Transcript

Decisions, Decisions: Bluebonnet’s New Process for Enhancement PacksLeslie BarriosBluebonnet Electric Cooperative

ABOUT BLUEBONNET

Who

How

When

• Suburban/Rural Distribution Coop• 280 employees

• SAP Milsoft Aclara• eMeter Clevest OSI• ImageNow Partner• Roadmaps!

• Modernization: 2003-2009• Reinventing: constantly**

What• 88,000+ meters • 11,000+ miles of line

A consolidation point

• Provide new, highly integrated core functionality encapsulated in business

• Accumulates functionality delivered in support packages and In-advance shipments

ENHANCEMENT PACKAGE OVERVIEW

OUR DILEMMA: THAT’S A LOT OF STUFF!!

Where to get info?1

What applies to us? 2

Who needs to review?3

Who has the time? 4

How can we fit this in with everything else?5

OUR PROCESS (PRE‐2016)

Stress about scope; decide on a technical-only upgrade

“CONTRIBUTING FACTORS”

Maturing organization and technology focus1

Wooed by shiny objects 2

“Unpracticed” Discipline / Planning3

On the bleeding edge (for a while)4

OUR 2016 PROCESS 

Step One Ask For Help

Step Two Find a trusted 

partner

Step ThreeSchedule and 

Commit

Step FourConsider and 

Plan

CURRENT STATE OF AFFAIRS

Component: BBPCRMRelease: CRM 7, EhP2 SP: 11

CRM

Business functions not activated

EhP1: • ODR, remote disconnect, meter status check• Marketing Permission• Alerts Rule Modeler • Collection Work List: agent view work items for overdue accts & collection fact sheet

EhP2:• Enhanced ID screen • Service Order and Notification Integration• Guided Procedure (Task‐based UI)• Utilities Check Cockpit• High Volume Customer Segmentation • IR Categorization & IC Inbox Search, Performance‐enhanced BP search, IC Utilities Max hits, Bill Correction, Process Framework Check Repository

• Demand Side Mgmt

CRM: EHP 3 (STILL DECIDING)

EhP3: • Premise Overview• Automatic Owner Move In• Utilities Free Text Search• Auto Completion of Address• Product Modelling for Utilities• Clarification Case (BPEM) &History Integration• Free Text Search (HANA only)

CURRENT STATE OF AFFAIRS

Component: IS-UTRelease: ECC6, EhP6 SP: 13

Business functions not activated

EhP ≤ 6: • Define consumption patterns• Transfer disconnection status of manually disconnected/reconnected AMI devices

• Send meter reading results for advanced meter• Reallocate PoD/Installation to New Premise• Enterprise services for EDM profiles• Enter/Display period consumption for interval meters• Monitoring of uploading profile values• Simulate TOU billing for interval meters• New AMI fields for serial number selection• BPEM Integration for bill and payment advice• Define external VEE codes for advanced meters

CURRENT STATE OF AFFAIRS

More ECC Eh ≤ 6:

• Activation group for AMI capabilities• Device Modification in the Future• Additional authorization for installation facts• Change log for EDM settlements data• Demand Side Management –CRM integration with Billing FICA• Enhanced contract search • Consumption profiles• Create disconnect/connect• Enhanced BOL tree for POD with disconnection

Integration Enhancements• Register groups added to enterprise services• Device timestamp for installation, removal, or replacement• Ability to print or download meter‐reading orders for smart 

meters (support for manual read)AMI Monitoring• Transaction Monitoring of AMI Communication 

(EAMIMON01), you can display two new columns(Object Key Descr & Additional Object Key Descr)

Simulate Billing – External System• Perform simulation of TOU billing (even without billable 

order and for Budget Billing*)

EHP 7 ‐ AMI

Conditional Billing• Bill Critical Peak prices or clear Peak Time Rebates

Monitoring and Editing TOU Exceptions/Responses• Also use it to create, change, and delete TOU exceptions or their 

activation status

Archive TOU Exceptions/Responses• Optional reloading of archived and deleted data.• Optional reading of TOU exception responses from the archive 

and output in a list before the deletion program is run

EHP 7 – AMI (CONTINUED)

Basic Category Gateway (Device Mgmt)• Gateway/Modules acts as the controlling device to transfer data 

from the meter to the head end system. Defining them as a separate device category to maintain them as a separate asset for controlling device.

Enhanced Monitoring of Profiles (EDM)• Monitor the profile‐value import (transaction code EDM1N) 

– Additional selection options– User‐friendly status distinctions– Ability to save selection variants– Status traffic lights for overview of profile‐value import– New fields and enhancement options for customers in the application list 

viewer (ALV) to make it easier to monitor import documents

EHP 7 – DEVICE MGMT & EDM

LIGHTBULBS

• Have a Roadmap (or several)• Treat as a project, include users, prioritize with their other requests

• Create your “Matrix of Dependencies”

• Do an “opportunity cost” analysis and involve others as appropriate

NEXT STEPS

• Confirm Alignment to Goals– Enterprise– Efficiency– Un‐customize

• Review Requirements and Pre‐reqs– Resources (x3)– Hardware – Systems Alignment

FOLLOW US

Thank you for your timeFollow us on        at @ASUG365


Top Related