CONSTRUCTION TECHNOLOGY\ CHAI JIA ERN 0324653 \ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 2: CT tutorial 2 presentation

ISSUES TO BE TAKEN INTO CONSIDERATION

BEFORE CONSTRUCTION

ACCESSIBILITY TO SITE SERVICE

WATER TABLE SITE CLEARANCE

SITE INVESTIGATION

SUBSOILS

Page 3: CT tutorial 2 presentation

ACCESSIBILITY TO SITE- Consideration on how the

vehicles will enter and exit the site.

- Condition of road

- If no suitable accessibility, temporary site is needed.

Page 4: CT tutorial 2 presentation

- Knows the building around the construction site

- To reduce disturbance to the resident ( noise )

- To guarantee the safety of resident

SITE INVESTIGATE

Page 5: CT tutorial 2 presentation

SERVICES- Is there any underground

service ?- Electricity cables, water

pipes, sewers

- SOLUTION ;- Locate the pipes and

cables

Page 6: CT tutorial 2 presentation

WATER TABLE- The level below which the

ground is saturated with water- Ground water pressure equals

to atmospheric pressure

- IMPACT ON CONSTRUCTION OF A HIGH WATER TABLE ;

- Extra costs to increase trench support

- Presence of chemical such as acid can lead to damage of foundation and other materials used below the ground level

Page 7: CT tutorial 2 presentation

SUBSOIL- Determine whether the type of subsoil is suitable for the construction

SANDGRAVEL

HARD ROCK CLAYGravel : Ideal subsoil, strong and easily drained

Sand : Loose, subject to movement

Hard Rock : Good foundation, High excavation cost

Clay : Good bearing capacity, does not drain well

Page 8: CT tutorial 2 presentation

SITE CLEARANCE- Removing existing

structure on the construction site

- Removing shrubs and trees

- Remove soil to reduce level

Bulldozer : equipped with a blade used to push large quantities of materials

[Rear] : claw-like device (ripper) to loosen densely compacted materials

Stump Grinder : power equipment attachment that remove tree stumps

Rotating cutting disk that chips away wood

Page 9: CT tutorial 2 presentation

TEMPORARY WORKS Part of construction project that are needed to enable the permanent works

to be built

A) ACCOMODATION FOR WORKERS B) SECURITY C)SCAFFOLDING D) TIMBERING

Page 10: CT tutorial 2 presentation

TEMPORARY WORKSPart of construction project that are needed to enable the permanent works to be built

• Site office• Site accommodation• Site toilet• Material storage• Guard house • Hoarding

Page 11: CT tutorial 2 presentation

SECURITY- FENCE AND LOCK- LIGHTING- ALARMS & SECURITY GUARDS- CCTV

Page 12: CT tutorial 2 presentation

FENCE & LOCK- Surrounded the whole

construction site- Offer a clear indication to any

outsiders that the area within is strictly off limits.

.LIGHTING- Large, open and outdoor- Due to these sites seldom

have sufficient lighting - To prevent criminals from

being able to operate in shadow.

.

Page 13: CT tutorial 2 presentation

ALARMS & SECURITY GUARD

Install a silent alarm which is designed to contact authorities directly, without giving the intruder any indication that an alarm has been triggered. For elaborate

- Image can be recorded or monitored live

- On site or remotely

CCTV

- Install a silent alarm- 24-hour manned guarding

- There are a variety of CCTV systems available to deter criminals. Image can be recorded or monitored live, either on site or remotely. ELABORATE

Page 14: CT tutorial 2 presentation

SCAFFOLDINGA temporary structure on the outside of the building, used by workers to climb up the building to work

Putlog Scaffold

Page 15: CT tutorial 2 presentation

TIMBERING

Trenches in Firm Soil

Trenches in Bad Soil Trenches in Loose Soil - When ground is so bad that it will not stand to a

vertical surface when poling board is inserted- Should the looseness of the soil supports being

fixed at closer intervals than 6 feet. - Timbering a trench in firm ground, in which case

short deal and batten “ends”.

- Temporary supports to sides of excavations.

- Planking & Strutting

https://www.youtube.com/watch?v=cFYkeT0Yk6k

Page 16: CT tutorial 2 presentation

Timbering of

trenches

STAY BRACING

VERTICAL SHEETING BOX

SHEETING

RUNNER SYSTEM

SHEET PILING