A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Dolphin Lane Sewer Sag ProjectProject No. WW-000017-012
Mt. Vernon District
November 28, 2016
![Page 2: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/2.jpg)
Dolphin Lane Sewer Sag Project
Capital Facilities Division/Wastewater Design and Construction Branch
Site Clearing and Repair
![Page 3: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/3.jpg)
Project DetailsDolphin Lane Sewer Sag Project
Capital Facilities Division/Wastewater Design and Construction Branch
Project Overview:• Installed approximately 115 LF of new 8” ductile iron pipe. • Added non-shrink grout filling to an abandoned, existing sanitary sewer line. • Replaced lateral. • Installed two standard manholes. • Installed a dog house manhole.
Project Team:• Matthew Doyle, P.E., Wastewater Design and Construction Division• Jennifer Arias, Wastewater Design and Construction Division • Robert White Jr., Wastewater Collection Division
DescriptionThis project provided installation of a new sanitary sewer line to replace the existing sanitary sewer line which contained an approximately 9” sewer sag. This project was substantially completed on November 28, 2016.
![Page 4: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/4.jpg)
Dolphin Lane Sewer Sag Project
Capital Facilities Division/Wastewater Design and Construction Branch
Mt. Vernon District, Tax Map No. 110-3
![Page 5: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/5.jpg)
Capital Facilities Division/Wastewater Design and Construction Branch
Upgrades to Dolphin Lane New Sanitary Sewer Line
![Page 6: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/6.jpg)
Capital Facilities Division /Wastewater Design and Construction Branch
Upgrades to Dolphin LaneDoghouse Manhole
![Page 7: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/7.jpg)
Capital Facilities Division /Wastewater Design and Construction Branch
Upgrades to Dolphin LaneReplacement of Storm Drain
![Page 8: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/8.jpg)
Capital Facilities Division /Wastewater Design and Construction Branch
Upgrades to Dolphin LaneNew lateral
![Page 9: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/9.jpg)
Before After
Dolphin Lane Sewer Sag Project
Capital Facilities Division /Wastewater Design and Construction Branch
![Page 10: Dolphin Lane Sewer Sag Project](https://reader036.vdocuments.mx/reader036/viewer/2022081605/588150951a28abb0508b5eb9/html5/thumbnails/10.jpg)
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Dolphin Lane Sewer Sag Project
Capital Facilities Division /Wastewater Design and Construction Branch
Matthew KaiserPublic Information Officer
703-324-8455, TTY [email protected]