Download - Achizitii Bssvrfd

Transcript
  • 5/28/2018 Achizitii Bssvrfd

    1/16

    S.C. GENERAL INSTALATII S.R.L.C.I.F.: RO15493284, Numar inreg. Registrul Comertului: J22-964 /2003

    IASI, STR.NICOLINA,nr.6,bl.Y1,sc.A,et.2,ap.10

    Telefon: 0751248062

    STATISTICA: PRODUSE CUMPARATE

    Perioada: 01.01.2013 - 31.05.2013

    CLASA: toate

    FURNIZOR: BLACK SEA SUPPLIERS SRL

    GESTIUNE: toate

    GRUPARE: produs

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    A.C. NORDSTAR 11 R410A 9000 BTU 1,000 818,12

    1 Factura 25136 18.04.2013 A.C. NORDSTAR 11 R410A

    9000 BTU

    BUC 1,000 818,12 818,12

    AERISITOR AUTOMAT 1/2 8,000 95,52

    1 Factura 24993 11.04.2013 AERISITOR AUTOMAT 1/2 BUC 4,000 11,97 47,88

    2 Factura 25079 16.04.2013 AERISITOR AUTOMAT 1/2 BUC 3,000 11,93 35,79

    3 Factura 25311 26.04.2013 AERISITOR AUTOMAT 1/2 BUC 1,000 11,85 11,85

    AERISITOR AUTOMAT 3/8 16,000 191,52

    1 Factura 024148 20.02.2013 AERISITOR AUTOMAT 3/8 BUC 8,000 11,90 95,20

    2 Factura 24609 25.03.2013 AERISITOR AUTOMAT 3/8 BUC 8,000 12,04 96,32

    ALIAJ MOALE SUDURA CU BRAZETEC 3MM 2,000 70,00

    1 Factura 24680 27.03.2013 ALIAJ MOALE SUDURA CU

    BRAZETEC 3MM

    BUC 2,000 35,00 70,00

    AVANS FURN. 0,000 0,00

    1 Factura 23671 17.01.2013 AVANS FURN. BUC 1,000 1934,79 1934,79

    2 Factura 23751 23.01.2013 AVANS FURN. BUC -1,000 1934,79 -1934,79

    BOILER ELECTRIC ELDOMAQU A 10L 2,000 329,48

    1 Factura 23940 06.02.2013 BOILER ELECTRIC

    ELDOMAQU A 10L

    BUC 2,000 164,74 329,48

    BUTELIE UNICA FOLISINTA MAPP3,000 7,17

    1 Factura 24680 27.03.2013 BUTELIE UNICA FOLISINTA

    MAPP

    BUC 2,000 2,39 4,78

    2 Factura 24993 11.04.2013 BUTELIE UNICA FOLISINTA

    MAPP

    BUC 1,000 2,39 2,39

    CANEPA 3,750 62,99

    1 Factura 24695 28.03.2013 CANEPA KG 0,250 16,85 4,21

    2 Factura 24789 02.04.2013 CANEPA KG 1,250 16,87 21,09

    3 Factura 25021 12.04.2013 CANEPA KG 1,000 16,79 16,79

    4 Factura 25155 19.04.2013 CANEPA KG 1,000 16,73 16,73

    5 Factura 25311 26.04.2013 CANEPA KG 0,250 16,66 4,17

    CH.DIV.MAT.CONSUMABILE 1,000 0,02

    1 Factura 25113 17.04.2013 CH.DIV.MAT.CONSUMABILE BUC 1,000 0,02 0,02

    CLAPET BZ 1" 3,000 51,60

    1 Factura 25081 16.04.2013 CLAPET BZ 1" BUC 3,000 17,20 51,60

    CLAPET BZ 11/2" 2,000 70,44

    1 Factura 25081 16.04.2013 CLAPET BZ 11/2" BUC 2,000 35,22 70,44

    CLAPET BZ 11/4" 4,000 113,12

    1 Factura 25081 16.04.2013 CLAPET BZ 11/4" BUC 3,000 28,36 85,08

    2 Factura 25511 13.05.2013 CLAPET BZ 11/4" BUC 1,000 28,04 28,04

    CLEMA SUPORT PPR D25 130,000 20,80

    1 Factura IS024961 10.04.2013 CLEMA SUPORT PPR D25 BUC 70,000 0,16 11,20

    2 Factura 24993 11.04.2013 CLEMA SUPORT PPR D25 BUC 60,000 0,16 9,60

    CLEMA SUPORT PPR D32 128,000 28,54

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 1 / 16

  • 5/28/2018 Achizitii Bssvrfd

    2/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura IS024961 10.04.2013 CLEMA SUPORT PPR D32 BUC 38,000 0,23 8,74

    2 Factura 24993 11.04.2013 CLEMA SUPORT PPR D32 BUC 90,000 0,22 19,80

    COL.DIBL.CU CAUCIUC 1" (32-36) 16,000 18,72

    1 Factura 024120 19.02.2013 COL.DIBL.CU CAUCIUC 1" (32-

    36)

    BUC 16,000 1,17 18,72

    COL.DIBL.CU CAUCIUC 11/2" (47-51) 32,000 42,44

    1 Factura 024158 21.02.2013 COL.DIBL.CU CAUCIUC 11/2"

    (47-51)

    BUC 12,000 1,32 15,84

    2 Factura 24789 02.04.2013 COL.DIBL.CU CAUCIUC 11/2"

    (47-51)

    BUC 20,000 1,33 26,60

    COL.DIBL.CU CAUCIUC 11/4" (34-43) 0,390 49,41

    1 Factura 24789 02.04.2013 COL.DIBL.CU CAUCIUC 11/4"

    (34-43)

    SUTE BUC 0,390 126,70 49,41

    COL.DIBL.CU CAUCIUC 3/4" (26-30) 16,000 17,28

    1 Factura 024120 19.02.2013 COL.DIBL.CU CAUCIUC 3/4"

    (26-30)

    BUC 16,000 1,08 17,28

    COL.DIBL.CU CAUCIUC 4" (107-112) 10,000 25,40

    1 Factura 024148 20.02.2013 COL.DIBL.CU CAUCIUC 4"

    (107-112)

    BUC 10,000 2,54 25,40

    COLIER CU DIBLU 11/2" 24,000 20,87

    1 Factura 24551 20.03.2013 COLIER CU DIBLU 11/2" BUC 20,000 0,87 17,40

    2 Factura 24628 25.03.2013 COLIER CU DIBLU 11/2" BUC 3,000 0,87 2,61

    3 Factura 24628 25.03.2013 COLIER CU DIBLU 11/2" BUC 1,000 0,86 0,86

    COLIER CU DIBLU 11/4" 20,000 15,80

    1 Factura 24551 20.03.2013 COLIER CU DIBLU 11/4" BUC 20,000 0,79 15,80

    COLIER DIBLU 11/4 (38-4 3) 20,000 16,64

    1 Factura 024228 26.02.2013 COLIER DIBLU 11/4 (38-4 3) BUC 8,000 0,83 6,64

    2 Factura 024228 26.02.2013 COLIER DIBLU 11/4 (38-4 3) BUC 4,000 0,84 3,36

    3 Factura 24695 28.03.2013 COLIER DIBLU 11/4 (38-4 3) BUC 8,000 0,83 6,64

    COLIER DIBLU 3/4" (26-30) 24,000 19,72

    1 Factura 24695 28.03.2013 COLIER DIBLU 3/4" (26-30) BUC 10,000 0,74 7,40

    2 Factura 25511 13.05.2013 COLIER DIBLU 3/4" (26-30) BUC 14,000 0,88 12,32

    COLIER DIBLU CU CAUCIUC INK 3/4 6,000 7,92

    1 Factura 24371 06.03.2013 COLIER DIBLU CU CAUCIUC

    INK 3/4

    BUC 6,000 1,32 7,92

    COLIER DIBLU" (32-36) 0,290 22,53

    1 Factura 24789 02.04.2013 COLIER DIBLU" (32-36) SUTE BUC 0,290 77,70 22,53

    CONTOR BM AR GSD5 DN15 FARA RACORD 1,000 36,04

    1 Factura 24371 06.03.2013CONTOR BM AR GSD5 DN15FARA RACORD

    BUC 1,000 36,04 36,04

    COT COMP.PEHD 25 6,000 16,96

    1 Factura 24371 06.03.2013 COT COMP.PEHD 25 BUC 2,000 2,82 5,64

    2 Factura 24384 07.03.2013 COT COMP.PEHD 25 BUC 4,000 2,83 11,32

    COT COMPRESIUNE FI 25*3/4 1,000 2,20

    1 Factura 24371 06.03.2013 COT COMPRESIUNE FI 25*3/4 BUC 1,000 2,20 2,20

    COT CUPRU 18-90GR 8,000 7,60

    1 Factura 25078 16.04.2013 COT CUPRU 18-90GR BUC 8,000 0,95 7,60

    COT CUPRU 22-90GR 14,000 21,14

    1 Factura 25078 16.04.2013 COT CUPRU 22-90GR BUC 14,000 1,51 21,14

    COT CUPRU 28-90GR 10,000 28,10

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 2 / 16

  • 5/28/2018 Achizitii Bssvrfd

    3/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura 25078 16.04.2013 COT CUPRU 28-90GR BUC 10,000 2,81 28,10

    COT CUPRU 35-90GR 6,000 83,88

    1 Factura 25078 16.04.2013 COT CUPRU 35-90GR BUC 6,000 13,98 83,88

    COT CUPRU D22, 90GR 10,000 15,10

    1 Factura 024163 21.02.2013 COT CUPRU D22, 90GR M 10,000 1,51 15,10

    COT CUPRU D28, 90GR 10,000 28,10

    1 Factura 024163 21.02.2013 COT CUPRU D28, 90GR M 10,000 2,81 28,10

    COT CUPRU MT 18MM 11,000 19,36

    1 Factura 024163 21.02.2013 COT CUPRU MT 18MM BUC 5,000 1,76 8,80

    2 Factura 25078 16.04.2013 COT CUPRU MT 18MM BUC 6,000 1,76 10,56

    COT CUPRU MT 22MM 6,000 18,12

    1 Factura 25078 16.04.2013 COT CUPRU MT 22MM BUC 6,000 3,02 18,12

    COT CUPRU MT 28MM 6,000 32,04

    1 Factura 25078 16.04.2013 COT CUPRU MT 28MM BUC 6,000 5,34 32,04

    COT CUPRU MT 35MM 4,000 86,52

    1 Factura 25078 16.04.2013 COT CUPRU MT 35MM BUC 4,000 21,63 86,52

    COT INT-EXT 92 Z 11/2" 2,000 12,48

    1 Factura 25311 26.04.2013 COT INT-EXT 92 Z 11/2" BUC 2,000 6,24 12,48

    COT INT-EXT 92 Z 2 1/2" 4,000 63,44

    1 Factura 24486 16.03.2013 COT INT-EXT 92 Z 2 1/2" BUC 4,000 15,86 63,44

    COT INT-INT 90 N 1/2" 1,000 0,66

    1 Factura 24371 06.03.2013 COT INT-INT 90 N 1/2" BUC 1,000 0,66 0,66

    COT INT-INT 90 N 11/2" 67,000 253,19

    1 Factura 24551 20.03.2013 COT INT-INT 90 N 11/2" BUC 32,000 3,72 119,04

    2 Factura 25054 15.04.2013 COT INT-INT 90 N 11/2" BUC 20,000 3,70 74,00

    3 Factura 25054 15.04.2013 COT INT-INT 90 N 11/2" BUC 5,000 3,71 18,55

    4 Factura 25155 19.04.2013 COT INT-INT 90 N 11/2" BUC 10,000 4,16 41,60

    COT INT-INT 90 N 11/4" 45,000 110,47

    1 Factura 024120 19.02.2013 COT INT-INT 90 N 11/4" BUC 12,000 2,35 28,20

    2 Factura 24551 20.03.2013 COT INT-INT 90 N 11/4" BUC 2,000 2,36 4,72

    3 Factura 24848 04.04.2013 COT INT-INT 90 N 11/4" BUC 7,000 2,37 16,59

    4 Factura 25155 19.04.2013 COT INT-INT 90 N 11/4" BUC 24,000 2,54 60,96

    COT INT-INT 90 N 2" 43,000 239,40

    1 Factura 024120 19.02.2013 COT INT-INT 90 N 2" BUC 6,000 5,54 33,24

    2 Factura 24757 01.04.2013 COT INT-INT 90 N 2" BUC 10,000 5,58 55,80

    3 Factura 24799 02.04.2013 COT INT-INT 90 N 2" BUC 8,000 5,58 44,64

    4 Factura 24848 04.04.2013 COT INT-INT 90 N 2" BUC 12,000 5,59 67,08

    5 Factura 25141 18.04.2013 COT INT-INT 90 N 2" BUC 7,000 5,52 38,64

    COT INT-INT 90 Z 2 1/2" 3,000 34,39

    1 Factura 24369 06.03.2013 COT INT-INT 90 Z 2 1/2" BUC 1,000 11,41 11,41

    2 Factura 24486 16.03.2013 COT INT-INT 90 Z 2 1/2" BUC 2,000 11,49 22,98

    COT INT-INT 90 Z 2" 2,000 13,06

    1 Factura 024158 21.02.2013 COT INT-INT 90 Z 2" BUC 1,000 6,53 6,53

    2 Factura 024158 21.02.2013 COT INT-INT 90 Z 2" BUC 1,000 6,53 6,53

    COT INT-INT 90 Z 3" 1,000 17,56

    1 Factura 24680 27.03.2013 COT INT-INT 90 Z 3" BUC 1,000 17,56 17,56

    COT PP 110*45 12,000 26,16

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 3 / 16

  • 5/28/2018 Achizitii Bssvrfd

    4/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura 024148 20.02.2013 COT PP 110*45 BUC 6,000 2,18 13,08

    2 Factura 024159 21.02.2013 COT PP 110*45 BUC 6,000 2,18 13,08

    COT PP 32*45 1,000 0,58

    1 Factura 25081 16.04.2013 COT PP 32*45 BUC 1,000 0,58 0,58

    COT PP 32/87G 2,000 1,24

    1 Factura 25081 16.04.2013 COT PP 32/87G BUC 2,000 0,62 1,24

    COT PP 40*87 G 4,000 2,96

    1 Factura 024148 20.02.2013 COT PP 40*87 G BUC 4,000 0,74 2,96

    COT PP 50*45 6,000 4,68

    1 Factura 024159 21.02.2013 COT PP 50*45 BUC 6,000 0,78 4,68

    COT PP 50*87 G 1,000 0,80

    1 Factura 024148 20.02.2013 COT PP 50*87 G BUC 1,000 0,80 0,80

    COT PPR 20/90G 57,000 10,83

    1 Factura IS024961 10.04.2013 COT PPR 20/90G BUC 57,000 0,19 10,83

    COT PPR 25/45G 10,000 4,30

    1 Factura 24993 11.04.2013 COT PPR 25/45G BUC 10,000 0,43 4,30

    COT PPR 25/90G 77,000 24,95

    1 Factura IS024961 10.04.2013 COT PPR 25/90G BUC 31,000 0,33 10,23

    2 Factura 24993 11.04.2013 COT PPR 25/90G BUC 46,000 0,32 14,72

    COT PPR 32/45G 20,000 16,80

    1 Factura 24993 11.04.2013 COT PPR 32/45G BUC 20,000 0,84 16,80

    COT PPR 32/90G 21,000 15,95

    1 Factura IS024961 10.04.2013 COT PPR 32/90G BUC 1,000 0,75 0,75

    2 Factura 24993 11.04.2013 COT PPR 32/90G BUC 20,000 0,76 15,20

    COT SUDAT 168.3 2,000 72,10

    1 Factura 024120 19.02.2013 COT SUDAT 168.3 BUC 2,000 36,05 72,10

    CT EOLO STAR 24 3E 1,000 1338,15

    1 Factura 25010 11.04.2013 CT EOLO STAR 24 3E BUC 1,000 1338,15 1338,15

    CUTIE DISTRIBUITOR 45*25*11 4,000 161,22

    1 Factura 24609 25.03.2013 CUTIE DISTRIBUITOR

    45*25*11

    BUC 2,000 40,31 80,62

    2 Factura 24609 25.03.2013 CUTIE DISTRIBUITOR

    45*25*11

    BUC 2,000 40,30 80,60

    CUTIE DISTRIBUITOR 45*50*11 4,000 201,76

    1 Factura 024148 20.02.2013 CUTIE DISTRIBUITOR45*50*11

    BUC 4,000 50,44 201,76

    CUTIE DISTRIBUITOR KAN S PE-3 2,000 283,34

    1 Factura 25319 26.04.2013 CUTIE DISTRIBUITOR KAN S

    PE-3

    BUC 2,000 141,67 283,34

    CUTIE HIDRANT INTERIOR NEECHIPATA 9,000 1260,00

    1 Factura 24395 08.03.2013 CUTIE HIDRANT INTERIOR

    NEECHIPATA

    BUC 3,000 140,00 420,00

    2 Factura 24443 13.03.2013 CUTIE HIDRANT INTERIOR

    NEECHIPATA

    BUC 3,000 140,00 420,00

    3 Factura 25354 30.04.2013 CUTIE HIDRANT INTERIOR

    NEECHIPATA

    BUC 4,000 140,00 560,00

    4 Factura 25495 10.05.2013 CUTIE HIDRANT INTERIOR

    NEECHIPATA

    BUC -1,000 140,00 -140,00

    DISTR.3/4*1/2 FE 2 CAI ROB.MAN.ALBS 5,000 106,36

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 4 / 16

  • 5/28/2018 Achizitii Bssvrfd

    5/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura 024148 20.02.2013 DISTR.3/4*1/2 FE 2 CAI

    ROB.MAN.ALBS

    BUC 1,000 21,08 21,08

    2 Factura 24609 25.03.2013 DISTR.3/4*1/2 FE 2 CAI

    ROB.MAN.ALBS

    BUC 4,000 21,32 85,28

    DISTR.3/4*1/2 FE 2 CAI ROB.MAN.ROSU 5,000 106,36

    1 Factura 024148 20.02.2013 DISTR.3/4*1/2 FE 2 CAI

    ROB.MAN.ROSU

    BUC 1,000 21,08 21,08

    2 Factura 24609 25.03.2013 DISTR.3/4*1/2 FE 2 CAI

    ROB.MAN.ROSU

    BUC 4,000 21,32 85,28

    DISTR.3/4*1/2 FE 3 CAI ROB.MAN.ROSU 4,000 122,08

    1 Factura 024148 20.02.2013 DISTR.3/4*1/2 FE 3 CAI

    ROB.MAN.ROSU

    BUC 4,000 30,52 122,08

    DISTR.3/4*1/2 FE 4 CAI ROB.MAN.ALBS 2,000 79,84

    1 Factura 024148 20.02.2013 DISTR.3/4*1/2 FE 4 CAI

    ROB.MAN.ALBS

    BUC 2,000 39,92 79,84

    DISTR.3/4*1/2 FE 4 CAI ROB.MAN.ROSU 2,000 79,84

    1 Factura 024148 20.02.2013 DISTR.3/4*1/2 FE 4 CAI

    ROB.MAN.ROSU

    BUC 2,000 39,92 79,84

    DOP 290N 3/4" 9,000 5,24

    1 Factura 024121 19.02.2013 DOP 290N 3/4" BUC 7,000 0,58 4,06

    2 Factura 024121 19.02.2013 DOP 290N 3/4" BUC 2,000 0,59 1,18

    FILTRU BZ Y 11/4" 1,000 24,89

    1 Factura 25079 16.04.2013 FILTRU BZ Y 11/4" BUC 1,000 24,89 24,89

    FILTRU BZ Y 3/4" 1,000 7,41

    1 Factura 25079 16.04.2013 FILTRU BZ Y 3/4" BUC 1,000 7,41 7,41

    FILTRU MAGNETIC 3/4" 1,000 41,51

    1 Factura 25079 16.04.2013 FILTRU MAGNETIC 3/4" BUC 1,000 41,51 41,51

    FILTRU MEC.5" RAC.1/2 POLIPOSFAT 1,000 14,41

    1 Factura 25079 16.04.2013 FILTRU MEC.5" RAC.1/2

    POLIPOSFAT

    BUC 1,000 14,41 14,41

    FURTUN INCENDIU 2"*20M 9,000 540,00

    1 Factura 24395 08.03.2013 FURTUN INCENDIU 2"*20M BUC 3,000 60,00 180,00

    2 Factura 24443 13.03.2013 FURTUN INCENDIU 2"*20M BUC 3,000 60,00 180,00

    3 Factura 25354 30.04.2013 FURTUN INCENDIU 2"*20M BUC 4,000 60,00 240,00

    4 Factura 25495 10.05.2013 FURTUN INCENDIU 2"*20M BUC -1,000 60,00 -60,00

    FURTUN INT-INT 100CM 1/2* 1/2 4,000 11,96

    1 Factura 23940 06.02.2013 FURTUN INT-INT 100CM 1/2*

    1/2

    BUC 4,000 2,99 11,96

    IZOLATIE 6*22 12,000 9,72

    1 Factura 25155 19.04.2013 IZOLATIE 6*22 M 12,000 0,81 9,72

    IZOLATIE 6*28 12,000 11,28

    1 Factura 25155 19.04.2013 IZOLATIE 6*28 M 6,000 0,94 5,64

    2 Factura 25511 13.05.2013 IZOLATIE 6*28 M 6,000 0,94 5,64

    IZOLATIE D18*6 4,000 2,56

    1 Factura 25078 16.04.2013 IZOLATIE D18*6 M 4,000 0,52 2,08

    2 Factura 25113 17.04.2013 IZOLATIE D18*6 M -4,000 0,52 -2,08

    3 Factura 25117 17.04.2013 IZOLATIE D18*6 M 4,000 0,64 2,56

    IZOLATIE TERMO 28*6 0,000 0,00

    1 Factura 25078 16.04.2013 IZOLATIE TERMO 28*6 BUC 6,000 0,75 4,50

    2 Factura 25113 17.04.2013 IZOLATIE TERMO 28*6 BUC -6,000 0,75 -4,50

    IZOLATIE TERMO 35/6 4,000 5,36

    1 Factura 25078 16.04.2013 IZOLATIE TERMO 35/6 BUC 4,000 0,97 3,88

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 5 / 16

  • 5/28/2018 Achizitii Bssvrfd

    6/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    2 Factura 25113 17.04.2013 IZOLATIE TERMO 35/6 BUC -4,000 0,97 -3,88

    3 Factura 25117 17.04.2013 IZOLATIE TERMO 35/6 BUC 4,000 1,34 5,36

    KIT EOLO STAR 24 3E 1,000 115,50

    1 Factura 25010 11.04.2013 KIT EOLO STAR 24 3E BUC 1,000 115,50 115,50

    MUFA 270 CUPRU 22MM 2,000 3,38

    1 Factura 024163 21.02.2013 MUFA 270 CUPRU 22MM BUC 2,000 1,69 3,38

    MUFA 270 CUPRU 28MM 2,000 4,64

    1 Factura 024163 21.02.2013 MUFA 270 CUPRU 28MM BUC 2,000 2,32 4,64

    MUFA 270 N 11/2" 41,000 104,35

    1 Factura 24559 21.03.2013 MUFA 270 N 11/2" BUC 16,000 2,55 40,80

    2 Factura 24680 27.03.2013 MUFA 270 N 11/2" BUC 2,000 2,54 5,08

    3 Factura 24695 28.03.2013 MUFA 270 N 11/2" BUC 14,000 2,55 35,70

    4 Factura 25079 16.04.2013 MUFA 270 N 11/2" BUC 9,000 2,53 22,77

    MUFA 270 N 11/4" 7,000 11,28

    1 Factura 24559 21.03.2013 MUFA 270 N 11/4" BUC 1,000 1,62 1,62

    2 Factura 24695 28.03.2013 MUFA 270 N 11/4" BUC 6,000 1,61 9,66

    MUFA 270 N 2" 3,000 15,33

    1 Factura 24695 28.03.2013 MUFA 270 N 2" BUC 3,000 5,11 15,33

    MUFA 270 Z 11/2" 2,000 7,42

    1 Factura 25311 26.04.2013 MUFA 270 Z 11/2" BUC 2,000 3,71 7,42

    MUFA 270 Z 2 1/2" 3,000 32,83

    1 Factura 24490 16.03.2013 MUFA 270 Z 2 1/2" BUC 2,000 10,94 21,88

    2 Factura 24490 16.03.2013 MUFA 270 Z 2 1/2" BUC 1,000 10,95 10,95

    MUFA 270 ZN 2" 4,000 21,72

    1 Factura 25354 30.04.2013 MUFA 270 ZN 2" BUC 4,000 5,43 21,72

    MUFA 270 ZN 3" 40,000 610,32

    1 Factura 24278 01.03.2013 MUFA 270 ZN 3" BUC 32,000 15,26 488,32

    2 Factura 24278 01.03.2013 MUFA 270 ZN 3" BUC 8,000 15,25 122,00

    MUFA BZ 1" 2,000 8,66

    1 Factura 25081 16.04.2013 MUFA BZ 1" BUC 2,000 4,33 8,66

    MUFA BZ 1/2 2,000 3,88

    1 Factura 25081 16.04.2013 MUFA BZ 1/2 BUC 2,000 1,94 3,88

    MUFA BZ 11/4" 4,000 32,40

    1 Factura 25081 16.04.2013 MUFA BZ 11/4" BUC 4,000 8,10 32,40

    MUFA BZ 3/4" 2,000 6,06

    1 Factura 25081 16.04.2013 MUFA BZ 3/4" BUC 2,000 3,03 6,06

    MUFA COMP.PEHD D25 1,000 1,75

    1 Factura 24384 07.03.2013 MUFA COMP.PEHD D25 BUC 1,000 1,75 1,75

    MUFA CU D18MM 2,000 1,76

    1 Factura 25078 16.04.2013 MUFA CU D18MM BUC 2,000 0,88 1,76

    MUFA CU D22MM 2,000 3,38

    1 Factura 25078 16.04.2013 MUFA CU D22MM BUC 2,000 1,69 3,38

    MUFA CU D28MM 1,000 2,32

    1 Factura 25078 16.04.2013 MUFA CU D28MM M 1,000 2,32 2,32

    MUFA PPR 20 8,000 1,28

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 6 / 16

  • 5/28/2018 Achizitii Bssvrfd

    7/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura IS024961 10.04.2013 MUFA PPR 20 BUC 8,000 0,16 1,28

    MUFA PPR 25 1,000 0,23

    1 Factura IS024961 10.04.2013 MUFA PPR 25 BUC 1,000 0,23 0,23

    MUFA PPR 32 19,000 9,69

    1 Factura IS024961 10.04.2013 MUFA PPR 32 BUC 9,000 0,51 4,59

    2 Factura 24993 11.04.2013 MUFA PPR 32 BUC 10,000 0,51 5,10

    NIPLU 280 Z 11/2" 3,000 9,15

    1 Factura 25311 26.04.2013 NIPLU 280 Z 11/2" BUC 3,000 3,05 9,15

    NIPLU 280 Z 3" 1,000 12,08

    1 Factura 24680 27.03.2013 NIPLU 280 Z 3" BUC 1,000 12,08 12,08

    NIPLU BRONZ 1/2*1/2 8,000 14,08

    1 Factura 23940 06.02.2013 NIPLU BRONZ 1/2*1/2 BUC 8,000 1,76 14,08

    NIPLU BRONZ 1/2*3/8 2,000 2,48

    1 Factura 23940 06.02.2013 NIPLU BRONZ 1/2*3/8 BUC 2,000 1,24 2,48

    NIPLU BZ 1 3,000 9,96

    1 Factura 25511 13.05.2013 NIPLU BZ 1 BUC 3,000 3,32 9,96

    NIPLU BZ 1/2 4,000 6,96

    1 Factura 25511 13.05.2013 NIPLU BZ 1/2 BUC 4,000 1,74 6,96

    NIPLU BZ 11/2 2,000 17,08

    1 Factura 25081 16.04.2013 NIPLU BZ 11/2 BUC 2,000 8,54 17,08

    NIPLU BZ 11/4" 2,000 9,48

    1 Factura 25081 16.04.2013 NIPLU BZ 11/4" BUC 2,000 4,74 9,48

    NIPLU BZ 3/4*3/4 2,000 3,74

    1 Factura 25081 16.04.2013 NIPLU BZ 3/4*3/4 BUC 2,000 1,87 3,74

    NIPLU CUPRU FE 18*1/2" 6,000 7,14

    1 Factura 25078 16.04.2013 NIPLU CUPRU FE 18*1/2" BUC 6,000 1,19 7,14

    NIPLU CUPRU FE 18*3/4 6,000 9,90

    1 Factura 25078 16.04.2013 NIPLU CUPRU FE 18*3/4 BUC 6,000 1,65 9,90

    NIPLU CUPRU FE 22*1" 8,000 24,16

    1 Factura 25078 16.04.2013 NIPLU CUPRU FE 22*1" BUC 8,000 3,02 24,16

    NIPLU CUPRU FE 22*3/4" 6,000 11,40

    1 Factura 25078 16.04.2013 NIPLU CUPRU FE 22*3/4" BUC 6,000 1,90 11,40

    NIPLU CUPRU FE 35*11/2 4,000 39,32

    1 Factura 25078 16.04.2013 NIPLU CUPRU FE 35*11/2 BUC 4,000 9,83 39,32

    NIPLU CUPRU FI 18*3/4 4,000 8,56

    1 Factura 25078 16.04.2013 NIPLU CUPRU FI 18*3/4 BUC 4,000 2,14 8,56

    NIPLU CUPRU FI 22*1" 8,000 23,04

    1 Factura 25078 16.04.2013 NIPLU CUPRU FI 22*1" BUC 8,000 2,88 23,04

    NIPLU CUPRU FI 22*3/4" 8,000 17,44

    1 Factura 25078 16.04.2013 NIPLU CUPRU FI 22*3/4" BUC 8,000 2,18 17,44

    NIPLU CUPRU FI 28*1 12,000 36,24

    1 Factura 024148 20.02.2013 NIPLU CUPRU FI 28*1 BUC 8,000 3,02 24,16

    2 Factura 25078 16.04.2013 NIPLU CUPRU FI 28*1 BUC 4,000 3,02 12,08

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 7 / 16

  • 5/28/2018 Achizitii Bssvrfd

    8/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    OLANDEZ 330 N 1" 1,000 2,96

    1 Factura 25081 16.04.2013 OLANDEZ 330 N 1" BUC 1,000 2,96 2,96

    OLANDEZ 330 N 11/2" 4,000 29,60

    1 Factura 25081 16.04.2013 OLANDEZ 330 N 11/2" BUC 4,000 7,40 29,60

    OLANDEZ 330 N 11/4" 4,000 18,88

    1 Factura 25081 16.04.2013 OLANDEZ 330 N 11/4" BUC 4,000 4,72 18,88

    OLANDEZ 330 N 3/4" 2,000 5,06

    1 Factura 25081 16.04.2013 OLANDEZ 330 N 3/4" BUC 2,000 2,53 5,06

    OLANDEZ 330 Z 3" 1,000 59,10

    1 Factura 24486 16.03.2013 OLANDEZ 330 Z 3" BUC 1,000 59,10 59,10

    OLANDEZ INT-EXT 331 N 1" 6,000 22,44

    1 Factura 25081 16.04.2013 OLANDEZ INT-EXT 331 N 1" BUC 6,000 3,74 22,44

    OLANDEZ INT-EXT 331 N 1/2" 2,000 5,22

    1 Factura 25081 16.04.2013 OLANDEZ INT-EXT 331 N 1/2" BUC 2,000 2,61 5,22

    OLANDEZ INT-EXT 331 N 3/4" 4,000 12,32

    1 Factura 25081 16.04.2013 OLANDEZ INT-EXT 331 N 3/4" BUC 4,000 3,08 12,32

    PACHET CENTRALA TERMICA BUDERUS, TIP LOGAMAX PLUS 1,000 13398,25

    1 Factura IS100796 08.03.2013 PACHET CENTRALA

    TERMICA BUDERUS, TIP

    LOGAMAX PLUS

    BUC 1,000 13398,25 13398,25

    PASTA VERDE 460GR 14,000 57,14

    1 Factura 24695 28.03.2013 PASTA VERDE 460GR BUC 1,000 4,10 4,10

    2 Factura 24789 02.04.2013 PASTA VERDE 460GR BUC 3,000 4,11 12,33

    3 Factura 25021 12.04.2013 PASTA VERDE 460GR BUC 3,000 4,08 12,24

    4 Factura 25021 12.04.2013 PASTA VERDE 460GR BUC 1,000 4,07 4,07

    5 Factura 25155 19.04.2013 PASTA VERDE 460GR BUC 5,000 4,07 20,35

    6 Factura 25311 26.04.2013 PASTA VERDE 460GR BUC 1,000 4,05 4,05

    PIESA CURATIRE PP D110 1,000 5,07

    1 Factura 024148 20.02.2013 PIESA CURATIRE PP D110 BUC 1,000 5,07 5,07

    PRELUNGITOR COAXIAL L=0.5M 0,000 0,00

    1 Factura 25022 12.04.2013 PRELUNGITOR COAXIAL

    L=0.5M

    BUC 1,000 75,21 75,21

    2 Factura 25157 19.04.2013 PRELUNGITOR COAXIAL

    L=0.5M

    BUC -1,000 75,21 -75,21

    PRELUNGITOR COAXIAL L=1M 1,000 110,02

    1 Factura 25045 13.04.2013 PRELUNGITOR COAXIAL L=1M BUC 1,000 110,02 110,02

    RACORD ALAMA BM DN15 1,000 6,30

    1 Factura 24371 06.03.2013 RACORD ALAMA BM DN15 BUC 1,000 6,30 6,30

    RACORD COMP.PEHD FE 25*3/4 1,000 1,19

    1 Factura 24371 06.03.2013 RACORD COMP.PEHD FE

    25*3/4

    BUC 1,000 1,19 1,19

    RACORD REFULARE TIP C 9,000 180,00

    1 Factura 24395 08.03.2013 RACORD REFULARE TIP C BUC 3,000 20,00 60,00

    2 Factura 24443 13.03.2013 RACORD REFULARE TIP C BUC 3,000 20,00 60,00

    3 Factura 25354 30.04.2013 RACORD REFULARE TIP C BUC 4,000 20,00 80,00

    4 Factura 25495 10.05.2013 RACORD REFULARE TIP C BUC -1,000 20,00 -20,00

    RAD.22*300*1400 VN 1,000 236,02

    1 Factura 23752 23.01.2013 RAD.22*300*1400 VN BUC 1,000 236,02 236,02

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 8 / 16

  • 5/28/2018 Achizitii Bssvrfd

    9/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    RAD.22*600*1000 VN 2,000 441,10

    1 Factura 23752 23.01.2013 RAD.22*600*1000 VN BUC 2,000 220,55 441,10

    RAD.22*600*1200 VN 2,000 524,92

    1 Factura 23752 23.01.2013 RAD.22*600*1200 VN BUC 2,000 262,46 524,92

    RAD.22*600*2000 VN 1,000 430,12

    1 Factura 23752 23.01.2013 RAD.22*600*2000 VN BUC 1,000 430,12 430,12

    RAD.22*600*400 VN 1,000 99,92

    1 Factura 23752 23.01.2013 RAD.22*600*400 VN BUC 1,000 99,92 99,92

    RAD.22*600*600 VN 1,000 136,71

    1 Factura 23752 23.01.2013 RAD.22*600*600 VN BUC 1,000 136,71 136,71

    RAMIF.PP PT.CANALIZ. LA 45 GR D110*50MM 4,000 12,20

    1 Factura 024159 21.02.2013 RAMIF.PP PT.CANALIZ. LA 45

    GR D110*50MM

    BUC 4,000 3,05 12,20

    RAMIF.PP PT.CANALIZ. LA 45GR D50*40mm 2,000 3,78

    1 Factura 024159 21.02.2013 RAMIF.PP PT.CANALIZ. LA

    45GR D50*40mm

    BUC 2,000 1,89 3,78

    RAMIF.PP PT.CANALIZ. LA 67 GR D110*110MM 1,000 4,36

    1 Factura 024148 20.02.2013 RAMIF.PP PT.CANALIZ. LA 67

    GR D110*110MM

    BUC 1,000 4,36 4,36

    RAMIF.PP PT.CANALIZ. LA 87 GR D110*110MM 1,000 53,50

    1 Factura 024148 20.02.2013 RAMIF.PP PT.CANALIZ. LA 87

    GR D110*110MM

    BUC 1,000 53,50 53,50

    RAMIF.PP PT.CANALIZ. LA 87 GR D110*50MM 1,000 3,00

    1 Factura 024148 20.02.2013 RAMIF.PP PT.CANALIZ. LA 87

    GR D110*50MM

    BUC 1,000 3,00 3,00

    REDUCTIE 241 1 - 3/4 8,000 8,08

    1 Factura 25155 19.04.2013 REDUCTIE 241 1 - 3/4 BUC 8,000 1,01 8,08

    REDUCTIE 241 1 1/2 - 1 21,000 50,20

    1 Factura 24757 01.04.2013 REDUCTIE 241 1 1/2 - 1 BUC 1,000 2,00 2,00

    2 Factura 25155 19.04.2013 REDUCTIE 241 1 1/2 - 1 BUC 20,000 2,41 48,20

    REDUCTIE 241 1 1/2 - 1 1/4 28,000 64,12

    1 Factura 24757 01.04.2013 REDUCTIE 241 1 1/2 - 1 1/4 BUC 8,000 1,99 15,92

    2 Factura 25155 19.04.2013 REDUCTIE 241 1 1/2 - 1 1/4 BUC 20,000 2,41 48,20

    REDUCTIE 241 1 1/4 - 1 31,000 93,83

    1 Factura 24757 01.04.2013 REDUCTIE 241 1 1/4 - 1 BUC 1,000 1,73 1,73

    2 Factura 25155 19.04.2013 REDUCTIE 241 1 1/4 - 1 BUC 30,000 3,07 92,10

    REDUCTIE 241 1"- 1/2" 14,000 13,30

    1 Factura 24757 01.04.2013 REDUCTIE 241 1"- 1/2" BUC 14,000 0,95 13,30

    REDUCTIE 241 11/2 - 3/4 1,000 2,00

    1 Factura 24757 01.04.2013 REDUCTIE 241 11/2 - 3/4 BUC 1,000 2,00 2,00

    REDUCTIE 241 11/2- 1/2" 11,000 22,00

    1 Factura 24757 01.04.2013 REDUCTIE 241 11/2- 1/2" BUC 11,000 2,00 22,00

    REDUCTIE 241 11/4- 1/2" 3,000 5,19

    1 Factura 24757 01.04.2013 REDUCTIE 241 11/4- 1/2" BUC 3,000 1,73 5,19

    REDUCTIE 241 2-1 1/2 9,000 29,61

    1 Factura 24757 01.04.2013 REDUCTIE 241 2-1 1/2 BUC 9,000 3,29 29,61

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 9 / 16

  • 5/28/2018 Achizitii Bssvrfd

    10/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    REDUCTIE BZ 1*3/4 8,000 17,60

    1 Factura 024148 20.02.2013 REDUCTIE BZ 1*3/4 BUC 8,000 2,20 17,60

    REDUCTIE BZ 1-1/2 2,000 7,20

    1 Factura 24993 11.04.2013 REDUCTIE BZ 1-1/2 BUC 2,000 3,60 7,20

    REDUCTIE BZ 3/4-1/2 4,000 5,36

    1 Factura 24371 06.03.2013 REDUCTIE BZ 3/4-1/2 BUC 2,000 1,33 2,66

    2 Factura 25036 12.04.2013 REDUCTIE BZ 3/4-1/2 BUC 2,000 1,35 2,70

    REDUCTIE CUPRU 22*18 10,000 15,90

    1 Factura 25078 16.04.2013 REDUCTIE CUPRU 22*18 BUC 10,000 1,59 15,90

    REDUCTIE CUPRU 28*22 4,000 12,64

    1 Factura 25078 16.04.2013 REDUCTIE CUPRU 28*22 BUC 4,000 3,16 12,64

    REDUCTIE CUPRU 35*22 2,000 30,48

    1 Factura 25078 16.04.2013 REDUCTIE CUPRU 35*22 BUC 2,000 15,24 30,48

    REDUCTIE CUPRU 35*28 2,000 34,62

    1 Factura 25081 16.04.2013 REDUCTIE CUPRU 35*28 BUC 2,000 17,31 34,62

    REDUCTIE INT-EXT 241 N 1" x 1/2" 15,000 14,25

    1 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N 1" x

    1/2"

    BUC 15,000 0,95 14,25

    REDUCTIE INT-EXT 241 N 1" x 3/4" 24,000 22,80

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N 1" x

    3/4"

    BUC 15,000 0,95 14,25

    2 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N 1" x

    3/4"

    BUC 9,000 0,95 8,55

    REDUCTIE INT-EXT 241 N 11/2" x 1" 61,000 121,67

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 3,000 1,98 5,94

    2 Factura 24551 20.03.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 16,000 1,99 31,84

    3 Factura 24799 02.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 20,000 1,99 39,80

    4 Factura 24848 04.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 11,000 2,00 22,00

    5 Factura 25079 16.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 10,000 1,97 19,70

    6 Factura 25511 13.05.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1"

    BUC 1,000 2,39 2,39

    REDUCTIE INT-EXT 241 N 11/2" x 1/2" 6,000 11,94

    1 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N

    11/2" x 1/2"

    BUC 6,000 1,99 11,94

    REDUCTIE INT-EXT 241 N 11/2" x 11/4" 55,000 109,31

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 6,000 1,98 11,88

    2 Factura 24551 20.03.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 16,000 1,99 31,84

    3 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 3,000 1,99 5,97

    4 Factura 24799 02.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 8,000 1,99 15,92

    5 Factura 24848 04.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 12,000 2,00 24,00

    6 Factura 25079 16.04.2013 REDUCTIE INT-EXT 241 N

    11/2" x 11/4"

    BUC 10,000 1,97 19,70

    REDUCTIE INT-EXT 241 N 11/4" x 1" 125,000 218,70

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 15,000 1,72 25,80

    2 Factura 24551 20.03.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 33,000 1,73 57,09

    3 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 9,000 1,72 15,48

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 10 / 16

  • 5/28/2018 Achizitii Bssvrfd

    11/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    4 Factura 24799 02.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 7,000 1,73 12,11

    5 Factura 24848 04.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 12,000 1,73 20,76

    6 Factura 25079 16.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 20,000 1,71 34,20

    7 Factura 25217 23.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 6,000 1,84 11,04

    8 Factura 25217 23.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 4,000 1,83 7,32

    9 Factura 25284 25.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 5,000 1,83 9,15

    10 Factura 25284 25.04.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 13,000 1,84 23,92

    11 Factura 25511 13.05.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1"

    BUC 1,000 1,83 1,83

    REDUCTIE INT-EXT 241 N 11/4" x 1/2" 9,000 15,48

    1 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N

    11/4" x 1/2"

    BUC 9,000 1,72 15,48

    REDUCTIE INT-EXT 241 N 2" x 1 1/2" 11,000 43,83

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N 2" x

    1 1/2"

    BUC 3,000 3,28 9,84

    2 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N 2" x

    1 1/2"

    BUC 3,000 3,28 9,84

    3 Factura 25117 17.04.2013 REDUCTIE INT-EXT 241 N 2" x

    1 1/2"

    BUC 5,000 4,83 24,15

    REDUCTIE INT-EXT 241 N 2" x 1" 26,000 93,15

    1 Factura 024120 19.02.2013 REDUCTIE INT-EXT 241 N 2" x

    1"

    BUC 3,000 3,28 9,84

    2 Factura 24799 02.04.2013 REDUCTIE INT-EXT 241 N 2" x

    1"

    BUC 5,000 3,29 16,45

    3 Factura 24848 04.04.2013 REDUCTIE INT-EXT 241 N 2" x

    1"

    BUC 8,000 3,31 26,48

    4 Factura 25117 17.04.2013 REDUCTIE INT-EXT 241 N 2" x

    1"

    BUC 8,000 4,04 32,32

    5 Factura 25117 17.04.2013 REDUCTIE INT-EXT 241 N 2" x

    1"

    BUC 2,000 4,03 8,06

    REDUCTIE INT-EXT 241 N 2" x 1/2" 3,000 9,84

    1 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N 2" x

    1/2"

    BUC 3,000 3,28 9,84

    REDUCTIE INT-EXT 241 N 2" x 11/2" 8,000 26,40

    1 Factura 24799 02.04.2013 REDUCTIE INT-EXT 241 N 2" x

    11/2"

    BUC 4,000 3,29 13,16

    2 Factura 24848 04.04.2013 REDUCTIE INT-EXT 241 N 2" x

    11/2"

    BUC 4,000 3,31 13,24

    REDUCTIE INT-EXT 241 N 3/4" x 1/2" 9,000 5,94

    1 Factura 24695 28.03.2013 REDUCTIE INT-EXT 241 N 3/4"

    x 1/2"

    BUC 9,000 0,66 5,94

    REDUCTIE INT-EXT 241 Z 11/2" x 11/4" 1,000 2,94

    1 Factura 25311 26.04.2013 REDUCTIE INT-EXT 241 Z

    11/2" x 11/4"

    BUC 1,000 2,94 2,94

    REDUCTIE INT-EXT 241 Z 2 1/2"-2" 2,000 15,00

    1 Factura 24369 06.03.2013 REDUCTIE INT-EXT 241 Z 2

    1/2"-2"

    BUC 2,000 7,50 15,00

    REDUCTIE INT-EXT 241 Z 3- 2 1/2" 1,000 9,91

    1 Factura 24369 06.03.2013 REDUCTIE INT-EXT 241 Z 3- 2

    1/2"

    BUC 1,000 9,91 9,91

    REDUCTIE INT-EXT 241 Z 3" x 2" 3,000 33,39

    1 Factura 024158 21.02.2013 REDUCTIE INT-EXT 241 Z 3" x

    2"

    BUC 2,000 9,96 19,92

    2 Factura 25354 30.04.2013 REDUCTIE INT-EXT 241 Z 3" x

    2"

    BUC 1,000 13,47 13,47

    REDUCTIE PPR 25*20 4,000 0,84

    1 Factura IS024961 10.04.2013 REDUCTIE PPR 25*20 BUC 4,000 0,21 0,84

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 11 / 16

  • 5/28/2018 Achizitii Bssvrfd

    12/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    REDUCTIE PPR 32*25 5,000 1,35

    1 Factura IS024961 10.04.2013 REDUCTIE PPR 32*25 BUC 4,000 0,27 1,08

    2 Factura 24993 11.04.2013 REDUCTIE PPR 32*25 BUC 1,000 0,27 0,27

    ROB BILA RAC OL MANER FLUTURE 3/4 8,000 112,00

    1 Factura 24609 25.03.2013 ROB BILA RAC OL MANER

    FLUTURE 3/4

    BUC 8,000 14,00 112,00

    ROB.BILA AQUASFER MT MAN ER FLUTURE 1/2" 3,000 16,26

    1 Factura 25511 13.05.2013 ROB.BILA AQUASFER MT

    MAN ER FLUTURE 1/2"

    BUC 3,000 5,42 16,26

    ROB.BILA AQUASFER MT MAN ER FLUTURE 3/4 8,000 65,12

    1 Factura 024148 20.02.2013 ROB.BILA AQUASFER MT

    MAN ER FLUTURE 3/4

    BUC 8,000 8,14 65,12

    ROB.BILA HYDROSFER MM MANER FLUTURE 1/2 5,000 22,80

    1 Factura 24848 04.04.2013 ROB.BILA HYDROSFER MM

    MANER FLUTURE 1/2

    BUC 5,000 4,56 22,80

    ROB.BILA HYDROSFER MT MA NER FLUTURE 1/2" 1,000 4,78

    1 Factura 25311 26.04.2013 ROB.BILA HYDROSFER MTMA NER FLUTURE 1/2"

    BUC 1,000 4,78 4,78

    ROB.BILA HYDROSFER RAC OL MM 3/4" 3,000 34,08

    1 Factura 25081 16.04.2013 ROB.BILA HYDROSFER RAC

    OL MM 3/4"

    BUC 3,000 11,36 34,08

    ROB.RETUR COLT 1/2 19,000 121,22

    1 Factura IS024961 10.04.2013 ROB.RETUR COLT 1/2 BUC 19,000 6,38 121,22

    ROB.TUR COLT 1/2 19,000 129,77

    1 Factura IS024961 10.04.2013 ROB.TUR COLT 1/2 BUC 19,000 6,83 129,77

    ROBINET DE GOLIRE 1/2" 3,000 24,93

    1 Factura 25079 16.04.2013 ROBINET DE GOLIRE 1/2" BUC 3,000 8,31 24,93

    ROBINET GOLIRE 1/2 16,000 137,92

    1 Factura 024148 20.02.2013 ROBINET GOLIRE 1/2 BUC 8,000 8,29 66,32

    2 Factura 24609 25.03.2013 ROBINET GOLIRE 1/2 BUC 8,000 8,95 71,60

    ROBINET HIDRANT INT TIP C 2" ALUMINIU 9,000 432,00

    1 Factura 24395 08.03.2013 ROBINET HIDRANT INT TIP C

    2" ALUMINIU

    BUC 2,000 48,00 96,00

    2 Factura 24443 13.03.2013 ROBINET HIDRANT INT TIP C

    2" ALUMINIU

    BUC 4,000 48,00 192,00

    3 Factura 25354 30.04.2013 ROBINET HIDRANT INT TIP C

    2" ALUMINIU

    BUC 4,000 48,00 192,00

    4 Factura 25495 10.05.2013 ROBINET HIDRANT INT TIP C

    2" ALUMINIU

    BUC -1,000 48,00 -48,00

    ROBINET MINI INT-INT 1/2*1/2 4,000 19,64

    1 Factura 23940 06.02.2013 ROBINET MINI INT-INT 1/2*1/2 BUC 4,000 4,91 19,64

    SEMI OLANDEZ CU 15*1/2 FI 14,000 26,60

    1 Factura 024148 20.02.2013 SEMI OLANDEZ CU 15*1/2 FI BUC 14,000 1,90 26,60

    SEMI OLANDEZ CU 18*1/2 34,000 75,46

    1 Factura 024148 20.02.2013 SEMI OLANDEZ CU 18*1/2 BUC 18,000 2,21 39,78

    2 Factura 24609 25.03.2013 SEMI OLANDEZ CU 18*1/2 BUC 16,000 2,23 35,68

    SEMI OLANDEZ CU 22*3/4 FI 4,000 12,76

    1 Factura 024159 21.02.2013 SEMI OLANDEZ CU 22*3/4 FI BUC 4,000 3,19 12,76

    SEMIOLANDEZ CUPRU 28*1" 4,000 22,60

    1 Factura 024159 21.02.2013 SEMIOLANDEZ CUPRU 28*1" BUC 4,000 5,65 22,60

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 12 / 16

  • 5/28/2018 Achizitii Bssvrfd

    13/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    SET ACCESORII RAD.OTEL VN 8,000 66,00

    1 Factura 23752 23.01.2013 SET ACCESORII RAD.OTEL

    VN

    BUC 8,000 8,25 66,00

    TEAVA COLAC TERMOIZOLATA 15*1 50,000 729,50

    1 Factura 024066 14.02.2013 TEAVA COLAC

    TERMOIZOLATA 15*1

    M 50,000 14,59 729,50

    TEAVA COLAC TERMOIZOLATA 18*1 50,000 847,50

    1 Factura 24033 13.02.2013 TEAVA COLAC

    TERMOIZOLATA 18*1

    M 50,000 16,95 847,50

    TEAVA CUPRU 35*1 3,000 101,64

    1 Factura 25078 16.04.2013 TEAVA CUPRU 35*1 M 3,000 33,88 101,64

    TEAVA CUPRU B18 3,000 27,87

    1 Factura 25078 16.04.2013 TEAVA CUPRU B18 M 3,000 9,29 27,87

    TEAVA CUPRU B22 18,000 231,66

    1 Factura 024163 21.02.2013 TEAVA CUPRU B22 M 6,000 13,59 81,54

    2 Factura 25078 16.04.2013 TEAVA CUPRU B22 M 12,000 12,51 150,12

    TEAVA CUPRU B28 12,000 295,92

    1 Factura 024163 21.02.2013 TEAVA CUPRU B28 M 6,000 24,16 144,96

    2 Factura 25079 16.04.2013 TEAVA CUPRU B28 M 6,000 25,16 150,96

    TEAVA PE80 PN6 SDR17.6 DN25*2 200,000 216,00

    1 Factura 24392 08.03.2013 TEAVA PE80 PN6 SDR17.6

    DN25*2

    M 200,000 1,08 216,00

    TEAVA PP CU MUFA 110/0.25M 4,000 14,84

    1 Factura 024159 21.02.2013 TEAVA PP CU MUFA

    110/0.25M

    BUC 4,000 3,71 14,84

    TEAVA PP CU MUFA 110/0.5M 3,000 17,88

    1 Factura 024159 21.02.2013 TEAVA PP CU MUFA 110/0.5M BUC 3,000 5,96 17,88

    TEAVA PP CU MUFA 110/1M 3,000 29,67

    1 Factura 024148 20.02.2013 TEAVA PP CU MUFA 110/1M BUC 3,000 9,89 29,67

    TEAVA PP CU MUFA 32/1M 2,000 4,06

    1 Factura 25081 16.04.2013 TEAVA PP CU MUFA 32/1M BUC 2,000 2,03 4,06

    TEAVA PP CU MUFA 40/0.25M 4,000 4,12

    1 Factura 024159 21.02.2013 TEAVA PP CU MUFA 40/0.25M BUC 4,000 1,03 4,12

    TEAVA PPR PN20 D20 FIBRA 32,000 55,36

    1 Factura IS024961 10.04.2013 TEAVA PPR PN20 D20 FIBRA M 32,000 1,73 55,36

    TEAVA PPR PN20 D25 FIBRA 100,000 245,00

    1 Factura IS024961 10.04.2013 TEAVA PPR PN20 D25 FIBRA ML 56,000 2,45 137,20

    2 Factura 24993 11.04.2013 TEAVA PPR PN20 D25 FIBRA ML 44,000 2,45 107,80

    TEAVA PPR PN20 D32 FIBRA 120,000 542,40

    1 Factura IS024961 10.04.2013 TEAVA PPR PN20 D32 FIBRA ML 52,000 4,52 235,04

    2 Factura 24993 11.04.2013 TEAVA PPR PN20 D32 FIBRA ML 68,000 4,52 307,36

    TEAVA REF. TIP C CU RACORD FIX 9,000 180,00

    1 Factura 24395 08.03.2013 TEAVA REF. TIP C CU

    RACORD FIX

    BUC 3,000 20,00 60,00

    2 Factura 24443 13.03.2013 TEAVA REF. TIP C CU

    RACORD FIX

    BUC 3,000 20,00 60,00

    3 Factura 25354 30.04.2013 TEAVA REF. TIP C CU

    RACORD FIX

    BUC 4,000 20,00 80,00

    4 Factura 25495 10.05.2013 TEAVA REF. TIP C CU

    RACORD FIX

    BUC -1,000 20,00 -20,00

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 13 / 16

  • 5/28/2018 Achizitii Bssvrfd

    14/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    TEAVA SUDATA N 1" 30,000 170,70

    1 Factura 24743 29.03.2013 TEAVA SUDATA N 1" M 30,000 5,69 170,70

    TEAVA SUDATA N 11/2" 78,000 655,20

    1 Factura 24773 01.04.2013 TEAVA SUDATA N 11/2" M 78,000 8,40 655,20

    TEAVA SUDATA N 11/4" 18,000 136,80

    1 Factura 24743 29.03.2013 TEAVA SUDATA N 11/4" M 18,000 7,60 136,80

    TEAVA SUDATA N 2 1/2 6,000 110,70

    1 Factura 24384 07.03.2013 TEAVA SUDATA N 2 1/2 M 6,000 18,45 110,70

    TEAVA SUDATA N 3/4" 36,000 154,98

    1 Factura 24743 29.03.2013 TEAVA SUDATA N 3/4" M 18,000 4,31 77,58

    2 Factura 24743 29.03.2013 TEAVA SUDATA N 3/4" M 18,000 4,30 77,40

    TEAVA SUDATA N 60.3*3.5 24,000 285,84

    1 Factura 24743 29.03.2013 TEAVA SUDATA N 60.3*3.5 M 24,000 11,91 285,84

    TEU 130 N 1" 132,000 256,12

    1 Factura 024120 19.02.2013 TEU 130 N 1" BUC 9,000 1,87 16,83

    2 Factura 24551 20.03.2013 TEU 130 N 1" BUC 33,000 1,89 62,37

    3 Factura 24695 28.03.2013 TEU 130 N 1" BUC 9,000 1,88 16,92

    4 Factura 24799 02.04.2013 TEU 130 N 1" BUC 9,000 1,88 16,92

    5 Factura 24848 04.04.2013 TEU 130 N 1" BUC 8,000 1,89 15,12

    6 Factura 25079 16.04.2013 TEU 130 N 1" BUC 20,000 1,87 37,40

    7 Factura 25155 19.04.2013 TEU 130 N 1" BUC 36,000 2,06 74,16

    8 Factura 25284 25.04.2013 TEU 130 N 1" BUC 8,000 2,05 16,40

    TEU 130 N 11/2" 89,000 418,45

    1 Factura 024120 19.02.2013 TEU 130 N 11/2" BUC 9,000 4,62 41,58

    2 Factura 24551 20.03.2013 TEU 130 N 11/2" BUC 16,000 4,65 74,40

    3 Factura 24695 28.03.2013 TEU 130 N 11/2" BUC 6,000 4,64 27,84

    4 Factura 24757 01.04.2013 TEU 130 N 11/2" BUC 13,000 4,65 60,45

    5 Factura 24799 02.04.2013 TEU 130 N 11/2" BUC 14,000 4,65 65,10

    6 Factura 24848 04.04.2013 TEU 130 N 11/2" BUC 13,000 4,66 60,58

    7 Factura 25079 16.04.2013 TEU 130 N 11/2" BUC 10,000 4,61 46,10

    8 Factura 25155 19.04.2013 TEU 130 N 11/2" BUC 8,000 5,30 42,40

    TEU 130 N 11/4" 78,000 260,60

    1 Factura 024120 19.02.2013 TEU 130 N 11/4" BUC 9,000 2,95 26,55

    2 Factura 24551 20.03.2013 TEU 130 N 11/4" BUC 12,000 2,97 35,64

    3 Factura 24551 20.03.2013 TEU 130 N 11/4" BUC 5,000 2,98 14,90

    4 Factura 24695 28.03.2013 TEU 130 N 11/4" BUC 9,000 2,97 26,73

    5 Factura 24848 04.04.2013 TEU 130 N 11/4" BUC 3,000 2,98 8,94

    6 Factura 25079 16.04.2013 TEU 130 N 11/4" BUC 10,000 2,95 29,50

    7 Factura 25155 19.04.2013 TEU 130 N 11/4" BUC 22,000 3,95 86,90

    8 Factura 25284 25.04.2013 TEU 130 N 11/4" BUC 8,000 3,93 31,44

    TEU 130 N 2" 23,000 166,12

    1 Factura 024120 19.02.2013 TEU 130 N 2" BUC 3,000 6,94 20,82

    2 Factura 24695 28.03.2013 TEU 130 N 2" BUC 3,000 6,97 20,91

    3 Factura 24757 01.04.2013 TEU 130 N 2" BUC 5,000 6,99 34,95

    4 Factura 24848 04.04.2013 TEU 130 N 2" BUC 8,000 7,01 56,08

    5 Factura 25117 17.04.2013 TEU 130 N 2" BUC 4,000 8,34 33,36

    TEU 130 N 3/4" 23,000 29,17

    1 Factura 024120 19.02.2013 TEU 130 N 3/4" BUC 6,000 1,24 7,44

    2 Factura 24695 28.03.2013 TEU 130 N 3/4" BUC 9,000 1,25 11,25

    3 Factura 25155 19.04.2013 TEU 130 N 3/4" BUC 8,000 1,31 10,48

    TEU 130 Z 2 1/2" 1,000 17,38

    1 Factura 24369 06.03.2013 TEU 130 Z 2 1/2" BUC 1,000 17,38 17,38

    TEU 130 Z 3" 3,000 68,77

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 14 / 16

  • 5/28/2018 Achizitii Bssvrfd

    15/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    1 Factura 024158 21.02.2013 TEU 130 Z 3" BUC 2,000 22,89 45,78

    2 Factura 24486 16.03.2013 TEU 130 Z 3" BUC 1,000 22,99 22,99

    TEU 130R Z 11/2" x 1/2" 1,000 6,98

    1 Factura 25311 26.04.2013 TEU 130R Z 11/2" x 1/2" BUC 1,000 6,98 6,98

    TEU BRONZ 1/2 2,000 6,86

    1 Factura 23940 06.02.2013 TEU BRONZ 1/2 BUC 2,000 3,43 6,86

    TEU CAPAT DISTR.3/4*1/2*3/8 16,000 81,28

    1 Factura 024148 20.02.2013 TEU CAPAT DISTR.3/4*1/2*3/8 BUC 8,000 5,05 40,40

    2 Factura 24609 25.03.2013 TEU CAPAT DISTR.3/4*1/2*3/8 BUC 8,000 5,11 40,88

    TEU CUPRU 15MM 2,000 2,04

    1 Factura 24680 27.03.2013 TEU CUPRU 15MM BUC 2,000 1,02 2,04

    TEU CUPRU 18MM 6,000 12,42

    1 Factura 25078 16.04.2013 TEU CUPRU 18MM BUC 6,000 2,07 12,42

    TEU CUPRU 22MM 10,000 35,40

    1 Factura 25078 16.04.2013 TEU CUPRU 22MM BUC 10,000 3,54 35,40

    TEU CUPRU 28MM 6,000 41,94

    1 Factura 25078 16.04.2013 TEU CUPRU 28MM BUC 6,000 6,99 41,94

    TEU CUPRU 35MM 1,000 20,79

    1 Factura 25078 16.04.2013 TEU CUPRU 35MM BUC 1,000 20,79 20,79

    TEU PPR 25*20*25 14,000 6,16

    1 Factura IS024961 10.04.2013 TEU PPR 25*20*25 BUC 14,000 0,44 6,16

    TEU PPR 32*20*32 24,000 20,40

    1 Factura IS024961 10.04.2013 TEU PPR 32*20*32 BUC 24,000 0,85 20,40

    TEU PPR D20 4,000 1,12

    1 Factura IS024961 10.04.2013 TEU PPR D20 BUC 4,000 0,28 1,12

    TEU PPR D25 13,000 5,33

    1 Factura IS024961 10.04.2013 TEU PPR D25 BUC 13,000 0,41 5,33

    TEU PPR D32 3,000 2,61

    1 Factura IS024961 10.04.2013 TEU PPR D32 BUC 3,000 0,87 2,61

    TEU PPR FI 25*1/2 2,000 5,62

    1 Factura 24993 11.04.2013 TEU PPR FI 25*1/2 BUC 2,000 2,81 5,62

    TEU PPR FI 25*3/4 2,000 6,96

    1 Factura 25036 12.04.2013 TEU PPR FI 25*3/4 BUC 2,000 3,48 6,96

    TEU PPR FI 32*1" 2,000 13,30

    1 Factura 24993 11.04.2013 TEU PPR FI 32*1" BUC 2,000 6,65 13,30

    TIJA COMPLET FILETATA 1M DIN 975-4.8 M10ZA 40,000 99,72

    1 Factura 024228 26.02.2013 TIJA COMPLET FILETATA 1M

    DIN 975-4.8 M10ZA

    BUC 8,000 2,49 19,92

    2 Factura 024228 26.02.2013 TIJA COMPLET FILETATA 1M

    DIN 975-4.8 M10ZA

    BUC 4,000 2,50 10,00

    3 Factura 024231 26.02.2013 TIJA COMPLET FILETATA 1M

    DIN 975-4.8 M10ZA

    BUC 20,000 2,49 49,80

    4 Factura 024231 26.02.2013 TIJA COMPLET FILETATA 1M

    DIN 975-4.8 M10ZA

    BUC 8,000 2,50 20,00

    VANA 3CAI VCV NBS AE-C33 20 3/41,000 99,22

    1 Factura 23848 30.01.2013 VANA 3CAI VCV NBS AE-C33

    20 3/4

    BUC 1,000 99,22 99,22

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 15 / 16

  • 5/28/2018 Achizitii Bssvrfd

    16/16

    S.C. GENERAL INSTALATII S.R.L. * Statistica *

    Nr. crt. Tip Seria Numar doc. Data doc. Cod produs Denumire produs U.M. Cantitate Pret

    cumparare

    Valoare cumparare

    VENTILOCONV.CAQ2 NBS CAS ETA TAVAN FC08CAQ2 1,000 1422,48

    1 Factura 23848 30.01.2013 VENTILOCONV.CAQ2 NBS

    CAS ETA TAVAN FC08CAQ2

    BUC 1,000 1422,48 1422,48

    VENTILOCONV.CB NBS TAVAN NECARC.FC14CB22/1P2LBC 1,000 975,62

    1 Factura 23987 08.02.2013 VENTILOCONV.CB NBS

    TAVAN

    NECARC.FC14CB22/1P2LBC

    BUC 1,000 975,62 975,62

    3342,43 36603,38TOTAL:

    Semnaturi,

    Data: 17.05.2013 09:04:35 (Administrator)

    Xecutive.SQL v.13.20.41 16 / 16


Top Related