SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
THE ARCHITECTURE SCHOOL
BACHELOR OF QUANTITY SURVEYING
SITE REPORT
NAME: GOH JENG JHIEH
STUDENT ID NO: 0315080
LECTURER: Ms Ang Fuey Lin
OBJECTIVE:
Understand the construction process.
Understand the construction techniques used on site and compare what
was taught in books.
To observe the importance of every role in construction site and how they
work together to finish project in time.
Learn the usage of construction equipment on site.
Identify the types of building materials and technology on site.
Create awareness of importance of safety on site and learn what action is
taken to prevent or overcome these safety issues.
Recognize the items measurable for sub-structure and reinforced concrete
frame works.
Purpose of the building
This building consists of commercial and residential areas. The project cost of
this building is about RM 100millions and 2 years of contract period.
The involved companies are listed below:
EMPLOYER AIKEE TIMBERS SDN. BHD
ARCHITECT L.T. LEONG SEKUTU
CIVIL & STRUCTURAL
ENGINEER
PERUNDING MAJUJAYA
MECHANICAL &
ELECTRICAL ENGINEER
KEW & ASSOCIATES
QUANTITY SURVEYOR PCM KOS PERUNDING SDN. BHD
MAIN CONTRACTOR ENCORP CONSTRUCT SDN. BHD
Function of different levels:
Photos:
Welded wire mesh (BRC) is net-
like steel bars and used in
reinforced concrete.
Slump test, it is left aside for a
long period and observes the
quality of the mixed concrete.
Temporarily work: Toilet for
workers.
Crane is used in constructing higher floor
level.
Forklift truck to carry heavy loads on site.
Wood sheet for formwork purposes.
Pipes for raisers or piping system. Wire
cover to fix the position of wires.
Temporarily work: Provide small rooms
for workers.
Steel rods are meant to hold piping
system or air-conditioner ducts.
Bore pile is used to provide stable
foundation to support high rise building.
Scaffold to provide worker to fix or construct things at ceiling.
Formwork to reinforced concrete wall which is not removed yet.
Formwork to soffit and sides of slab, and
formwork to soffit and sides of attached
beam.
2 beams are connected to one column.
Reinforced bar to build kerb.
Starter bars for extension to connect 2
buildings together and construction for
higher level.
Workers are bending bars manually.
Formwork to soffit of staircase and
reinforced bars are put inside.
Scaffold to provide movement
for workers.
Materials used on site:
Conclusion:
After the site visit, I can roughly tell the basics of construction. In this building,
they choose to use bore pile because it is a high rise building, where the other
types of foundation cannot provide the same function. To save more cost and
time, they had to build some temporarily work such as toilet and rooms for
worker’s convenience. If not, the worker has to come from far away and more
cost spent on transportation. Another new thing I learnt from this site visit is that
the starter bars on sides of building are meant for extension purpose. To ensure
the quality of concrete, they had carried out the slump test. On site, I was able to
observe how the formwork is constructed for concrete pour and to sides of walls
& soffits. This is a great experience to be in a site to learn how things were
constructed.