services (Mobinil) - Restricted
Thank You