Mike Phillips

Design and Operations Considerations of a Distributed Control System

Page 2: FSRUG Meeting San Antonio, Texas February 21, 2011

FSRUG Meeting – San AntonioInvensys Attendees• Mike Phillips – Director Nuclear Marketing• Chris Wiegand – Nuclear Client Executive• Scott Zimmerman – Customer Sales Executive• Tim Frost – Project Engineer• Masud Ahmad – Product Sales Engineer• Daren Zahabizadeh – Technical Sales Consultant• Tony Moreland – NA TSC DirectorParticipating in the Vendors Nights Monday & Tuesday. Look forward to seeing your there.

Page 3: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems Discussion Topics• What is a distributed control system

– Why go digital in the first place– What is the difference between a DCS and a PLC– What are the pros and cons of each

• Implementation of Digital Systems– Lessons Learned

• Project Documents / Specifications• SQA and your system• Cyber Security• Service and Maintenance of your system

• Customer Feedwater Solution Overview and Results

Slide 3

Page 4: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems Why go digital in the first place?• Obsolescence• Single Point Failure Vulnerability• Maintenance Issues

– Problems maintaining old system– Spares– Original suppliers out of business

• Nuisance Plant Trips / Startup delays• Tribal Knowledge / Plant “As Builts”• Multiple platforms and vintage• Workforce attrition

Slide 4

$$

$$$$

Page 5: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems

Plant Computer &

Data Acquisition

Potential Upgrade

Applications

t

Page 6: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems

Plant Computer &

Data Acquisition

Potential Upgrade

Applications

t

Wikipedia:

A distributed control system (DCS) refers to a control system…..in which the controller elements are not central in location (like the brain) but are distributed throughout the system with each component sub-system controlled by one or more controllers. The entire system of controllers is connected by networks for communication and monitoring. DCS is a very broad term used…….to monitor and control distributed equipment.

Page 7: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems

Plant Computer &

Data Acquisition

Potential Upgrade

Applications

t

Distributed Control Backbone

Distributed Control Backbone

Page 8: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems - PLC

Plant Computer &

Data Acquisition

Potential Upgrade

Applications

t

PLC

HMI

A programmable logic controller (PLC) or programmable controller is a digital computer used for automation of electromechanical processes. The PLC is designed for multiple inputs and output arrangements, extended temperature ranges, immunity to electrical noise, and resistance to vibration and impact.PLCs may include logic for single-variable feedback analog control loop, a "proportional, integral, derivative" or "PID controller". Historically PLCs were usually configured with only a few analog control loops. Where processes required hundreds or thousands of loops, a distributed control system (DCS) would instead be used. As PLCs have become more powerful, the boundary between DCS and PLC applications has become less distinct.

Page 9: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems DCS & PLCs: What are the pros and cons of each?• DCS PROs

– DCS gives you a plant backbone and the built in capacity to distribute controllers and expand the system in the future.

– Single platform for the plant... learn and maintain ONE platform, the only difference in the “distributed controllers” is the application configuration

– Higher level built in configuration tools. Wider range of control algorithms– On-line repair and self calibration (may decrease surveillances)

• DCS CONs– Non-DCS HMI solutions can provide more flexibility in developing application

specific graphics– Longer Outage time and Higher cost of installation– Non-safety rated and no triple redundancy offering

Slide 9

Page 10: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems (PLC’s) DCS & PLCs: What are the pros and cons of each?• PLC PROs

– Allows an “islands of automation” approach to plant upgrades– Triple Modular Redundancy (TMR) for “Production Critical” applications– On-line repair and self calibration (may decrease surveillances)– PLC Speed response times– Ladder Logic, Function Block, and Structured Text programming languages– Single, Dual, & Triplicated options

• PLC CONs– Limited set of predefined Algorithms (but can be developed)– Need to build communications infrastructure– Utilizes Non-DCS packages for HMI graphics

Slide 10

Page 11: FSRUG Meeting San Antonio, Texas February 21, 2011

Distributed Control Systems So, do I use a DCS or a PLC?But first, what is the reason for considering a digital

upgrade and what is the overall objective?• Are you considering a plant wide digital solution?• Do you have a digital upgrade plan in place for your facility?• Solving a nagging maintenance issue with no future digital

plans? • Capturing operational knowledge?• Looking for a common platform for BOP systems• Is there a specific SQA Level required?• Maybe we should look at lessons learned……..

Slide 11

Page 12: FSRUG Meeting San Antonio, Texas February 21, 2011

Digital Systems - Lessons Learned

Specifications

• Educate your team on what is possible• Define the functionality you will require in your system• At a minimum - develop a good I/O list to include in the specification. Result?

• More accurate proposals from the vendors• Will get the project off on the right foot

• Clearly identify vendor documentation requirements• Avoid the “Kitchen Sink” approach when listing Codes and Standards

• Increases the risk factor to the vendor & increases cost • Penalized by Purchasing

• Determine the level of SQA that will be required. Make sure you understand your requirements so you can explain it to the vendor• Example: Applying typical 1E requirements to a non 1E class system

Slide 12

Page 13: FSRUG Meeting San Antonio, Texas February 21, 2011

Implementation of Digital Systems Specifications

• Give yourself time to write a good specification • Make sure the schedule is realistic

• Un-realistic schedules increase pricing…..somewhere along the line• Don’t forget about the Simulator Upgrade

• Should have a strong focus since it is usually the first to be implemented• Are there plant standard devices? Encourage vendor to incorporate

but be flexible to vendor options• Network Switches• Field Transmitters

Slide 13

Page 14: FSRUG Meeting San Antonio, Texas February 21, 2011

Picking a Supplier

14

• Experience, Experience, Experience• All Experience, not just Nuclear• “Production Critical” projects especially• Vetted Project Procedures and SQA Plan

• Experience with a variety of Nuclear Plant Digital I&C Projects

• Does the supplier have a strong history of product support and a strong migration path• Past performance is an indication of the future performance• Be wary of installing “one off” or obsolete equipment!• Know what you are getting and get involved

Page 15: FSRUG Meeting San Antonio, Texas February 21, 2011

15

Picking a Control System Platform• Experience, Experience, Experience• Will the platform lend itself to previous plant digital upgrades?• Open or closed type of architecture• Does it fit into the Plant Standardization philosophy?• Is the Platform Fault Tolerant?• Is the system a COTS Technology and used in other industries

• Knowledge of processes• Data base of reliability data• Economies of scale• Longer term support from vendor

• Ask the question how will we maintain the system ourselves?• Implement a configuration control program • Allows ease of upgrading digital hardware and software • Don’t drive yourselves into DIGITAL OBSOLESCENCE!

Page 16: FSRUG Meeting San Antonio, Texas February 21, 2011

16

Enhancements• Elimination of Single Point Failures• Ease of Maintenance• Reduction of test frequency of control system• Automation of testing• Additional Information available to operations

and maintenance through the Human Machine Interface

• Improved diagnostics of the control system as well as process

• Management of Change Friendly

Page 17: FSRUG Meeting San Antonio, Texas February 21, 2011

Project Issues

17

• Team for success• Assign the proper personnel for the project and make sure

they have the right attitude toward the project• Design • System Engineering• Operations• Simulator• Maintenance• IT

• Keep the same project team for the duration of the project• Make sure management sees the project as top priority

• Need contractor help for the project? Have the contractor take on day to day plant responsibilities

• Let plant personnel concentrate on the project• THIS IS YOUR FUTURE!

Page 18: FSRUG Meeting San Antonio, Texas February 21, 2011

Project Issues

18

• Answer the question “Who will own the system?”• If budget allows, include a training system• If schedule will allow, get the system onsite early and try

to “break it”• The vendor you have chosen needs to be flexible to small

additions that come up during the project • Resist scope creep unless you take schedule and cost

impacts into account.• Train Early

– If possible go to training as part of the Control System evaluation

– Train key project personnel early in the project so they have better input during the project

Page 19: FSRUG Meeting San Antonio, Texas February 21, 2011

Mechanical & Instrumentation

19

• Single Point VulnerabilitiesTo the extent possible, consider duplicating or triplicating critical

system components. These include:• Oil Pumps and Drivers

• Pressure Switches

• Supply Filters

• Header Pressure Transmitters

• Level Transmitters

• Servo Coils

• LVDT’s

• Coolers

Page 20: FSRUG Meeting San Antonio, Texas February 21, 2011

IPS Confidential

Quad-redundant Hydraulic Trip Block• Online Testing• Online Repair• No single point of failure• Manifold mounting for

easy installation and repair• Fully instrumented for

automatic testing

Page 21: FSRUG Meeting San Antonio, Texas February 21, 2011

Mechanical & Instrumentation

3D Modeling of new assemblies Hydraulic Control Components Panel

Hydraulic and Pump Skids

Page 22: FSRUG Meeting San Antonio, Texas February 21, 2011

Human Machine Interface Issues

22

• Resist the urge to hold onto the past.• Try to eliminate hard panels whenever possible• If possible, convince operations to not try to duplicate the

hard panels on the HMI

• Information overload• Resist the urge to alarm everything. This can end up

overwhelming the operator. Again use the simulator to work out Human Factor issues.

• Decide where the HMI will be mounted. • Is there spare space? • Can it be mounted where the hard controls were located?• Do you need to get more creative on where and how to

mount the monitors?

Page 23: FSRUG Meeting San Antonio, Texas February 21, 2011

Good or Bad?

23

Page 24: FSRUG Meeting San Antonio, Texas February 21, 2011

Cyber Security Issues

24

• Minimize connections between the control network and corporate networks and only then through firewalls and buffers

• Do not connect the control network to the internet

• If possible limit communications to a unidirectional output to the plant computer and plant historian

Page 25: FSRUG Meeting San Antonio, Texas February 21, 2011

25

Summary• Communications between all parties essential• Be open to what has been done in and outside nuclear• Understand the details of all requirements • Don’t make assumptions• Study lessons learned and truly implement them in your

project• Start small and grow with those successes with open

systems– Too much at once – is a recipe for failure

• Cultural change – the most challenging of them all!• Take ownership its your Future

Page 26: FSRUG Meeting San Antonio, Texas February 21, 2011

ABWR Advanced Control Room

26

Page 27: FSRUG Meeting San Antonio, Texas February 21, 2011

OK, But Where’s the Beef?Digital Control Systems are as good as the planning, expertise of the

people, platform reliability, application capability, SQA, and installation and start-up of the system.

Today’s systems are not just replacements……they are Digital Upgrades Offering:

– Operational philosophy enhancements– improved startup and runtime performance – Significant reduction of unplanned unit trip outages

 These advanced control techniques allow: – Less operator required interaction – Automatic control, especially during start-up and shut-down when most unit

trips are caused – The entire control system is more capable of handling normal operation as

well as process upset conditionsSlide 27

Page 28: FSRUG Meeting San Antonio, Texas February 21, 2011

Feedwater Upgrade Enhancements• Redundant Sensor Algorithms (RSA)

• Dual Transmitter Input Algorithm• Dual Transmitter Input Algorithm with Arbiter (Voter)• Triple Transmitter Input Algorithm

• Redundant Valve Outputs• Fully Integrated Single Element/Three Element Control Philosophy• Control Element Assembly Position Indication Logic• Incore Flux Monitoring• Calorimetric Monitoring• Sequence of Events Recording• Atmospheric Steam Dump Control• Steam Bypass to Condenser Control

Slide 28

Page 29: FSRUG Meeting San Antonio, Texas February 21, 2011

Typical Client NeedReplace an aging existing Feedwater Control System and

Improve Operational Reliability and Availability• Design a digital replacement solution for this critical system • Should address & mitigate future obsolescence • Should incorporate both high reliability and high availability as

inherent attributes• Should allow the plant operator to focus on the plant behavior • Focus the operators attention on monitoring field parameters critical

to running the plant effectively • Allow quick response on performing corrective actions• Integrate the new feedwater control system with the main turbine

controller and the feedwater turbine controller• Remove single point vulnerabilities in the system wherever possible

Page 30: FSRUG Meeting San Antonio, Texas February 21, 2011

Critical Feedwater ConsiderationsImportant To Safety Opportunity• Section 7.7 of the SRP, NUREG-0800, indicates increased scrutiny of

certain non-1E systems by the NRC• Reason? Failure of these systems would challenge the plant safety

systemsFeedwater Control is certainly one such application• Feedwater is critical to continuous plant operation• When the feedwater system goes down, the plant goes down• A single component failure causing unscheduled plant outages• Cost of downtime averages $1M / dayChallenge: Provide highly reliable and available digital solution• Improve the operational efficiency of the plant – gain Megawatts!• Decrease downtime and regulatory risk

Page 31: FSRUG Meeting San Antonio, Texas February 21, 2011

The Existing SystemThe unit has two steam turbine driven feedwater

pumps • Both pumps are required to function to achieve 100% power• Significant operation risk and concern for any pump loss• Additional Operational Procedures to compensate for risk• In case of a sudden pump loss it is not possible for the

Operator to react quickly enough to prevent a turbine trip.• Recovery from Reactor Trip = 3 days at a total cost of

operation of $5.5M

Page 32: FSRUG Meeting San Antonio, Texas February 21, 2011

The Feedwater Control Solution Digital Upgrade was funded for feedwater control including:• Main Feedwater Control Valves• Feedwater Bypass valves• FWP Demand SignalAutomate By-Pass valves operation and integrate operation into

start up and shut down sequence• Control from the control room.Automate control valve surveillance testing• Push button test from the control room• Test time dropped from 2 days to 15 minutes per valveIntegrate control functionality• Seamless communication with the previously upgraded main turbine

controller for start up, shutdown, and runback control.• Automatic demand placed on feed water turbine governors.

Page 33: FSRUG Meeting San Antonio, Texas February 21, 2011

The Feedwater Control Solution Provide Improved Operator Awareness• Dual redundant Operator HMI screens for control and monitoring.• Separate large display mounted to provide easily visible chart

recorder screen. Existing chart recorders were removed.Integrated system now automatically responds to

any feed water level changeOn Unit Runback the system can now survive 50%

reduction in Reactor Power without Operator Intervention

• No Operator action required• No Plant Trip

Page 34: FSRUG Meeting San Antonio, Texas February 21, 2011

Solution ValueOne mitigated outage Recovered Original InvestmentReduced maintenance costsDeveloped a consultative relationship with the upgrade teamClient is a valued reference and proud of the resultsMaster Services Agreement now in placeFuture Committed Business IdentifiedPositively impacting relationships across the industryThe ultimate “Win - Win” scenarioIncreased Safety Margin, Reduces Operating CostNo Regulatory Oversight$2.2M Savings minimum for each mitigated event

Page 35: FSRUG Meeting San Antonio, Texas February 21, 2011

FEEDWATER – Menu Select Screen

Page 36: FSRUG Meeting San Antonio, Texas February 21, 2011

Steam Generator 1 & 2 Feed & Steam Flow

Page 37: FSRUG Meeting San Antonio, Texas February 21, 2011

FEEDWATER – Valve Control & Chart Recorders

Page 38: FSRUG Meeting San Antonio, Texas February 21, 2011

FEEDWATER – Pump Control

Page 39: FSRUG Meeting San Antonio, Texas February 21, 2011

Summary: DCS or PLC?Definitions gave us a feel for the differences but very little definition of

where to use one over the other.One seems better for a system with a lot of analog loops and the other

seems better for electro-mechanical high speed applications.One seems better overall if long range digital upgrades have been

scheduled and the other seems more suited to “islands of automation” or stand alone systems

But tie all the islands of automation together and what do you have? A distributed control system.

So after all that, the real answer is……it just depends Use the right platform for the application and utilize “lessons learned”

“Production Critical” / “Important to Safety”– TMR PLC’s Balance of plant – DCS and tie it all together

Slide 39

Page 40: FSRUG Meeting San Antonio, Texas February 21, 2011

Please come by our booth for additional information and discussion

Slide 42

Thank you for your attention!

Questions?

Page 41: FSRUG Meeting San Antonio, Texas February 21, 2011