BLD 520 BUILDERS FUNCTION
& PROCEDURES
PREPARED BY :NORAIBAH BINTI RAZALI 2009711737NURULHIDAYU BINTI NARUZAMAN 2009229733
NOR HIDAYAH BINTI IBRAHIM 2009799373NUR AZUWANIZA BINTI ISMAIL 2009349793NUR KHAFIZAH BINTI AZMAN 2009367503
GROUP: AP226/3D
PREPARED FOR : CIK ZARINA ALIAS
INTERNATIONAL CONTRACTING
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
2/25
CASE STUDY : IJM HOLDING BERHAD
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
3/25
I - IGB Construction Sdn Bhd was incorporatedin 1981.
J - Jurutama Sdn Bhd was incorporated in 1970as Soon Tat Construction Sdn Bhd.
M - Mudajaya Construction Sdn Bhd wasincorporated in 1965 as Chye Hin Construction
Co Ltd.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
4/25
LOGORATIONALE
The logo depicts IJMsglobal outlook as
symbolized by the circle andsolid horizontal lines at thebottom. This symbolrepresents a globe showingIJMs links with itsinternational partners.
The rich blue backgroundreflects the Companyscorporate colour. The bold white letteringemphasizes IJMs clarity ofpurposes in its corporatevision and mission.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
5/25
VISION
To be an internationally competitive Malaysianbuilder of world class infrastructure andbuildings.
MISSION To deliver the highest standards of performance
in all our ventures with the IJM Mark ofExcellence.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
6/25
CORE BUSINESS (CONSTRUCTION)CIVIL ENGINEERING Highway, Roads and Bridges Airports, Railways & Monorails Foundation, Water Supply & Marine Work Power, Oil & Gas
Projects undertaken and successfully completed include: The North Klang Valley Expresswaay Several sections of the North-Sourth Expressway The Jelutong Expressway in Penang, The U4 Expressway in Putrajaya,
The Kuala Lumpur International Airport Runway 2 and MASCargo Terminal The Kuala Lumpur Light Rail Transit KTM Double Tracking, Pelabuhan Tanjung Pelepas Rail Link Petronas Gas Processing Plant 5 and 6 in Terengganu Port Klang Power Station
The Kuala Terengganu Water Treatment Plant
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
7/25
BUILDING CONSTRUCTION
Resort, Hotel & Clubs Condominium & Housing Commercial & Cultural Complexes Hospitals, Clinics & Medical Centres Preservation and Refurbishment IJM has built:-
The world-class Mid Valley Megamall in Kuala Lumpur Hamsphire Park, Riana Green and Sri Pangkor Condominium Renaissance and New World hotels in Kuala Lumpur, the Pan
Pacific Resort in Pulau Pangkor, the Berjaya Hotel and BeachResort in Mauritius and the Riviera Bay Resort
The Putrajaya Convention Centre The National Heart Centre The Ministry of Works Office Complex The National Theatre in Kuala Lumpur The Putrajaya Clinic and Hospital The Putrajaya Library
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
8/25
CORE BUSINESS(INFRASTRUCTURE)MALAYSIAi. Highway Toll Concessions
The6-lane Sungai Besi Highway The New Pantai Expressway
ii. Port Operations Kuantan Port and Kemaman Port
OVERSEAS
i. Western Access Tollway Project in Buenos Aires,Argentinaii. Swarna Tollway in Andra Pradesh, Rewa Tollway
in Madya Pradesh, Jaipur-Mahua Tollway inRajasthan and Trichy Tollway in Tamil Nadu
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
9/25
MCDCIV
ICCENTREBU
ILDINGPROJE
CT Value : Rs.545.54 Crores.
Client : Municipal Corporation Of
Delhi.
Description : Construction ofCivic Centre for MunicipalCorporation of Delhi at JawaharlalNehru Marg, Minto Road, NewDelhi.
Built up Area : 2,14,260 Sqm(Including Basement area 3 levels)
Number of Floors : 4 Blocks ofG+5 One Block of G+27 and 3Basement Levels.
Commencement: May-2005.
Expected Completion : June-2011
Status : Under Progress
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
10/25
PRESTIG
ESHANTINIKETAN,
BANGALO
RE
Value : Rs. 120.21 Crores
Value : Rs.120.21 Crores
Client : Prestige Estates ProjectsPvt. Ltd.
Description : Construction ofcivil and architectural works forhigh rise commercial blocks cum
multi level car park developmentat Prestige Shantiniketan Whitefield Road Bangalore.
Built Up Area : 4.13 Million Sqft.
Commencement : April 2006
Expected Completion : March2011
Status : Under Progress
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
11/25
PREST
IGESHANTINIKETANTOWNSHIP
,
BANGALORE
Value : Rs 208.77 Crores
Client : Prestige Estates ProjectsPvt. Ltd.
Description : Construction ofResidential Township comprisingof 23 Towers along with associatedpodium works at PrestigeShantiniketan Whitefield Road,
Bangalore.
Built Up Area : 6.5 Million Sq.Ft
Commencement : December -2005.
Expected Completion : March-2010
Status : Completed
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
12/25
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
13/25
RAINTREEPARK-INTEG
RATEDTOWNSH
IP
PROJECTH
YDERABAD
Value : Rs.241.26 Crores
SPV: Swarnandhra-IJMII Integrated
Township Development CompanyPrivate Limited, A Joint VentureCompany between APHB & IJM(India) Infrastructure Limited
EPC Contractor : IJM (India)Infrastructure Limited
Description : Construction and
development of Integrated Townshipon turn key basis at Kukutpally,Hyderabad
Built up Area : Approx 32,00,000sq. ft.
No. of units : 1,800 (950 sq. ft to3000 sq. ft.)
Commencement :February 2004
Completed : August 2006
Status : Open for Public
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
14/25
TCSITPARK,
GACHIBO
WLI,HYDERABAD
Value : Rs. 38.25 Crores
Client : TATA Consultancy
Services Ltd.
Description: Construction ofGeneral Civil Works, Road worksand site development for proposedoffice at IT Park, CMC Campus,Old Mumbai Highway,Gachibowli, Hyderabad.
Built Up area : 4,76,691/- Sq ft
Commencement: December2005
Completed : November 2006
Status : Open for Public
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
15/25
G
AUTAMIPOWE
RPVT.LTD
Gautami power Pvt Ltd is ajoint Venture Company
promoted byIJM,Maytas,NCC and GVKpower.Gautami is setting upa 464 MW Natural gasbased Combined CyclePower Plant in IDAPeddapuram in Andhra
Pradesh with a total capitaloutlay of about Rs.1300Crores.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
16/25
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
17/25
DELHIMETRORAILCORPORATIONLIMIT
ED-
CONTRACT3C21R
Value: Rs.154 Crores.
Client: DMRC
Description: Constructionof elevated viaduct betweenConnaught place andKirtinagar.
Length: 8 KM
Started: April 2003
Status: Completed.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
18/25
RAINTREEPARK-DWA
RAKAKRISHNA
VIJAYAW
ADA
Value:586 Crores(approx)Client:IJM-LINGAMNENITownship Pvt.Ltd.Description: Raintree Park
Dwaraka Krishna is a way of lifethe people truly deserve. In a lushlandscape of 100 acres, risemajestic blocks that offer 3000stunningly designed apartments.The two and three bedroom unitscater to every individualrequirement. Open, sunlit and
breezy, your home gives you justthe elegance, tranquility andsecurity one needs for a qualitylifestyle. The fittings and finish,the space planning and design areso impressive that even yourmorning cup of tea becomes amagical experience!.
No. of units: 3,324Apartments,274 BungalowsBuilt up Area: 70,39,000 Sq.FtCommencement:April 2007Contract Period:60 MonthsExpected Completion: March2012
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
19/25
Raintree Park Dwaraka Krishna is a way of life the people
truly deserve. In a lush landscape of 100 acres, rise majesticblocks that offer 3000 stunningly designed apartments. Thetwo and three bedroom units cater to every individualrequirement. Open, sunlit and breezy, your home gives youjust the elegance, tranquility and security one needs for aquality lifestyle. The fittings and finish, the space planning
and design are so impressive that even your morning cup oftea becomes a magical experience!.
For those looking for a wonderful reason to celebrate life,independent villas at Raintree Park is a great answer.Designed to usher in a new lifestyle in the business cities ofVijayawada and Guntur, each of the villa is a masterpiece.Abundant open spaces, state-of-the-art finishes andinternational-class styling mark this beauty spot. Surroundedby beautiful landscaping and round-the-clock security, thegated community is truly an abode of peace and tranquility.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
20/25
Location
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
21/25
MASTER PLAN
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
22/25
Villas
Type Facing Area inSQY.
Type ATriplex
East 336 SQY.
Type ATriplex
West 357 SQY
Type BTriplex
East 244 SQY.
Type B
Triplex
West 260 SQY.
Type CDuplex
East 198 SQY.
Type CDuplex
West 198 SQY.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
23/25
ApartmentsType Facing Area in
Sft.
2Bedroom
East, West 1279 Sft.
2Bedroom
North,South
1199 Sft.
2Bedroom
North,South
1411 Sft.
3Bedroom
East, west,North
1744 Sft.
3BedroomDuplex
East, West1941 Sft.
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
24/25
IJMII has got the ISO 9001:2000accreditations in January 2003
-
7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES
25/25