Welcome to theVirginia Avenue Tunnel
Environmental Assessment and
Section 106 Public Scoping Meeting
Project representatives are on hand to receivecomments and answer questions.
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 2/25
• The purpose of this meeting is to gather early public input into the scope of the Virginia Avenue Tunnel project’s environmental assessment (EA), potentialalternatives, and areas of concern regarding the project.
• This evening’s meeting is an Open House format, during which you will be able totalk directly with members of the project team.
• Although we will be glad to answer any questions you might have, we will onlyknow your thoughts and ideas if you fill out a comment form, speak to the courtreporter stationed at this meeting, email us, or visit and leave comments at ourproject website.
• We thank you for your participation in this process.
DDOT is committed to ensuring that no person is excluded from participation in, or denied the benefits of its projects, programs, and services on the basis of race, color, national origin, or gender, as provided by Title VI of
the Civil Rights Act of 1964 or on the basis of disability as provided by the Americans with Disabilities Act.
Tonight’s Meeting
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 3/25
Purpose and Need
FHWA actions associated with
this project would occur duringconstruction and include potentialclosure of the I-295 on-ramp at 8thStreet SE and potential temporaryuse of air rights under I-295/11thStreet Bridge.
CSX is proposing this project to
address:• Tunnel Deficiencies
• Future Freight Demand
• Capacity Limits
I-295/11th Street Bridge I-295 On-Ramp at 8th Street SE
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 4/25
What is the Virginia Avenue Tunnel?
• Originally constructed between 1872 and 1904
• Approximately 4,000 feet long
• Located beneath eastbound Virginia Avenue SE between 2nd and11th Streets
• Major chokepoint
• Single track tunnel
• Insufficient vertical clearance to operate double-stack intermodalcontainer freight trains
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 5/25
Where is the Virginia Avenue Tunnel?
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 6/25
West Portal at 2nd Street SE (Existing Conditions)
East Portal at 11th Street SE (Existing Conditions)
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 7/25
Section 106 of the NationalHistoric Preservation Act
Section 106 of the National Historic PreservationAct as amended requires consultation with the
State Historic Preservation Officer and other
interested parties for any federal undertaking.An assessment of effect on historic properties
will be conducted and disclosed in the project’sEnvironmental Assessment.
Interested parties are invited to participate.
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 8/25
Final Decision Document
NEPA Environmental Assessment Process
Initiate Project
Public Scoping
Purpose and Need
Alternatives Development
Historic Properties (Section 106) Evaluation
Public Review/Public Hearing
Environmental Assessment
We Are Here
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 9/25
Environmental Issues
What we heard from previous public outreach:
• Access to interstate
• Air quality
• Claims
• Emergency Vehicle Access
• Hours of Construction• Noise and Vibration
• Parking
• Pedestrian/Bicycle Access
• Public TransportationAccess
• Safety and Security
•
Storm Water Drainage• Traffic
• Utility Service
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 10/25
MILESTONE DATEPublic Meeting 1 September 14, 2011
Public Meeting 2 Fall 2011
Environmental Assessment Spring 2012
Public Meeting 3 Spring 2012
Final Decision Document Summer 2012
Project Schedule
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 11/25
About The Virginia Avenue Tunnel Project
• The Virginia Avenue Tunnel Project is a 107year-old tunnel that has been identified asone of the most significant bottlenecks onthe East Coast in the last two Mid AtlanticRail Operations Planning Studies. The tunnelhas been in operation for over a century and
must be modernized to help meet 21st centurytransportation needs.
• This tunnel is part of the National Gateway,an $842 million multistate public-privateinfrastructure initiative that plans to upgradetracks, equipment and facilities, and provide
clearance for doublestack intermodal trains.
National Gateway Project
Existing Doublestack Clearance Routes
ChicagoNew Yor k
Boston
St. Louis
Memphis
New Or leans
Baltimor e
Wilmington
Hampton Roads
TampaTampa
Pittsburgh
ChicagoNew York
Boston
St. Louis
Memphis
New Orleans
Baltimore
Wilmington
Hampton Roads
Pittsburgh
CharlotteCharlotte
NW OhioNW Ohio
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 12/25
The Challenge in the Washington Region
Figures according to the Federal Railroad Administration and theUS Census Bureau. 2025 population projection based on growthrate between 2000 and 2010.
4.80 5.587.00
DC Metro Area Population
(millions)
2000 2010 2025
40TONSAnnual freight
demand perperson
Pollution
Road & Rail Congestion
Logistics Cost
57MILLIONMORETONS
Annual regional freightdemand increasefrom 2010–2025
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 13/25
Freight: Modal GreenhouseGas Comparisons
Ton of Greenhouse Gas Emissions(per million ton-miles)
100
90
80
70
60
50
40
30
20
10
0
71.61
26.88
TRUCK RAIL
• A train can move a ton of freight nearly500 miles on a single gallon of fuel.
• On average, railroads are three or moretimes more fuel-efficient than alternativesand with constant innovation freight railbecomes more efficient every day.
• The EPA estimates that moving freightby rail emits three times less nitrogenoxide and particulates per ton-mile thanhighway transportation
• Shifting 10 percent of long-haul freightfrom the highway to the railroad would
reduce annual greenhouse gas emissionsby more than 12 million tons.
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 14/25
• Double-stack trains carry twocontainers on top of one another on asingle car. In this manner a double-stacktrain can transport up to twice theamount of freight as a single-stack trainof equal length.
• Encouraging use of double-stack trainswill result in fewer highway milestraveled, faster connecting service,and lower overall transportation costs-savings that will alleviate pressure onour highways and lower the cost of doing business in the region.
What is Double-Stack?
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 15/25
• Intermodal transportationemploys multiple modesof transportation to movefreight in a containeror vehicle, without anyhandling of the freight itself when changing modes.
• Intermodal transportationallows shippers tocombine the long-haulefficiencies of rail withthe flexibility of short-haul trucks to achievecost-effective, efficient
and reliable freighttransportation.
What is Intermodal?
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 16/25
How to provide comments:
Fill out a comment form available at this meeting
Speak to the court reporter stationed at this meeting
E-mail [email protected]
Visit www.VirginiaAvenueTunnel.com
How to Provide Comments
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 17/25
Welcome
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 18/25
Project
Overview
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 19/25
NEPA
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 20/25
CSX
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 21/25
Comments
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 22/25
ConceptAlternativeSuggestions
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 23/25
8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards
http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 24/25