Establishing a Pipeline GIS - Developing a Data Collection

Strategy Kevin Miller

Summit Midstream Rockies GIS Technician

Page 2: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Summit Overview • Growth-oriented midstream company focused on developing and

acquiring strategically located midstream infrastructure in unconventional resource basins.

• Own and operate approximately 2,660 miles of natural gas and crude oil

gathering pipelines

• Headquartered in Dallas, TX • Operations

• Piceance Basin – Western CO • Niobrara Shale – Northern CO • Barnett Shale – Dallas-Fort Worth, TX • Bakken Shale – North Dakota • Marcellus Shale – West Virginia

Page 3: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

• Two acquisitions totaling 1,700 miles of pipeline in the Piceance Basin

• Acquired two GIS databases with

overwhelming amount of centerline inaccuracies and very limited attribute data

• Outdated / inaccurate field maps • Lack of GIS support and

anticipated growth prompted Summit’s need for a GIS Tech.

A Need for GIS Support

Page 4: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Importance of an Accurate GIS Pipeline Database

• One Call Coverage to Prevent Line Strikes • Engineering and Modeling • Field Efficiency • Pipeline Mileage • Land Team / ROW • Regulatory • Business Development Decisions • Strategy / Planning • Cannot Share Inaccurate Data

Page 5: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Original Pipelines Corrected Pipelines

Page 6: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Original Pipelines Corrected Pipelines

Page 7: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Original Pipelines Corrected Pipelines

Page 8: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Original Pipelines Corrected Pipelines

Page 9: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Challenges • Existing Gathering System (50+ years old)

– Work with what is handed to you – Unknown data source

• Time Frame / Consumption • Dissecting the job books • Choosing a Data Model • Data collection limitations on re-survey of buried pipeline • Conflicting information from operators

Page 10: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Correcting and Populating the Databases • Phase 1 (What do we have and where is it?)

- Manually correct all centerline inaccuracies - Populate all pipelines with name and correct diameter - 2D to 3D using a DEM for more accurate pipeline lengths

• Phase 2 (Additional / Offline Pipeline Equipment) - Identify all valve yards and in-line block valves for ER concerns - Identify launcher / receiver locations for pigging operations - Intersect roads and streams layers with pipelines to establish crossings/bores

• Phase 3 (Attribute Data) - Alignment Sheets - Job Books - As-built Files - Operators

Page 11: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Correcting and Populating the Databases • Phase 4 (Re-survey / Data Collection)

– Trimble GeoXH6000 • Centimeter Accuracy • Floodlight Technology • GLONASS and GPS • Wireless Connectivity • 5 megapixel camera

– Field-verify centerlines (prioritize by confidence level) – Collect all missing valves, launchers, receivers, and meters – Data Dictionaries used on re-survey helped define Summit’s data collection

standard moving forward.

Page 12: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Why Use a Data Model?

• Trusted Source of Information • Improves Data Quality and Reliability • Regulatory Issues • Accurate Data Sharing

Page 13: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Data Model Creation – New Construction

Alignment Sheets + MTRs + As-built Documents + Operator’s Knowledge + Data Dictionaries + Wish List

= “SUMMIT 1.0 Data Model”

Page 14: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Sharing Our GIS - Paper Maps

Page 15: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Sharing Our GIS - Paper Maps

Page 16: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Web Map Demo / Video

Page 17: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Something Out of Nothing - Original Attributes • Diameter • Length • Name

Page 18: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

Something Out of Nothing - Corrected Attributes • Diameter • Length Feet • Length Miles • Name • Wall Thickness • Grade • MAOP • HTP • Coating • County • AFE Code

Page 19: Establishing a Pipeline GIS - Developing a Data Collection ... Miller GeoGathering... · Establishing a Pipeline GIS - Developing a Data Collection Strategy ... - Alignment Sheets

New Construction

Segment Attributes • Diameter • 3D Length • Wall Thickness • Grade • Coating • Begin Measure • End Measure • Mill Test Pressure • Heat # • Joint # • Slope