Download - Chisel n Bailer
Piling In Difficult Ground Conditions
Dr.K.S.Rama KrishnaLarsen & Toubro Ltd
ECC-DivisionChennai
Difficult Ground Conditions for Piling
1.Piling in Soft Soils Over Rock
2.Piling in Bouldary Soils
3.Piling with Socketing in Rock
4.Piling on Slopes
5.Piling in Soils with Under water Streams
7.Piling Over Water
Piling with Socketing in Rock
6.Piling Through Loose Fills under High Water Table
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
2
Piling With Socketing in Rock
1.Bored Cast-In-Situ Piles with Socketing in Rock
2.Precast Concrete/Steel Piles with Socketing in Rock
Bored Cast-In-Situ Piles with Socketing in Rock
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
3
Bored Cast-In-Situ Piles with Socketing in Rock
Contents: A. Our Current Projects
B. Some Design Aspects
C. Construction Practices
D. Importance of Equipment & Tools
E. A Process Approach Being Followed In L&T Sites
F . Use of Polymer as Drilling Mud
G. Suggested Process for a Sound Rock Socket
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
4
A. Current Infrastructure Projects of L&T with
Bored Piles Socketed in Rock
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
5
Bored Piles Socketed in Rock
-:L&T Projects:-
Project Type of Rock
1. MIAL, Mumbai - Basalt, Breccia, Trachyte
2. Mono Rail, Mumbai - Basalt, Breccia, Trachyte
3. Nasik Elevated Corridor - Breccia, Basalt
4. Bangalore Metro Rail Project - Granite, Gneiss, Schist
5. Chennai Metro Rail Project - Charnockite
6. Hyderabad Metro Rail Project - Laterites, Basalts
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
6
Pile Sizes and Capacities
Project Pile Diameter
(mm)
No of
piles
Compression
Capacity(MT)
MIAL(Mumbai International
Air port)
600,800,1000 5000 140,250,400,500 T
MONO RAIL, Mumbai 800,1000 3000 350,500 T
Nasik Elevated corridor 1000 500 500 T
Bangalore Metro Rail Project 1200 900 500T
Chennai Metro Rail Project 1200 500 500T
Hyderabad Metro Rail Project Design Stage – Monopile Under Consideration
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
7
B. Some Design Aspects for Rock Socketed Bored Piles
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
8
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
9
• Rock Socket Friction is a function of
• Surface Roughness of Rock Socket
• Unconfined Compressive Strength of
– Intact Rock
• Confining Stiffness Around the Socket
– in Relation to Fractures of Rock Mass &
– Socket Diameter
• Socket Length-to-Diameter Ratio
Cole & Stroud MethodIS 2911, Part-1, Section 2
• In Hard Rock – 300mm Penetration for Large Diameter Piles
• In Weathred or Soft Rocks:
1) Shear Strength of Rock based on Rock Type
& Quality ( Easy methods of Identification in
Field)
2) Standard Pile Capacity Estimate using inputs
from Point 1 and arrive capacity/Socket
Length27-11-2010
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
10
Cole & Stroud
Chart for Piles
socketted in Weak rocks – Basis for Draft IS-
2911 Part I Sec 2
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
11
Cole & Stroud Table for Piles socketed in Weak rocks(Ref: Draft IS-2911 Part I Sec 2)
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
12
IRC SPECIFICATIONS
Qu = Ksp x qc x df x Ab + As x Cus
qc = average UCS of rock
Ksp = An empherical coefficient whose value
ranges from 0.3 to 1.2 for the rocks where
core recovery is reported.
Cus = Ultimate shear strength along socket length =
0.225√(qc), The same shall be restricted to 5Mpa
CR : Core Recovery ; RQD : Rock Quality Designation
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
13
Method -1: Where Rock Cores can be taken & UCS Established
(CR+RQD)/2 Ksp
30% 0.3
100% 1.2
27-11-2010
Pile capacity chart Based on IRC78:2000-Cole and Stroud
Strength/
Consistency (qc)
Strong Moderately
Strong
Moderately
Weak
Weak Very
Weak
Approx N Value > 600 600-400 400-200 200-
100
100-60
Compressive
Strength in Mpa
80-40 40-10 10-4 4-1.4 1.4-0.8
Qu = Re+Raf = Cu.b x Nc x Ab + Cus x As
Where,
Cub = Average shear Strength below base of pile for the depth twice the
diameter/ least lateral dimension of pile.
Cus = Ultimate shear strength along socket length = 0.225√(qc), The same
shall be restricted to 5Mpa
L = Length of socket
Nc = 9
Factor of safety : Skin friction = 10 and End bearing = 5
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
14
Method – 2: When RQD shows Highly Fragmented Strata
IRC SPECIFICATIONS
• Large Diameter Bored piles : Pile Dia > 600mm
• Design :
Safe load capacity = Socket friction+ End Bearing
Minimum socket length: Hard rock = 300mm
Weathered Rock = 0.5x Dia of pile
Ignore top 300mm socket length for calculation of socket friction capacity.
• Friction Capacity Shall be limited to 6 times Diameter of piles
• The allowable end bearing component after dividing by factor of safety
shall be restricted to 5Mpa.
• Minimum Grade of concrete : M35
• Factor of safety on Friction component : 10
• Factor of safety on End Bearing Component : 5
• Minimum Diameter of Pile:
Bridges on land :1000mm
River Bridges : 1200mm
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
1527-11-2010
• Large Diameter Bored Piles(LDBP) : Pile Dia>600mm
• Design: Granitic & Volcanic Bed Rocks
Safe Load Capacity = Socket Friction + End Bearing
Socket Length ≤ Min (2 x Pile Dia Or 6m)
Ignore top 600mm socket length
• For LDBP : Minimum Grade of Rock = Gr. III
• Allowable Socket Friction:
– Min Gr.II + TCR ≥ 95% + UCS ≥ 50MPa = 700 kPa
– Min Gr.III+ TCR ≥ 85% + UCS ≥ 25MPa = 500 kPa
– Concrete Min 30MPa
– In Case Gr. II & Gr. III met in Pile Bore – USE Gr.III for Socket Friction
• Soil Investigation : – At Every Pile Point:BH = 1 For Pile Dia < 2.5m & 2 for Pile Dia >2.5m
– Continuous Rock Core(N-Size) for Length = 600mm+1.5 Pile Dia below Bed Rock Level
Hong Kong Specifications
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
16
Hongkong- Stringent Quality Standard for Piling
100% predrilling prior to pile drilling
100% verticality check, 10% verticality check by Koden
or as per Specifications
100% Sonic Logging
100% Interface
Full core of pile 5% to 10% depending on
Specifications
Material testing such as cube crushing and Rebar
Tensile Test as per Specifications
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
17
From Tomlinson
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
18
C. Construction Practices
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
19
Design & Construction Compatibility
1. Design of Bored Piles in general & Rock
Sockets in Particular MUST Consider
Construction Practices
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
20
2. Equipment, Tools & Methods Play an Important
Role in Quality, Time and Cost
3. Construction Process(QA/QC) Determines the Capacity
Tripod, Bailer & Chisel Method
3.5 T CHISEL
BAILER
Conventional Tripod System
Productivity :
No.of days per pile,
Depends on Many factors
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
21
Limitations of Tripod- Chisel- Bailer Method
1. Very Slow and some times indefinite
2. Capacity of Chisel is limited by the Winch Capacity
3. It is highly Operator Oriented
4. Very High Quality Supervision Required
5. The Actual Rock in which Pile is socketed is assessed by
indirect method- by energy input
6. Energy is Spent breaking the Entire Rock Mass within the
Socket Portion – Inefficient Method
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
22
Rock Socket Using Rotary Piling Rigs
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
23
BORE PILE CONSTRUCTION SEQUENCE
Bentonite (drilling fluid) fillingCommence drilling
Drilling soil & rock
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
24
BORE PILE CONSTRUCTION SEQUENCE
Solid Rock Core Extracted
Working Sequence for Rock Socket
Construction –Kelly Drilling Method with
Bentonite Mud
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
25
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
26
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
27
Koden Test For Verticality
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
28
Cores for Concrete Quality
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
29
Pile Toe-Rock Contact Verification by Contact Coring
Tsing Yi Viaduct
Interface Cores recovered
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
30
D. Importance of Equipment & Tools
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
31
Equipment
The Pile Drilling Rig must have sufficient
– Torque
– Crowd Pressure
– Engine Capable of Running without getting heated
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
32
Supported by • Right Type and Quality Tools• Right Method• Experienced Operator
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
33
Bauer-BG-25
27-11-2010
MAIT-HR180
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
3427-11-2010
Nasik Elevated Corridor Project
L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
35
Core Coming
out of the core
barrel
Retrieved
Cores of length
0.5m to 1.4 m
Casagrande
B180
27-11-2010
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
36
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
37
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
38
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
39
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
40
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
41
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
42
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
43
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
44
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
45
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
46
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
47
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
48
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
49
Solid rock core recovered on Route 8 Stonecutter
Approach Viaducts
Roller Bit Core Barrel used on Tsing Yi
Viaduct
Solid Rock Cores recovered on Tsing Yi
Viaduct
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
50
THANK YOU
27-11-2010L&T-ECC Division : Dr.K.S.Rama Krishna : Piling in Difficult Ground, IGS, Madurai
79