doel new generation integrated container terminals … · 2019. 8. 13. · c=new deep sea terminal...

1
R300 m TURNING CIRCLE 1753 m 1505 m 400 m 2454 m NEW SEAWALL CONTOUR DEURGANCKDOK PUTTEN WEIDE AREA 3 26,1 HA TERREIN 3 39,8 HA DOEL 5434 TGS 5434 TGS LOGISTIC AREA 1 26 HA GATE & FACILITIES 2880 TGS KOCH Consultancy Group Engineers Architects NEW GENERATION INTEGRATED CONTAINER TERMINALS ® 2 3 4 4 4 5 sound distance 3 1594 m 5 1055 m 1632 TGS 5304 TGS 5304 TGS 5304 TGS 5304 TGS TEMPORARY PASSAGE FUTURE CUT-THROUGH A B C D 415 m 435 m 442 m 850 m SCALE:1/FIT DATE: 30-07-2019 PROJECT NO.:100-043-G02 DRAWING NO.: ENCLOSURE 3 SUBJECT: 2 E TIDAL DOCK AT ANTWERP ALTERNATIVE 2 ND TIDAL DOCK IMPLEMENTATING NGICT - OHBC CHARACTERISTICS: A = Existing deep sea terminal (remaining part) Straddle carrier operation Stack capacity (100% occ.): 18.400 TGS x 3 = 55.200 TEU B = New deep sea terminal NGICT - OHBC operation Stack capacity (100% occ.): 22.848 TGS x 5 = 114.240 TEU C = New deep sea terminal NGICT - OHBC operation Stack capacity (100% occ.): 10.868 TGS x 5 = 54.340 TEU D = New barge terminal NGICT - OHBC operation Stack capacity (100% occ.): 2.880 TGS x 5 = 14.400 TEU 1.New to build 2 nd tidal dock 2.Existing Deurganck dock 3.Intermediate one-directional AGV tracks 4.Truck lanes 5.Railway tracks Phasing: 6 new deep sea berths and at least 3 barge berths are available before realising the main entrance from the river Scheldt 1

Upload: others

Post on 20-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOEL NEW GENERATION INTEGRATED CONTAINER TERMINALS … · 2019. 8. 13. · C=New deep sea terminal NGICT - OHBC operation Stack capacity (100% occ.): 10.868 TGS x 5 = 54.340 TEU D=New

R

3

0

0

m

TURNING

CIRCLE

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

4

1

8

T

G

S

1

7

5

3

m

1

5

0

5

m

4

0

0

m

2

4

5

4

m

N

E

W

S

E

A

W

A

LL C

O

N

TO

U

R

D

E

U

R

G

A

N

C

K

D

O

K

PUTTEN WEIDE

AREA 3

26,1 HA

TERREIN 3

39,8 HA

DOEL

4

1

8

T

G

S

4

1

8

T

G

S

5434

TGS

5434

TGS

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

2

8

8

T

G

S

LOGISTIC

AREA 1

26 HA

GATE &

FACILITIES

2

8

8

0

T

G

S

KOCH Consultancy Group

Engineers Architects

NEW GENERATION INTEGRATED CONTAINER TERMINALS

®

2

3

4

4

4

5

sound distance

3

1

5

9

4

m

5

1

0

5

5

m

1632

TGS

5304

TGS

5304

TGS

5304

TGS

5304

TGS

TEMPORARY

PASSAGE

FUTURE

CUT-THROUGH

A

B

C

D

4

1

8

T

G

S

4

1

5

m

4

3

5

m

4

4

2

m

8

5

0

m

SCALE:1/FIT

DATE: 30-07-2019

PROJECT NO.:100-043-G02

DRAWING NO.: ENCLOSURE 3

SUBJECT: 2

E

TIDAL DOCK

AT ANTWERP

ALTERNATIVE 2ND TIDAL DOCKIMPLEMENTATING NGICT - OHBC

CHARACTERISTICS:

A = Existing deep sea terminal (remaining part)Straddle carrier operationStack capacity (100% occ.): 18.400 TGS x 3 =55.200 TEU

B = New deep sea terminalNGICT - OHBC operationStack capacity (100% occ.): 22.848 TGS x 5 =114.240 TEU

C = New deep sea terminalNGICT - OHBC operationStack capacity (100% occ.): 10.868 TGS x 5 =54.340 TEU

D = New barge terminalNGICT - OHBC operationStack capacity (100% occ.): 2.880 TGS x 5 =14.400 TEU

1.New to build 2nd tidal dock2.Existing Deurganck dock3.Intermediate one-directional AGV tracks4.Truck lanes5.Railway tracks

Phasing:6 new deep sea berths and at least 3 bargeberths are available before realising the mainentrance from the river Scheldt

1