Download - Impala Warehousing
MANZANILLO, COLIMA. MEXICO
I M P A L A
W A R E H O U S I N G
BULK CONCENTRATE STORAGE FACILITY
Impala Warehousing
37 acre Development, including:
• Corporate Offices Building
• High Tech Laboratory & Sampling Dock
• 50,000 m² enclosed storage
• 100,000 m² open area storage
• Shops & Warehouse for Operation’s fleet
maintenance
• 6 Scale Weighting Stations linked to the data
network
• Fuel Station with 40,000 Lt Diesel capacity
• 8 meter high perimeter wall
• Fiber Optic Telecommunications
• High Tech Global CCTV Closed Circuit Television System
• Hydrant based Fire Fighting System
• 1,500 KVA Power Substation with Emergency Power generation at full charge
• 500 KVA Laboratory Power Substation with Emergency Power generation at full charge
• Complex wide Storm drainage Treatment Plant
• Precast High flow Storm Trenches system that performs pre-decantation, reinforced grids to support loaded eighteen wheelers transit
• 5 Wash Bays with high pressure washing system for incoming and outgoing trucks
Impala Warehousing
30,000 m² structure for Copper storage
Foundation
550 tonns of reinforcement steel
7,750 m³ of concrete in 15 meter deep piles @ 1.20 m
average diameter
10 inch concrete slab reinforced with high strenght
thermofused 3/8" steel rebar, executed in 50 days
Structure
2,250 tonns of A-50 structural steel
5,000 m² roofed storage area delivered to the client
every 4 weeks, without affecting the operational
functionality
Complete storage facility delivered in 6 months
Transport, Sandblast, Painting and installation of up to
200 tonns of A-50 structural steel on a typical week
KR-18 Sheet metal roofing, 180° joint, fully waterproof
system
10,000 m² structure for Zinc storage
Foundation
34 tonns of reinforcement steel
250 m³ of concrete in 15 meter deep piles @ 1.0
meter average diameter
10 inch concrete slab reinforced with high strenght
thermofused 3/8" steel rebar, executed in 20 days
Structure
880 tonns of A-50 structural steel
Complete storage facility delivered in 3 months
KR-18 Sheet metal roofing, 180° joint, fully
waterproof system
2,500 m² enclosed storage facility
for precious metals
Foundation
10 tonns of reinforcement steel
120 m³ of premixed concrete
10 inch concrete reinforced with high strenght
thermofused 3/8" steel rebar, executed in 3 days
Structure
450 tonns of A-50 structural steel
Complete storage facility delivered in 3 months
KR-18 Sheet metal roofing, 180° joint, fully waterproof
system
5,000 m² Isolated Lead storage facility
Foundation
40 tonns of reinforcement steel
300 m³ of premixed concrete
Precast concrete wall system conforms interior
material holding bays
10 inch concrete reinforced with high strenght
thermofused 3/8" steel rebar
Structure
1,000 tonns of A-50 structural steel
Completely isolated storage design facility, All Lead is
contained within, isolated from the rest of the complex
This facility is still under construction
KR-18 Sheet metal roofing, 180° joint, fully waterproof
system
Fuel Station
40,000 lt Diesel capacity
2 Wheel loader simultaneous fueling capacity
Facility constructed under PEMEX’s
standards
Electronically controlled Fuel supply, linked to
the main data infrastructure
Burst proof Enclosure
Each piece has 1 meter wide and 11
meters high
Each one is constructed with 5.5 m³
of premixed concrete and 350 kg of
reinforcement steel
110 m² of perimeter wall installation
in just 12 hours
620 pieces conform Impala
Warehousing’s perimeter
Precast division, Perimeter Walls
Precast Division, Architectural Wall
2 meter high architectural wall
20 m² installed per day
300 pieces installed at Impala Warehousing
2,100 m² of concrete parking lot slab, enclosed with
precast architectural walls, installed in only 21 days
Precast Division, Tankreto
Independant precast cistern system
12,000 liter storage capacity, with the ability to adjoin pieces
for increased storage capacity if required
5.5 m³ of premixed concrete with 150 kg of reinforcement
steel
1’128,000 liter capacity installed at Impala Warehousing
Precast Division, Storm Trenches
2.36 m. wide by 3 m. long precast pieces
Up to 42 Linear meters Installed each day
High speed flow capacity
Galvanized Reinforced heavy load Grids
Easy cleaning
Precast Division, Custom design
“J” shaped storm trenches that allow pre-
decantation process by retaining suspended
solids in the storm system
Column Protectors to maximize the storage space
and avoid accidental bumps to the structure
Movable Precast Walls to divide storage areas
with ease
Precast Custom solutions include Post anchors,
SuperPost footings. Manholes and registers,
Shade areas and service shacks and booths help
shorten the construction timeframe
General Power Substation
1,500 KVA installed capacity
2@750 KVA transformers, each backed up with a 750
KVA emergency diesel generator, joined together in a
redundant system that allows maintenance services
without electrical interruptions that may affect
operations
The building has 120 m³ of premixed concrete with 6
tonns of reinforcement steel, built in 30 days
All the equipment was installed in only 6 days
1,670 m³ premixed concrete
140 tonns of reinforcement steel
450 m² of Landscaping areas
5 executive meeting rooms
80 person Canteen / Dining room
CCTV & Data Sitte for the Complex
Completed in 4 Months
700 m² Corporate Offices
800 m² Maintenance facility
Parts warehouse Mezzanine with 1 ton/ m² capacity
Fully equipped shops and maintenance areas,
including compressed air system and oil change
ramps
450 m³ premixed concrete
40 tonns of reinforcement steel
KR-18 Sheet metal roofing, 180° joint, fully
waterproof system
Maintenance Shops & Parts Warehouse
Lockers, Showers &
Restrooms
80 m³ premixed concrete
14 tonns of reinforcement steel
Laundry Area
Shower & Dressing rooms
Locker room
24 hr service facility
To be Completed in 3 Months
Sampling Dock & Laboratory
800 m² High tech facility
Sampling dock with 6 truck simultaneous capacity
Fully equipped sampling pre-testing stage, Air extraction and dust recolection process
Fully equipped Lab, also with Air extraction and dust recolection process
250 m³ premixed concrete
20 tonns of reinforcement steel
Sampling dock has KR-18 Sheet metal roofing, 180° joint, fully waterproof system
Re-Weighting Station &
Panoramic Supervisor
Office
Full Operation views
Strategically placed
45 m³ premixed concrete
8 tonns of reinforcement steel
Support Areas
4 access/egress exchangeable lanes each with a Weighting Scale and a hidrojet Washbay tunnel to expedite Operations, fully integrated to the Fiber Optic Data network and Particle removal treatment plants to completely clean the water emission
Particle removal treatment plants to completely clean the water emission
Wastewater treatmant plants
Fire Fighting pressurized system
Presurized Irrigation system
OTHER ACTIVE PROJECTS
01 year Maintenance Contract
Cleanup, sandblasting and
rustproofing of upper impeller shield
and upper turbine shield.
Sandblasting and rustproofing of
spillway floodgates
Santa Rosa Dam Power Plant , CFE
01 year Maintenance Contract
Fabrication, galvanized rustproofing
and installation of main intake’s
metallic 65 ton grating
Agua Prieta Dam Power Plant , CFE
01 year Maintenance Contract
Puente Grande Dam Power Plant , CFE