Download - 2011 put it all
-
8/6/2019 2011 put it all
1/15
SHANNON MILLIKEN
Network
Proposal
June 13
2011CCNA Discovery Networking for Home and Small Businesses: Capstone
Project Putting it All Together
-
8/6/2019 2011 put it all
2/15
2
Dear, Susan Roberts
Enclosed in this packet is a network proposal for the Anycompany Corperation. This
packet contains the hardware specifics for the computers that will be used by the
administrative manager, film and graphics editor, and the mobile film crew. This packet also
contains the cost of those specific computers along with the cost of the server wireless router
and DSl Modem. The physical layout of the network and the Adressing Scheme for the Server
and other user computers. After assessing your Building and Budget in this packet I have given
you my best recommendations of what you need to start your business over.
Your IT advisor ,
Shannon Milliken
-
8/6/2019 2011 put it all
3/15
3
Computer System Planning For
Job Role: Administrative manager
Component Recommendation
Processor:
(Manufacture/model/speed)AMD Pheonix X6 10907/3.2Ghz
Memory:
(typem, amount)Kingston ram/ 4GB
Hard Drive:
(type, capacity)SEAGATE /2TB
CD-ROM/DVD:
(R,R/W,speed)
HP/ 130ms
USB Ports:
(number, location)4 integrated on the front
Video Card:
(manufacturer, model, video RAM)MSI / 768MB
Sound Card:
(Manufacture, model)Aseus Xonar DS Audiocard
Modem:
(Internal/external, speed, standard)Integrated
Network Card(s):
(Ethernet: speed, wireless, standard)Rosewill 100/1000 Mbps/ 802.3
standard
Operating System:(manufacturer, version, compatibility)
Windows XP
Monitor:
(size, resolution, refresh)17x10 inch lcd
Printer:
(manufacturer, model, type, speed)Hp laser All in one
Speakers:
(manufacturer, model, type)N/A
Internet Connection:
(USB/Ethernet/wireless)
-
8/6/2019 2011 put it all
4/15
4
Computer System Planning Form
Job Role: Film and Graphics Editor
Component Recommendation
Processor:
(Manufacture/model/speed)AMD Pheonix X6 10907/3.2Ghz
Memory:
(typem, amount)Kingston ram/ 4GB
Hard Drive:
(type, capacity)SEAGATE /2TB
CD-ROM/DVD:(R,R/W,speed) HP/ 130msUSB Ports:
(number, location)4 integrated on the front
Video Card:
(manufacturer, model, video RAM)MSI / 768MB
Sound Card:
(Manufacture, model)Aseus Xonar DS Audiocard
Modem:
(Internal/external, speed, standard)Integrated
Network Card(s):
(Ethernet: speed, wireless, standard)Rosewill 100/1000 Mbps/ 802.3
standardOperating System:
(manufacturer, version, compatibility)Windows XP
Monitor:
(size, resolution, refresh)17x10 inch lcd
Printer:
(manufacturer, model, type, speed)Hp laser All in one
Speakers:
(manufacturer, model, type)N/A
Internet Connection:
(USB/Ethernet/wireless)
-
8/6/2019 2011 put it all
5/15
5
Computer System Planning Form
Job Role: Mobile Worker * 6
*Shared Printer:
Component Recommendation
Processor:
(Manufacture/model/speed)Intel Dual core/ 2.6 GHz/3mb
Memory:
(typem, amount)2GB DDr3
Hard Drive:
(type, capacity)Seagate 320GB
CD-ROM/DVD:
(R,R/W,speed) Sony optime Black 18x Dvd/Cdrom
USB Ports:
(number, location)4 integrated left side
Video Card:
(manufacturer, model, video RAM)1024 Ati HD SSOU
Sound Card:
(Manufacture, model)Integrated
Modem:
(Internal/external, speed, standard)None
Network Card(s):
(Ethernet: speed, wireless, standard) IntegratedOperating System:
(manufacturer, version, compatibility)Windows XP
Monitor:
(size, resolution, refresh)Given
Printer:
(manufacturer, model, type, speed)Shared
Speakers:
(manufacturer, model, type)Integrated
Internet Connection:
(USB/Ethernet/wireless)Wireless
-
8/6/2019 2011 put it all
6/15
6
The Following Printer will be installed and shared to all workers.
Brother MFC Series MFC-7840W MFC Monochrome Laser Printer
ISP
y Verizon : Small Business Quick Plan with Static IPy Speed: 3MBPS/768KBPSy Services:
o Emailo Static Public Ipo DNSo Internet Connectivityo 74.99 per month
Internal Services:
y FTP/File Servery Mail Servery DHCPy DNSy Network Connectivity
Devices providing these services:
y Windows 2003 Server ( FTP/File Server and Email Server )y Linksys ISR ( DHCP, DNS, Firewall, and Network Connectivity )
Equipment is to be installed after hours when possible.
y Wireless SecurityWPA2 Key : K!@#112345
SSID : Main Office
ESSID-Broadcast: disabled
y Windows Server 2003Static IP : 182.18.1.167Host Name: Company server
Server Services: Mail, FTP, File sharing
y Linksys ISRLinksys Wireless-G Broadband Router WRT54GL
-
8/6/2019 2011 put it all
7/15
7
Are Wired connections required? Number: 4
Are Wireless connections required? Number: 6
Wireless standard Standard N
Firewall required? Yes
ISP connectivity required? Yes
Type of ISP connectivity DSLInternal or external modem required? Yes External DSL
Cables required? Yes Straight Threw
Battery backup required? Yes
-
8/6/2019 2011 put it all
8/15
8
Logical Topology
-
8/6/2019 2011 put it all
9/15
9
Physical Topology
-
8/6/2019 2011 put it all
10/15
10
Budget for Computers
Employee Computers
Administrative Manager $1,096.67Film and Graphics editor $857.82
Mobile Worker # 1-6 $469.99 per computer totaling $2819.94
Network Hardware
Linksys Wireless Router $59.99
Ethernet Cable $20.99
SDR-S1346-T04 $1199.00
Printers
HP all in one 149.99
SAMSUNG ML Series ML-2851ND 279.99
Total $6475.39
-
8/6/2019 2011 put it all
11/15
11
Budget Specifics
Administrative manager
Processor $229.00
RAM $44.99
Hard Drive $79.99
CD-RW/DVD $59.99
Video Card $159.99
Monitor $49.99
Speakers $49.99
Total $673.94
Film and Graphics Editor
Processor $240.00
RAM $44.99
Hard Drive $79.99
CD-RW/DVD $59.99
Video Card $159.99
Monitor $49.99
Speakers $49.99
Total $ 673.94
Mobile Worker
Bundle of laptops $2819.99
-
8/6/2019 2011 put it all
12/15
12
Checklist for installation of Computers at the customer site.
Film and Graphics Editor
Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.
Administrative Manager Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.
Mobile Workers
Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System
-
8/6/2019 2011 put it all
13/15
13
Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.
Checklist for the configuration and installation of the network equipment at the customer site.
Connect and verify power to the Linksys ISR Change IP of Router to 172.16.1.1 Set DHCP Range and settings on the ISR Set Authentication to TSK and Encryption to WPA2 On the ISR Change ISR ESSID to accompany Disable ISR Broadcast ESSID Set Username and Password on the ISR
Checklist for overall Security at A Company
6 Key pass code on all doors Password Policies that require a password change every 60 Days Installation of ADT Small Business Security Systems Site Survey Penetration test for the networks security and wireless security
Router Configuration:
-
8/6/2019 2011 put it all
14/15
14
Installation Documentation
1/14/11 Started at 1:00 P.M.
-Dcomputer1 Set to DHCP Successfully
-Dcomputer2 Set to DHCP Successfully
-ISR IP set to 172.16.1.1
-ISR DHCP Enabled
-ISR DHCP Range set to 182.16.1.150-250
-Server IP Set to 182.16.1.151
-
8/6/2019 2011 put it all
15/15
15
-Server Subnet Set to 255.255.255.0
-Printer IP Set to 182.16.1.162
-Printer Subnet Set to 255.255.255.0
-1:03 P.M. Ran Simulation of packet from Server to WComputer 1
Result : Unsuccessful
-1:07 P.M. Ran Simulation of packet from Server to WComputer 2
Result : successful
-1:09 P.M. Checked WComputer 1 & 2 IP settings and found DHCP Failed then set the IPs Statically but
within the DHCP Range.
Set WComputer 1 ip to 182.16.1.54
Set WComputer 2 ip to 182.16.1.102
-1:12 P.M. Ran Simulation of packet from Server to DComputer 1
Result : Successful
-1:17 P.M. Ran Simulation of packet from Server to DComputer 2
Result P: Successful
-1:20 P.M. Tested DComputer 1 and DComputer 2 connectivity to the printer
Result : Successful
-1:26 PM Tested Wireless Connectivity with the ISR to all Mobile Workers Computers
Result : Successful
-1:30 PM There was an average 1.5 Second Time Delay for the transportation of Wired Packets, and 2.3
Second Time Delay for all Wireless Packets.