Buro CITE supports Kika

STEP BY STEP CONSTRUC-TION OF A NEW STRUC-TURE WITH BURO CITE

1. Schedule of requirementsIn this phase together with the client we define the require-ments regarding functionality, safety, design, sustainability, manageability, and financial feasibility.

2. SketchingOur next step is to explore possible solutions by sketch-ing, taking into account the schedule of requirements.

3. DesignWe optimize the chosen alternative and perform the necessary strength and stability calculations.

4. Technical drawingsUsing the results of the calculations we develop the chosen alternative into a technical design, 3D if required.

5. Contract specificationsBased on the technical design, (RAW) contract specifications are drawn up.

6. Procurement and constructionWe organize the tender process up to the contract award. When the necessary permits are granted construc-tion can begin, during which we can supervise the work in progress.

7. Application, management and maintenanceTo ensure functionality and structural integrity during it’s intended life-cycle regular maintenance is essential. Identifying defects or deterio-ration in an early stage can prevent excessive mainte-nance costs. Buro CITE advises you on managing construction maintenance and sets up maintenance plans.

Cycle bridge Zuidereinde (Netherlands)Construction of a cycle bridge over the Hilversums Kanaal, which put an end to a dangerous traffic situation. Commissioned by the local authority of Wijdemeren, Buro CITE coordinated engineering and contract supervision, according to the UAV 2012 system.

BURO CITE PROJECTS

Bridge over the Saramacca river near Pikin Saron (Surinam)Part of the program to upgrade the existing second east-west connection bridges to “class 60” bridges. Buro CITE provided engineering and contract supervision commissioned by the Ministry of Public Works.

Oil Jetty (Surinam)Modification of an existing oil jetty to allow larger oil tankers to dock and unload. Buro CITE provided the design and project-mangement during construction commis-sioned by the Port Authorities of Surinam.

Bridge over the Saramacca Canal (Surinam)Creation of an alternative north-south link to relieve the pressure on the congested existing routes. Buro CITE provided engineering and contract supervision commissioned by the Ministry of Public Works.

River Dikes at Commewijne and Albina (Surinam)The raising of existing river dikes with an average of 55 cm, to withstand sea level rise over the next 15 years. Buro CITE was responsible for the design and supervision on behalf of the Ministry of Public Works.

Buro CITE coöperates with the leading construction engineers of Rustwijk & Rustwijk in Surinam