Download - BS M'sia
![Page 1: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/1.jpg)
Adi Irfan Che Ani
Building Surveying Division,
Royal Institution of Surveyors Malaysia
Dec 2014
![Page 2: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/2.jpg)
![Page 3: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/3.jpg)
REGISTER
Pay subscription fee
Maintain CPD
![Page 4: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/4.jpg)
1 Carry out dilapidation survey or pre-construction condition
survey of existing buildings;
Carry out pre-purchase building survey of building condition
through inspection and checking;
Checking of procedural requirements of drawings and buildings
to ensure compliance to by-laws and regulations;
Inspect and prepare programmes for implementing
maintenance management, asset, facilities and refurbishment
works of building; and
Inspect and prepare reports on conditions of buildings, post-
occupancy evaluation of buildings conditions and risk
assessment.
3
4
5
2
![Page 5: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/5.jpg)
![Page 6: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/6.jpg)
Registered BS: 46 only
![Page 7: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/7.jpg)
![Page 8: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/8.jpg)
![Page 9: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/9.jpg)
![Page 10: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/10.jpg)
![Page 11: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/11.jpg)
Building Surveyors (BS) Continuous Professional Development Program (CPD) is to ensure the registered building surveyors of the
Royal Institution of Surveyors Malaysia (RISM) have an equivalent level of competence in practicing building surveying scope of work, in order
to provide the best service to the community and country.
CPD introduced collection points system through the involvement of Building Surveyors in various events or activities organized by the
Building Surveying Division RISM / RISM / government or organizer who are registered / recognized by the Building Surveying Division
RISM / RISM.
Building surveyors need to collect the prescribed number of points during their active period of the registration and the number of points
accumulated will be used for renewal purpose in the future.
![Page 12: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/12.jpg)
Keeping up to date
More rounded professional
Equivalent level of competence in practicing building surveying scope of work
![Page 13: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/13.jpg)
‘Clause No. 8.0 – For each transfer class of membership application, the CPD points must be the pre-requisite of the candidate to be followed and completed, before the
transfer is going to be approved. In the event of non-fulfilment, the transfer application shall be suspended and
pending until the candidate complete the CPD points required
For Registered BS, license renewal is pending approval(required 20 points per year)
![Page 14: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/14.jpg)
Attending seminar/talk/course/training/etc
CPD via points collection
Refer to guidelines
More details, follow this link
![Page 15: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/15.jpg)
RISM Membership
Categories
CPD Points per
annum
Fellow (F) / RBS / PBS 20
Corporate (M) / RBS / PBS 20
Graduate (G) / GBS 15
Probationer (P) 10
• RBS = Registered Building Surveyor• PBS = Professional Building Surveyor• GBS = Graduate Building Surveyor
![Page 16: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/16.jpg)
Date of Implementation: Jan 2012
Renewal: 31 Dec every year
CPD credit hours calculated in the current year of renewal shall be a rolling average of the one in the previous year i.e. For 2013, it can be counted from 2012 CPD program
NO double counting is allowed
CPD credit hours shall be submitted in the format as per form below
![Page 17: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/17.jpg)
Failure to submit this form is non-compliance, even though the CPD hours collection is more than required
![Page 18: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/18.jpg)
![Page 19: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/19.jpg)
![Page 20: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/20.jpg)
![Page 21: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/21.jpg)
![Page 22: BS M'sia](https://reader031.vdocuments.mx/reader031/viewer/2022020218/55a8bb011a28aba3418b4717/html5/thumbnails/22.jpg)