![Page 1: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/1.jpg)
Double tracks betweenHallsberg and Degerön
![Page 2: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/2.jpg)
Ten-T Core Network
![Page 3: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/3.jpg)
Hallsberg
Hallsberg–Stenkumla
Stenkumla–Dunsjö
Dunsjö–Jakobshyttan
Jakobshyttan–Degerön
Jakobshyttan
![Page 4: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/4.jpg)
2019 2020 2021 2022 2023 2024 2025
Hallsberg
Hallsberg–Stenkumla
Stenkumla–Dunsjö
Dunsjö–Jakobshyttan
Jakobshyttan
Jakobshyttan–Degerön
2026 2027 2028
![Page 5: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/5.jpg)
Hallsberg–Stenkumla
![Page 6: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/6.jpg)
Design and Build Contract. Four bridges in the north.
Estimated cost: EUR 28 million.
Specifications will be publishedin the autumn
of 2021.
Hallsberg–Stenkumla
1stCONTRACT
2ndCONTRACT
3rdCONTRACT
4thCONTRACT
Design and Build Contract. Two bridges in the south.
Estimated cost: EUR 14 million.
Specifications will be published in the spring
of 2022.
Building contract. Two single track tunnels,
soil modificationsand smaller bridges.
Estimated cost: EUR 120 million.
Specifications will be published in the autumn
of 2021.
Building contract. BEST, MBEST Hallsberg
(holding sidings) and connection.
Estimated cost: EUR 140 million.
Specifications will be published in the spring
of 2022.
![Page 7: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/7.jpg)
13km tracks,
12 km in new terrain.
2,5km tunnel.
two single track tunnels.
Hallsberg–Stenkumla
1,5km rebuilding of
public roads.
Construction and service roads.
11bridges.
2km of rock excavation
Max 12–15 m high.High banks.
Rebuilding and extension of holding sidings.
Noise reduction barriersand screens.
Environmental measures.
Reading in existinginterlocking system, svt 95.
![Page 8: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/8.jpg)
Hallsberg–Stenkumla
Soil from the tunnel, but big barriers: Highway 50, the Western Main Line and electric lines.
Connection to holding sidings.
Building of holding sidings in the Hallsberg rail yard.
Subdivisions to make traffic work during construction.
Two environmental sentences.
Environmentally protected area in the vicinity of the tunnel.
![Page 9: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/9.jpg)
Dunsjö–Jakobshyttan
![Page 10: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/10.jpg)
Dunsjö–Jakobshyttan
Design and Build Contract.
Estimated cost: EUR 33 million.
Specifications will be publishedin the spring of 2020.
1CONTRACT
![Page 11: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/11.jpg)
Dunsjö–Jakobshyttan
3km of new track running
alongside the existing one.
2,5km of double tracks in new terrain.
260m tunnel (double tracks).
Lined tunnel.
Construction and service roads. 2
km of rock excavationMax 16 meters high.
Noise reduction barriers and screens.
Environmental measures.
Reading in existing interlockingsystem, svt 95.
Upgrading of signal box.
Complete design ofconstruction document.
![Page 12: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/12.jpg)
Dunsjö–Jakobshyttan
Construction work within and alongside a line that is open to traffic.
Soil and rock handling in a narrow work area.
Groundwater impact.
Design and construction work incorporate all kinds of rail specific techniques.
Tunnel on turnkey contract.
Lined tunnel, not previously built in Sweden.
![Page 13: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/13.jpg)
Jakobshyttan–Degerön
![Page 14: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/14.jpg)
Jakobshyttan–Degerön
Design and Build Contract.
Estimated cost: EUR 71 million.
Specifications will be publishedin the summer of 2020.
1CONTRACT
![Page 15: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/15.jpg)
Jakobshyttan–Degerön
5km of new track running
alongside the existing one.
6km of double tracks
in new terrain.
1km station withpassing loop.
3new roads,
in total 8 km.
Construction and service roads.
7bridges near the track.
3km of rock excavation
max 10 m high.
Noise reduction barriersand screens.
Environmental measures.
Complete design ofconstruction documents.
![Page 16: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/16.jpg)
Jakobshyttan–Degerön
Construction works within and alongside a line that is open to traffic.
Recreation of meandering river channel.
Groundwater impact.
Design and construction work incorporate all kinds of rail specific techniques.
![Page 17: Double tracks between Hallsberg and Degerön · 2019 2020 2021 2022 2023 2024 2025 Hallsberg Hallsberg–Stenkumla Stenkumla–Dunsjö Dunsjö–Jakobshyttan Jakobshyttan Jakobshyttan–Degerön](https://reader035.vdocuments.mx/reader035/viewer/2022071002/5fbe7cb0ac11247a1530439c/html5/thumbnails/17.jpg)