Donaldson Run Tributary B Stream Restoration Project Update Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011

Upload: others

Post on 09-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Donaldson Run Tributary B

Stream Restoration Project Update

Donaldson Run Stakeholder Advisory Group MeetingJune 2, 2011

Page 2: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Review of changes from 30% to 60% design

ØReducing width of channel/floodplain to reduce footprint and tree/valley impacts

Ø Limiting re-location of pathway and narrowing pathway

ØReducing disturbance and tree impacts below the footbridge

Page 3: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Updates from 60% design to 75% in February 2011

Ø Step pool ‘grade control’ and ‘riffle’ structures

Ø Initial analysis of hillside and storm pipe drainage inputs

Ø Initial water main surveyØ Preliminary planting plan Ø Invasive plant management framework

Page 4: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Updates from 75% design to 90% design

Ø Hydraulic analysesØ Vertical elevation of water main (pending)Ø Hillside and storm pipe drainage inputs

l Meetings with specific property ownersl Easement researchl Preliminary design

Ø Advancement of planting plan and invasive plant management strategy

Ø Consideration of construction access, equipment type, future maintenance access

Page 5: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Hillside drainage inputsØ Working with specific

property ownersØ Accommodating flow

inputs in project design

Page 6: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%
Page 7: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Storm pipe drainage inputsØ Verifying

easements/pipe conditions

Ø Incorporating needed repairs/modifications into project design

Page 8: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Storm pipe drainage inputs –next steps

ØComplete easement research – meet with specific property owners

Ø At least one new easement may be neededØ TV inspection of all three pipesØ Finalize designs that control stream energy

and minimize future maintenance

Page 9: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

30” Water Main

Ø Interim work completed to protect exposed pipeØ Completed horizontal location survey in JanuaryØ May - Small borings excavated to confirm pipe

elevationsØ Data analysis pendingØ Few apparent conflicts with stream restoration

design except at stilling basin – TBDØ Considering reinforced streambed crossings for

future access to main if needed

Page 10: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%
Page 11: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%
Page 12: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Trees

ØNo change in tree impacts from project from 60% designs to current design

ØOne tree removed to protect water main (previously listed as a potential removal)

ØOne tree has fallen (previously listed as a removal)

Ø Project impact: 36 trees>10” diameter, 72 trees overall

Page 13: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Invasive Management & Planting Plan

Goals:Ø To restore forest structure and

functionØ To support recreational use and

aesthetics

Page 14: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Kudzu

Invasive PlantsØ 85-95% invasive species in the shrub and ground layersØ invasive species present on both park and private properties Ø 27 different species

Page 15: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

ImplicationsØ Invasive management considerable

component of the projectØ Project requires integrated planting and

invasive plant removalØ 4-6 year planting and invasive plant

maintenance scheduleØComplete removal of invasive species is

likely not possibleØMost successful if private citizens are

involved in invasive management

Page 16: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Invasive Management Actions to Date

Ø Invasive plant removal workday, April 2 Ø Invasive Plant Workshop – Upshur St, May 1

– Hosted by Amy WhiteØ Invasive Plant Workshop – Stuart St, May 17

– Hosted by Sarah & Jeffrey KnightØ PRCR sprayed lesser celandine along both

Tributary B and Tributary A

Need help from the Civic Association to generate volunteer turn out and ideas on how to recruit additional volunteers

Page 17: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Invasive Management Actions - Next Steps

Ø In the future, a spring and fall event will be held on both Tributary A and Tributary B

Ø Coordination with or expansion of the 2 existing RIP teams (Remove Invasive Plants) working in Zachary Taylor Park and coordination with Arlington Master Naturalists is being pursued

Ø Possibly one more invasive plant workshop to engage homeowners is under consideration for fall 2011

Page 18: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Invasive Management –Looking Ahead

Ø During construction/plantingl “Clean” equipmentl Mulch or mats for trees/shrubsl Seed heavilyl Protect deer candy

Ø Post-Project/Maintenance• Protect trees and shrubs• Focus on stream banks• Target species• Coordinate invasive removal and planting• Timing of control will depend on plant life cycle• Flexible and adaptive

Page 19: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Planting Plan

Ø Site specificØ All plants will be native to Zachary Taylor

ParkØ Planting “zones” to account for habitat

changes with elevation and distance from the stream.

Ø Special plantings for sensitive areasØMulti-year to account for invasive control

and natural forest succession

Page 20: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%
Page 21: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Zoned Planting - Example

SlopeFloodplain

Page 22: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Special Areas – Bare Slopes

Page 23: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Scarlet oakQuercus coccinea

ArrowwoodViburnum dentatum

Bluestem goldenrodSolidago caesia

Page 24: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Construction methods, equipment, & materials

Page 25: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Smaller materials and equipment

Page 26: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Smaller materials and equipment

Page 27: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Tree protection mats

Page 28: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%
Page 29: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Step pools and Step run feature

Page 30: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Next StepsØ Continue work with property owners on

hillside drainage inputs and design work for storm pipe drainage inputs

Ø Finalize planting plan and invasive plant management plan

Ø Develop construction access/staging planØ Complete specifications including tree

protection planØ Target design completion by end of yearØ Construction schedule still TBD

Page 31: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011  · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%

Learn more at: www.arlingtonva.us – search “Donaldson Run.”

Tributary A, June 2010

Stream restoration, watershed retrofits, Chesapeake Bay Preservation Ordinance, Stormwater Permit and more….