Download - 13.September MPR 2012
-
7/31/2019 13.September MPR 2012
1/92
National Cyclone Ri
(NCRevenue (D
Government of
National Cyclone Ri
(NCRevenue (D
Government of
sk Mitigation Project
MP)) DepartmentAndhra Pradesh
sk
Mitigation Project
MP)) DepartmentAndhra Pradesh
-
7/31/2019 13.September MPR 2012
2/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
2.0 Third Party Quality Audit Consultant 3
3.0 Major Activities and Review Meetings of the Month 3
4.0 Status of TPQA Visits 4
5.0 Progress of NCRMP works 5
TPQA Status Report for NCRMP Works To the end of(30-09-2012) 6
6.0 District wise status of tests conducted by TPQA 30
7.0 Details of QC Audit Reports Submitted during this Month 31
8.0 Details of Environmental & Social Reports Submitted during this Month 33
-
7/31/2019 13.September MPR 2012
3/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state,
the nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-
December, cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic
events are increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years
ranging from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster
due to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based
on experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.
National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra Pradesh, headquartered at
Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project Construction of Multipurpose Cyclone Shelters, Roads to Cyclone
Shelters, and Roads to habitations and Roads & Bridges under NCRMP is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for which
agreements are concluded in each district is shown in the table below.
District
No. of works(Under Concluded Agreements) No. of works under ProgressNo. ofworks
-
7/31/2019 13.September MPR 2012
4/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone
Shelters, Roads to Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal
districts The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU)
NCRMP has selected Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd. On 31st
May2011, the Contract for Consultancy Service was signed between The Commissioner for Disaster
Management & Project Director, Project Implementation Unit (PIU) NCRMP and the Egis International in JV
-
7/31/2019 13.September MPR 2012
5/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
DistrictTotal Number of Visits
Up to Aug.'2012 In Sep.'2012Up to
September.'2012
Srikakulam 332 28 360
Vizianagaram 61 0 61
Vishakhapatnam 290 18 308
East Godavari 518 24 542
West Godavari 369 18 387
Krishna 227 10 237
Guntur 269 28 297
Prakasam 322 18 340
Nellore 272 13 285
No. of Visits by TPQA
-
7/31/2019 13.September MPR 2012
6/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 Progress of NCRMP works:
The district wise progress of works is shown below. The works in the West Godavari are not started and the works in
Krishna District has just started. At many places the first milestone is completed but works are not started. The line
departments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per the
agreement conditions should be imposed.
Third Party Quality Audit by Egis India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated
Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 21 0
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
5 West Godavari 3 0 10 0
6 Krishna 4 0 8 0
7 Guntur 6 2 17 0
-
7/31/2019 13.September MPR 2012
7/92
MONTHLY REPORT
6 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA Status Report for NCRMP Works To the end of(30-09-2012)
S.No. District
Packages /Works
entrustedStatus of Works
No.of
Visitsof
TPQA
TotalNo.
of QCtestsdone
NCRsAudit
ReportsIssued
Environmentaland Social
ReportsIssued
Issued closed Pending
PR R&B StartedNot
Started
1 Srikakulam 06_16 5_5 21 0 360 1358 42 36 6 60 52
2 Vizianagaram - 3_3 3 0 61 366 3 1 2 11 9
3 Visakhapatnam 13_21 - 21 0 308 1971 25 21 4 62 41
4 East Godavari 07_13 - 12 1 542 988 21 21 0 46 26
5 West Godavari 03_10 - 10 0 387 349 17 17 0 44 37
6 Krishna 04_08 - 8 0 237 82 3 3 0 33 21
7 Guntur 06_15 2_2 17 0 297 549 12 12 0 48 13
8 Prakasham 12_23 1_1 24 0 340 1887 31 22 5 109 49
9 Nellore 16_24 - 24 0 285 976 29 26 3 104 48
Total 67_130 11_11 140 1 2817 8526 183 159 20 517 296
-
7/31/2019 13.September MPR 2012
8/92
MONTHLY REPORT
7 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 30.09.2012
Category Packages allotted under Phase - 1Names of works under
each packageAgreement No. / Date DHS DFC
Progress up to
30.09.2012
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&Broad to Uddandapalem
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
Road from K. UmiladaJunction to Koduru (LinkRoad)
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
Road from Borubadra,Malagam to Kollipadu viaSeepuram, Gantapeta
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B road
Mobagam toDuubakavanipeta viaGajapathinagaram
/2010-11, Dt.30.04.2011
30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
Road fromTalasamudram to DolaRegulator
/2010-11, Dt.30.04.2011
30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B roadEdulavalasa - Killam toJonnam viaTalasamudram
/2011-12, Dt.30.04.2011
30.04.11 31.01.12
First Milestone i.eEarthwork & Cd
works &GSB
Bridges
NCRMP/B-W/ AP/Br/R&B/01/
Patnavanipeta/001
Construction of bridge atKm 11/6-8 of NH-5 toPatnavanipetaConnectingSundarapalem
46/2011, Dt.
17.12.201017.12.10 17.06.12
Completion of entire
work
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
Construction of MinorBridge at Km 12/2-4 ofNH-5 to SurampetaRoad via Naruva,Mentada
45/2010-2011,Dt17.12.2010
17.12.10 17.03.12Completion of entire
work
-
7/31/2019 13.September MPR 2012
9/92
MONTHLY REPORT
8 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
Construction of Highlevel bridge acrossBendigadda at KM 4/10of Pundi-Parlakimidi road
in Srikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.12Completion of entire
work
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)Improvements Naupada-Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.12Completion of entire
work
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
Road from NP road toURK Puram
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
Road from Deppuru,Bahadapalli road toOnkuluru to CycloneShelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
Road from R & B Roadto Devunthalada
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12 WBM GR-II &IIIcomplete
Road from Pollada toKomarthalada toCyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
Road from Koyyam R &B Road toMoosavanipeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Mentada toDovupeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Kotcherelaroad to Kollibhemavaram& Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Kotcherlaroad toPathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
-
7/31/2019 13.September MPR 2012
10/92
MONTHLY REPORT
9 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCSNCRMP/B_W/AP/MPCS/PRED/01/Sa
nthabommali/005
Construction of Cyclone shelterat Kollipadu
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of stilt floor & firstfloor
Construction of Cyclone Shelterat Runku
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of stilt floor & firstfloor
Status of works in Vizianagaram District up to 30.09.2012
CategoryPackages allottedunder Phase - 1
Names of works under eachpackage
Agreement No./ Date DHS DFCProgress up to
30.09.2012
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligadda of Konada Ramatheertham R&B Road toKonathalapalem via Yerukonda,
Pasupam, Kollayavalsa (Z.P.Road)
31/2010-201 Dt.1.12.2010
01.12.10 31.05.12100% of work
completed
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of Minor Bridge atKm 15/2 near Chakaligadda of
Konada Ramatheertham R&B roadto Konathalapalem (via)Yerukonda, Pasupam,
Kollayavalsa (ZP Road)
34/2010-2011 Dt.8.12.2010
08.12.10 07.06.1279% of workcompleted
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalsa from Km 12/0 to 16/5
(Km 0/0 to 4/0 i.e. up to NH-5crossing)
33/2010-201 Dt.8.12.2010
08.12.10 07.03.12100% of work
completed
-
7/31/2019 13.September MPR 2012
11/92
MONTHLY REPORT
10 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.09.2012
Category Packages allotted under Phase- 1Names of works
under each
package
Agreement
No. / Date
DHS DFC Progress up to 30.09.2012
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011
11.01.11 11.01.12 Work Completed.
Road from R&B road toMullaparra up to Beach
end
/2010-11, Dt.11.01.2011
11.01.11 27.10.11 Work Completed.
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011
10.03.11 09.12.11 Work Completed.
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011
28.03.11 27.12.11 Work Completed.
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011
28.03.22 28.12.11 Work Completed.
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006Road from R & B road
to Venkayyapalem/2010-11, Dt.11.01.2011
11.01.11 11.10.11 Work Completed.
NCRMP/B-W/AP/RHB/PRED/03/Achyutapuram/007
Road from R&B road toAva- Somavaram
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Work Completed.
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Work Completed.
-
7/31/2019 13.September MPR 2012
12/92
MONTHLY REPORT
11 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.09.2012
CategoryPackages allotted under
Phase - 1
Names of works under each
package
Agreement No. /
Date
DHS DFCProgress up
to
30.09.2012
RCS
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001
Road from NH-5 toRamarayadupalem
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
RoadFurniture &B.T iscompleted.
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road toKrishnampalem
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works arecompleted &B.T work isCompleted
Road from R & B road toKattubolu to Marripalem
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works are
completed &B.T work isCompleted
Road from R & B road toRajakoduru
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD Work iscompleted &B.T work iscompleted
NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003
Road from R & B road toPedateenarla to Chinatheernala
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
B.T & C.Croad worksareCompleted.
Road from Upmaka RajayyapetaR & B road to Janakayyapeta
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
CD works areCompleted &B.T work iscompleted
-
7/31/2019 13.September MPR 2012
13/92
MONTHLY REPORT
12 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.09.2012
Category Packages allotted under Phase - 1Names of works under
each packageAgreement No.
/ Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.09.2012First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
Plinth beam &Staircase, Rampand Stilt columnsare completed.Form work for Stiltslab completed.Istfloor columnscompleted up toroof level. Ist floorform work to beprogress. EOAT
submitted on24.08.12
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
All Slabs arecompleted. Insideand outside wallplastering workcompleted. Wood
joinery andElectrical works areto be progress.
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002Construction of cyclone
shelter at Patimeeda/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Stilt Slab & 1st floorcolumns are
Completed.Staircase, Formwork for 1st floorslab is in progress.EOAT submitted on24.08.12
-
7/31/2019 13.September MPR 2012
14/92
MONTHLY REPORT
13 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Construction of cycloneshelter at Mullaparra
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Stilt Slab & 1st floorcolumns areCompleted. Ist floorslab completed.
Head roomcolumns arecompleted. Headroom form work tobe progress.
Construction of cyclone
shelter at Bangarampeta
/2011-12, Dt.
03.10.2011
02.03.12 02.08.12 02.01.13
1st floor Slab, IIndfloor columns &staircase areCompleted. Iindfloor slabcompleted Headroom columns
completed up toroof level. Headroom formworkcompleted andreinforcementplacing work is inprogress.
NCRMP/B-W/AP/MPCS/PRED/03/Rambilli/004Construction of cyclone
shelter at
Venkayyapalem
/2011-12, Dt.03.10.2011
02.01.12 02.04.12 02.07.12
Footings &Pedestals worksare in progress.Sand filling infoundation work is
in progress. EOATproposalssubmitted on29.06.12.
NCRMP/B-W/AP/MPCS/PRED/03/Paravada/001Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011
06.01.12 06.04.12 06.07.12Work not starteddue to site problem
-
7/31/2019 13.September MPR 2012
15/92
MONTHLY REPORT
14 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in East Godavari District up to 30.09.2012
Category Packages allotted under Phase - I
Names of works
under eachpackage
Agreement
No. / Date
Mile stones
RemarksFirst Second Third
RHB (2 )RCS (8)MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta and
to Cyclone Shelter
/2011-12Dt:27.04.2011
30-11-2011 30-11-2011 20-01-2012 Completed
NCRMP/B-W /RCS/PRED/04/Karapa/001Approach Road tocyclone Shelter at
Adivipudi
2011-12Dt:20.05.2011
30-11-2011 31-10-2011 31-01-2012 Completed
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
Road fromGurjanapalli to
Bandulavaripalem
2011-12Dt:27.04.2011
30-09-2011 31-10-2011 31-01-2012 Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W
/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road
to K.Chodipallipeta CS
/2011-12
Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
-
7/31/2019 13.September MPR 2012
16/92
MONTHLY REPORT
15 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Road from R&B Roadto G.MusalayyapetaCS
2011-12Dt:07.09.2011
3 months 3 months 3 months Not yet Started
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto Chinaraghavulapeta
Cyclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011
----------- Completed
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction ofCyclone Shelter at
Pedaraghavulapeta ofUppalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012
3 months16.07.2012
Sand filling work isin progress below
plinth beam
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Laxamanudupadu inThondangi
/2011-12Dt:07.09.2011
First floor SlabCompleted
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Avulamanda
/2011-12Dt:07.09.2011
Stilt floor SlabCompleted
Status of works in West Godavari District up to 30.09.2012
CategoryPackages allotted under Phase
- 1Names of works under
each packageAgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.09.2012Remarks
First Second Third
-
7/31/2019 13.September MPR 2012
17/92
MONTHLY REPORT
16 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
RHB
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/0
01
Road from NH 214 A atRanga Statue center to
Harijanawada of Kalipatnam(E) (Mogalthuru Mandal
W.G.Dist.)
16 /2011-12Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
100% Work Completed.
R&B road at PanchayatOffice to Pulaparthivarithota
via Badava(Mogalthuru Mandal
W.G.Dist.)
100% Work Completed.
Mogalthuru Vempa R&BRoad at Uchintha Kalava
Bridge to GogulammaHarijanapeta (Mogalthuru
Mandal W.G.Dist.)
100% Work Completed.
From Narsapur MogalthuruR&B road to Dayadaldaspetavia Venkateshwara Swamytemple (Mogalthuru Mandal
W.G.Dist.)
100% Work Completed.
Road from NH 214 A road toHarijanapeta of Kothota
(Mogalthuru MandalW.G.Dist.)
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012100% Work Completed.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/0
02
R&B road to Indira Nagar(via) Pochamma temple
(Narsapur Mandal W.G.Dist.)
21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
100% Work Completed.
Road from R&B road toPedalanka (Narsapur Mandal
W.G.Dist.)100% Work Completed.
Road from LB Cheria CCroad to Chillapalemm of LBCheria (Narsapur Mandal
W.G.Dist.
100% Work Completed.
NCRMP/B-
From A-U R&B Road toSatyanarayanapuram (Kalla
Mandal W.G.Dist.)
25 /2011-12Dt.26.05.2011
26/5/2011To
20/8/2011
20/8/2011to
21/11/2011
22/11/2011To
23/2/2012100% Work Completed.
-
7/31/2019 13.September MPR 2012
18/92
MONTHLY REPORT
17 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District up to 30.09.2012
Category Packages allotted under Phase - 1Names of works under each
packageAgreement No. /
DateDHS DFC
Progress up to30.09.2012
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B roadthrough Gantalammapalem
/2011-12Dt.27.4.2011
27.04.11 26.01.2012 Work Completed.
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002
Road from R & B Road to B.V
Thota/2011-12
Dt.27.4.201127.04.11 26.01.2012
Work Completed.
Road from Potalapalem Z.Proad to Chikativanipalem Work Completed.
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011
27.04.11 26.01.2012
Work Completed.
Road from R&B road to CycloneShelter at Chandala Work Completed.
Status of works in Krishna Districts up to 30.09.2012
Category Packages allotted under Phase - 1Names of works Agreement
Milestone Completion DatesProgress
Remarks
W/AP/RHB/PRED/05/Kalla/003From A-U R&B Road to
Mekaladibba (Kalla MandalW.G.Dist.)
100% Work Completed.
-
7/31/2019 13.September MPR 2012
19/92
MONTHLY REPORT
18 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
under eachpackage
No. / Date
First Second Third
w.r.t.milestone
up to30.09.2012
RCSNCRMP/B-W
/AP/RCS/PRED/06/Machipatnam/001
Road fromBhogireddipalliR&B Road to
Ramakhandam
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.12 13.20% Work Completed.
Road from R&BRoad Chinnapuram
to Gundupalem
/2011-12/27.04.2011
01.12.2011 01.03.12 01.06.12
12.14%Work Completed.
Road fromPotalapalem Z.Proad to Potepalli.
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.1231.68%
Work Completed.
Status of works in GUNTUR District up to 30.09.2012
-
7/31/2019 13.September MPR 2012
20/92
MONTHLY REPORT
19 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
CategoryPackages allotted under
Phase - 1Names of works under each package
Agreement No./Date
DHS DFCProgress up to
30.09.2012
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
R/f Ganapavaram R&BRoad t o Kesavapuri ST colony 7/2011-2012
27.04.2011
27.04.11 26.01.2012 Completed.
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&B Road to Mohammad Alipalem
8/2011-201227.04.2011
27.04.11 26.4.2012
Completed.
R/f R&B Road to Katuivaripalem.Completed.
Bridges
NCRMP/B-
W/AP/Br/R&B/07/Bapatla/010
Reconstruction of High level Bridge @Km5/2 ofBapatla-Suryalanka Road across Perali drain in
Guntur79/2010-2011
1.12.2010
01.12.10 31.5.2012WMM completed.
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of High level Bridge @Km2/4 ofBapatla-Pandurangapuram Road across Perali
drain in Guntur78/2010-2011
1.12.201001.12.10 31.5.2012
Approaches is inprogress
Status of works in GUNTUR District up to 30.09.2012
-
7/31/2019 13.September MPR 2012
21/92
MONTHLY REPORT
20 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Category Packages allotted under Phase - 1Names of works under each
package
Agreement No. /
DateDHS DFC Progress up to 30.09.2012
RCS
NCRMP/B-W/AP/RCS/PRED/07/P
Palem/001
Road from R&B Road to
Mandevaripalem
/2010-11
Dt.01.11.2011 01.11.11 30.09.2012 Completed.
Road from R&B Road Alluru to
Yadavapalem
/2010-11
Dt.01.11.201101.11.11 30.09.2012 From Km 0.574 to km 0.964
CC completed.
NCRMP/B-
W/AP/RCS/PRED/07/KarlaPalem/002
Road from Ganapavaram R & B
road to Pedamarpuvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2012
Earth work is in progress.
Road from R & B Road to
Chinapuluguvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2011
GSB is in Progress
Road from R & B road toYaramvaripalem
/2010-11Dt.01.11.2011
01.11.11 31.10.2011Shoulders are in progress.
Road from R & B road to
Pedagollapalem Cyclone Shelter
/2010-11
Dt.01.11.201101.11.11 31.10.201 CC Road work, Shoulder work
is Completed.
Pedagollapalem PR Road to
Bonthagorlapalem
/2010-11
Dt.01.11.201101.11.11 31.10.201
Shoulders are in progress.
NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road to
Gurunadhanagar
/2010-11 Dt.
17.10.2011 17.10.11 16.07.12
Earth work, Slab Culvert
Completed, WBM Gr-III layer isin progress.
Road from R&B Road to Adavala
H/O Bavajipalem
/2010-11 Dt.
17.10.201117.10.11 16.07.12
Completed.
Road from R&B Road to
Atlavaripalem
/2010-11 Dt.
17.10.201117.10.11 16.07.12
Km 0.0 to Km0.055 GSB is inprogress.
-
7/31/2019 13.September MPR 2012
22/92
MONTHLY REPORT
21 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-
W/AP/RCS/PRED/07/Bapatla/004
Road from R&B Road to
Hanumanthanagar2010-11
Dt13.10.201113.10.11 12.07.2012
Completed.
Road from R & B road to
Adarsanagar Completed.
Status of works in Prakasam District up to 30.09.2012
CategoryPackages allottedunder Phase - 1
Names of worksunder eachpackage
Agreement No. /Date
Milestone completion dates
Progress up to30.09.2012
Remarks
First Second Third
BRIDGESNCRMP/B-
W/AP/Br/R&B/08/Kanaparthy/012
Construction ofHigh level Bridge at
Km 16/10 ofNaguluppalapadu Kanaparthy road inPrakasam District
76/2010-11 Dated1/12/2010
5/31/2011Completion
up to silllevel
12/31/2011Completion upto below deck
slab
5/31/2012Completion of
entire workincluding
approaches
Bridge work iscompleted
As permilestonecompleted
RHBNCRMP/B-
W/AP/RHB/PRED/0
8/S.Konda/001
Road from PakalaZP Road to
AulavaripalemCyclone shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
8/24/2011Earth work,
CD work,GSB
12/24/2011WBM, Grade II
& III
4/24/2012 BT,Shoulders &
road furniture
CC Road &Shoulders work isCompleted.
Mile stone-IIIcompleted
Road from R&BRoad to
Somarajupalli
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001
Dated 25.04.2011
BT, CC road &culverts arecompleted from KM
0/0 to 2/146.
Mile stone-IIIcompleted
Road from R&Broad to
Narravaripalem
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT & culverts areCompleted fromKM 0/0 to 0/900.work is completed
Mile stone-IIIcompleted
-
7/31/2019 13.September MPR 2012
23/92
MONTHLY REPORT
22 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-
W/AP/RHB/PRED/08/S.Konda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011 6/9/2011
Earth work,CD work,GSB
10/9/2011
WBM, Grade II& III
2/9/2012 BT,
Shoulders &road furniture
WBM-Grade-IIImaterial laying iscompleted.Compaction is inprogress
Not Reached asper Mile stone-III
Road from R&Broad to
Chalivendradibba
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated -10/02/2011
WBM-Grade-IIImaterial laying iscompleted.Compaction is inprogress
Not Reached asper Mile stone-III
NCRMP/B-
W/AP/RHB/PRED/08/S.Konda/002
Road from PakalaR&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
6/9/2011Earth work,
CD work,GSB
10/9/2011
WBM, Grade II& III
2/9/2012 BT,
Shoulders &road furniture
WBM-Grade-IIImaterial layingwork is in progress
Not Reached asper Mile stone-III
Road from R&Broad to Binginapalli
HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
CC road work iscompleted from KM0/0 to KM 0/220.Shoulders work isto be taken up.
Mile stone-III(Awaiting for 2
nd
EOT Proposal)
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&BRoad Allur to M T
Raju colony
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003Dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT, CC road,shoulders &culverts arecompleted from km0/0 to km 3/8.workis completed
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Road from KEMR&B Road to
Sankuvarigunta
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004Dated 27/04/2011
9/26/2011Earth work,CD work,
GSB
2/26/2012WBM, Grade II
& III
7/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted from km0/0 to km 1/430and CC dip work iscompleted
Reached Milestone-III
Road from KEM R& B Road to
NCRMP/B-W/AP/RHB/PRED/0
BT completed.CDwork completed.CC
As permilestone
-
7/31/2019 13.September MPR 2012
24/92
MONTHLY REPORT
23 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Pullareddypalem 8/Kothapatnam/004Dated 27/04/2011
road and shoulderswork completedfrom km 0/0 to km3/900.
completed
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
Road from MCRoad to
SubbarayaduSatram
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CD
work completed.CCroad and shoulderswork completedfrom km 0/0 to km4/4. work iscompleted
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
Road from R&Broad Tettu to
Ramayapatnam
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km5/086. work iscompleted
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09
Road from R&Broad Pellur toVasepallipadu
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09dated 16/03/2011
7/15/2011Earth work,CD work,
GSB
11/15/2011WBM, Grade II
& III
3/15/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km4/5. work iscompleted
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10
Road from R&Broad to Kesupalem
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10dated 19/04/2011
7/18/2011Earth work,CD work,
GSB
10/18/2011WBM, Grade II
& II
1/18/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km2/103. work iscompleted
As permilestonecompleted
RCSNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
Road from R&Broad to
Vijayanagaramcolony cyclone
shelter
NCRMP/B-W/AP/RCS/PRED/0
8/Vetapalem/001dated 2011/12
dated 30.09.2011
1/29/2012Earth work,
GSB
5/29/2012shoulders, Gr-
III
9/29/2012 BT,CC pavement
and roadfurniture
cc road completed,BT roadcompleted&shoulderscompleted. Roadfrom km 0/0 to km0/525. work iscompleted
As permilestonecompleted
Road from NH road cc road completed, As per
-
7/31/2019 13.September MPR 2012
25/92
MONTHLY REPORT
24 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
toChallareddypalem
BT roadcompleted&shoulderscompleted. Roadfrom km 0/0 to km
1/735. work iscompleted
milestonecompleted
Road from R&Broad to Jeevaraksh
nagar colonycyclone shelter
C.C.road andShoulders arecompleted Roadfrom km 0/0 to km0/500.
As permilestonecompleted
Road from R&Broad to Ramnagar
colony cycloneshelter
C.C.completedRoad from km 0/0to km0/475.Shoulders tobe taken up.
Reached Milestone-III
Road from R&Broad to cyclone
shelter atMankenavaripalem
CC roadcompleted.Shoulders work isto be taken up.
Reached Milestone-III
NCRMP/B-W/AP/RCS/PRED/0
8/Chirala/002
Road from R&BRoad to
Keertivaripalemcyclone shelter NCRMP/B-
W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
C.C road andShoulders arecompleted from km0/0 to km 0/265.work is completed
As permilestonecompleted
Road from R&BRoad to Devinutulacyclone shelter of
Chirala Mandal inPrakasham district.
C.C road andShoulders arecompleted from km
0/0 to km 0/800.work is completed
As permilestone
completed
MPCSNCRMP/B-
W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cycloneshelter in
Ulavapadu MandalPrakasam district
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
24.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,
24.02.2012 Allitems up tosecond floor
slab includingfirst floor, andin 2nd floor
including staircase, columns
24.05.2012Head room,plastering,
flooring, watersupply
arrangements,sanitary fitting,
electrical
St ilt floor, G.F, &Terrace floor- roofslab completed.Brick workcompleted,Plastering workcompleted, Cattleplatform completed
As permilestonecompleted
-
7/31/2019 13.September MPR 2012
26/92
MONTHLY REPORT
25 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
columns,beams,pcc
flooring etc.,
etc., items,compound
wall, ccpavement.
Earthen
mounds(raised
portion), waterharvesting,septic tank,slump and
soak pit.etc.
revetment workcompleted, flooringwork is completed,and compound wall120 meters length
completed,Electrical work iscompleted.work is completed
NCRMP/B-W/APMPCS/PRED/
08/NG Padu/003
Kanaparthy cycloneshelter in
NaguluppapaduMandal Prakasam
district
NCRMP/B-W/AP/MPCS/PRED/08/NG Padu/003
23.11.2011All items up
to stilt floorslab
includingramp, stair
casefoundations,columns,bea
ms,pccflooring etc.,
23.02.2012 All
items up tofirst floor slab
and headroom slab in 2
nd floorincluding staircase, columns
etc.,
23.05.2012plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthenmounds(raised
portion), waterharvesting,septic tank,slump and
soak pit.etc.
Internal & ExternalPlasteringcompleted.Flooring Work
Completed.Compound WallPaintingCompleted. CCRoad Completed.Shoulder work inprogress. Paintingwork in progress.Electrical work inprogress. Tiles inbathrooms work inprogress.
Not as perMilestone
-
7/31/2019 13.September MPR 2012
27/92
MONTHLY REPORT
26 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Nellore District up to 30.09.2012
(RCS)
Package Number Name of Work Milestone1 Milestone2 Milestone3
Progress up
to 30.09.2012
NCRMP/B-W/AP/09MUTHUKUR/RCS/002
Road from R&B Roadkappaladoruvu to bandla Palem
H.wada
3Months: EarthWork, Pipe Culverts,
GSB
6 Months: WBMGrII,GrII,CC Pavement
and Shoulders
9 Months: BTCC road and
Road Furniture
OGPC+ Sealcoat completed
NCRMP/B-W/AP/09/D.V.SATRAM/RCS/008
Road from R&B road to SullurpetaMallam to berjengalapalli cyclone
shelter 3Months: EarthWork, Pipe Culverts,
GSB
6 Months: WBM GrII,GrII Shoulders and
CC Pavement
9 Months: BT,CC Pavement
and RoadFurniture
OGPC+ Sealcoat completed
NCRMP/B-
W/AP/09T.P.GUDUR/RCS/005
Road from7/2 M.C Road to
venkannapalem pattapupalem work completed
NCRMP/B-W/AP/09chillakur/RCS/004
Road from Katuivaripalem R&Broad to vellapalm
3Months: EarthWork,CD Works,
GSB
6 Months: WBM GrII,GrII and Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
OGPC+ Sealcoat completed
NCRMP/B-W/AP/09kota/RCS/001
road from R&B road to A.SPURAM 3Months: Earth
Work, Pipe Culverts,GSB
6 Months: WBM GrII,GrII and Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
OGPC+ Sealcoat completed
Road from GD Road toVavillapalem
OGPC+ Sealcoat completed
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007
Road from Kotha Satram R&B toIndiranagar (via) Thumalapenta
palam, Patharavadu palam,Ramudu palam, Karaduvari palam&Sreeramapuram in SPSR Nellore
District.
4Months: EarthWork, Pipe Culverts,
GSB
4 Months: WBM GrII,GrII , Shoulders and
CC Pavement
4 Months: BT,CC Pavement
and RoadFurniture
OGPC+ Sealcoat completed
-
7/31/2019 13.September MPR 2012
28/92
MONTHLY REPORT
27 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006
Road Connecting R&B Roadthrough Voter Village in SPSRNellore District.
4 Months: EarthWork, Pipe Culverts,GSB
4 Months: WBM GrII,GrII , Shoulders andCC Pavement
4 Months: BT,
CC Pavementand RoadFurniture
GSB. From0.00 to 2.0800
,WBM Gr-II ,Gr-III from 0.00 to
5.320 and
OGPC+SC 0/6to 2/6is in
completed,6nos pipeculverts iscompleted
Status of works in Nellore District up to 30.09.2012
RHB
NCRMP/B-
W/AP/RHB/PRED/09RHB/KAVALI/004
Road from5/8 ofChennayapalem Road to
Gummadi bandla5Months:
Earthwork, CD
Works,ccpavementand GSB
10 Months:
WBM GrII, GrIIand Shoulders
15 Months:
BT and RoadFurniture
OGPC+ Seal coat completed
Road from PedattapupalemR&B road to
Chennayapalem H.wadaOGPC+ Seal coat completed
Road from K.T R&B Road toAlliguntapalem
OGPC+ Seal coat completed
NCRMP/B-W/AP/RHB/PRED/09BOGOLU/RHB/002
Road from 1/6 ofJuvvaladinne R&B Road to
Tellagunta KM to 2/720
3Months: EarthWork, Pipe
Culverts, GSB
6 Months:WBM GrII, GrIIand Shoulders
9 Months: BTand RoadFurniture
OGPC+ Seal coat completed
NCRMP/B-W/AP/RHB/PRED/09BOGOLO/RHB/001
1. Road from NH5 toSambasivapuram
5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months:BT and Road
FurnitureOGPC+ Seal coat completed
-
7/31/2019 13.September MPR 2012
29/92
MONTHLY REPORT
28 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from 9/6 ofJuvvaladinne R&B Road to11/0 of Juvvaladinne R&BRoad Via Venkateshpalem
OGPC+ Seal coat completed
NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005
1)Road from kt R&B ROADTO ALLAGANIPADU to
Vavilla5Months: Earth
Work, PipeCulverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months:BT and Road
Furniture
OGPC+ Seal coat completed
Road from R&B roadKancharapalem HW to
Alaganipadu.Embankment is in progress
NCRMP/B-W/AP/RHB/PRED/09V.CHALEM/RHB/007
ROAD FROM SUVEPALLI-PUDIPARTHI ROAD TO
SRIKANTH COLONY 4Months: EarthWork, Pipe
Culverts, GSB
8 Months:WBM GrII, GrIIand Shoulders
12 Months:BT and Road
Furniture
OGPC+ Seal coat completed
providing BT Surface to theroad from R&B road to
Edagali KandrigaOGPC+ Seal coat completed
NCRMP/B-W/AP/RHB/PRED/09CHITTAMURU/003
Road from R&B Road toMuttembake Via
Pittuvanipalli 5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrII
and Shoulders
15 Months:BT and Road
Furniture
OGPC+ Seal coat completed
Road from R&B Chittamur toSoma Samudram
OGPC+ Seal coat completed
NCRMP/B-W/AP/09/MUTHUKUR/RHB/006
Road from R&B road toPatuvariKandriga
3Months: EarthWork, Pipe
Culverts, GSB
6 Months:WBM
GrII,GrII,CCPavement and
Shoulders
9 Months: BTand RoadFurniture
OGPC+ Seal coat completed
-
7/31/2019 13.September MPR 2012
30/92
MONTHLY REPORT
29 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/09Allur/RHB/009Road from R&Broad alluru toGalidibbalu (via)Chukavani
dibba
5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months:BT and Road
FurnitureOGPC+ Seal coat completed
NCRMP/B-W/AP/RHB/PRED/009/T.P.GUDUR/012
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and MandapamVillage 3Months: Earth
Work, PipeCulverts, GSB
6 Months:WBM
GrII,GrII,CCPavement and
Shoulders
9 Months: BTand RoadFurniture
OGPC+ Seal coat completed
Road from R & B Road C SPuram to Sivaramapuram
OGPC+ Seal coat completed
-
7/31/2019 13.September MPR 2012
31/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at various
stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards. These tests are
carried out in the site itself and in some cases samples are collected and testing done in outside laboratories. The details of
tests conducted in the field till end of September 2011 are presented.
Summary of QC Tests - Up to 30.09.2012
S.No. District
No. TestsConductedduring the
Month
Total no. of TestsCumulativeTests Done
Total no. of Tests
Passed Failed Passed Failed
1 Srikakulam 35 35 0 1358 1354 4
2 Vizianagaram 0 0 0 366 366 0
3 Visakhapatnam 104 104 0 1971 1820 151
4 East Godavari 82 82 0 988 988 0
5 West Godavari 0 0 0 349 349 0
6 Krishna 3 3 0 82 82 0
-
7/31/2019 13.September MPR 2012
32/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Quality Control Audit Reports Submitted During this Month:
Package Number Name of Work District
NCRMP/ B-W/ AP/ Br/ R&B/ 02/Chakaligadda/ 008
Construction of Minor Bridge at Km. 15/2
near Chakaligadda of Konada Ramatheertham R&B Road to
Konathalapalem (via) Yerukonda, Pasupam,ll l ( d)
Vizianagaram
-
7/31/2019 13.September MPR 2012
33/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
Construction of Cyclone shelter atChakicharla in Ulavapadu Mandal
Prakasam
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002
Road from Deppuru, Bahadapalli road toOnkuluru & cyclone shelter.
Srikakulam
NCRMP/BW/AP/RHD/PRED/01/Santhabommali/003
Road from K.Umilada jn to Koduru (linkroad) in Santhabommali Mandal.
Srikakulam
NCRMP/BW/AP/RHB/PRED/01/Santha
bommali/003
Road from DPN R&B Road to
Uddandapalem in Santhabommali Mandal.
Srikakulam
NCRMP/B-W/AP/RCS/PRED/09/Kavali/006
Road Connecting R&B Road through VoturuVillage.
SPSR Nellore
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002
Road from Deppuru, Bahadapalli road toOnkuluru & cyclone shelter.
Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002
Road from NP road to URK Puram. Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002
Road from R&B Road to Devunthalada. Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002
Road from Pollada to Komaralthada & tocyclonic shelter.
Srikakulam
NCRMP/BW/AP/RHB/PRED/09/Vidaval
ur/005.
Road from R&B road Alaganipadu to Vavilla
of Vidavalur.
Nellore
NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/00
3
Road from R&B Road to Atlavaripalem inGuntur Dt.
Guntur
-
7/31/2019 13.September MPR 2012
34/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RD/R&B/01/Nowpada/006
Improvements to Nowpada -Venkatapuram Road from km 0/0 to 15/0
Srikakulam
8.0 Details of Environmental and Social Reports Submitted During this Month:
Package Number Name of Work District
NCRMP/B-
W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of Cyclone Shelter at
Bangarampeta Visakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of Cyclone Shelter atMullaparra
Visakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of Cyclone Shelter atPatimeeda
Visakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of Cyclone Shelter at
GajapathinagaramVisakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of Cyclone Shelter atRatnayampeta
Visakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Rambilli/004
Construction of Cyclone Shelter atVenkayyapalem
Visakhapatnam
NCRMP/B-
W/AP/RCS/PRED/03/Anandapuram/001 Road from NH-5 to Ramarayadupalem Visakhapatnam
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road to Rajakoduru Visakhapatnam
-
7/31/2019 13.September MPR 2012
35/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.P.Kallalu toMatchvanipalem
Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/03/ParaWada/004
Road from R&B Road toPothurajanapalem
Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/03/ParaWada/004
Road from R&B Road to Jalaripeta Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006
Road from R&B road to Venkayyapalem Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
Road from R&B Road to AvaSomavaram
Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
Road from R&B Road to Avarajam Visakhapatnam
NCRMP/B-
W/AP/RHB/PRED/04/Thondangi/003
Construction of Cyclone Shelter at
Avulamanda
East Godavari
District
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Cyclone Shelter at PedaraghavulapetaEast Godavari
District
NCRMP/B-W/AP/RHB/PRED/04/Thondangi/003
Construction of Cyclone Shelter atLakshmanudipeta
East GodavariDistrict
NCRMP/B-W/AP/RCS/PRED/04/Karapa/001
Approach Road to Cyclone Shelter atAdivipudi
East GodavariDistrict
NCRMP/B R d f R&B R d t E t G d i
-
7/31/2019 13.September MPR 2012
36/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to K.Chodipallipeta CS
East GodavariDistrict
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to P.Chodipallipeta CS
East GodavariDistrict
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001
Road from Gurjanapalli toBandulavaripalem
East GodavariDistrict
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR Road to Dasarivanipetaand to CS
East GodavariDistrict
NCRMP/B-W/AP/BR/R&B/02/Puligedda/007
Construction of Minor Bridge at Km.7/2near Puligedda of Kona Ramatheertham
R&B Road to Konathalapalem viaYerukonda, Pasupam, Kollayavalsa (ZP
Road)
Vijaynagaram
NCRMP/B-W/AP/BR/R&B/02/Chakaligadda/008
Construction of Minor Bridge at Km.15/2 near Chakaligadda of Kona
Ramatheertham R&B Road toKonathalapalem via Yerukonda,Pasupam, Kollayavalsa(ZP Road)
Vijaynagaram
NCRMP/B-W/AP/RD/R&B/02/Konada/009 Improvements to road from KonadaRamatheertham (R&B) Road toKonathalapalem (Via) Pasupam,
Yerukonda, Kollayavalsa from Km. 12/0to 16/5 (Km. 0/0 to 4/0 i.e., up to NH-5
crossing)
Vijaynagaram
NCRMP/B-W/AP/RHB/PRED/O8/Ulavapadu/07
Road from MC road to Subbarayudusatram
Prakasam
-
7/31/2019 13.September MPR 2012
37/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/O8/Kothapatnam/004
Road from KEM R&B Road toSankuvarigunta
Prakasam
NCRMP/B-W/AP/RHB/PRED/O8/Kothapatnam/004
Road from KEM R&B Road toPullareddypalem.
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09
Road from R&B road Pellur toVasepallipadu.
Prakasam
NCRMP/B-W/AP/RHB/PRED/O8/Kothapatnam/003
Road from R&B Road Allur to M T Rajucolony
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Road from R&B road to Narravaripalem Prakasam
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10
Road from R&B road to Kesupalem Prakasam
NCRMP/B-W/AP/MPCS/PRED/08/N.G.Padu/003
Kanaparthy Cyclone Shelter inNaguluppapadu Mandal
Prakasam
NCRMP/B-W/AP/Br/R&B/08/Kanaparthy/012
Construction of high level bridge at km16/10 between Naguluppapadu
Kanaparthy roadPrakasam
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B Road to Cyclone shelterat Mankenavaripalem
Prakasam
NCRMP/B- Road from R&B Road to
-
7/31/2019 13.September MPR 2012
38/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/O8/Ulavapadu/08
Road from R&B Road Tettu toRamayapatnam
Prakasam
NCRMP/B-W/AP/RCS/PRED/O8/Chirala/002
Road from R&B Road toKeerthivaripalem cyclone shelter
Prakasam
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/001
Road from NH 214 A at Ranga StatueCentre to Harijanawada of Kalipatnam
(E)West Godavari
NCRMP/B-
W/AP/RHB/PRED/05/Mogaltur/001
R&B road at Panchayat Office to
Pulaparthivarithota via Badava West Godavari
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/001
Road from Mogaltur Vempa R&B Roadat Uchintha Kalava Bridge to
Gogulamma HarijanapetaWest Godavari
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/001
Road from Narsapur Mogaltur R&BRoad to Dayadaldaspeta via
Venkateswara Swamy Temple.
West GodavariDistrict
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/001
Road from NH 214 A road toHarijanapeta of Kothota
West GodavariDistrict
NCRMP/B-W/AP/RHB/PRED/O5/Narsapur/002
Road from R&B Road to Indira Nagar(Via) Pochamma Temple)
West Godavari
NCRMP/B-W/AP/RHB/PRED/O5/Narsapur/002
Road from R&B Road to Pedalanka West Godavari
NCRMP/B-W/AP/RHB/PRED/O5/Narsapur/002
Road from LB Cheria CC Road toChillapalem of LB Cheria
West Godavari
-
7/31/2019 13.September MPR 2012
39/92
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/O6/Machilipatnam/001
Road Connecting R&B Road throughGantlammapalem
Krishna
NCRMP/B-W/AP/RCS/PRED/O6/Machilipatnam/001
Road from Potalapalem Z.P.Road toPothepalli
Krishna
NCRMP/B-W/AP/RCS/PRED/O6/Machilipatnam/001
Road from Chinnapuram R&B Road toGundupalem
Krishna
NCRMP/B-
W/AP/RCS/PRED/O6/Machilipatnam/001
Road from Bhogireddypalli R&B Road to
Ramakhandam
Krishna
NCRMP/B-W/AP/RHB/PRED/O6/Machilipatnam/002
Road from R&B Road to B.V.Thota Krishna
-
7/31/2019 13.September MPR 2012
40/92
MONTHLY REPORT
39 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Consolidated E&S Report for East Godavari District in the Month of September 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Detailsof East Godavari in September,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan forEMPimplementation
The Contractors Project Manager shall be responsible forimplementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programed, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement theprovisions laid out in the EMP
13 13
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
Consent for establishment and operation of plant (for concretework) from SPCB.
13 13
PUC certification for all vehicles/equipment used for/duringconstruction.
13 13
Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operations formaterials like sand and earth.
13 13
Permission for water extraction, if applicable in the local areacontext.
13 13
The Contractor shall abide by all conditions laid out in the saidclearances. 13 13
3Consultation andCommunityConsent
The Contractor shall consult and obtain written consents oflandowners(individual/Panchayat/govt. agency) for temporary use ofland for all construction related activities including:
a) Setting-up and operation of construction camp including labourcamps, stock yards etc.
13 13
b) borrow areas and 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
41/92
MONTHLY REPORT
40 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) Disposal of debris and other waste material. 13
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities oflocal inhabitants, particularly those of schools and health facilities.Written permission (no objection certificate) shall be taken from the
Gramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
13 13
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
13 13
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
13 13
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisions ofLabour Laws. Separate toilet facilities shall be provided for women
workers. If a common mess is not provided/operated additional space forcooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
13 13
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /Labour camp.
13 13
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
13 13
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
13 13
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction from
the Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are obtainedprior to cutting of such trees.
13 13
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
13 13
c) The Contractor shall strip, store and preserve top soil from the site ofconstruction work and in the stock yards prior to stacking of materials.The top soil shall be reinstated in the cyclone shelter compound after the
13 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
42/92
MONTHLY REPORT
41 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
construction is over.
6Protection ofProperties andResources
The Contractor shall take due care to protect and prevent damages tothe following resources during preparatory and construction work:
a) Water supply lines 13 13
b) Irrigation canals 4 9 13
c) Cart, cattle and/or foot trail/tracks 13 13
d) Cultural properties and sites/structures of religious importance 13 13
e) Houses, Farmlands, Orchids and/or Trees. 13 13
f) School and other existing buildings adjacent to the site ofconstruction.
2 11 13
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
13 13
7 QuarryOperations
The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
13 13
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractorfollowing the stipulations given below: The finalization of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verification tocross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractorshall enter into a formal agreement with landowner.
13 13
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protected areas.
13 13
c) Identification and Selection: 131. The borrow area should not be located in agriculture fields/ unlessunavoidable i.e. barren land is not available. In case borrowing needs tobe done on an agricultural land, top-soil stripping, stacking andpreservation is must.
13 13
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
13 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
43/92
MONTHLY REPORT
42 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
13 13
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centers.
13 13
5. No borrow area shall be opened with in 500mts. from a reserved or
protected forest area, protected sites, wildlife movement zone andcultural heritage site.
13 13
6. No tree cutting shall be undertaken. 13 13
7. Borrow area near any surface water body will be at least 100mts.away.
13 13
d) Operation
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
13 13
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 13 13
3. Borrowing of earth should be preferably limited to a depth of 1.5mtrfrom the existing ground level.
13 13
4. Slope at the edges will be maintained not steeper than 2:3 (Vertical: Horizontal)
13
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after theuse has ceased and at least three weeks prior to monsoon
13 13
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
13 13
9
Water Extraction
/Use
Water for construction and for use at construction camps (includingLabour camps) is to be extracted with prior written permission of(a) the
individual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
13 13
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warning signage,speed breakers etc.) shall be made by the contractor to ensure safety ofroad users and local people, particularly in the internal village roadswhich will be used for transporting materials.
13 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
44/92
MONTHLY REPORT
43 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) Material shall be covered during transportation to prevent spillage,accidents and pollution.
13 13
c) All required measures to ensure safety of local residents includingchildren and other near-by residents shall be taken up by the Contractor.This shall include provisions to prevent un authorized entry into the
construction.
13 13
11 Workers Safety
a) All measures required for ensuring safety and health of the workersshall be taken up by the Contractor. This includes provision andenforcement of appropriate personal protective equipment; first aidfacility; emergency response arrangement; proper storage ofhazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
13 13
b) All methods steps and measures are required for ensuring safety ofworkers, particularly those needed while undertaking work in or aroundexcavations; workings at height; and; while handling inflammable, toxicand/or hazardous materials shall be ensured by the contractor.
13 13
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site. 13 13
12 Air pollut ion a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and fine materialstorage stock yards
13 13
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
13 13
c) All plants and equipment shall comply with pollution control norms. 13 13
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
13 13
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts to waterbodies (such as ponds, streams, canals and rivers), water sources (suchas hand pumps and wells) and adjacent farmland shall be undertaken bythe Contractor.
8 13
b) Storage of materials like fuel, chemicals, and cement shall be donein a manner (with impervious layer on bottom and a covered shed ontop) that does not contaminate land and ground/surface water.
8 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
45/92
MONTHLY REPORT
44 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
14 Noise Pollution
a) All noise causing activities shall be stopped during night time (9.00PM to 6.00 AM). The Contractor shall schedule construction works inconsultation with local Panchayat Authority and School Principal toensure least disturbance to school children and other adjacent residents.
b) Ear plugs shall be provided to the Labour facing risk from high
noise pollution such as plant site and those working near generators,heavy equipment /machinery.
13 13
c) Appropriate noise controlling devices including acoustic generatorsshall be used to minimize noise during construction work and operationof camp.
8 13
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
8 13
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and waterbodies. In no case, debris shall be disposed within 500mts. ofecologically sensitive areas, including forests, wetlands and protected
natural habitats.
8 13
16Restoration andRehabilitation ofSites
All work sites and areas under temporary use (including construction andLabour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
8 13
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposal ofdebris/construction wastes at pre-approved locations and; restoration ofborrow areas and other sites/ locations used for material sourcing.
8 13
17 Liabilities
Any liability arising out of Contractors agreement with landowners/ local
people/gram Panchayat (including those related to temporary use ofland, water extraction and disposal of debris) shall be settled by theContractor.
8 13
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
46/92
MONTHLY REPORT
45 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Consolidated E&S Report for West Godavari District in the Month of September 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Detailsof West Godavari in September ,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractors Project Manager shall be responsible forimplementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programmed,the Contractor shall submit a plan including method statement andtimeline about specific actions that will be taken by him to implementthe provisions laid out in the EMP
10 10
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtaining
permission/consent for plants, water and extraction and borrow areasoperations. This includes:
Consent for establishment and operation of plant (for concretework) from SPCB.
10 10
PUC certification for all vehicles/equipment used for/duringconstruction.
10 10
Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operationsfor materials like sand and earth.
10 10
Permission for water extraction, if applicable in the local areacontext.
10 10
The Contractor shall abide by all conditions laid out in the saidclearances. 10 10
3Consultation andCommunity Consent
The Contractor shall consult and obtain written consents oflandowners(individual/Panchayat/govt. agency) for temporary use ofland for all construction related activities including:
a) Setting-up and operation of construction camp including Labourcamps, stock yards etc.
10 10
b) borrow areas and 10 10
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
47/92
MONTHLY REPORT
46 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) Disposal of debris and other waste material. 10 10
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishmentshall be done in a manner that does not interfere or disturb theactivities of local inhabitants, particularly those of schools and healthfacilities. Written permission (no objection certificate) shall be taken
from the Gramsabha and the land owner prior to location selectionand a copy shall be submitted to the Engineer approval.
10 10
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
10 10
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and RamsarSites) and Coastal Regulation Zone.
10 10
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as perprovisions of Labour Laws. Separate toilet facilities shall be providedfor women workers. If a common mess is not provided/operatedadditional space for cooking shall be provided. The contractor shallensure that hygienic conditions are maintained during the operationof such camps/facilities.
10 10
c) Fuel for Cooking: The Contractor shall ensure that fuel wood isnot used as a cooking medium in the construction /Labour camp.
10 10
d) Potable water supply: Drinking water supply of at least 40Ipcdwith the required supply points shall be provided.
10 10
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
10 10
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction
from the Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) areobtained prior to cutting of such trees.
10 10
b) The non-timber grade trees are to be stacked and possession isto be given to Employer/concerned Govt. Department.
10 10
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
48/92
MONTHLY REPORT
47 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) The Contractor shall strip, store and preserve top soil from thesite of construction work and in the stock yards prior to stacking ofmaterials. The top soil shall be reinstated in the cyclone sheltercompound after the construction is over.
10 10
6Protection ofProperties andResources
The Contractor shall take due care to protect and prevent damages to
the following resources during preparatory and construction work:a) Water supply lines 10 10
b) Irrigation canals 10 10
c) Cart, cattle and/or foot trail/tracks 10 10
d) Cultural properties and sites/structures of religious importance 10 10
e) Houses, Farmlands, Orchids and/or Trees. 10 10
f) School and other existing buildings adjacent to the site ofconstruction.
10 10
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
10 10
7 Quarry Operations The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approvalshall be submitted to the Engineer prior to procuring material.
10 10
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractorfollowing the stipulations given below: The finalization of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-siteverification to cross-check the accuracy of details provided by thecontractor. Only after receipt of the written approval from theEngineer, the Contractor shall enter into a formal agreement withlandowner.
10 10
b) The Contractor shall not procure any kind of construction material
(such as aggregates, sand and earth) from ecologically protectedareas.
10 10
c) Identification and Selection:
1. The borrow area should not be located in agriculture fields/unless unavoidable i.e. barren land is not available. In case borrowingneeds to be done on an agricultural land, top-soil stripping, stackingand preservation is must.
10 10
-
7/31/2019 13.September MPR 2012
49/92
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
50/92
MONTHLY REPORT
49 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10Safety of RoadUsers and Local
Residents
a) Traffic safety arrangements (including provision of warningsignage, speed breakers etc.) shall be made by the contractor toensure safety of road users and local people, particularly in theinternal village roads which will be used for transporting materials.
10 10
b) Material shall be covered during transportation to prevent
spillage, accidents and pollution.
10 10
c) All required measures to ensure safety of local residentsincluding children and other near-by residents shall be taken up bythe Contractor. This shall include provisions to prevent un authorizedentry into the construction.
10 10
11 Workers Safety
a) All measures required for ensuring safety and health of theworkers shall be taken up by the Contractor. This includes provisionand enforcement of appropriate personal protective equipment; firstaid facility; emergency response arrangement; proper storage ofhazardous/toxic and polluting materials and; measures for ensuringfire electrical and mechanical safety arrangements in camp and inwork site.
10 10
b) All methods steps and measures are required for ensuringsafety of workers, particularly those needed while undertaking work inor around excavations; workings at height; and; while handlinginflammable, toxic and/or hazardous materials shall be ensured bythe contractor.
10 10
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site.
10 10
12 Air pollution a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and finematerial storage stock yards
10 10
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover on
materials, based on activity and site conditions.
10 10
c) All plants and equipment shall comply with pollution controlnorms.
10 10
d) Water shall be sprinkled at least twice during dry day onhaulage roads passing through or near settlements(including at least100m before the settlement)
10 10
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
51/92
50 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts towater bodies (such as ponds, streams, canals and rivers), watersources (such as hand pumps and wells) and adjacent farmland shallbe undertaken by the Contractor.
10
b) Storage of materials like fuel, chemicals, and cement shall bedone in a manner (with impervious layer on bottom and a coveredshed on top) that does not contaminate land and ground/surfacewater.
10
14 Noise Pollution
a) All noise causing activities shall be stopped during night time(9.00 PM to 6.00 AM). The Contractor shall schedule constructionworks in consultation with local Panchayat Authority and SchoolPrincipal to ensure least disturbance to school children and otheradjacent residents.
8
b) Ear plugs shall be provided to the Labour facing risk from highnoise pollution such as plant site and those working near generators,heavy equipment /machinery.
10 10
c) Appropriate noise controlling devices including acousticgenerators shall be used to minimize noise during construction workand operation of camp.
10 10
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
10 10
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and waterbodies. In no case, debris shall be disposed within 500mts. ofecologically sensitive areas, including forests, wetlands and protectednatural habitats.
10 10
16Restoration andRehabilitation ofSites
All work sites and areas under temporary use (including construction
and Labour camps, plant, sites, haul roads and borrow areas) shallbe restored/rehabilitated to a better condition (if not at least to itsoriginal condition) and to the satisfaction of the Engineer and landowner upon completion of construction work by the Contractor.
10 10
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
52/92
51 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposalof debris/construction wastes at pre-approved locations and;restoration of borrow areas and other sites/ locations used formaterial sourcing.
10 10
17 Liabilities
Any liability arising out of Contractors agreement with landowners/local people/gram Panchayat (including those related to temporaryuse of land, water extraction and disposal of debris) shall be settledby the Contractor.
10 10
Consolidated E&S Report for Krishna District in the Month of September 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Details ofKrishna in September,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractors Project Manager shall be responsible forimplementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programmed,the Contractor shall submit a plan including method statement andtimeline about specific actions that will be taken by him to implementthe provisions laid out in the EMP
8 8
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtaining
permission/consent for plants, water and extraction and borrow areasoperations. This includes:
Consent for establishment and operation of plant (for concretework) from SPCB.
8 8
PUC certification for all vehicles/equipment used for/duringconstruction.
8 8
MONTHLY REPORT
-
7/31/2019 13.September MPR 2012
53/92
52 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operationsfor materials like sand and earth.
8 8
Permission for water extraction, if applicable in the local areacontext.
8 8
The Contractor shall abide by all conditions laid out in the saidclearances. 8 8
3Consultation andCommunity Consent
The Contractor shall consult and obtain written consents oflandowners(individual/Panchayat/govt. agency) for temporary use ofland for all construction related activities including:
a) Setting-up and operation of construction camp including Labourcamps, stock yards etc.
8 8
b) borrow areas and 8 8
c) Disposal of debris and other waste material. 8 8
4Construction/ LabourCamp
a) Location: The camp and plant site/s location and establishmentshall be done in a manner that does not interfere or disturb the
activities of local inhabitants, particularly those of schools and healthfacilities. Written permission (no objection certificate) shall be takenfrom the Gramsabha and the land owner prior to location selectionand a copy shall be submitted to the Engineer approval.
8 8
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
8 8
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and RamsarSites) and Coastal Regulation Zone.
8 8
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisions
of Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional spacefor cooking shall be provided. The contractor shall ensure thathygienic conditions are maintained during the operation of suchcamps/facilities.
8 8
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking mediu