Transcript
Page 1: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

1

Presentation to Planning Board No 4

Revisions to Size, Scale, and Mass

• Hyland – New design, rear setbacks and massing, shadow impact

• Pomona – Revised design, rear setbacks and massing, shadow impact

• Winslow – Revised design, rear setbacks and massing, shadow impact

• Street Views with revised designs

• Fourth Floor Ratio

• Summary

Page 2: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

2

Massing at Residential Boundary

Building Height By-Right

Site Section – Allowed By-right

20’

28’

32’ H

20’ Minimum Setback

8’ 4’

PL

By-Right Height = 28’ Max

Special Permit Height = 32’

RESIDENTIALDISTRICT

LB-I DISTRICT

By-Rig

ht Set

back

Specia

l Per

mit

0’ AVE GRADE45 deg

Footnote 9 - Adjacent to Residential District, no less than building height or 20 feet, whichever is greater. [28-ft is allowed by right, 32’ by ZBA Special Permit]

Page 3: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

3

RESIDENTIALDISTRICT

LB-I DISTRICT

Previous

WINSLOW

4th story at gable ends.

Resolve awkward geometries and openflat roof.

The Winslow at Williston Rd.

Issues

Page 4: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

4

WINSLOWProposed

The Winslow at Williston Rd.

Reduced prominence of gable ends

Push back projection away from Williston St

Delete awkward angles

Page 5: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

5Previous

WINSLOW

Reduced height of gable ends

Push back projection away from Williston St

Trapelo Rd Elevations

Proposed

Page 6: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

6Previous

Proposed

Deleted awkward angles

Reduced Mass at the peak

Pushed back projection away from Williston St

WINSLOWTrapelo Rd Elevations

Page 7: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

7

Site Section - Proposed

PL

31.75’

41’

Locus

RESIDENTIALDISTRICT LB-I DISTRICT

Specia

l Per

mit

By-Rig

ht19 Horne Rd

20’ Minimum Setback

45 deg

Massing at Neighbors@ 19 Horne Rd

(Midpoint)

WINSLOW

Page 8: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

8

Winslow Setbacks

4th Floor Plan1st Floor Plan

20’

41’

SB

31.75’

Page 9: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

9

Winslow Shadow Study

Page 10: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

10

Winslow Shadow Study

Page 11: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

11

Winslow Shadow Study

Page 12: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

12

Previous

The Pomona on Horne Rd.

POMONA

Insufficient stepping at the 4th floor.

Issues

Page 13: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

13

Proposed

POMONA

The Pomona on Horne Rd.

Step back @ fourth floor

Page 14: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

14

POMONA

Proposed

Previous

Lowered Parapet Lowered TowerCommon St

Elevation

Page 15: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

15

Proposed

Previous

POMONA

Lowered Parapet

Lowered TowerTrapelo RdElevation

Page 16: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

16

Proposed

Previous

POMONALowered parapet and gable roof

Reduced mass & increased setbackInterior Driveway

Elevation

Page 17: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

17

Proposed

Previous

POMONA

Lowered parapetand gable roof

Horne Rd Elevation

Page 18: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

18

Site Section - Proposed

PL

45’-55’

50’ – 60’

13 Horne Rd

Locus

RESIDENTIALDISTRICT

LB-I DISTRICT

Specia

l Per

mit

By-Rig

ht

Closest distance shown

45 deg

20’ Minimum Setback

0’ AVE GRADE

Massing at Neighbors@ 13 Horne Rd

POMONA

Page 19: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

19

4th Floor Plan1st Floor Plan

20’

50’

Pomona Setbacks

45’

Page 20: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

20

Pomona Shadow Study

Page 21: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

21

Pomona Shadow Study

Page 22: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

22

Pomona Shadow Study

Page 23: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

23

Previous

HYLAND

#569 Belmont St.

Disliked aesthetics of the Hyland.-We will redesign using neighborhoodforms and reduced massing.

Too high; gives perception of five stories.

Stepping back not sufficient;too much mass.

Too much of a flat wall.

The Hyland on Belmont St

Issues

Page 24: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

24

HYLAND

#569 Belmont St.

Proposed

Remove highest level

Step back from residences

Vary wall planes

The Hyland on Belmont St

Page 25: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

25

RESIDENTIALDISTRICT

LB-I DISTRICT

Previous

HYLAND

#16 Horne Rd.

Remove highest level

Insufficient Stepping

The Hyland on Horne Rd.

Issues

Page 26: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

The Hyland on Horne Rd.

26

Proposed

HYLAND

Remove added level

Step back @ residences

Page 27: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

27

Belmont Street Elevation

Common Street Elevation

HYLAND

Page 28: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

28West Elevation

Horne Road Elevation

HYLAND

Page 29: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

29

Hyland Floor Plans

2nd Floor Plan 1st Floor Plan

3rd Floor Plan 4th Floor Plan

Page 30: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

30

Site Section - Proposed

PL

27’

38’

569 Belmont St

Specia

l Per

mit

By-Rig

ht

RESIDENTIALDISTRICT

LB-I DISTRICT

Locus

CSOD24’

20’ Minimum Setback

45 deg

0’ AVE GRADE

Massing at Neighbors@ 569 Belmont St

HYLAND

Page 31: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

31

Site Section - Proposed

PL

22’

42’

16 Horne Rd

16 Horne Rd

Locus

RESIDENTIALDISTRICT

LB-I DISTRICT

By-Right

30’

45 deg

20’ Minimum Setback

0’ AVE GRADE

Massing at Neighbors@ 16 Horne Rd

HYLAND

Page 32: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

32

4th Floor Plan1st Floor Plan

24’38’

Hyland Setbacks

20’ 22’

20’

42’

Page 33: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

33

Hyland Shadow Study

Page 34: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

34

Hyland Shadow Study

Page 35: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

35

Hyland Shadow Study

Page 36: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

36

Building Area

Revised Plan

4th Floor 35,441–SF 41% of Lot Area

Lot Area 86,073 –SF

4th Floor Ratio

4th Floor as a ratio of Building Area = 19%

Page 37: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

37

Streetscape

Previous

Proposed

Common Street

Page 38: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

38

Previous

Proposed

StreetscapeTrapelo Road

Page 39: Fourth Planning Board Hearing Cushing Village, Belmont, MA - April 17, 2012

Cushing VillageBelmont, MA

39

Summary

Size, Scale & Mass

• We have provided a contextual basis for determining the impact on neighboring properties for size, scale, and mass. 

• The By-Right view and light angle provides a means of evaluating whether the size, scale, and mass adversely impacts the neighbors.

• Site sections along with the shadow studies show that the impact on the revised proposal is comparable to the By-Right impact.

• The Fourth Floor has been reduced so as to have minimal impact on neighboring properties. 

• The Hyland is designed to transition to neighborhood scale and to provide a complement to the other Cushing Village buildings. 