Transcript
Page 1: BBU 3900 instation Guide

HUAWEI TECHNOLOGIES CO., LTD.

BBU3900 V200

Installation Guide

Issue: 05Part Number: 31504449Date: 2009-03-05

Page 2: BBU 3900 instation Guide

Safety Information 1. Information About the Installation 2. Installing the BBU in the APM30 3. Installing the BBU in the APM30H4. Installing the BBU in the APM30 (+24 V)5. Installing the BBU in the 19-Inch Cabinet 6. Installing the BBU on the Wall7. Installing the BBU in the PS4890 Cabinet 8. Installing the BBU in the OMB Cabinet 9. Installing the BBU in the TMC 10. Installing the BBU in the TMC11H11. Checking the Power-On Status of the BBU 12. Reference

Content

238

15171923283339414243

1

Page 3: BBU 3900 instation Guide

Safety Information

2

Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents.The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations.

When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use.

Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations.

Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work.

Symbols

Safety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger.• Non-standard and improper high voltage operations may result in fire and electric shock.• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast.• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.• Power off the device before performing operations on the power supply equipment.• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down.• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. • When working at a height, be cautious about falling objects.

Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.• The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation.• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.• The NodeB must be powered on within one week after installation.

This symbol indicates that casualty or serious accident may occur if you ignore the safety instruction.

This symbol indicates that serious or major injury may occur if you ignore the safety instruction.

This symbol indicates that the operation may be easier if you pay attention to the safety instruction.

Page 4: BBU 3900 instation Guide

1 Information About the Installation

a Installation Tools

3

Insulated screwdriver Cross screwdriver Straight screwdriver

Adjustable wrench Socket wrench Torque wrench

Power cable crimping pliers RJ-45 crimping pliers Wire cutter

Rubber hammer Claw hammer Cable peeler

Percussion drill Heat gun Level bar

Multimeter Long measuring tape Vacuum cleaner

Page 5: BBU 3900 instation Guide

1 Information About the Installation

b Installation Scenarios

1.APM30 2.APM30H

BBU

3.TMC 4.TMC11H

4

BBU

BBU BBU

Page 6: BBU 3900 instation Guide

1 Information About the Installation

b Installation Scenarios

5.APM30 (+24V) 6.PS4890

7. In OMB cabinet 8. In other 19-inch cabinet 9. On the Wall

5

BBU

BBU

BBU

BBUBBU

Page 7: BBU 3900 instation Guide

1 Information About the Installation

c BBU Hardware and Cables

1. Appearance of the BBU (Unit: mm)

2. Configuration Principles of the BBU Boards

6

Board Mandatory/Optional

Full Configuration

Installation Slot Remarks

WMPT Mandatory 2 S6 and S7 Preferentially configured in Slot 7.

WBBP Mandatory 4 S0 to S3 Preferentially configured in Slot 3, then Slot 2, at last Slot 0,1.

UPEU Mandatory 2 PWR1 and WR2 Preferentially configured in PWR2.

UBFA Mandatory 1 FAN Only in the FAN slot.

UTRP Optional 5 S0 to S5 Preferentially configured in Slot 4, 5.

UELP Optional 2 S0 and S4 Preferentially configured in Slot 4.

UFLP Optional 2 S0 and S4 Preferentially configured in Slot 4.

UEIU Optional 1 PWR1 Preferentially configured in PWR1.

Page 8: BBU 3900 instation Guide

1 Information About the Installation

Cable connections of the BBUd

7

e Procedure

FE surge protection transfer cableFE cable

E1 surge protection transfer cable

E1 Cable

Alarm Cable

Monitoring Cable

CPRI OpticalBBU Power Cable

Monitoring Equipment

Alarm Equipment

Power System

Page 9: BBU 3900 instation Guide

2 Installing the BBU in the APM30

a Cable connections

8

Installation PositionNO.

From... To ...

1

2

3

4 Monitoring cable TX/RX on APMI MON1on BBU

5 CPRI CPRI on BBU CPRI on RRU

BBU power cable LOAD3 on PDU PWR on BBU

E1 transfer cable E1/T1 on WMPT INSIDE on UELP

E1cable OUTSIDE on UELP Transmission equipment

Cable

Page 10: BBU 3900 instation Guide

2 Installing the BBU in the APM30

b Installing BBU

1 Install the mounting ears at both sides of the BBU reversely.

2 Slide the BBU case into the cabinet.

3 Check the DIP switches (see appendix).

BBU

M6 bolt

PDU

c Installing cables

Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.

1. Install power cable.

LOAD3

NEG(-)

RNT(+)

PWR

The power cable is to be made depending on field requirements.

9

Page 11: BBU 3900 instation Guide

2 Installing the BBU in the APM30

b Installing the BBU cables

2. Install optical cables.

Optical module

Puller

10

Connect one end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other end to the RRU.

Remove the dustproof caps from the optical connectors.

Wrap the fiber tail with the winding pipe till the first cable tie.

Insert the optical module into CPRI0, CPRI1, or CPRI2.

Turn outwards the puller on the optical module.

Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

Optical cable connector

Winding pipe

• Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.• Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the WMPT.

Page 12: BBU 3900 instation Guide

Strip the jacket off the E1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer

Thread the E1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.

Fix the DB26 connector of the E1 cable to the OUTSIDE port on the UELP.

Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the WMPT.

2 Installing the BBU in the APM30

b Installing the BBU cables

4. Install the E1 cable.

E1 transfer cable

Cabling the E1 cable.

E1 cable

Shielding layer of the E1 cable

25mm

INSIDE

E1/T1

OUTSIDE

11

3. Install the E1 transfer cable.

Page 13: BBU 3900 instation Guide

2 Installing the BBU in the APM30

b Installing the BBU Cables

FE transfer cable

FE cable

25mm

Thread the FE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.

Shielding layer of the FE cable

12

Connect one end of the FE transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the WMPT.

5. Install the FE transfer cable (FE transmission mode).

6. Install the FE cable (FE transmission).Connect one end of the FE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

Strip the jacket off the FE cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer

INSIDE FE0

FE0

OUTSIDE FE0

Page 14: BBU 3900 instation Guide

When the MON0 port on the BBU is available, fix the RJ45 connector of the EMUA monitoring signal cable to the MON0 port on the UPEU, and the DB9 connector to the corresponding port on the EMUA.

2 Installing the BBU in the APM30

b Installing the BBU Cables

9. Install the EMUA monitoring signal cable.

MON0

RS485

External alarm cable

MON1Monitoring signal cable between the APMI and the BBU

EXT-ALM1

13

Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU.

7. Install the monitoring signal cable between the APMI and the BBU.

Connect one end of the alarm cable to the EXT-ALM port on the UPEU, and the other end to the associated alarm device.

8. Install the external alarm cable.

The port on the external alarm device is added depending on field requirements.

Page 15: BBU 3900 instation Guide

2 Installing the BBU in the APM30

b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed bare wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and wires. Fix the DB9 connector to the corresponding port on the EMUA.

b Installing the BBU Cables

Pin on the RJ45 Connector

Pin on the DB9 MaleConnector

Color Type Port on the APMI

X1.1 X2.3 White TX+

X1.2 X2.7 Orange TX-

X1.4 X2.2 Blue RX+

X1.5 X2.6 White RX-

Twisted pair

Twisted pair

EMUA monitoring signal cable

14

Page 16: BBU 3900 instation Guide

3 Installing the BBU in the APM30H

a BBU Cable Connections

15

The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 9–14. The following figure shows the cable connections of the BBU. Page 15 shows how to install the monitoring signal cable between the HEUA and the BBU in the APM30H.

Installation PositionNo.

One end is connected to... The other end is connected to...

1

2

3

4 Monitoring signal cable

COM IN port on the HEUA MON1 port on the BBU

5 CPRI optical cable

CPRI port on the BBU CPRI port on the RRU

BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

E1 cable OUTSIDE port on the UELP External transmission device

Cable

Page 17: BBU 3900 instation Guide

3 Installing the BBU in the APM30H

MON1COM IN

UPEU on the BBU

HEUA

b Installing the Monitoring Signal Cable between the HEUA and the BBU

16

Page 18: BBU 3900 instation Guide

4 Installing the BBU in the APM30 (+24 V)

a BBU Cable Connections

17

The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For details, see pages 9–14. The following figure shows the cable connections of the BBU. Page 17 shows how to install the monitoring signal cable of the cabinet.

Installation PositionNo.

One end is connected to... The other end is connected to...

1

2

3

4 Monitoring signal cable

COM IN port on the HEUA MON1 port on the BBU

5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

E1 surge protection transfer cable

E1/T1 port on the WMPT INSIDE port on the UELP

E1 cable OUTSIDE port on the UELP External transmission device

Cable

Page 19: BBU 3900 instation Guide

4 Installing the BBU in the APM30 (+24 V)

b Installing the Monitoring Signal Cable of the Cabinet

18

Pin assignment of the monitoring signal cable of the cabinet

Pin on the RJ45 Connector

Pin on the RJ45 Connector

Wire Color Wire Type

X1.1 X2.1 White/orange

X1.2 X2.2 Orange

X1.3 X2.3 White/green

X1.6 X2.6 Green

X1.5 X2.5 White/blue

X1.4 X2.4 Blue

X1.7 X2.7 White/brown

X1.8 X2.8 Brown

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Page 20: BBU 3900 instation Guide

19

Installation PositionNo.

From... To...

1

2

3

4 Monitoring signal cable

External monitoring device MON/ALM on the BBU

5 CPRI optical cable

CPRI port on the RUU CPRI port on the BBU

BBU power cable

External power supply PWR port on the BBU

E1 cable External transmission device E1/T1 port on the WMPT

FE cable (optional)

External transmission device FE0 port on the WMPT

Cable

5 Installing the BBU in the 19-Inch Cabinet

BBU Cable Connectionsa

Page 21: BBU 3900 instation Guide

20

1. 25 mm on the left of the BBU for ventilation2. 25 mm on the right of the BBU for ventilation3. 70 mm in front of the BBU for cabling

5 Installing the BBU in the 19-Inch Cabinet

Space Requirementsb

Slide the BBU case into the cabinet. Then, tighten the four M6 screws.

Installing the BBU Case c

Page 22: BBU 3900 instation Guide

PWR

5 Installing the BBU in the 19-Inch Cabinet

Installing BBU Cablesd

21

EXT-ALM0 MON1

Grounding bolt on the right side

of the BBU

PGND cable

3 Install the signal cable.

1 Install the PGND cable.

2 Install the power cable.

Page 23: BBU 3900 instation Guide

5 Installing the BBU in the 19-Inch CabinetInstalling the BBU Cablesd

4 Install the CPRI optical cable and the E1 cable.

E1/T1

Optical module

Puller

22

CPRI optical cable

Winding pipe

E1/T1

Turn outwards the puller on the optical module.Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.

Remove the dustproof caps from the optical connectors.

Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

Page 24: BBU 3900 instation Guide

6 Installing the BBU on the Wall

BBU Cable Connectionsa

23

Installation PositionSN

One End Connected to... The Other End Connected to...

5 BBU power cable PWR port on the BBU LOAD6 on the DCDU-03

6 DCDU power cable DC input port on the DCDU-03 External power equipment

1

2

3

4 Monitoring signal cable

MON/ALM port on the BBU External monitoring equipment

7 PGND cable Grounding bolt on the equipment External grounding bar

RRU power cable LOAD0 to LOAD5 on the DCDU-03 Power supply socket on the RRU

CPRI optical cable CPRI port on the BBU CPRI port on the RRU

E1 cable E1/T1 port on the WMPT External transmission equipment

Cable

External transmission equipment

External monitoring equipment

External power equipment

External

grounding bar

External

grounding bar

Page 25: BBU 3900 instation Guide

6 Installing the BBU on the Wall

A single BBU BBU+DCDU-03C

Space Requirementsb

Installing the BBU Casec

1. Install the mounting ears for wall installation.

24

BBU

DCDU-03C

The DCDU is installed near the BBU.

Mounting ear for wall installation

Mounting ear on the BBU case

Page 26: BBU 3900 instation Guide

6 Installing the BBU on the Wall

BBU

wall

25

55mm~60mm

20mm

Installing the BBU Casec2. Place the BBU against the wall, and then use the marking pen to markthe holes of the mounting ears for wall installation.

Bolt M10×80NutSpring washer 10Flat washer 10

Expansion tube

3. Install the expansion bolts.

Page 27: BBU 3900 instation Guide

6 Installing the BBU on the Wall

Installing the BBU Casec

26

4. Mount the BBU on the wall.

d Installing the DCDU-03C Case

1. Turn the mounting ears on theDCDU-03C by 90 degrees.

2. Place the DCDU-03C against the wall, and then use the marking pen to mark the anchor points of the mounting ears forwall installation.

wall

Flat washer

Spring washer

Page 28: BBU 3900 instation Guide

6 Installing the BBU on the Wall

27

55mm~60mm

20mm

Bolt M10×80NutSpring washer 10Flat washer 10

Expansion tube

d Installing the DCDU-03C Case3. Install the expansion bolts.

4. Mount the DCDU-03C on the wall.

Page 29: BBU 3900 instation Guide

28

7 Installing the BBU in the PS4890 Cabinet

BBU Cable Connectionsa

Installation PositionNo.

From... To...

1

2

3

4 Monitoring signal cable between the PMU and the BBU

RS232/RS422 port on the PMU

MON0 port on the BBU

5 CPRI optical cable CPRI port on the RRU CPRI port on the BBU

BBU power cable LOAD6 terminal on the DCDU

PWR port on the BBU

E1 cable External transmission device

E1/T1 port on the WMPT

BBU alarm cable (optional) External transmission device

ALM port on the UPEU

Cable

Page 30: BBU 3900 instation Guide

7 Installing the BBU in the PS4890 Cabinet

29

Installing the BBU b

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

Page 31: BBU 3900 instation Guide

7 Installing the BBU in the PS4890 Cabinet

PWR

LOAD 6

30

Installing the BBU Cablesc

1 Install the power cable.

Page 32: BBU 3900 instation Guide

7 Installing the BBU in the PS4890 Cabinet

c

EXT ALM1

MON0RS232/RS422

31

2 Install the signal cable.

Install the BBU alarm cable (optional).Install the monitoring signal cable between the PMU and the BBU.

Installing the BBU Cables

Page 33: BBU 3900 instation Guide

7 Installing the BBU in the PS4890 Cabinet

Installing the BBU Cablesc3 Installing the CPRI optical cable and the E1 cable.

E1/T1

Optical module

Puller

32

Remove the dustproof caps from the optical connectors.

Turn outwards the puller on the optical module.

Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.

CPRI optical cable

Winding pipe

Page 34: BBU 3900 instation Guide

33

Installation PositionNo.

From... To...

1 PGND cable External grounding bar Grounding bar of the OMB cabinet

2

3

4

5 E1 cable OUTSIDE port on the UELP External transmission device

6 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

Input power cable

of the OMB

External DC power supply DC input terminal of the DCDU

BBU power cable LOAD6 output terminal on the DCDU

PWR port on the BBU

E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

Cable

8 Installing the BBU in the OMB Cabinet

BBU Cable Connectionsa

Page 35: BBU 3900 instation Guide

8 Installing the BBU in the OMB Cabinet

Installing the brackets on the metal pole and mounting plateb

Use a level bar to adjust the levelness of the brackets to ensure that the front and back brackets are on the same plane.

a.1 Install the brackets on the metal pole.

a.2 Install the mounting plate.

34

Flat washer Spring washer

Bolt M10×110

appearance of the mounting plate

Inner hexagon spanner

255~306kgf·cm

Inner hexagon spanner

255~306kgf·cm

Flatwasher

Springwasher

Bolt M10×110

Page 36: BBU 3900 instation Guide

8 Installing the BBU in the OMB Cabinet

Installing the OMB CabinetcSlide the BBU case into the OMB cabinet gently. Then, tighten the four M6 screws.

1. Install the PGND cable of OMB Cabinet.

35

d Installing the BBU Cables

Page 37: BBU 3900 instation Guide

8 Installing the BBU in the OMB Cabinet

36

NEG(-)

RNT(+)

3. Install the BBU power cable. LOAD6

Installing the BBU Cablesd2 Install the input power cable.

Page 38: BBU 3900 instation Guide

8 Installing the BBU in the OMB Cabinet

Installing the BBU Cablesd4 Install the E1 cable (E1 transmission).

E1/T1

INSIDE

37

Shielding layer

OUTSIDE

Page 39: BBU 3900 instation Guide

5. Install the FE cable (FE transmission).

38

6. Install the CPRI optical cable.

Optical module

Puller

8 Installing the BBU in the OMB CabinetInstalling the BBU Cablesd

3. Remove the dustproof caps from the optical connectors.

2. Turn outwards the puller on the optical module.

4. Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.

Page 40: BBU 3900 instation Guide

9 Installing the BBU in the TMC

a BBU Cable Connections

39

Installation PositionNo.

From... To...

1

2

3

4 Monitoring signal cable Wiring terminal of cabinet monitoring

ALM1 port on the BBU

5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

BBU power cable LOAD6 terminal of the PDU PWR port on the BBU

E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

E1 cable OUTSIDE port on the UELP External transmission device

Cable

The procedure for installing the BBU in the TMC is the same as that in the APM30. For details, see pages 9–14. Page 39 shows how to install the TMC alarm cable in the TMC.

Page 41: BBU 3900 instation Guide

9 Installing the BBU in the TMC

Installing the BBU b

Installing the BBU CablescAPMI

Door status sensor

Wiring terminal of DCDU surge protection

40

Slide the BBU case into the TMC cabinet. Then, tighten the four M6 screws.

Installing the TMC alarm cable

b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals on the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT+ and OUT- alarm wiring terminals on the APMI.

d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals on the DCDU.

a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU.

Page 42: BBU 3900 instation Guide

10 Installing the BBU in the TMC11H

a BBU Cable Connections

41

Installation PositionNo.

From... To...

1

2

3

4 BBU power cable LOAD6 terminal on the PDU PWR port on the BBU

5 Monitoring signal cable

Wiring terminal of cabinet monitoring MON1 port on the BBU

CPRI optical cable CPRI port on the BBU CPRI port on the RRU

E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

E1 cable OUTSIDE port on the UELP External transmission device

Cable

The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For details, see pages 9–14.

Page 43: BBU 3900 instation Guide

11 Checking the Power-On Status of the BBU

42

Procedure for checking the power-on status of the BBU:

The normal status of LED on theWMPT is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF• ACT LED: ON

The normal status of LED on theUPEU is as follows:• RUN LED: ON

The normal status of LED on theUBFA is as follows:• STATE LED: Green1s ON, 1s OFF (blinking at 0.5 Hz)

The normal status of LED on theWBBP is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF

a

Powering on the BBU3900

Start

End

Powering off theBBU3900

Clearing the fault

Checking whether all LEDs on theBBU are normal?

Yes

No

a

Page 44: BBU 3900 instation Guide

43

Cable Connector Connects to…

OT terminal Grounding bolt of the BBU3900

DB26 male connector E1/T1 port on the WMPT, or OUTSIDE port on the UELP

E1 cable

The connector needs to be made on site according to the field requirements.

Peer device

DLC connector Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU

CPRI optical cable

DLC connector Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI3 ports on the WBBP

PGND cable

OT terminal Protection grounding bar

3V3 connector PWR port on the UPEUBBU power cable

Bare wire. The connector needs to be made on site according to the field requirements. (The following figure shows the BBU power cable by taking OT terminals as an example.)

External power supply

12 Reference

c Cable Lista

Page 45: BBU 3900 instation Guide

44

12 Reference

Cable Connector Connects to…

DB26 male connector PWR port on the UPEU

DB25 male connector E1/T1 port on the WMPT

RJ45 connector FE0 port on the WMPT

RJ45 connector FE0 port on the WMPT

RJ45 connector FE0 port near the INSIDE label on the UFLP

FE transfer cable

RJ45 connector RS232/RS422 port on the PMU

RJ45 connector MON port on the BBU

Monitoring signal cable between the PMU and the BBU

RJ45 connector Routing equipment

FE cable

E1 transfer cable

c Cable Lista

Page 46: BBU 3900 instation Guide

12 Reference

Cable Connector Connects to…

Be connected APMI

RJ45 connector MON1 port on the UPEU

APMI-BBU Monitoring

signal cable

RJ45 connector MON0 or MON1 port on the UPEU

DB9 male connector RS485 port on the EMUA

EMUA Monitoring signal cable

RJ45 connector EXT-ALM0 or EXT-ALM1 port on the MON0 or MON1 port on the UPEU

RJ45 connector External alarm device

Alarm cable

Cable Lista

45

Page 47: BBU 3900 instation Guide

12 Reference

c

ESD gloves

ESD strap

b

46

Item Specification

Dimensions 86 mm (height) x 442 mm (width) x 310 mm (length)

Weight Typical configuration: 7 kg; full configuration: 11 kg

Input voltage –48 V DC or +24 V DC

Engineering Specifications of the BBU

Checking the DIP Switches of the BBU

Wear an ESD wrist strap or a pair of ESD gloves when performing operations related to the boards, as shown in the figure below.

1. Remove the BBU boards.

Page 48: BBU 3900 instation Guide

12 Reference

2. Set the DIP switches of the BBU.

47

75-ohm E1 Mode

Other Modes

T1 Mode

75-ohm E1 Mode 120-ohm E1 Mode

3. Reinstall the boards.

Settings of the DIP switches on the UELP

Settings of the DIP switches on the WMPT

c Checking the DIP Switches of the BBU

Page 49: BBU 3900 instation Guide

12 Reference

48

Pin Assignment of the BBU Signal Cablesed75-ohm E1 cable

Pin on the DB26 Male Connector

Wire Type Coaxial SN. Label

X1.1 Tip RX1+

X1.2 Ring RX1-

X1.3 Tip RX2+

X1.4 Ring RX2-

X1.5 Tip RX3+

X1.6 Ring RX3-

X1.7 Tip RX4+

X1.8 Ring RX4-

X1.19 Tip TX1+

X1.20 Ring TX1-

X1.21 Tip TX2+

X1.22 Ring TX2-

X1.23 Tip TX3+

X1.24 Ring TX3-

X1.25 Tip TX4+

X1.26 Ring TX4-

8

6

4

2

7

5

3

1

Page 50: BBU 3900 instation Guide

12 Reference

49

Pin Assignment of the BBU Signal Cablesd120-ohm E1 cable

Pin on the DB26 Male Connector

Wire Color Wire Type Label

X1.1 Blue RX1+

X1.2 White RX1-

X1.3 Orange RX2+

X1.4 White RX2-

X1.5 Green RX3+

X1.6 White RX3-

X1.7 Brown RX4+

X1.8 White RX4-

X1.19 Grey TX1+

X1.20 White TX1-

X1.21 Blue TX2+

X1.22 Red TX2-

X1.23 Orange TX3+

X1.24 Red TX3-

X1.25 Green TX4+

X1.26 Red TX4-Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Page 51: BBU 3900 instation Guide

12 Reference

50

Pin Assignment of the BBU Signal Cablesd

Pin on the RJ45 Connector

Wire Color Wire Type Pin on the RJ45 Connector

X1.2 Orange X2.2

X1.1 White/orange X2.1

X1.6 Green X2.6

X1.3 White/green X2.3

X1.4 Blue X2.4

X1.5 White/blue X2.5

X1.8 Brown X2.8

X1.7 White/brown X2.7

Twisted pair

Twisted pair

Twisted pair

Twisted pair

RX-Twisted pair

X5WhiteX1.5

RX+Twisted pair

X4BlueX1.4

TX-Twisted pair

X3OrangeX1.2

TX+Twisted pair

X2WhiteX1.1

Port on the APMI

Wire TypePins on the X2, X3, X4, and X5

Wire Color

Pin on the RJ45 Connector

FE cable

Monitoring signal cable between the APMI and the BBU

Page 52: BBU 3900 instation Guide

12 Reference

51

Pin Assignment of the BBU Signal Cablesd

EMUA monitoring signal cable

Pin on the RJ45 Connector

Pin on the RJ45 Connector

Wire Color Wire Type

X1.1 X2.1 White/orange

X1.2 X2.2 Orange

X1.3 X2.3 White/green

X1.6 X2.6 Green

X1.5 X2.5 White/blue

X1.4 X2.4 Blue

X1.7 X2.7 White/brown

X1.8 X2.8 Brown

Twisted pair

Twisted pair

Twisted pair

Twisted pair

Alarm cable

RX-Twisted pair

WhiteX2.6X1.5

RX+Twisted pair

BlueX2.2X1.4

TX-Twisted pair

OrangeX2.7X1.2

TX+Twisted pair

WhiteX2.3X1.1

Port on the APMI

Wire Type

Wire Color

Pin on the DB9 MaleConnector

Pin on the RJ45 Connector

Page 53: BBU 3900 instation Guide

HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang

Shenzhen 518129People’s Republic of China

www.huawei.com


Top Related