Alternative Comparison Matrix 1Alternative Comparison Matrix 1Alternative Comparison Matrix 1Alternative Comparison Matrix 1
August 28, 2017 DEL-61-4.71, PID 104623 ODOT District 6 Public Meeting
Criteria
Alternative
High Medium Low
*Since all options will require culvert work, the criteria for that work was not considered in the decision matrix.
¹Profile Adjustment lowers the crest curve of SR 61 north of the intersection
OverallMaintenance of
Traffic
Traffic
OperationsCost
Alternative 5 - Profile
Adjustment¹ Only
Alternative 4b - Roundabout w/
Profile Adjustment¹
Alternative 1 - No Build
Alternative 2 - 4-way Stop
Alternative 3 - Traffic Signal
Alternative 4a - Roundabout
w/o Profile Adjustment¹
Safety BenefitRight-of-Way
ImpactsUtility Impacts
Environmental
Impacts
Alternative Comparison Matrix 2Alternative Comparison Matrix 2Alternative Comparison Matrix 2Alternative Comparison Matrix 2
August 28, 2017 DEL-61-4.71, PID 104623 ODOT District 6 Public Meeting
Criteria
Alternative
None No changes None None None None None
Reduce all crashes by 48%.
Reduce injury & fatal crashes by
77%.
This alternative places a stop
condition on SR 61 where there is
currently a long stretch of
roadway with free flow
movement from Sunbury to I 71
None None None Temporary (<10
minutes) closure to SR
61 when uncovering
stop signs
$1,152
Based off of the trend of past
signal installations, the number
of crashes does not decrease.
Instead the type of crash shifts
from angle to rear end.
This alternative places a
controlled stop condition on SR 61
where there is currently a long
stretch of roadway with free flow
movement from Sunbury to I 71
None Relocate overhead lines
in northeast corner.
Potential to relocate
underground gas and
telephone lines in
southwest corner
None Flagging operations,
temporary lane
closures, short term
full closure of
intersection to install
spans and signals
$216,000
Reduce all crashes by 71%.
Reduce injury & fatal crashes by
87%.
This alternative provides yield
condition movement for all
roadways at the intersection
Acquisition from 7
property owners
amounting to 1.2 acres
of acquisition.
Relocate power,
telephone, fiber, cable,
and gas, water.
Potential historic
property/structure in
southeast corner. NOI
and BMPs required.
Part width
construction allowing
two of the four roads
to remain open at a
time
$1,720,800
Reduce all crashes by 71%.
Reduce injury & fatal crashes by
87%. Improved sight of the
intersection for SR 61 southbound
traffic
This alternative provides yield
condition movement for all
roadways at the intersection
Acquisition from 7
property owners
amounting to 1.2 acres
of acquisition.
Relocate power,
telephone, fiber, cable,
and gas, water.
Potential historic
property/structure in
southeast corner. NOI
and BMPs required.
Part width
construction allowing
two of the four roads
to remain open at a
time
$1,764,000
Improved sight distance for SR
656 and Wilson Rd traffic to better
judge when to move into the
intersection. Improved stopping
sight distance for SR 61
southbound traffic
This alternative provides better
sight distance of SR 61 traffic but
does not change the operation of
the intersection
Acquisition from 3
property owners
amounting to 0.3 acres
of acquisition.
Relocate power,
telephone, fiber, cable,
and water.
None Full closure of SR 61
north of the
intersection. Detour is
1.8 miles longer than
original route
$331,632
This evaluates the quantitative
and qualitative safety benefits
This evaluates the proposed
movement of traffic
This evaluates the
need for right of way
acquisition
This evaluates utility and
utility easement
relocations
This evaluates the
impact to
environmental factors
including waterways,
endangered species,
and historical
This evaluates the
impact to traffic
during construction
This is the estimated
cost for construction
and right of way
acquisition
*Since all options will require culvert work, the criteria for that work was not considered in the decision matrix.
¹Profile Adjustment lowers the crest curve of SR 61 north of the intersection
CostUtility ImpactsTraffic Operations
Comments
Alternative 4b -
Roundabout w/ Profile
Adjustment¹
Alternative 5 - Profile
Adjustment¹ Only
Environmental
ImpactsSafety Benefit Right-of-Way Impacts
Alternative 4a -
Roundabout w/o Profile
Adjustment¹
Alternative 1 - No Build
Alternative 2 - 4-way
Stop
Alternative 3 - Traffic
Signal
Maintenance of Traffic
A B C D E F G H
4a&4b 0.047 0.050 0.134 0.355 0.238 0.078 0.257
5 0.078 0.116 0.119
Culverts 0.224 0.088 0.041 0.041
Alternative
Preliminary Right of
Way Acquisition, Acres
Property
Alternatives 1, 2, and 3Alternatives 1, 2, and 3Alternatives 1, 2, and 3Alternatives 1, 2, and 3
No Build, 4No Build, 4No Build, 4No Build, 4----Way Stop, Traffic SignalWay Stop, Traffic SignalWay Stop, Traffic SignalWay Stop, Traffic Signal
August 28, 2017 DEL-61-4.71, PID 104623 ODOT District 6 Public Meeting
Alternative 4b Alternative 4b Alternative 4b Alternative 4b –––– Preferred AlternativePreferred AlternativePreferred AlternativePreferred Alternative
SingleSingleSingleSingle----Lane RoundaboutLane RoundaboutLane RoundaboutLane Roundabout
August 28, 2017 DEL-61-4.71, PID 104623 ODOT District 6 Public Meeting