downer's eam success through integration technologies

37
Downer’s EAM Journey EAM Success through Integrated Technologies

Upload: sun-w-kim

Post on 20-Mar-2017

129 views

Category:

Software


0 download

TRANSCRIPT

Page 1: Downer's EAM Success through Integration Technologies

Downer’s EAM Journey EAM Success through Integrated Technologies

Page 2: Downer's EAM Success through Integration Technologies

Introduction

Uchiraka Yatawara Websphere Applications Manager E: [email protected]

Abhijeet Rajankar EAM Technical Manager E: [email protected]

Dean La Porte IBM Product Design E: [email protected]

Page 3: Downer's EAM Success through Integration Technologies

3

Session Abstract

Introduction – Company and Project

Project Challenges – Both Business & Technology

Approach taken - Journey

Solutions selected and applied

Outcome, Lessons Learnt and Future Journey

Page 4: Downer's EAM Success through Integration Technologies

4

Downer Company Profile

• Overview • Leading provider of engineering and infrastructure &

asset management services to public and private sectors

• Located predominantly in Australia, New Zealand and the Asia-Pacific region

• Market Sectors • Minerals and Metals • Oil and Gas • Transport

• Power • Communications • Property

• Operating Divisions • Downer Infrastructure • Downer NZ • Downer Mining • Downer Rail

Page 5: Downer's EAM Success through Integration Technologies

5

Downer Rail

• Overview • The leading provider and maintainer of freight

and passenger rolling stock in Australia

• Operates • 3 engineering design centres • 4 manufacturing plants • 20+ maintenance facilities in Australia

• Asset Management Services

• Passenger rolling stock • Freight rolling stock • Simulators • Locomotives

• Operations and maintenance facilities

Page 6: Downer's EAM Success through Integration Technologies

1. With clear strategic intent, you can find opportunities that you may not have realised existed

2. Use major projects to help define your strategy or consolidate your smaller projects to create critical mass

3. Once you have clear strategic direction align support structures early to start building internal capabilities

EAM Strategy – 3 Key Points

6

Page 7: Downer's EAM Success through Integration Technologies

7

Waratah Train Project

In 2006 Downer entered in to an agreement as a major contractor to the Waratah Train Project as part of the Public Private Partnership (PPP). WTP is the largest rolling stock procurement project ever undertaken in Australia.

Page 8: Downer's EAM Success through Integration Technologies

8

Sydney’s Waratah Train Innovation

Named after the state of NSW’s floral emblem ‘WARATAH’

Comprises of 2 driver cars, 4 motor cars and 2 trailer cars

Live video streaming with 150+ CCTV cameras per train

Energy efficient LED lighting – World’s first for passenger trains

3G network connectivity

Automatic Climate Control

Page 9: Downer's EAM Success through Integration Technologies

9

Sydney’s Rail Transportation

306 Railway stations within the metropolitan of Sydney

Over 1 million passenger journeys are made daily

2060KM+ of railway tracks only within the Sydney metropolitan Waratah trains to replace 50% of Sydney’s existing train fleet

Page 10: Downer's EAM Success through Integration Technologies

10

Waratah Train Project - Current Status

72 Waratah trains are in passenger service

6 more trains are in current production

Expected completion is mid 2014 Supply chain improvements to fast track manufacturing

Page 11: Downer's EAM Success through Integration Technologies

11

Three Core Project Elements

1. Designing, building and commissioning the Auburn Maintenance Centre 2. Designing, building and commissioning 78 eight-car train sets for use on the Sydney rail network 3. Maintaining all 78 train sets as part of a 30-year Through-Life-Support contract

Auburn Maintenance Centre

30-year Through-Life- Support contract

78 eight-car train sets

Page 12: Downer's EAM Success through Integration Technologies

12

Systems Opportunity

A ‘best of breed’ approach to an EAM solution

Highly available platform for real-time transactions

IBM products were selected as the core platform Provides a focus to build and align support capability

Page 13: Downer's EAM Success through Integration Technologies

13

System Challenges

• Application Roadmap

• System support & maintenance

• Bespoke solutions

• Multiple Legacy systems • Manufacture • Maintenance • Costing

Page 14: Downer's EAM Success through Integration Technologies

14

Project Challenges

• Managing asset configuration and maintenance activities

• Ability to effectively manage a detailed contract with multiple stakeholders

• Ability to integrate with multiple systems via highly available integration platform

• Ability to maintain integration to and from legacy systems

Supporting ‘state of the art’ fleet rollout

30-year Through-Life- Support contract

High priority real-time B2B Transactions

Legacy Systems and Business

Transformation

Page 15: Downer's EAM Success through Integration Technologies

15

Why IBM Technologies?

Existing implementation across the organization

Industry specific EAM solutions

Internal capabilities

Page 16: Downer's EAM Success through Integration Technologies

16

IBM Product Suite

• IBM Maximo Enterprise Asset Manager • IBM Maximo Asset Configuration Manager • IBM Maximo for Transportation • IBM Maximo Service Request Manager • IBM Maximo Calibration • IBM SLA Manager • IBM Maximo Adaptor for Microsoft Project • IBM Maximo for Service Providers • IBM Websphere Message Broker • IBM Websphere MQ • IBM Websphere Partner Gateway • IBM Websphere Application Server • IBM Tivoli Omnibus and Network Manager • IBM Tivoli NetCool/Omnibus Gateway • IBM Smart Cloud Control Desk

Page 17: Downer's EAM Success through Integration Technologies

Maximo Integration Framework (MIF)

• Event driven, real time, rules based integration • Application configuration • Integrated Security • Proactive Notification and Reprocessing • Native synchronous and asynchronous Web services • Highly scalable • Integrate any Maximo object • Over 75 pre-built integrations • Product adapters to

SAP and Oracle

Page 18: Downer's EAM Success through Integration Technologies

Enterprise Applications

Maximo M I F File (FTP)

Messaging e.g MQ Series

EAI

Interface Tables

Interface Tables

JDBC

Maximo IS

XML DSF

JMS

HTTP

Connectivity

Page 19: Downer's EAM Success through Integration Technologies

Delivered Integrations

--...- --�---

- - ---- - -- -. ---- - - ---

--- - -----·-·

Cost Management

Chart m Accounts

Tr-ansactlons

Sto.-e.-ooms

Items

Inventory

Balance

Mater-la! Reservations

Mate.-lal Issues

Pu.-chase Requisitions

Pu.-chase Or-der-s

Receipts

Invoices

Assets

Locations

vvo

vvo Details

Labo.­

c.-an

Time

= I S1

;:c Ci)

II Downer

Page 20: Downer's EAM Success through Integration Technologies

Fleet Management Facilities System (FMFS)

20

Page 21: Downer's EAM Success through Integration Technologies

21

“A Day in the Life of the Business..”

OPERATIONS Train schedules refined to optimise use of fleet Trains monitored in operation to minimise Incidents Faults identified/analysed -> preventive maintenance MAINTENANCE Work orders issued to maintenance personnel Scheduled maintenance performed Faults rectified CONTRACTUAL Daily negotiation of all invoice affecting items Required number of trains made available to operate Daily Performance monitoring & revenue calculation Monthly invoice calculated & supporting data provided

Page 22: Downer's EAM Success through Integration Technologies

22

FMFS Solution in Focus

The Fleet Management Facilities System (FMFS) is a customisable, reusable application that integrates all aspects of the value chain and provides interoperability with customer’s applications.

Page 23: Downer's EAM Success through Integration Technologies

23

Maintenance Management Information System (MMIS)

Page 24: Downer's EAM Success through Integration Technologies

Maintenance Management Information System (MMIS)

Preventative Maintenance

Incident Management

Fault Management

Set Data Management

ReimbursableManagement

MMIS(Maximo)

Page 25: Downer's EAM Success through Integration Technologies

25

Integration Platform

Integration with highly available down-stream applications

Highly available transactional B2B Gateway

Traceability of high priority transactions

Ensure secured transactions between Downer and the client

Streamlined Service integration model to communicate to trains

Internal legacy systems were not included

Page 26: Downer's EAM Success through Integration Technologies

26

Integration Platform

Page 27: Downer's EAM Success through Integration Technologies

Integration with Specialized Equipment

27

Page 28: Downer's EAM Success through Integration Technologies

Integrated Service Management

28

Customized Tivoli products are used for monitoring trains

Monitor the high availability and the scalability

Waratah trains are sending feeds to Maximo

Netcool OMNIBUS and Tivoli Monitoring are used

Page 29: Downer's EAM Success through Integration Technologies

Alert Management System (AMS)

29

Page 30: Downer's EAM Success through Integration Technologies

30

Fleet Network Display (FND)

Page 31: Downer's EAM Success through Integration Technologies

31

Train Crew Display Emulator (TCDE)

Page 32: Downer's EAM Success through Integration Technologies

32

Set Planning & Analysis (SPA)

Page 33: Downer's EAM Success through Integration Technologies

Lessons Learned

33

Ensure operational requirements are not disconnected from contract negotiations

Ensure there is a clear plan and focus for legacy system integration and data management

Timing of training is equally as important as the provision

Page 34: Downer's EAM Success through Integration Technologies

Key Business Outcomes

34

Day to day processes are streamlined

Up skilling users with leading edge Asset Management System

Perform Maintenance – both Proactive and Reactive

Defining and Managing KPIs

High priority, transactional Business-to-Business Gateway

Supply Chain Automation

Enterprise level integration architecture

Page 35: Downer's EAM Success through Integration Technologies

Next Phase of the EAM Journey

35

Keep up to date with changing technology

Stay abreast of the new solutions from the IBM product suite and roadmap

Leverage FMFS solutions in other business areas

Focus on current rail contracts to leverage FMFS solutions

Align with broader Application strategy

Application Roadmap with planned review phased across organisation

Busin

ess

Enga

gem

ent

Page 36: Downer's EAM Success through Integration Technologies

Future Projects

36

Rolling out integrated condition based maintenance

Maximo Scheduler for planning and execution of PMs

Leveraging EAM practice in the other business areas

Expanding deployment of Maximo and Websphere

Utilizing Maximo for service provider

Page 37: Downer's EAM Success through Integration Technologies

Further Information & Contacts

Uchiraka Yatawara – Websphere Applications Manager E: [email protected] M: +61 437 099 677

Abhijeet Rajankar – EAM Technical Manager E: [email protected] M: +61 421 716 556 Dean La Porte – IBM Product Design E: [email protected] M: +1 978 899 2588

Downer Website: www.downergroup.com