Transcript
Page 1: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Agenda -TPL Standards Workshop Agenda -TPL Standards Workshop Sponsored by NERC PC –June 3, 2008Sponsored by NERC PC –June 3, 2008

1. NERC Antitrust Compliance Guidelines

2. Opening Remarks and Introductions

3. Workshop Objectives

4. Background

• Drafting Team Objectives

• Update on Standard Drafting Team Activities

• Brief Overview of Proposed Standard

1

Page 2: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Agenda -TPL Standards Workshop Agenda -TPL Standards Workshop Sponsored by NERC PC –June 3, 2008Sponsored by NERC PC –June 3, 2008

5. High Level Overview of Comments Received

6. Highlight of Areas where Drafting Team made changes

7. Major areas where the industry has differing views

8. Q & A

9. Proposed Drafting Team Schedule

10. Discussion of PC involvement

11. Wrap-up 2

Page 3: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

TPL Standards Workshop TPL Standards Workshop Sponsored by NERC PCSponsored by NERC PCToronto – June 3, 2008Toronto – June 3, 2008

John OdomJohn Odom

Florida Reliability Coordinating Florida Reliability Coordinating CouncilCouncil

Page 4: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

ATFNSDT RosterATFNSDT Roster

John Odom, FRCC (Chair)

Bob Millard, RFC

(Vice chair)

Darrin Church, TVA

Bill Harm, PJM

Doug Hohlbaugh, FirstEnergy

Bob Jones, Southern

Brian Keel, SRP

Tom Mielnik, MidAmerican

Bernie Pasternack, AEP

Bob Pierce, Duke Paul Rocha, CenterPoint

Chifong Thomas, PG&E

Yury Tsimberg, Hydro One

Jim Useldinger, KCPL

Dana Walters, National Grid

Bob Williams, FMPA

4

Page 5: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

ATFNSDT ObserversATFNSDT Observers

Ray Kershaw, ATC

Doug Powell, Entergy

Hari Singh, ATC

Tom Gentile, Quanta Technology

Daniela Hammons, Centerpoint

NERC Staff Coordinator – Ed Dobrowolski

5

Page 6: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

1. Update PC on Standard Drafting Team (SDT) efforts.

2. Highlight areas where SDT made changes from 1st posting.

3. Highlight areas where industry consensus has not been reached.

4. Q & A to clarify SDT positions and begin to formulate a NERC PC position.

Workshop ObjectivesWorkshop Objectives

6

Page 7: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Create a new standard that:

1.Has clear, enforceable requirements

2.Is not a Least Common Denominator standard

3.Addresses the issues raised in the SAR and issues raised by FERC and others

Background – Drafting Team Background – Drafting Team ObjectivesObjectives

7

Page 8: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

The first draft was posted for comment from Sept. 12, 2007 through Oct. 26, 2007.

Response was very good

More than 80 sets of comments

233 different people

80 companies

9 of the 10 Industry Segments

5 face-to-face meetings & 6 full team conference calls & many more sub-team conference calls

2nd posting completed & under review by NERC Staff

Background- Update on Standard Background- Update on Standard Drafting Team ActivitiesDrafting Team Activities

8

Page 9: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Background – Brief Overview of Background – Brief Overview of Proposed StandardsProposed Standards

Upcoming draft remains very similar to 1st draft

R1 – Maintaining models (moved modeling requirements to end)

R2 – Assessment and Corrective Action Plan requirements

R3 – Steady State Analysis

R4 – Short Circuit Analysis (was part of R2) 9

Page 10: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Background – Brief Overview of Background – Brief Overview of Proposed StandardsProposed Standards

Upcoming draft remains very similar to 1st draft

R5 (old R4) – Stability Analysis

R6 – Define & document how cascading and voltage instability are addressed

R7 (old R5) – Identify work coordination amongst planners

10

Page 11: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Background – Brief Overview of Background – Brief Overview of Proposed StandardsProposed Standards

Upcoming draft remains very similar to 1st draft

R8 (old R6) – Make assessment available to other planners

Coordinate open and transparent peer review process

R9 – R14 (old R1) – Modeling details, e.g. planned outages, etc.

11

Page 12: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Background – Brief Overview of Background – Brief Overview of Proposed StandardsProposed Standards

Performance Tables

Table 1 – Steady state

Table 2 - Stability

12

Page 13: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

High Level Overview of High Level Overview of Comments Received Comments Received Draft standard still not clear

Many commenter's agreed with general approach

Most significant disagreements were based on:

1. Lack of clarity in the draft standard

2. Disagreed with a specific requirement, often based on cost to implement

3. Thought that standard caused too much study work

13

Page 14: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

High Level Overview of High Level Overview of Comments Received Comments Received

1. Definitions

2. Sensitivity Studies

3. Corrective Action Plans

4. Performance Requirements

5. Stability

14

Page 15: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

High Level Overview of High Level Overview of Comments Received Comments Received

6. Generation runback and Tripping

7. General QuestionsShort circuit requirements

Proxies for instability, cascading outages and uncontrolled islanding

Actions allowed to prepare for next contingencies

Applicable ratings

Define bus-tie breaker

15

Page 16: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Most definitions modified for clarity

Consequential Load Loss – concern about what, if any, local load should be treated the same as Consequential Load

Year One more detailed – acknowledge moving window

16

Page 17: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Relationship of modeling requirements in TPL standard to other modeling standards (MOD series)

Identify gaps – modeling needed for TPL not in MOD standards

Identify how results of modeling standards are to be used in TPL

17

Page 18: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes Sensitivity studies modified and

clarified

Include additional studies as appropriate

Must run at least one basic sensitivity – explain why others not needed

Qualifications for “past” studies more defined

18

Page 19: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Corrective Action Plan

Examples of type of “actions” expanded, include SPS/RAS, etc

Sensitivity studies considered but not sole basis for “actions”

19

Page 20: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Remedial Action Schemes (RAS) or Special Protection Systems (SPS) may be allowed but should not be inadvertently encouraged

Eliminate differences between “committed” and “planned” projects

Generator redispatch and tripping detailed and clarified throughout requirements 20

Page 21: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Clarify the acceptable results immediately after event and also what actions are allowed to prepare for the next event

Firm Non-Consequential load should not be lost for single contingency

21

Page 22: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Treatment of “firm” transfers clarified

Mapped requirements to FERC Orders 693 & 890

Standard must have a detailed implementation plan

22

Page 23: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes

Performance Requirements (Tables)

Changed “Equipment Ratings shall not be exceeded” to “Facility Ratings shall not be exceeded. Planned System adjustments are allowed, unless precluded in the Requirements, to keep Facilities within the Facility Ratings, if such adjustments are executable within the time duration applicable to the Facility Ratings.”

Re-formatted tables for clarity.

23

Page 24: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Areas Where Drafting Team Areas Where Drafting Team Made ChangesMade Changes Added P0 – Normal System

Conditions

Loss of one element, followed by system adjustments, followed by loss of a second element – changed to allow non-consequential load loss

Clarified wide area events in extreme events

24

Page 25: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Should there be different performance requirements for facilities above 300kV?

25

Page 26: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Should the use of generation tripping be limited?

26

Page 27: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Should there be a requirement to model dynamic loads?

27

Page 28: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Should there be an exception to allow “local load” loss for single contingencies?

28

Page 29: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Are the performance requirement changes made in the proposed standard appropriate?

29

Page 30: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The Industry Major Areas Where The Industry Has Differing ViewsHas Differing Views

Are the new study requirements and documentation in the proposed standard appropriate?

30

Page 31: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Major Areas Where The IndustryMajor Areas Where The IndustryHas Differing ViewsHas Differing Views

Is the starting point for required studies in the proposed standard defined adequately?

31

Page 32: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Industry InvolvementIndustry Involvement

SDT should issue responses to comments and the 2nd draft this month

More consensus needed before items like VSLs are proposed

Everyone is encouraged to provide specific comments and discuss issues with SDT members

32

Page 33: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Questions & AnswersQuestions & Answers

33

Page 34: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Proposed Drafting Team Schedule Proposed Drafting Team Schedule

34

Monthly meetings with conference calls every two weeks

Post 3rd Draft in December 2008

Post 4th Draft in April or May 2009

Ballot in June or July 2009

Page 35: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Discussion of PC Involvement Discussion of PC Involvement

35

Next steps

- to be discussed at PC meeting

Page 36: Agenda -TPL Standards Workshop  Sponsored by NERC PC –June 3, 2008

Wrap-up Wrap-up

36

Thank you

for your participation