Page 1: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

SOLID WASTEMANAGEMENT & IMPLEMENTATION

FRAME WORK OF

Dr.Deni Nurdyana Hadimin

Presented By:

Page 2: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

ABOUT USSed ut perspiciatis unde omnis iste natus error sit

voluptatem accusantium doloremque laudantium, totam

rem aperiam, eaque ipsa inventore veritatis et quasi

architecto beatae vitae dicta sunt explicabo.

SOLID WASTE MANAGEMENT &

SUSTAINABLE MATERIAL

MANAGEMENT

(Sharing Experience in Bandung City,

Indonesia)

Page 3: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste
Page 4: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

ABOUT USSed ut perspiciatis unde omnis iste natus error sit

voluptatem accusantium doloremque laudantium, totam

rem aperiam, eaque ipsa inventore veritatis et quasi

architecto beatae vitae dicta sunt explicabo.

SOLID WASTE MANAGEMENT &

SUSTAINABLE MATERIAL

MANAGEMENT

(Sharing Experience in Bandung City,

Indonesia)

• Bandung City as the capital city of West Java province

• The total area is 16,729.650 Ha

• Located at an altitude of 675 m - 1,050 m asl

• Geographical an Mountains, which lie between 1070 36 'East Longitude and 600 55' South Latitude

• Population in 2015 recorded by the Department of Population 2,378,627 inhabitants, with the commuter/urban3,000,000 million

• Divided into 30 districts, 151 Sub Districts, 1561 Pillars of Citizens (RW)

Overview of Bandung City

Page 5: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

2.4 million population70% under 40

9 % economic growth29.5 yrs avg. age

30 districts, 151 Sub Districts,

1561 Pillars of Citizens (RW)

Page 6: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

PIE CHART

Solid Waste Generation in Bandung 1500 ton/day

An Organic Waste23%

Residual Waste14%

Organic Waste63%

An Organic Waste

Residual Waste

Organic Waste

BANDUNG WASTE CHARACTERISTIC & GENERATION

Page 7: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

WASTE COMPOSITION

Page 8: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

ABOUT USSed ut perspiciatis unde omnis iste natus error sit

voluptatem accusantium doloremque laudantium, totam

rem aperiam, eaque ipsa inventore veritatis et quasi

architecto beatae vitae dicta sunt explicabo.

(Sharing Experience in Bandung City,

Indonesia)

BANDUNG WASTE MANAGEMENT

SYSTEM

LAW & REGULATION ASPECT

INSTITUTION ASPECT

OPERATIONAL ASPECT

FINANCING ASPECT

PUBLIC PARTISIPATORY

Page 9: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

REGULATION

FRAME WORK OF WASTE MANAGEMENT

IN INDONESIA

LAW OF THE REPUBLIC OF INDONESIA

GOVERNMENT REGULATION

PRESIDENTIAL REGULATION

1. Financial Development of The Public Service Agency (No.23 /2005)2. Distribution of Governmental Affairs between the central

Government, Provincial Government and district / City Government(No. 38 / 2007)

3. The Implementation of Spatial Planning (No. 15 /2010)4. Management of Household Waste and Similar Household waste

(No. 81/2012)5. National Waste Management Policies and Strategies (No. 97/ 2017)

1. Law of Republic Indonesia No. 18 /2008 Concerning Waste Management

Page 10: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

SOLID WASTE MASTER PLAN ON CITY PLANNING

Page 11: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

The change of Waste Management Mindset

WASTE of MANAGEMENT

END OF PIPE REDUCE AT SOURCE

Listed at Undang-undang No 18 TAHUN 2008

Page 12: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste
Page 13: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

SOLID WASTEMASTER PLAN &

IMPLEMENTATION

FRAME WORK OF

Dr.Deni Nurdyana Hadimin

Presented By:

Page 14: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

IMPLEMENTATION

A New Framework for Household Waste

KSM = Komunitas swadaya masyarakat (Self-help Community)

ZERO WASTE AREA

Page 15: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

3 R PROGRAM

KANG PIS MAN PROGRAM

REDUCE

KURANGI

SORT

PISAHKAN

RE-USE

MANFAATKAN

LET’S FOLLOW KANG PISMAN’S

STEP

Page 16: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

BiodigesterBiopore HoleTakakuraLiquid Fertilizer (FELITA)ComposterWindrow

Waste Banks“ oh Darling”

Orang Hebat SadarLingkungan

Waste is transported to a temporary waste

disposal by garbage cart

Organic Plastic Paper Others

Page 17: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

ACTIVITIES

LIQUID FERTLIZER

COMPOSTER PIPE

ORGANIC PICKING

Weighing

BIODEGESTER

CHOPPING ORGANIC

COMPOSTER

Page 18: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

ZERO WASTE AREA

BIOPORE HOLE

These is handicraft from

garbage made fron packaging

of shampoo,detergent,coffee

etc

HanDICRAFT PRODUCT FROM GARBAGE

Education on how to sort the

waste to

housewives,teenagers and

children

EDUCATION

ACTIVITIES

Page 19: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

OUR PORTFOLIO

This is an example for a subtitle message

Lorem Ipsum

Sed ut perspiciatis unde omnis iste

natus error sit voluptatem.

Lorem Ipsum

Sed ut perspiciatis unde omnis iste

natus error sit voluptatem.

Lorem Ipsum

Sed ut perspiciatis unde omnis iste

natus error sit voluptatem.

PERSONAL LAPTOPS HARDWARE SERVICES BRANDED PRODUCTS

Page 20: FRAME WORK OF SOLID WASTE CHART Solid Waste Generation in Bandung 1500 ton/day An Organic Waste 23% Residual Waste 14% Organic Waste 63% An Organic Waste Residual Waste Organic Waste

THANK YOUHope to hear from you soon