Page 1: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

1

JAG/CCMStatus Updates and Recommendations

Fall COPC Meeting

Nov 4-5, 2014

JAG-CCM Team

Page 2: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

2

Outline• CCM Team Membership• Status of the 2nd DOD/NOAA Connection• NFG Connection

– DISA Update• Network Diagram• Network Outages• Monitoring• Bandwidth Requirements

Page 3: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

3

CCM TeamMember Organization

Chris Finnigsmier (temporarily lead POC)TSgt Michael DentRoger Sirois

Air Force/AFWA/A6

Cameron Shelton Doug Fenderson

NOAA/NWS/NCEP/NCO

Craig Wade (CCM Chair)Russell Dyson

NOAA/NESDIS/OSPO

Tracy LePire Navy/NAVO

Jackie Lord NOAA/NWS/TOC

Duane Anderson (Acting) Derek Eddington

Navy/FNMOC

Kevin Greenlee Navy/CNMOC/N6

Ken Barnett OFCM

Technical Advisor/SME/Alternate Organization

Bruce Kenison DISA Field Office USSTRATCOM

Michael Quilty DISA

* Upcoming Vacancy ** Vacant role/representative *** New to the role or group

Page 4: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

2nd COPC Network Connection• CSAB Action Item 2014-2.2: CCM and CSAB will

create a 2nd DOD/NOAA connection at Boulder.– Recurring charge for the (OC48) between Buckley and NOAA.

• OC192 was too expensive.• DISA working with DITCO for final cost mod to the contract.

– Will be split between Navy and AF.– The updated price estimates:

» MRC: $18,134.52 (MRC: Monthly Recurring Cost)» NRC: $5,753.54 (NRC: Non-Recurring Cost)

• Working to get OASD DCIO approval for the point to point.– Letter has been signed by the AFWA commander.

– NOAA procuring hardware for Boulder and temporary implementation in the SWPC rack.• IDP build out in Boulder complete by March 2015.• Network upgrades to 10Gbps to Boulder.• The 2nd Connection through Boulder is the first phase.

4

Page 5: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

NFG Connection• To help coordinate the transition to NFG, CCM has

created a working plan.– PHASE 1 -- Creating a 2nd Connection [Estimated Timeframe:

Dec 2014 – Mar 2015]– PHASE 2 -- Testing NFG to the Navy Centers [Estimated

Timeframe: Mar – Dec 2015]• Plan to use the second path to test NFG latency.

– PHASE 3 -- Navy NFG Implementation (on both paths)[Estimated Timeframe: Jan – Jun 2016]

– PHASE 4 -- AFWA NFG Implementation [Estimated Timeframe: Jun 2016 - 2017]

– Corporate AF planned upgrades to the 2 AF gateways by FY17

5

Page 6: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

NFG ConnectionDISA gave an update at the Sept CSAB meeting:• Site 1: Warner Robins – June 2013• Site 2: Columbus – Sept 2013 (Supporting Suitland) • Site 3: San Antonio – 14 Nov 2014 (Supporting Boulder) • Timeline and Dependencies

– CCM intends to continue use of the current Point To Point (PTPs), as well as utilize the new Boulder links when necessary, while also pursuing our individual NFG connectivity readiness efforts.

– NFG request submitted by AF for NOAA to connect to the NFG (either from Suitland or Boulder).

– Suitland• Backbone upgrades to support 4Gig out of Suitland -- (DISA) needs to install some additional

equipment which is scheduled to take place by end of calendar year or early 2015• 4 Gig - NMIC capable of supporting the bandwidth.

– Boulder• NRC from Boulder to the NFG?• NOAA full build out

– For either location AF must deal with the AF-gateway issues before they can receive NOAA data that way?

– Navy will most likely move forward.

6

Page 7: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

Network Diagram• AFWA (Tom Harrison A6) developed a complex network

diagram.– Fairly all encompassing, but layers that can be turned on and off.– Too complex to view through a Power Point presentation.– Somewhat sensitive.

• Contains IP addresses and network structure, so encrypted with password access.

– Tom is no longer with the CCM group but we would like to get an editable version for future updating.

7

Page 8: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

Network Outages

Date OPC (circuit) Outage Hrs:mins

1 7/7 AFWA - 78Y2 10hrs : 30 mins

2 7/17 FNMOC - 7CU2 :10 mins

3 8/16 NAVO - 73WU 8:07

4 8/21 NAVO - 73WU :45

5 9/10 NAVO - 73WU :07

6 9/18 AFWA - 78Y2 21:21

7 9/19 NAVO - 73WU 11:40

8 9/30 FNMOC - 7CU2 14:32

9 10/13 NAVO - 73WU 3:05

NAVO - 73WU 29:51

10 10/18 NAVO - 73WU :558

• NCEP POP (@NSOF) circuit tracking.– Does not include DOD to DOD outages, nor data issues.

• 2nd connection could help in some cases.• 2nd connection and multiple NFGs with dynamic routing should

prevent all but the last mile outages.

Page 9: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

Network Monitoring• CSAB Action Item 2014-2.1: CCM will work to develop a

(no extra cost) COPC network monitoring solution. – NAVO (Tracy LePire) took the

lead by implementing a monitoring solution.

• NAVO is monitoring the NOAA/NAVO circuit and the AFWA/NAVO circuit.

– Group would like to setup similar processes at AFWA and FNMOC.

9

Page 10: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

Bandwidth Requirements• COPC Action Item 2014-1.2: JAG CCM shall coordinate

with COPC partners to update the network requirements (now FY14-FY17). The requirements shall include COPC related or COPC impacted initiatives such as NUOPC and modeling data, existing and new satellite data, and conventional/observational data. – AFWA’s requirements are up to date.– Navy plans to make their requirements match the format of

AFWA submission. (Est. Nov).

10

Page 11: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

11

Questions

Page 12: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

12

2nd Connection NOAA/DOD

12

NOAA

DoD

Page 13: 1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team

13

Final Solution through NFG

13

DoD

NOAA