MECHANICAL | ELECTRICAL | INSTRUMENTATION | CONTRACTORS | ENGINEERS • Keep up to date with our current projects in Spotlight. • Be informed on our completed or near completion projects in Review. • Dornan win again at NISO. • Read about Dornan’s award for the prestigious CPD Accreditation Employer Status. DORNAN WIN MAJOR NISO AWARD | Pg 4 SEE OUR PROGRESS ON PROJECTS | Pg 6-9 CPD ACHIEVEMENT FOR DORNAN | Pg 12 1ST CLASS DELIVERY Our Dornan team complete the works at the Royal Mail site in Hemel Hempstead. | Page 10-11 ISSUE 3: NOVEMBER 2011 www.dornan.ie / www.dornan.co.uk Keeping you informed on our National and International progress Digest

Upload: dornan

Post on 10-Feb-2016

250 views

Category:

Documents


2 download

DESCRIPTION

Dorna Digest Newsletter. Keeping you informed of our National and International progress.

TRANSCRIPT

Page 1: Dornan Digest - Issue 3

MECHANICAL | ELECTRICAL | INSTRUMENTATION | CONTRACTORS | ENGINEERS

•KeepuptodatewithourcurrentprojectsinSpotlight.

•BeinformedonourcompletedornearcompletionprojectsinReview.

•DornanwinagainatNISO.

•ReadaboutDornan’sawardfortheprestigiousCPDAccreditationEmployerStatus.

DORNANWINMAJORNISOAWARD|Pg 4 SEEOURPROGRESSONPROJECTS|Pg 6-9 CPDACHIEVEMENTFORDORNAN| Pg 12

1ST CLASS DELIVERYOur Dornan team complete the works at the Royal Mail site in Hemel Hempstead.| Page 10-11

ISSUE 3: NOVEMBER 2011

www.dornan.ie/www.dornan.co.uk

Keeping you informed on our National and International progress D i g e s t

Page 2: Dornan Digest - Issue 3

contents

2 DORNANDIGESTJULY-DECEMBER2011

1. HEALTH AND SAFETY

2. SPOTLIGHT ON PROJECTS:• WESTSUSSEXENERGYPLANT• ROYALMAILCROYDON• GROVEHOUSE• LONZABIOLOGICS

3. FEATURE:1ST CLASS DELIVERYDETAILSABOUTOURROYALMAILPROJECTATHEMELHEMPSTEAD

4. QUALITY

5. UPDATE

6. REVIEW

7. PEOPLE

8. NUTS & BOLTS

pg4

pg14

pg16pg18

pg13 pg12

pg10

pg6

Page 3: Dornan Digest - Issue 3

PRIDE IN WHAT WE DOBefore I start my review of our last 6 months, I want to highlight and acknowledge firstly the people power behind the Dornan brand- the people who make us who we are.Personally, it’s great to come to work everyday with a sense of pride that I work with the people I have with me in Dornan. From the Trades, Site Supervision, Project Management, our Engineers and of course the office staff in our locations- without their effort, intelligence, inspiration and above all, sense of duty and pride to deliver safe quality projects, Dornan would not be the success that we are. On behalf, of my fellow directors, you our clients and myself, I want to thank our people (past and present) for making us who we are.

2011-aninterestingyearAswecometothecloseoftheyear,itcertainlyhasbeinginterestingdoingbusinessthisyear.With thesuccessfulcompletionof theTiconaProject inFrankfurtand thenearcompletionof thePembrokePowerStation, thechallengehasbeingfinding replacementprojects for2012.Whilstour traditionalmarketssuchasthePharmaceuticalsectoretc.havehadcapitalexpendituredecline,weareluckytohavefoundanicheinnewexcitingmarketssuchasWastetoEnergyand thecontinuingboominDataCentreDevelopments.Wehaverecentlyhandedovera facility inSurrey foroneof themost recognisablenamesintheFinancialServicesIndustryandnowjuststartinganotheroneforanotherFinancialheavyweight inSheffield.Added to this is therecentawardoftheElectricalServicesonanewDataCentreinIrelandforoneoftheGlobesmostrecognisablenames,meansDornanarenowconsideredoneofEurope’spremierdeliveryspecialistsinthisfield.

2012-newfrontiersandold?As our Blue Chip clients continue to expand into new geographicalmarkets,Dornanare frequently invited toundertake thedeliveryof thesenew installations as a preferred supplier. We have a number of theseopportunitiesthatwearepresentlyexploringthatwillpotentiallybringustonewandexcitingmarketsin2012.AndanotherbonusforusasacompanyarethegreenshootsofrecoverythatIseeintheIrisheconomyatlast,Ithink2012couldbetheyearwithIrelandwillstarttocomeouttheothersideofitseconomicnightmare.

IhopeyouenjoythisissueoftheDigestandIlookforwardtomeetingupwithyouinthecomingmonths.

from our CEOmessage

3DORNANDIGESTJULY-DECEMBER2011

Brian Acheson,Chief Executive OfficerJuly - December 2011

Page 4: Dornan Digest - Issue 3

4 DORNANDIGESTJULY-DECEMBER2011

Health and Safety

The National Irish Safety Organisation Awards took place in Killarney on 7th October 2011.

Dornan Engineering secured a “MajorAward” on the night in the category ofRegionalAward,denoting thatwehad thebestentryoutofhundredsofcompaniesinIreland,NorthernIrelandandtheUKacrosssectors such as energy, construction,manufacturingandtransport.FollowingonfromourPresident’sAwardin

2010, aRegionalAward is a testament oftheinvestmentandresourcesthecompanycontinually commits to the safety& healthof itsemployees.Theseawards recogniseour safetymanagement system combinedwithstrongmanagementleadershipandthegoaltoachievecontinuousimprovement.CompilingasubmissiontotheawardsplacesourHealth&Safetymanagementsystemsunder thescrutinyofan independentbodyandinturnDornan’sgainanexternalreviewoftheeffortswehaveputintoimprovingour

Health&Safetycultureandperformance.Dornan Engineering have entered theawards since 2005, winning consecutiveRegional Awards and the PresidentsAward and this demonstrates that we areprogressing well on our journey to beingrecognised as one of the companies withthe top safety performance in Republic ofIreland,NorthernIrelandandtheUK.Image L-R: Tom Stephenson NISG; Sean Kelly MEP; Paula Kennedy Dornan Engineering EHS Manager; Pauric Courigan, NISO President.

Pembroke team awarded Safety Contractor of the Month

Dornan wins Major award at NISO

Image L-R: Bob Huitson, Ian Hough of RWE, Michael Thomas of Alstom Power and Brian Foskin.

Our Dornan Pembroke Power Station team were awarded Safety Contractor of the Month earlier this year in July, from RWE and Alstom Power.

Wewerepleasedtohavebeenfurnishedwith this award as the safety standardwithin our team is a reflection of ourstandardsacrosstheboardandforallourprojects.

SincetakingovertheleadEHSpositionon

site, Brian Foskin has been instrumentalin providing the backup information thatRWEandAlstomwerelookingfor.Brian has been able to demonstrateDornan personnel involvement frommanagementtoworkfaceincludingaudits,safetycoaching,trainingstructure,reportsandworkplacechecks.Alongwithouraward,wewerepresentedwith a cheque of £1,000 to donatte to a

charityofourchoice.Wechose tomakethatdonationtothelocalNSPCCcharity,whodogreatworkwithchildrenintheUK.Bob Huitson, our Project Managerpresented the cheque to a NSPCCrepresentative, see our ‘People’ sectionforthearticleandphoto.

Page 5: Dornan Digest - Issue 3

5DORNANDIGESTJULY-DECEMBER2011

Dornan receives Safe Working Award from ECIADornanEngineeringreceivedaSafe Working Award from theECIA(EngineeringConstructionIndustryAssociation) followinga recent submission byPaulaKennedy.

In February 2011 our EHS Manager entered the UK RoSPA Awards for the second consecutive year.

In2010weachievedaRoSPASilverAwardandthisyear,wearedelightedtohavewontheGoldAward.This key fixture in the UK Health andSafety calendar offers organisations aprime opportunity to prove their ongoingcommitmenttoraisinghealthandsafetystandards.

The RoSPA awards are not just aboutreducingthenumberofaccidentsandcasesof ill-health at work; they help to ensurethat organisations have good health andsafety management systems in place. Inthecurrenteconomicclimate,theseawardsdemonstratethatemployerscareabouttheiremployeesandwillnotlethealthandsafetystandardsslip.

The Awards Ceremony was held at theHilton Metropole Hotel in Birmingham on

18thMay2011.TheprestigiousGoldAwardwaspresentedthatafternoonbyLordJordanofBournville,CBE.In attendance for Dornan EngineeringwereOliver Lonergan -ManagingDirector,DerekDuffy-UKOperationsDirector,PaulaKennedy - EHSManager, EamonnCarty -ContractsManager,MartinRooney-SafetyOfficer,DonalCoakley-SafetyOfficer.

Dornan awarded Gold at the RoSPA Awards Ceremony in Birmingham

External Audits on OHSAS 18001 & ISO 14001 Systems

Image (L-R): Back Row: Eamonn Carty, Donal Coakley, Martin Rooney, Derek Duffy. Front Row: Paula Kennedy, Oliver Lonergan.

Accidents:January - September 2011

UK ZeroRIDDOR

Eire ZeroLTA

Paula Kennedy, our EHS Manager recently secured a position on a newly formed panel named ‘Health & Safety Experts for Europe and the Middle East’. Todatethey'vehad3meetingsandarenowprovidingexpertadvicetomanufacturingandpharmaceuticalcompaniessettingupofficesinEuropeanlocations.

In June 2011, the Dornan Engineering EHS Department were audited by Wates Interiors.PaulaKennedyexplains“Wedidwell intheauditbutweneed to ensure that we maintain these high standardsacrossallofoursites”.

Since January 2011, 29 EHS Audits have been conducted by our EHS Manager.

Sites Audited include: Great MinsterHouse, University College London,KajimaGroveHouse,Kingswood,Ticona,HarbourExchangeTower,EastGrinstead,Horsham, Lonza Slough, Royal MailHemelHempstead,UCC&EliLillyIE2.

Therewasatotalof10NonConformancesfromtheseaudits.

Our next external OHSAS 18001 & ISO14001Audit will take place in November2011.

Page 6: Dornan Digest - Issue 3

6 DORNANDIGESTJULY-DECEMBER2011

Dornan Engineering has been awarded the M&E services on a £1bn plus Biffa project for West Sussex County Council.

Biffa is to construct anMBT facility next to its BrookhurstWoodlandfillsitenearHorsham,inthenorthoftheCounty.Thecompanysaidthenewfacilitywilldivertupto80%oftheresidualwastefromlandfillandwillsavetheCouncilaround£300millionoverthelifeoftheContract.It will also significantly reduce the carbon footprint of householdwaste management in the County. Additionally, the mechanicalsortingplantwillextractany remainingmetals from thewaste forrecycling,helpingtoboostWestSussex’srecyclingrates.

Themechanicallyseparatedbiodegradablefractionwillbetreated

Spotlight on Projects

WEST SUSSEX COUNCIL WASTE ENERGY PLANT

using anaerobic digestion technology. The resultant biogas willinitiallybeusedtogeneraterenewableenergyandmayinthefuturebeharnessed toproduce fuel forvehicles.Whenoperatingat fullcapacitythefacilitywillproduceupto3.5MWofrenewableenergy,enoughtopoweraround7,000homes.

In addition, the facility’s mechanical sorting plant will produce aRefuseDerivedFuel(RDF).SubjecttoajointexercisebyBiffaandWestSussexCountyCounciltofindalong-termsustainablemarketfortheRDF, itwilleitherbesenttoathirdpartyoutletorusedtofuelathermaltreatmentfacilitythatwillproduceenergyintheformofelectricityandheat.Subjecttoplanningandoperatingconsents,the thermal treatment facilitywould, if required,beconstructedattheBrookhurstWoodsite.

Dornan Engineering Services was awarded the M&E ServicescontractforthisprojectinAugust2011.

TheWastetoEnergySectorisanewandexcitingoneforDornantoenter.WehopetodeveloprelationshipswithbothBiffa&M+WGroup by demonstrating our ability to complete major Industrial

Page 7: Dornan Digest - Issue 3

7DORNANDIGESTJULY-DECEMBER2011

projects while meeting the high safety, schedule andqualitystandardsthatareset.Constructionon theproject has kickedoff,with cablecontainmentinstallationwellunderway.

Our Electrical scope on this project includes thefollowing:• CompleteCableContainmentsystem.• CompleteLVPowerinstallationinclTesting.• CompleteProcessCablinginstallation&Testing.• Lighting&GeneralServicesInstallation.• CCTVSystem.• UPSInstallation.

Mechanicalscopeincludes:• HeatingInstallation.• CoolingInstallation.• VentilationInstallation.• RainWaterHarvestingSystem.• WaterServicesInstallation.

SincecommencingoperationonsitetheendofAugust,wehavemadegoodprogress.Containmentinstallationbeganon5thOctober.The first sections of the MBT Treatment equipmentbegan arriving from Germany on 13th Oct - thisinstallationwillcontinueonaphasedbasisoverthenext4months.And3ofthe5AnaerobicDigestiontankshavenowbeeninstalledaswecontinueourprogressonthisproject.

Images. Opposite page and this page top and bottom right- The Waste Energy Plant site. Three images above- 3D model examples of the completed site.

Page 8: Dornan Digest - Issue 3

8 DORNANDIGESTJULY-DECEMBER2011

Following on from our Royal Mail centre project at Hemel Hempstead, Dornan was also awarded the M&E installation of the Royal Mail centre in Croydon.

The scope ofworks includes upgrade to theexisting AC systems, upgrade to the southtoiletblock,installof2newAHU’sservingthenewsorthallextension,installofanewchillerandrelocatingof2noexistingchillers tonewcompound, relocation of existing generator,extension of lightning protection, installationof new gas radiant heaters, upgrade to gasline, new lighting in sort hall, installation ofnew heat recovery units and fans, completeBMS package and fire alarm and relocationgatehouse.

The Dornan team have been on site sincemid-June,strippingouttheexisitngworksandhavesincebeenmakinggoodprogressonceonsitefulltimefromtheendofAugust.

Stamping our mark

KAJIMA GROVE HOUSE

Work at our Kajima Grove House site in Marylebone is progressing well and we are on schedule to complete the project for the end of the year.

OurprojectmanagerShaneFogartyhasbeenoverseeingtheworksonthis7storeybuilding.ThesitewasoriginallyKajima’s(PropertyDeveloper/PropertyInvestingCompany)Londonbasedofficesforwhichweweretostrip-outtheoriginalservicesandinstallnewCATAinstallation.

Kajimaintendtoletouteachfloorandmanagethetenants.Eachfloorhasitsownindividualserviceswhichcanbecontrolledandadjustedtothetenant’srequirements.DornanEngineeringare installing the Mechanical, Electrical & Public Health Services including new plantroominstallation.

ShaneisworkingalongsideStephenFletcher,ourElectricalEngineer(whosplitshistimewithanother project at Hammersmith).At present we have 7 Subcontractors under our controlincluding:4No.MechanicalPipefitters,8No.ElectricalContractors,3No.Ductworkers,2No.InsulatingContractors,5No.BMSContractors,2No.FlushingSpecialistsand2No.FireAlarm/Securitypersonnel.

Thebuildingisaimingtoachievean“excellence”BREEAMcertification.

Spotlight on Projects

Page 9: Dornan Digest - Issue 3

9DORNANDIGESTJULY-DECEMBER2011

LONZA BIOLOGICS PROTEUS PROJECTDornan Engineering are currently involved in the Proteus Project for Lonza Biologics in Slough.

The scope of workscomprises of Mechanical,Electrical, HVAC, BMSand IMS works on the 228Buildingrefurbishment.The Proteus project iscomplex in that over 80%of the floor area is beingcompletelyrefurbished(stripout to core and refit) whilestillmaintainingproduction.

The project is split into 8phaseswhichcommencedinMay2011and is scheduledfor completion in August2012.

Phase 2 was handed overto the client in the middleof September and Phase 1isdue for completionat theendofOctober.

Phase3whichisthelargestphaseoftheproject,whichincorporatesMainPlantsuchasMainDistributionBoards,AirHandlingPlant,PumpSets,Blackutilitypipeworksystems,isscheduledtoCommenceinNovember2011andcompletedforMarch2012.

TheProjectteamconsistsof:JohnO’Mahony(ProjectManager),HughMcElligott,ConorRattigan,FergalMeagherandMarkGibson.

Dornan Engineering is due to commence work on our first secured project with Verizon in Dublin.

TheVerizonBusinessencompassesGroundto4thfloorsandarooftopplantarea.

Dornanaretoprovideuninterruptedofficespaceforstaffacrossthefloors.The3rdand4thfloorsshallbefittedoutin2stagesbysplittingthefloorsinhalf;thereforecreatingswingspacewhileonehalfofeachfloorisbeenfittedout.ThefitoutisdueforcompletioninJanuary2012

Thescopeofworksincludes:• Supplyandinstallationofnewfan-coilunitsinofficelocations(currentlyservedby

VRVair-conditioningsystems);• SupplyandinstallationofLowPressureHotWater(LPHW)andChilledWater(CHW)

pipeconnectionsfrom5thfloorplantroomtoFCUlocations;• Supplyandinstallationofpumps,heatexchanger,valvesandcontrolsforhotwater

andchilledwatercirculation;• Supplyandinstallationofcabling,containmentandothermaterialsfortheprovision

ofpowerandcontroltotheFCUequipment;• Supply and installation of control and BMS equipment to provide the required

functionalityforoperationandmonitoringofthecompletesairconditioningsystem;• Removal and safe disposal of redundant VRV equipment and associated R22

refrigeratedgas;• Testing and commissioning of the new air conditioning system including formal

certificationandhandoverdocumentation;• Provisionofoperationandmaintenancemanuals,as-builtdrawingsandschedules.

VERIZON

Page 10: Dornan Digest - Issue 3

10 DORNANDIGESTJULY-DECEMBER2011

Feature

First class delivery

Page 11: Dornan Digest - Issue 3

11DORNANDIGESTJULY-DECEMBER2011

Our Dornan Engineering team worked on the new Royal Mail delivery and sorting centre at Hemel Hempstead, completed in July 2011, value of £3.5m.

Our Dornan team were responsible for the design, supply, installation,testing, commissioning and system proving of the MEP (Mechanical,ElectricalandPlumbing)package.

The 25’000sq/m state-of-the-art centre combined the mail distributioncentresofnearbyWatford,StevenageandHemelHempsteadcentres tobecomeanewandlargercentreservingtheHertfordshirearea.Thiscentreis known as the Northern Home Counties Mailing Centre. The buildingconsistsofalargewarehousespaceconstructedofthreeportalsections.LoadingbaysarelocatedintheSouthWestelevationofthebuilding.AnexistingofficeaccommodationblockislocatedontheNorthEastelevationoverthreefloors.

ThefasttrackDesignandBuildcontractwascompletedin8monthsandhandedovertoRoyalMailinJuly.Thebuildingwillbeused24hoursaday,365daysayear.Theprojectwasvalueengineeredtomaximisereturns,whilst still maintaining high quality installation. The project was built tobudgetandwithintheoriginalconstructionprogramme.

Thekeydesignconcepts for thevariouselementsof theworkswereasfollows:Officeaccommodation-maximisingreuseofexistingplantwherepossible,modifyingandincreasingthecapacityforventilation&cooling/heatingandcosteffectivesystems.Warehouseaccommodation-positivepressurisation to reduce infiltration,incorporation of environmental control to warehouse space to provideventilation,heating&coolingappropriatetotheoccupancyandequipment(automation) requirements,avoid stratificationanduseof freecooling inmidseasons.

Ourmechanicalservicesinstalledincludethefollowing:1).Provideandinstall3No.45kWStulzComputerRoomairConditioningUnits(CRACs)withintheLocalAreaProcessingClusterRoom.2).H i g hvelocity induction ventilation system in the main Sorting Hall. 3). 4 No.63’000m³/hrAHU’sand4No280kWDXCondensers.4).Fan Coil Units(FCUs)withinofficeareas.5).HeatRecoveryUnits (HRUs)withinofficeareas.6).Toiletextractsystemsassociatedductworkandgrilles.7).2NoCRAC units within CommsRoom. 8). Electric under sink instantaneoushot water heaters for all wash hand basins, sinks and all Public HealthServices. 9). Internal drainage and connect to existing undergrounddrainage–pointofconnectiontobeconfirmedviaasitesurvey.10).FullBuildingManagementControlSystem.

Electricalservicesinstalledincludethefollowing:1). 400Volt 1650KVA/1320kW generator and enclosures complete withallassociatedcontrolsandswitchgearincludingallcontrols,set,daytankand central mounted fuel tank and exhaust systems. 2). 1No 1600kVAtransformercompletewithallaccessorieslocatedadjoiningLVSwitchroom.3).Busbar lightingcontrolsystemthroughout thewarehouse.4).100kVAUPS,criticalpowersupplyfortheLAPCRoom.5).MainLVdistributionandsubdistributionboards.6).Lightingandsmallpowersystems,includingalllightfixtures,cables,containmentandfinalconnections.7).EarthingandLightningProtectionsystem.8).Smokedetectors,firebeams,callpoints,sounders,panels,aspiratedpipework,fireratedcablesforthefiresystemincludingallcables,containmentandfinalconnections.9).Securitysystem,includingtheCCTV,AccessControl,IntruderAlarmandIntercomSystems.

First class delivery

Page 12: Dornan Digest - Issue 3

12 DORNANDIGESTJULY-DECEMBER2011

Dornan Engineering continues to offer the reassurance to complete projects to high standards demanded by our Clients.

Recent projects have beencompleted for clients such asMace, ISG, Structuretone,Eli Lilly, University CollegeCork,BostonScientific,EMC,Wates Interiors, Ticona, Kierand Royal Mail. While thisselection of clients is diverse,theroleoftheQualitySystem

istoachieveconsistencywithinadiverseportfolioofprojects.

ConsistencyinadiversemarketseemscontradictorybutitisarequirementofallprojectQualitysystems.OurvisionistofurtherdevelopourQualityManagementandprojecthandoversystemstoallowandofferongoingverificationandturnoverof systems and building zones as the project progresses.Earlyreviewofsinglelinediagrams,identificationofsystems,development of cable schedules and line lists, build up ofsystemhandover“files”andallocationofownership toeach“System”, feeds intobetterplanningforsystemcompletion,inspection,testingandhandover.Since the last issueof the newsletter ourQualityTeamsatTicona in Frankfurt, RoyalMail in Hemel Hempstead, EastGrinstead and EMC, Department for Transport in London,and EMC and Eli Lilly in Cork have handed over projectsusingsystembysystemhandoverfolders.Continualsystemhandover is challenging for our Quality teams but hascontributedtoimprovedonsitequalityandprojectcontrol.

Continual system handover is challenging for our Qualityteams but has contributed to improved onsite quality andprojectcontrol.

A portion of our work involves installations of new andmodifications to existing Data Centres, and in theseenvironments phased system by system handover is moreimportantthanever.

Data hall handover culminates in a successful IntegratedSystemTest (IST)of the facility.Phased systemby systemhandoverresultsinastraightforwardfeedintotheISTphase.

Thedocumentationpreparedpriortoandduringdatacentrecommissioning is a very important deliverable in the lifeof thedatacentre. Inourworkondatacentres,ourQualityteamshavehadtoworkalongsidethirdpartycommissioningspecialists (Dome and Core for example) working in animpartialbasisonbehalfoftheclient.

EarlyinteractiononaprojectbetweenourQualityTeam,theClient and the Commissioning Specialist has facilitated insuccessfulcommissioningofdatacentreprojectstodate.

Thedriversforthissuccesshaveincluded:• Earlyinteractionwiththeclient’scommissioningspecialist

in meeting the requirements of the commissioningplan and understanding our role in the predefined andcommunicatedcommissioningprocess.

• Ourteambeingawareofthetechnologybeinginstalledand itsreactiontotestprocedures(whichmust test thecritical functionality of the equipment) and the centresresponsetorealisticheatloads.

• Our understanding of our role in the Commissioningprocess.

• Our participation as part of the commissioning team inproving the resilience of the data centre’s operation.This has been key in all Data Centre projects to dateas our Quality Team interacts with system designers,clientrepresentatives,vendorspecialists,commissioningAgents and ultimate facilities Management staff in theDataCentre(Oursystemhandoverfoldersalsofacilitatesystemwalkdownandtrainingatdemonstrationstage).

Our consistent approach to Project Quality Assurance hasenabled us to compete in a diverse market of demandingClients.

Quality

Bob Feaheny, Quality Manager

Page 13: Dornan Digest - Issue 3

13DORNANDIGESTJULY-DECEMBER2011

Update

• 11PilgrimStreet

• LonzaBiologics

• KajimaGroveHouse

• RoyalMailCroydon

• 80HammersmithRoad

• ExchangeTowerLevel4

• WestSussexWasteEnergyPlant

• GreatNorthernHotel

• ACEInternationalDC(FinancialClient)

• SheffieldDC(FinancialClient)

PROJECTS SECURED SINCE THE LAST ISSUE

Sinceourlastissue,wearepleasedtohavesecuredtheprojectslistedbelow.

Wearedelightedtheseprojectscomefromsomeexistingclientrelationships,aswellasnewones;whowelookforwardtoworkingwithindemonstratingourcapabilitiesasacompany.

Lonza Biologics, Slough

ACE International DC, Crawley

11 Pilgrim Street, Blackfriars

Great Northern Hotel, Kings Cross

Exchange Tower Level 4, Canary Wharf

80 Hammersmith Rd, Hammersmith

Royal Mail, Croydon

Kajima Grove House, Marylebone

Waste Energy Energy Plant, Horsham

Sheffield Mission Critical Facility

Page 14: Dornan Digest - Issue 3

14 DORNANDIGESTJULY-DECEMBER2011

Review

HARBOUR EXCHANGE TOWER

Dornan Engineering were awarded the Mechanical of Level 4 at Harbour Exchange Tower in Canary Wharf, London.

Theprojectwasacommercialfitoutonthe4thflooroftheExchangeTower consisting of refurbing the existingVAVboxes and installingnewVAVboxesaswell.Wewere togive theAHU’sa serviceandrefurbishment.We removedasbestosgaskets from theexistinghotwater pipework serving the AHU’s and they were disposed of byothers.WecarriedoutrefurbishmenttotheexistingductworkandalsoaddednewroutestosuittheVAVboxlayout.Weinstalled2noextractfansonthe4thfloor.Wealsorefurbishedthetoiletpipework.

GroundfloorworksconsistedofrefurbingAHU’sinplantroomservingbuilding1and2lobbies.Weinstallednewgrillesandductworkservingtheseareas.Wedidacompletestripoutandnewinstallofpipeworkfor the ground floor toilets.Also installed new grilles serving theseareas.

ThismarkedthefirstprojectwithISGandafterasuccessfulhandover,welookforwardtobuildingonourrelationshipwiththegroupoverthecomingmonths.DornanwasalsoawardedSafetyContractorof theMonthontwooccasionsduringtheshortprogramme.

“Refreshing in this current market”TE

STIM

ON

IAL “IwouldliketotakethisopportunitytoexpressmyappreciationoftheservicesprovidedbyDornanwhilstconductingaprojectat

ExchangeTowerinCanaryWharf.HavingneverusedDornanonanyofmypastprojectsIwasslightlyapprehensiveabouthowtheywouldperform.HowevertheysurpassedexpectationsonQuality,Safety,Delivery;arealproactivecompanyandrefreshinginthiscurrentmarket.The commitment from the site and projectmanagementmeant theywere always at hand to deal with our queries and abletoaccommodateourneeds inashort timescale. TheeffortsbyPatBuckleyandRonanKeohanegoing thatextramilewerenoticeableandappreciated,thesegentlemanareanassettoyourcompany.Ilookforwardtoworkingwiththemagaininthecomingmonthsandkeepupthegoodwork.”

Darren Allen MCIOB, MIET, MCMI, I. EngAccount Manager

Page 15: Dornan Digest - Issue 3

15DORNANDIGESTJULY-DECEMBER2011

“Refreshing in this current market”

“IwouldliketotakethisopportunitytoexpressmyappreciationoftheservicesprovidedbyDornanwhilstconductingaprojectatExchangeTowerinCanaryWharf.HavingneverusedDornanonanyofmypastprojectsIwasslightlyapprehensiveabouthowtheywouldperform.HowevertheysurpassedexpectationsonQuality,Safety,Delivery;arealproactivecompanyandrefreshinginthiscurrentmarket.The commitment from the site and projectmanagementmeant theywere always at hand to deal with our queries and abletoaccommodateourneeds inashort timescale. TheeffortsbyPatBuckleyandRonanKeohanegoing thatextramilewerenoticeableandappreciated,thesegentlemanareanassettoyourcompany.Ilookforwardtoworkingwiththemagaininthecomingmonthsandkeepupthegoodwork.”

Darren Allen MCIOB, MIET, MCMI, I. EngAccount Manager

PEMBROKE POWER STATIONProgress on the Pembroke CCGT Power Station project has moved to 93% complete overall in week 34.

Theteamhavebeenworkingunderextremepressureforlongdurationstocompleteturnoverpackagesoneachoftheunits.

InarecentBritishSafetyCouncilauditthePembrokePowerStationProjectachievedanexceptionalscoreof98.6%.DornanwereinvolvedintwoseparateauditswiththeBritishSafetyCouncilsotheauditresultisagoodreflectionofallourhardworkatthesite.

Image: Our Pembroke Site Team- always happy to come together for a photo!

Page 16: Dornan Digest - Issue 3

16 DORNANDIGESTJULY-DECEMBER2011

Dornan Engineering is delighted to announce that we had been awarded the prestigious ‘CPD Accreditation Employer Status’ by Engineers Ireland.

Thisisasignificantachievementforthecompanyastheaccreditationrecognisesgoodorganisationalpractice intheareaofprofessionaldevelopment for engineers and technical staff and receives theformalbackingoftheDepartmentofEducation&Skills.Throughout the preceding months the CPD committee werecontinuallyworkinghardtoattaintheaccreditation.Theintroductionof our CPD policies and practices, which encourages careersatisfactionandprogressionthroughtrainingandacquisitionofnewskills,wasanessentialstartingpointonourroutetoaccreditation.The addition of a new member to the committee James Dougan(Project Engineer for Dornan) further strengthened our crossfunctional committee which is an essential component for thecommunicationandimplementationofCPDthroughoutthecompany.Witheveryonecommittedtosucceeding,thepreparationfortheauditwaswellunderway.On 9thAugust, representatives fromEngineers Ireland conductedanauditintoourCPDpoliciesandprocedures.Itwasnecessaryforthecommitteetodemonstratetothepanelhowwemetasetofeightcriteria including our CPD Policy, CPD Committee, PerformanceManagementSystemsandKnowledgeSharingActivities.Newsofour accreditation success was proudly welcomed throughout thecompany.

Managing Director Oliver Lonergan was presented with the CPDAccredited Employer parchment by John Power, Director GeneralEngineers Ireland at the Engineers Ireland Company of the YearAwards (pictured). The awards ceremony took place in the D4BerkleyHotel,Dublinonthe5thOctober.Theaccreditation has focusedour commitment to the introductionand development of further CPD practices which will ultimatelyencourage and enhance the performance and development of allemployees.

People

Little Britain Challenge CupIt was ‘Aye Aye Captain!’ for the Dornan Engineering crew at the Little Britain Challenge Cup this September.

Taking place on the Isle ofWight, the eventisanannualregattaorganisedforandbytheconstruction industry to raise money for UKandlocalsailingcharities.Thisyeartheeventtook place fromThursday 8th -Sunday 11thSeptember.ThiswasthefirstyearthatDornanparticipatedas a host and despite our race rankings(ahem!),crewmembershadafantastictimeatseaoverthe3dayswewerethere.In theweekof theevent, theweather lookedominouswithforecastsofrainandgreyclouds,

which might have made for an interestingregatta. But mother nature looked kindly onus and what we had instead was fine drysunshinedays.Wehad3crewgroupsovertheThursday, Friday and Saturday racing days.Amongst them were some veteran sailorsand some novices; with the novices slightlyoutnumberingtheveterans!Nevertheless,allcrewmembersgave it theirallonceonboardouryachttheBeaufortVenture.The opening race on Thursday afternoonwas an indication of how we might fair forthe following races- fully engagedand readyfor action to take that number one spot!Wehadasmaller teamon theopeningdayso itwasalmostagiventhatperhapswemaynot

be as quick as the other boats in the race.Maybe a lot slower. Ok, so we came last intherankingbutweallknowit’sthetakingpartthat counts right?! Our other races on thefollowing twodayswith other crewmemberswerejustasenviable.Wehadtheenthusiasm,thecompetitivespirit,theeagernesstotryandclinch thatnumberonespotagain...butalas,wecamelast,inthealltheraces!

AspecialthanksmustbegiventoskipperNickRussell,ofMace.Hisexperienceatthehelmcoupled with that of our Operations DirectorDerekDuffymeantwe remained competitiveand in high spirits.We’ll come back fightingnextyear!

Page 17: Dornan Digest - Issue 3

17DORNANDIGESTJULY-DECEMBER2011

Paris to Geneva Cycle Ride

Job Title:Junior Quantity Surveyor

Joined Dornan Engineering:6 years ago

Years of Industry Experience:6 years

Dornan Project Experience:Great Northern Hotel, Kings Cross, London, UKPresentMission Critical Facility, East Grinstead, UKMarch2011-October2011Mission Critical Facility/Office Fit Out, Kingswood UKAugust2010-February2011Mission Critical Facility, Newbury, UKAugust2009-July2010Whitegate IPP Power Station, UKMay2009-August2009Telecity Data Centre, Stockholm, SwedenSeptember2008-May2009Pfizer Pegasus Strangnas, SwedenSeptember2007-September2008Dornan Dublin OfficeFebruary2007-August2007Pfizer Aspetic Facility, Dun Laoghaire, IrelandOctober2005-February2007

Previous Project Experience:She’s a Dornan Baby!

Qualifications:• 2011, CIOB/EPA course, Mace Business School/

Chartered Institute of Building.• 2009-2011, various courses with Mace Business

School. • 2002-2003, AutoCAD course, Gdansk University

of Technology, Poland.

Interests:Photography, travelling, reading, socialising.

EMPLOYEEPROFILE

PAULINA KAWCZYŃSKA

Paula Kennedy, our EHS ManagercompetedintheEveningEchoWomen’sMiniMarathoninCorkonSunday25thSeptember.The race startedat 1pm from theCityendofCentreParkRoadandcoveredafour-milecoursetakinginCentreParkRoad, The Marina, Blackrock Village,Ballintemple, Monahan Road andfinishinginKennedyPark.PaulawasrunningfortheTheJackandJillFoundationinIreland.Shemadeherchoiceasshefeltitwasatrulydeservingcharityfortheincredibleworktheydoforfamilieswithsickchildren.

ResidentbikefanaticJamieBarlow,ourBusinessDevelopmentExecutive,wasonceagainturningheadsandwheelsashejoinedagroupofindustryfriendsforafundraisingcycleride.Starting in Paris and finishing inGeneva, they tackled 350miles of terrain over 4 days,with just 1minor crash and4puncturesbetweenthegroup.Theywerealsoluckywiththeweather as they enjoyed sunny days despite the unsettledSeptemberweatherwewereexperiencing.JamiewascyclingfortheOxfamcharity,oneofthemostwellknown global charities working on saving lives and puttingpoorpeopleinchargeoftheirlivelihoodsallaroundtheworld.

Our Pembroke PowerStation team donated£1,000 to the NSPCCcharityinSeptember.This donation was madepossible followingour teambeing awarded the SafetyCotnractorof theMonthbyRWE and Alstom, allowingus to present the donationtotheNSPCCcharity.OurProjectManagerBobHuitsonpresented thecheque toNerysSales, theNSPCCCorporate FundraiserManager forWales.Wehope our donation helps tomake a difference to the lives of thechildrentheNSPCCareworkingwith.

Page 18: Dornan Digest - Issue 3

18 DORNANDIGESTJULY-DECEMBER2011

Nuts Bolts&

2,000metres of IPA clean and duct were installed at the Lonza Biologics site.

1,305,035 metres of cable was installed at the Pembroke Power Station site.

1,600,310

9,200

2,521

3,542

1,853 metres of insulated phase of Busbar installed at the Pembroke Power Station site.

of light fittings and 2,800 metres of Busbar lighting fitted at Great Minster House.

Page 19: Dornan Digest - Issue 3

19DORNANDIGESTJULY-DECEMBER2011

2,000metres of IPA clean and duct were installed at the Lonza Biologics site.

1,305,035 metres of cable was installed at the Pembroke Power Station site.

1,600,310 is the value of switchgear installed in the East Grinstead Mission Critical facility.

DATESFORTHEDIARYJULY

5 DATACENTER DYNAMICS ROADSHOW LONDON

12 CONSTRUCTION NEWS AWARDS

AUGUST

3 CONSTRUCTION INDUSTRY BREAKFAST - THE IMPORTANCE OF TRAINING & APPRENTICESHIPS

SEPTEMBER

5- 6 INSTRUMENTATION SCOTLAND & OFFSHORE SYSTEMS

8 - 11 LITTLE BRITAIN CHALLENGE CUP ANNUAL REGATTA

9 RUGBY WORLD CUP KICKS OFF- COME ON THE IRISH!

22 MIPTEC CONGRESS AND TRADE FAIR, SWITZERLAND

OCTOBER

12 BRITISH CONSTRUCTION INDUSTRY AWARDS

13 CONSTRUCTION MANAGER OF THE YEAR AWARDS

25 - 27 RENEWABLEUK 2011

NOVEMBER

23 - 24 EIC CONNECT POWER EVENT 2011

15 DATECENTER DYNAMICS STOCKHOLM

29 - 1 EWEA OFFSHORE 2011, NETHERLANDS

30 - 1 DATECENTER DYNAMICS LONDON

DECEMBER

6 THE FUNDAMENTALS OF OIL & GAS

7 - 9 WORLD FRONTIER EXPLORATION CONGRESS

23 DORNAN OFFICES & SITES CLOSED FOR FESTIVE SEASON, SEE YOU ALL IN THE NEW YEAR.

25 CHRISTMAS DAY- HOPE YOU HAVE ALL BEEN GOOD FOR SANTA!

ARTICLECONTRIBUTORS:• PAULA KENNEDY, EHSManager• SEAN LANE,ProjectManageratWestSussexEnergyPlant• TIM O’DONNELL,BuildingServicesEngineeratRoyalMailCroydon• SHANE FOGARTY,ProjectManageratGroveHouse• BOB HUITSON,ProjectManageratPembrokePowerStation• FERGAL MEAGHER,MechanicalProjectManageratLonzaBiologics• RONAN KEOHANE,ProjectManageratvariousLondonprojects• BOB FEAHENY, QualityManager• JAMIE BARLOW,BusinessDevelopmentExecutive• SHAY MCGAURAN,BusinessDevelopmentManager• BARRY O’HEA,PurchasingManager• STEPHANIE MADDEN,HumanResources

DORNAN DIGEST, ISSUE 4 AVAILABLE NEXT MONTH

9,200 of 1000mm 400KV Cable were installed at the Pembroke Power Station site.

2,521 of lighting Busbar consisting of control energy & standard feeds fitted at the

Royal Mail Centre in Hemel Hempstead.

3,542

1,853 metres of insulated phase of Busbar installed at the Pembroke Power Station site.

of light fittings and 2,800 metres of Busbar lighting fitted at Great Minster House.

Page 20: Dornan Digest - Issue 3

DORNANDIGESTNEWSLETTERISISSUEDBYDORNANENGINEERING.ISSUE3,JULY-DECEMBER2011.ALSOAVAILABLETOVIEWONLINEONOURWEBSITE.NEXTISSUEAVAILABLEJANUARY2012.

LONDON OFFICE:36BROADWAY,FIFTHFLOOR,LONDON,SW1H0BH,UK.

CORK OFFICE: 10EASTGATEAVENUE,EASTGATE,LITTLEISLAND,CORK,IRELAND.

DUBLIN OFFICE:CENTREPOINTBUSINESSPARK,OAKROAD,DUBLIN12,IRELAND.

MANCHESTER OFFICE:3000MANCHESTERBUSINESSPARK,AVIATORWAY,MANCHESTER,M225TG,UK.

BELGIUM OFFICE:UITBREIDINGSTRAAT842600,ANTWERP,BELGIUM.

GERMAN OFFICE:NOVE-MESTO-PLATZ3D,D-40721HILDEN,GERMANY.

STOCKHOLM OFFICE:RINGVAGEN44,SE11867,STOCKHOLM,SWEDEN.

www.dornan.ie / www.dornan.co.uk