Download - ADAL Profile
ARUP DATTA ARCHITECT LTD.
ARCHITECTUREINTERIOR DESIGNMASTER PLANNINGURBAN DESIGN
ARUP DATTA ARCHITECT LTD. provides a full range ofArchitectural & Planning Services including our specialexpertise in Master Planning & Urban Design - a directbenefit from working in a multi-disciplinary teamenvironment & the experience gained from past projects.
ARUP DATTA ARCHITECT LTD. team members have avaried architectural & planning background & ourreputation for quality design has led to a large & diverseportfolio of projects.
A D A L D E S I G N P H I L O S O P H Y
• Good design probes the dimensions ofharmony & vitality.
• Beauty is its inspiration: function is itsmandate.
A D A L D E S I G N P H I L O S O P H Y
• Great architecture comes from acombination of talent, experience & anunderstanding of the issues involved in theproject.
Nordic Centre, Naantali, Finland
Resort Tourist Recreation Centre
Ville de Lille, France
Retail & Conference
Master Planning & Urban Design
Tourist Holiday Resort, Mysore, India
46.5 Acre Site11 Acre Site
Mahabalipuram Beach Resort, India
Beidaihe Resort, China Mixed - Use Development
Harvard Park, Red Deer, Canada• Master Planning of 112 Acres site• Single family & Multi family• Commercial, Office & Industrial
A D A L D E S I G N P H I L O S O P H Y
• We bring to your project the talent, theskills & experiences that when combinedwith our farsighted thinking can achieveremarkable results.
Bankers Hall, Calgary, CanadaOne of the most prestigious addresses in downtown Calgary with Central Atrium Space allowing natural light over the shopping retail areasThe proper use of bonus standards under zoning guidelines has allowed the creation of a Floor Area Ratio of 15 times site area
55 & 56 Storey Office Towers on 2 levelsof Commercial / Retail & 4 levels of Parking.
Construction Cost - $250 Million CDN
One of the 100 most liked buildings in Canada - BOMA review
Highest Bonused building in Alberta & Canada @ 17.99 FAR
Due to unique & creative design with 3-level interconnected atrium space while bringing natural light to the Main Floor Plazamaximum density was achieved.
Estimated Budget - $100 Million CDNConstruction Cost - $86 Million CDN
Cost Effecint Architectural & Structural design, with effective Mechanical & Electrical system overlap in design
Western Canadian Place, Calgary, Canada
* Maximization of corneroffices for executives* 4 - Tower, 220,000 sqmeters,* Winning design of alimited competition offive local firms
Olympic Centre, Calgary, Canada
A four tower office & retailcomplex with aCentral Atrium Spacespanning the railway tracksin the heart of Calgary
* One of the largest projects in N igeria* Met all the criteria of the Federal Capital Development Authority* Unique landscaped spaces around the perimeter.* Integrated pedestrian & vehicular movements between the shopping, the office & convention uses.
Nigerian Industrial Bank Headquarters,Convention Centre & Shopping Complex- Abuja, Nigeria
Batra Centre, Chennai, IndiaOffice Building
Concept Designs
Final Design
A D A L D E S I G N P H I L O S O P H Y
Our creative process is synergistic,involving all team members, includingour client & users, from the beginning.
A D A L D E S I G N P H I L O S O P H Y
Our process begins withdefining & understanding theproject objectives & the client’s values.
We understand the potential of cultural traditional and social
interaction with architecturecan produce very significant architectural results.
170 Acre DCA Concept Master Plan for Kuala Lumpur, Malaysia
* Achieved 8.65 million sq ft with a low 1.16 FAR* Unique distribution of buildable space* Assembly for 2000 @ Tabung Haji Pilgrim Centre* Offices, Hotel / Convention Retail, Apartments, Cultural & Aviation Training Centre
Maison Regale, Jeddah, Saudi Arabia* 8 - 16,000 sq ft Villas - Islamic & Colonial Themes* Compact Design in a Limited Site* Stylized Design Features for Aesthetics & Climatic Requirements
Kopai er DhareResidential Project @ Santiniketan
Birbhum, West Bengal, India
A D A L D E S I G N P H I L O S O P H Y
We have a record of producing exceptionaldesigns - creating people places with vitality.
West Edmonton Mall, Edmonton, Canada“The World’s Largest” - Two Level Retail / Entertainment / Theme Amusement / Recreation Centre
800 Retail Store, Fantasyland Themed Hotel Rooms, 3 Loop Roller Coaster & Amusement RidesMini - Golf, Indoor Water-park & Wave Pool, Ice Skating Rink, Roof Top Golf Driving Range
Indoor Lake, Restaurants & Nightclubs, Movie Theatres, Live Entertainment Stages
A D A L P R I N C I P L E S
INTENT
• to create excellent planning & architecture
• to have a free exchange of ideas betweenthe client & the design team
A D A L P R I N C I P L E S
EFFECTIVENESS
• Every design solution must be effective for& meet the objectives of our clients.
Boat Club II, Chennai, India Luxury Condominiums
Boat Club I, Chennai, India Luxury Condominiums
UNDER CONSTRUCTION
UNDERCONSTRUCTION
A D A L P R I N C I P L E S
TEAMWORK MANAGEMENT
• A firm & responsible designmanagement network is vital for efficientcreativity.
• Powerful design solutions evolve fromreal teamwork
Nice, FranceMixed - Use Development
FIVE STAR LUXURY HOTEL,Moscow, Russia3000 Rooms with Conference, Retail, Leisure & Recreation
FOUR MOUNTAIN RESORT, Yukon, Canada
120 Room Resort & Cultural Centre withConvention, Training & Adventure Facilities
A D A L P R I N C I P L E S
INTEGRITY
• We are committed to the highestprofessional & ethical standards.
A D A L P R I N C I P L E S
EXCELLENCE
• We insist on excellence
• We run the practice with an unwaveringsense of urgency & purpose.
A D A L P R I N C I P L E S
INDIVIDUAL - YET SYSTEMATIC
• Every project has an individual solution.
• We are deeply committed to addressingour client’s needs
• & recognizing the cultural environmentof the project.
Theme Hotel, Kuala Lumpur, Malaysia
C A T E G O R I E S O F S E R V I C E
ARUP DATTA ARCHITECT LTD. - C A T E G O R I E S O F S E R V I C E
MASTER-PLANNINGResorts, Recreation & Leisure ProjectsAmusement Park & Water Park ProjectsComplex Mixed Use Urban/ Rural Design ProjectsBusiness Park/ Industrial EstatesResidential - Single & Multi Family Low-rise & High-rise
URBAN DESIGN AND RENEWALCentral Business District Design Development & Planning.Redevelopment & Rehabilitation of Urban Core Areas
ARCHITECTURE & INTERIOR DESIGNCOMMERCIALCorporate Offices: High & Low RiseInternational Convention CentersHotels, Resort Hotels & ResortsCommunity Business Districts & ParksMixed Use & Employment Centers - Retail, Office, Leisure
& RecreationAmusement / Entertainment Centres - Hotel, Resort,
ConventionShopping Centers (Regional & Neighborhood)Financial Centres
EDUCATIONAL / INSTITUTIONAL /CULTURAL & PERFORMING ARTS
CENTERSAquariums & MicrariumsUniversity Campuses, Colleges, High School &
Elementary SchoolsPerforming Arts CentersCultural Centers
HI TECH / SCIENTIFIC RESEARCH /COMPUTER ORIENTED / LIGHT
INDUSTRIALComputer BuildingsResearch Laboratories & Controlled Environment
BuildingsNon-Process Light Industrial Projects
PROJECT MANAGEMENTProject Program CoordinationProject Financial & Budget ControlDesign Coordination, with client & other disciplinesProject Administration, including full time site reviews if
required
KEY PERSONAL
ARUP DATTA B. Arch. (Hons.) MAAA, MRAIC, MAIBC, AIIA Project Management (Harvard), Principal in Charge / President
Mr. Datta, as the principal of ARUP DATTA ARCHITECT LTD hasbeen involved in designing major architectural and planningprojects in Canada and abroad for over 30 years. Mr. Datta hasled design teams for large mixed use complexes, educational,cultural and institutional projects in Canada, USA, Europe,Africa and S. E. Asia.
Mr. Datta is recognized in the “National Register’s Who’s Who” inExecutives and Professionals”, 2002 -2003 Edition.
Mr. Datta's contextual approach to design is sympathetic towardssocial, cultural economic and environmental aspects of a project.Combining international caliber design capability and a strongmanagement background, he delivers the best end product to allclients, with astute leadership.
* His designs/ proposals have won or been at the final roundsin many competitions. He has managed projects mosteffectively, of all sizes, all across Canada as well as in othercountries.
* Mr. Datta has been involved in designing over $1.0 Billiondollars of construction value.
* Mr. Datta was among the twenty-two architects choseninternationally by Arriyadh Development Agency, Riyadh,Saudi Arabia to design the Law Courts Project for Riyadh, in1993.
MASTER PLANNINGHarvard Park Business Centre Ltd. - 114 acre
Mixed Use Residential, Commercial andIndustrial Development, Springbrook,Alberta
170 acre master planning - Mixed UseDevelopment, Kuala Lumpur, Malaysia
European Environmental Centre, Nice,France
Nordic Centre, Naantali - Resort TouristRecreation Centre, Finland
Jawharlal Nehru University – New Delhi,India
MIXED USE PROJECTS & SHOPPINGCENTRES
West Edmonton Mall (Phase IV), Edmonton,Canada – the largest shopping mall inthe world with entertainment, leisure &recreation facilities.
Mall of America - Major Shopping/Entertainment/ Recreational complex,Minnesota, USA (Largest Shopping Mall– in the USA) – up to DevelopmentPermit Stage.
National Industrial Bank Headquarters -Offices, Shopping, Convention &Parking- Abuja, Nigeria
ARUP DATTA B. Arch. (Hons.) MAAA, MRAIC, MAIBC, AIIA Project Management (Harvard), Principal in Charge / President(Continued)
* Mr. Datta spearheaded the export of Canadian Architectural& Planning expertise to foreign countries. He has made overone hundred & seventy development & marketingpresentations to major clients in Hong Kong, Singapore,Malaysia, Saudi Arabia, Thailand, India, England, & USA.
* He was the Project Architect of Mall of America – the largestshopping Mall in the USA (up to Development Permit Stage)
* Mr. Datta was in charge of MacEwan Student Centre,University of Calgary, ($ 17.2 Million) - one of the best StudentCentres in Canada & the Nigerian Industrial DevelopmentBank Headquarters project ($ 135 Million US) - one of thelargest projects in Nigeria
* In 1992 he was chosen by a Malaysian developer tomasterplan a major mixed use complex for 170 acres of land &develop a conceptual design for a 400 room $34 million luxuryhotel in Kuala Lumpur, Malaysia.
* Between 1979 – 1982 he was involved in designing two ofCalgary’s outstanding tower complexes which are well knownin Canada i.e.: the Western Canadian Place ($86 million), theBanker’s Hall Complex ($250 million) & a 4-tower High-riseoffice project the Olympic Centre ($210 million)
COMMERCIAL: OFFICEWestern Canadian Place - 34 & 44 Storeys,
($86 M), Calgary, CanadaBankers Hall - 55 & 56 Storey Twin Towers,
Initial design scheme, Calgary, CanadaHOTEL / RESORT/ LEISURE &
RECREATIONOberoi Grand - 5 Star Hotel Renevation ,
Calcutta, IndiaOberoi Sheraton - 5 Star Hotel, 35 Storey
Bombay, IndiaFantasyland Hotel - 300 room theme hotel,
Edmonton, CanadaTheme Hotel - 400 room, concept design, Kula
Lumpur, MalaysiaHoliday Inn Sunspree Resort - 120 suites
Osoyoos, CanadaINSTITUTIONAL & SPECIAL PROJECTSState Cultural Center - Owerii, IMO, Nigeria
($25 M): Competition Winner. MacEwan Student Centre, University of
Calgary, Canada,RESIDENTIAL / MULTIFAMILY/ CUSTOM
HOMES & VILLAS Maison Regale - Luxury Villa Complex -
Riyadh, Saudi ArabiaBoat Club Luxury Condominium Complex –
Chennai, India
BRIAN DENNIS Architectural Technology (S.A.I.T.), Project Manager
Brian Dennis has had over thirty six years experience in all phases ofdesign, construction & contract administration including clientcontact & liaison; supervision & coordination of specifications &drawings, site inspection & contract administration ofnumerous shopping centre complexes, high rise residential &office complexes, institutional, government & commercialprojects constructed throughout Western Canada
* Project Manager for world famous projects such as WestEdmonton Mall, Eaton Centre, CN Tower & the AlbertaGovernment Telephone Toll Building in Edmonton as well asa large office complex in Denver, Colorado & numerous othercommercial & institutional facilities throughout Alberta & inother parts of Western Canada
* Project Coordinator & Associate Designer on the PalaceCasino, West Edmonton Mall.
* Project Coordinator: 5 million dollar renovation to EatonCentre. Coordination of the consultant team including specialistHotel & Retail Design Consultants from Vancouver & Toronto.
* Project Manager on major shopping centres in WesternCanada including Kingsway Garden Mall Expansion,Westmount Shopping Centre Renovations, St. Albert Centre,Grandin Park Plaza, Bonnie Doon Shopping CentreRenovations, Marketplace at Callingwood, Londonderry MallRenovations, Terra Losa Shopping Centre.
LARGE MIXED USE PROJECTS &SHOPPING CENTRES
West Edmonton Mall : World’sLargest mall,Edmonton, Canada
Mall of America - Shopping/ Entertainment/Recreational complex, Minnesota, USA –largest shopping mall in the USA (up toDevelopment Permit Stage
Eaton Centre, Original & Renovation,Kingsway Garden Mall, Original & Expansion,Londonderry Mall, Original & Expansion,South Centre Shopping Centre, CalgaryTerra Losa Shopping Centre, EdmontonSt. Albert Centre, St. AlbertGrandin Park Plaza, St. AlbertBonnie Doon Shopping Centre Expansion,Terwillegar Heights Shopping Centre,Marketplace At Callingwood, Edmonton
OFFICE BUILDINGSAlexander Administration Offices, MorinvilleCN Tower, EdmontonCapital Place, EdmontonCalgary Place, CalgaryDenver Place, Colorado, USAAlberta Government Telephone Toll, CalgaryAlberta Government Telephone Toll, Edmonton
BRIAN DENNIS Architectural Technology (S.A.I.T.), Project Manager
(Continued)
* Project Manager on Callingwood Professional Centre &Safeway Division office projects.
* Architectural Technologist & Drafting Supervisor on variousoffice & retail projects such as Londonderry Mall, South Centre(Calgary), MacLeod Mall, Unicity Mall (Winnipeg), NorthgateShopping Centre (Regina), Cranbrook Mall, CN Tower, CalgaryPlace, Western Centre, AGT Toll Buildings, Calgary &Edmonton, Denver Place, Denver, USA
* Project Manager on educational projects including Ecole deProvidence, BQRP, & St. Stephen’s School, BQRP, renovationsto the University of Calgary MacEwan Hall.
HOTELSConvention Inn South, EdmontonFantasyland Hotel, EdmontonArgyle Plaza Hotel, EdmontonCentre Suite Hotel (Delta), EdmontonCentre Suite Hotel (Delta) Renovations,
EdmontonGalaxyland Hotel, EdmontonWest Edmonton Mall Inn, EdmontonRECREATIONALCallingwood Bowling Centre, EdmontonTwin Ice Arena, EdmontonArgyle Plaza ArenaWest Edmonton Village Recreation Centre,
EdmontonSouthgate Village Recreation Centre, EdmontonPalace Casino, West Edmonton Mall, EdmontonAPARTMENT / RESIDENTIALSouthgate Village, 600 Suites, EdmontonPenthouse Towers, CalgaryMarlboro Apartment, CalgaryStrathcona House, EdmontonWest Edmonton Village, 1200 Suites, EdmontonEDUCATIONALScience IIIB Addition, U of C, CalgaryMacEwan Hall Renovation, U of C, CalgaryF R Hawthorne Jr. High School, Sherwood Park
MITCHELL ELLIOTT, B.E.S., B.ArchProject Architect– Research, Resource & Design Development
Project Design Research and Resource workingclosely with Arup Datta & Brian Dennis throughoutthe design and contract documentation part of theproject.
Has worked on a number of international projectsincluding the Merican Residence and Maison Regalewith Mr. A. Datta.
MAUREEN BULLOCK – InteriorDesign, Space Planning & Finishes
Will assist Mr. Datta in developing interiordesign concepts & design developmentdrawings.
Has extensive high quality Interior Designexpertise & excellent skills in determiningmaterials & finishes.
BRIANNE SPARKS - In charge ofArchitectural CAD production
Will assist with the input and coordination ofArchitectural CAD drawings in all stages ofproject development.
Has worked on a variety of Internationalprojects and has work experience in Australia.
CONCLUSION
ARUP DATTA ARCHITECT LTD.
with a team of local & international designprofessionals are well positioned to developaesthetically pleasing & excellent designs,highly functional & creative environments,
with cost effective solutions
to meet your goals and project objectives.