AutoCAD SHX Text
M8.0
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
MINERAL COUNTY SCHOOLS
AutoCAD SHX Text
GUARANTEED ENERGY SAVINGS CONTRACT
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL
AutoCAD SHX Text
FORT ASHBY, WV
AutoCAD SHX Text
Louisville, KY 40059
AutoCAD SHX Text
10411 Meeting Street
AutoCAD SHX Text
AutoCAD SHX Text
T 502 326.3085 F 859 326.2691
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
10/30/18
AutoCAD SHX Text
A :BIDDING 10/30/18
AutoCAD SHX Text
AAC
AutoCAD SHX Text
BDUVALL
AutoCAD SHX Text
F
AutoCAD SHX Text
CO
AutoCAD SHX Text
2
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
CARBON DIOXIDE SENSOR
AutoCAD SHX Text
PRESSURE GAUGE & COCK
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
ACCESS DOOR IN CEILING
AutoCAD SHX Text
DUCT TEE (TURNED UP/DOWN)
AutoCAD SHX Text
DUCT ELBOW (TURNED UP/DOWN)
AutoCAD SHX Text
DDC TEMPERATURE SENSOR
AutoCAD SHX Text
TRANSITION - RECT. TO ROUND
AutoCAD SHX Text
DIRECTION OF FLOW (PIPING OR DUCTWORK)
AutoCAD SHX Text
TRANSITION - RECT. TO RECT. OR
AutoCAD SHX Text
ROUND TO ROUND
AutoCAD SHX Text
REDUCED PRESSURE BACKFLOW PREVENTER
AutoCAD SHX Text
VOLUME DAMPER (MANUAL)
AutoCAD SHX Text
DUCT ELBOW WITH TURNING VANES
AutoCAD SHX Text
FLEXIBLE DUCT
AutoCAD SHX Text
OPPOSED BLADE DAMPER (MOTORIZED)
AutoCAD SHX Text
M
AutoCAD SHX Text
CONTROL VALVE (2-WAY)
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FIRE/SMOKE DAMPER
AutoCAD SHX Text
TRIPLE DUTY VALVE
AutoCAD SHX Text
SMOKE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
SPECIFICATION (L=LOUVER, T=TRANSFER
AutoCAD SHX Text
E=EXHAUST GRILLE OR REGISTER)
AutoCAD SHX Text
OUTSIDE AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
SUPPLY AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
RETURN AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
EXHAUST AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
20"HORZ.X12"VERT. (TURNED UP/DOWN)
AutoCAD SHX Text
GRILLE, S=SUPPLY DIFFUSER OR REGISTER,
AutoCAD SHX Text
R=RETURN GRILLE OR REGISTER,
AutoCAD SHX Text
MECHANICAL EQUIPMENT DESIGNATOR
AutoCAD SHX Text
INDICATES AIR DISTRIBUTION DEVICE
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
20X12 EA
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
20X12 SA
AutoCAD SHX Text
20X12 RA
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
O S & Y VALVE (GATE)
AutoCAD SHX Text
SAFETY OR RELIEF VALVE
AutoCAD SHX Text
PRESSURE REDUCING VALVE (WATER)
AutoCAD SHX Text
TAGGED NOTE
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
NORMALLY CLOSED
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NC
AutoCAD SHX Text
NO
AutoCAD SHX Text
NIC
AutoCAD SHX Text
BELOW FLOOR
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
ABOVE FINISHED CEILING
AutoCAD SHX Text
EXPOSED AT CEILING
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
BF
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TYP
AutoCAD SHX Text
EAC
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AFC
AutoCAD SHX Text
GATE VALVE (NORMALLY OPEN)
AutoCAD SHX Text
PETE'S PLUG OR EQUIVALENT
AutoCAD SHX Text
GATE VALVE (NORMALLY CLOSED)
AutoCAD SHX Text
PIPING TEE (TURNED UP/DOWN)
AutoCAD SHX Text
PIPING ELBOW (TURNED UP/DOWN)
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
D
AutoCAD SHX Text
UNION
AutoCAD SHX Text
DIELECTRIC UNION
AutoCAD SHX Text
FLANGE
AutoCAD SHX Text
FLEXIBLE CONNECTOR
AutoCAD SHX Text
P
AutoCAD SHX Text
T
AutoCAD SHX Text
MECHANICAL LEGEND
AutoCAD SHX Text
PIPING EXPANSION JOINT
AutoCAD SHX Text
A
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
AUTOMATIC AIR VENT
AutoCAD SHX Text
S
AutoCAD SHX Text
FS
AutoCAD SHX Text
CD
AutoCAD SHX Text
CONDENSATE
AutoCAD SHX Text
EOM
AutoCAD SHX Text
STEAM END OF MAIN DRIP
AutoCAD SHX Text
AD
AutoCAD SHX Text
19x14%%C SA
AutoCAD SHX Text
19" MAJOR AXIS, 14" MINOR AXIS
AutoCAD SHX Text
SUPPLY AIR DUCT - FLAT OVAL
AutoCAD SHX Text
14" DIAMETER
AutoCAD SHX Text
SUPPLY AIR DUCT - ROUND
AutoCAD SHX Text
14"%%C SA
AutoCAD SHX Text
HYDRONIC RUNOUT
AutoCAD SHX Text
TO TERMINAL UNIT
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
NC
AutoCAD SHX Text
DUCT MOUNTED STATIC PRESSURE SENSOR
AutoCAD SHX Text
D
AutoCAD SHX Text
PIPE MOUNTED DIFFERENTIAL PRESSURE SENSOR
AutoCAD SHX Text
P
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
DS
AutoCAD SHX Text
P
AutoCAD SHX Text
s
AutoCAD SHX Text
ACCESS DOOR IN DUCT
AutoCAD SHX Text
AD
AutoCAD SHX Text
AIR VENT DUCT FROM MEDICAL EQUIPMENT
AutoCAD SHX Text
V
AutoCAD SHX Text
TRANSFER AIR DUCT
AutoCAD SHX Text
TA
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
XYZ = ZONE
AutoCAD SHX Text
PUMP SUCTION DIFFUSER
AutoCAD SHX Text
PSD
AutoCAD SHX Text
PRESSURE REDUCING VALVE (STEAM)
AutoCAD SHX Text
GEOTHERMAL HEAT PUMP SUPPLY
AutoCAD SHX Text
GEOTHERMAL HEAT PUMP RETURN
AutoCAD SHX Text
GS
AutoCAD SHX Text
GR
AutoCAD SHX Text
20X12 OA
AutoCAD SHX Text
MAV
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
(SEE DETAIL)
AutoCAD SHX Text
DDC HUMIDITY SENSOR
AutoCAD SHX Text
H
AutoCAD SHX Text
BRANCH DUCT. REFER TO BRANCH DUCT TAKEOFF DETAIL FOR HIGH EFFICIENCY TAKEOFF AND DAMPER
AutoCAD SHX Text
BRANCH DUCT. REFER TO BRANCH DUCT TAKEOFF DETAIL FOR HIGH EFFICIENCY TAKEOFF AND DAMPER
AutoCAD SHX Text
SUPPLY/RETURN/EXHAUST /OUTSIDE AIR DEVICE
AutoCAD SHX Text
DUCT MAIN
AutoCAD SHX Text
TERMINATION POINT OF DEMOLITION
AutoCAD SHX Text
TERMINATION POINT OF DEMOLITION WITH CAP
AutoCAD SHX Text
C
AutoCAD SHX Text
CONNECTION POINT OF NEW TO EXISTING
AutoCAD SHX Text
GENERAL NOTES (APPLICABLE TO ALL DRAWINGS) 1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS, "GENERAL CONDITIONS - THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS, "GENERAL CONDITIONS - MECHANICAL" AND TO ALL OTHER CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE WORK AND WHICH ARE HEREBY MADE A PART OF THE WORK SPECIFIED. 2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS FOR ANY PART OF ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR APPLIED TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE CONTRACT DOCUMENTS. IN CASE OF CONFLICTS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CLARIFICATION AND FINAL DETERMINATION PRIOR TO THE BID. 3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION, EXCAVATION & BACKFILLING, THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION, EXCAVATION & BACKFILLING, SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY INSTALLATION OF THE COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE CONTRACT DOCUMENTS. 4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN WHICH MAY BE ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN WHICH MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL MANNER, IN COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE PLANS AND SPECIFICATIONS, SHALL BE INCLUDED IN THE BID AS PART OF THE CONTRACT. 5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE AND IS NOT INTENDED TO DEFINE A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION REGARDING INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE CONTRACT DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE ORDERS FOR FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS WHEN PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE SUBDIVISION AND ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR HOLDING THE PRIME CONTRACT. 6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND OPERATIONAL SYSTEM, IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE PROVIDED AND INCLUDED AS PART OF THE BID. 7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE PLANS AND ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE PLANS AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS NECESSARY RELATIVE TO THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC MANUFACTURER'S INSTALLATION REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY METHODS, FEATURES, OPTIONS, ACCESSORIES, ETC. NECESSARY TO INSTALL THE PROPOSED EQUIPMENT AND MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING OFFERED AS A SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S INSTALLATION REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE PLANS AND SPECIFICATIONS. 8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY INTERPRETATION AS TO THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER. SHOULD AN INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE PROPOSAL SO THAT THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT, DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE ENGINEER SHALL BE FINAL. 9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO VERIFY THAT ALL THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO VERIFY THAT ALL EQUIPMENT SUBMITTED WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE CLEARANCE FOR SERVICES. COORDINATE THE LOCATION OF DRAINS, ELECTRICAL OUTLETS, ETC. WITH ALL MECHANICAL ROOM EQUIPMENT, ETC. PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S). 10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL PROVISIONS - EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED BY ADDENDUM. REQUESTS MADE AFTER THIS PERIOD WILL BE REJECTED. 11. IGNORANCE OF CODES, RULES, REGULATIONS, LAWS, ETC. SHALL NOT RENDER THE CONTRACTOR NOT IGNORANCE OF CODES, RULES, REGULATIONS, LAWS, ETC. SHALL NOT RENDER THE CONTRACTOR NOT RESPONSIBLE FOR COMPLIANCE. THE CONTRACTOR SHALL ALSO BE VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE WORK PRIOR TO SUBMISSION OF THE PROPOSAL. 12. ALL WARRANTIES SHALL BEGIN STARTING AT THE SUBSTANTIAL COMPLETION DATE. ALL EQUIPMENT, MATERIAL AND ALL WARRANTIES SHALL BEGIN STARTING AT THE SUBSTANTIAL COMPLETION DATE. ALL EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT SUPPLIER/VENDOR. 13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT DIMINISH OR VOID THE WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL SUCH WORK WITH THE ROOFING INSTALLER. 14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED ON THE JOB DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED ON THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY COVERED IN PLASTIC. INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN". IF THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL BE REQUIRED TO CLEAN THE DUCT SYSTEM UTILIZING A NADCA CERTIFIED CONTRACTOR. 15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH THE CONSENT OF THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH THE CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS - MECHANICAL - TEMPORARY USE OF EQUIPMENT." 16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE EQUIPMENT AND THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS - MECHANICAL - EQUIPMENT/CONTROLS STARTUP & VERIFICATION." 17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF COMPLETION FOR THE THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE MET SO AS TO ALLOW THIS COMPLETION TO BE MET. 18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED WITH THIS PROJECT, THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED, INSPECTED AND APPROVED SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS WILL BE IMMEDIATELY REJECTED. 19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL CONTRACTOR SHALL BE PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS (I.E. VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE ELECTRICAL CONTRACTOR. THERE WILL BE NO CHANGE IN THE CONTRACT AMOUNT FOR ANY DISCREPANCIES. 20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION. 21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM CONTRACTOR DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM CONTRACTOR GENERATED DIMENSIONED DRAWINGS. 22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE CONTRACTOR'S EXPENSE. 23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, ELEVATIONS THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, ELEVATIONS AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC. AT THE TIME OF BID. 24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR THEIR WORK. ALL THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR THEIR WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND PERFORMED BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION "SLEEVING, CUTTING, PATCHING, REPAIRING, ETC." AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING STRUCTURE. DO ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING. 26. PRIOR TO PURCHASE OR FABRICATION OF PIPING OR DUCTWORK, THE CONTRACTOR SHALL COORDINATE PRIOR TO PURCHASE OR FABRICATION OF PIPING OR DUCTWORK, THE CONTRACTOR SHALL COORDINATE INSTALLATION WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY. 27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT ON THE PLANS TO ALLOW ACCESS AND ADJUSTMENT. 28. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL WALL AND THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL WALL AND CEILING DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC. 29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.
AutoCAD SHX Text
GENERAL DEMOLITION NOTES A. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR THEIR OWN DEMOLITION. THE INTENT OF THIS PROJECT IS TO REMOVE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR THEIR OWN DEMOLITION. THE INTENT OF THIS PROJECT IS TO REMOVE ALL COMPONENTS (DUCTWORK, ACCESSORIES, INSULATION, PIPING, HANGERS/SUPPORTS, THERMOSTATS, CONTROLS, ETC) COMPONENTS (DUCTWORK, ACCESSORIES, INSULATION, PIPING, HANGERS/SUPPORTS, THERMOSTATS, CONTROLS, ETC) OF THE EXISTING HVAC SYSTEM (WHERE INDICATED). EXACT ACCURACY OF EXISTING CONDITIONS SHALL BE FIELD VERIFIED. B. PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH ADJACENT SURFACES AS A RESULT OF MECHANICAL PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH ADJACENT SURFACES AS A RESULT OF MECHANICAL SYSTEMS DEMOLITION UNLESS NOTED OTHERWISE. PATCH SHALL BE PERFORMED BY QUALIFIED TRADESMAN. C. PROVIDE AND INSTALL BLANK STEEL COVER-PLATES OVER OPENINGS WHERE THERMOSTATS AND OTHER WALL-MOUNTED PROVIDE AND INSTALL BLANK STEEL COVER-PLATES OVER OPENINGS WHERE THERMOSTATS AND OTHER WALL-MOUNTED CONTROL DEVICES ARE REMOVED AND NOT REPLACED. PAINT TO MATCH SURROUNDING-WALL. D. MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS DURING AND AFTER MECHANICAL EQUIPMENT MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS DURING AND AFTER MECHANICAL EQUIPMENT DEMOLITION. E. MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL EQUIPMENT IN A LEGAL MANNER AND MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL EQUIPMENT IN A LEGAL MANNER AND COORDINATE WITH THE GENERAL CONTRACTOR. F. PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL VERIFY WITH ELECTRICAL CONTRACTOR THAT PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL VERIFY WITH ELECTRICAL CONTRACTOR THAT POWER FEEDS AND CONTROL WIRING HAVE BEEN DISCONNECTED AND LOCKED OUT FROM MECHANICAL EQUIPMENT WHICH IS TO BE REMOVED. G. MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR PIPING INSULATION DAMAGED DURING DEMOLITION MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR PIPING INSULATION DAMAGED DURING DEMOLITION WORK. H. MECHANICAL CONTRACTOR SHALL AVOID DAMAGING EXISTING DOMESTIC, AND SANITARY PLUMBING. IF ANY OF THESE MECHANICAL CONTRACTOR SHALL AVOID DAMAGING EXISTING DOMESTIC, AND SANITARY PLUMBING. IF ANY OF THESE SERVICES ARE DAMAGED, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF DAMAGED PLUMBING LINES, BUILDING MATERIALS, AND CLEANUP OF AREA AFFECTED BY DAMAGED PLUMBING SYSTEM AT THE EXPENSE OF THE MECHANICAL CONTRACTOR. I. INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND CONCRETE SLABS MAY BE ABANDONED IN PLACE. INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND CONCRETE SLABS MAY BE ABANDONED IN PLACE. J. WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE OF WORK/SCOPE AREA, THIS CONTRACTOR SHALL WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE OF WORK/SCOPE AREA, THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CUT, PATCH, REMOVAL, AND REINSTALLATION (OR REPLACEMENT IF DAMAGED) OF ALL CEILING TILES, HARD CEILINGS, AND GRID MEMBERS NECESSARY TO PERFORM THE WORK. THIS SHALL BE PERFORMED AT THIS CONTRACTOR'S EXPENSE. COORDINATE CLOSELY WITH ARCHITECT. REFER TO ARCHITECTURAL DRAWINGS FOR NEW CEILING LOCATIONS.
AutoCAD SHX Text
MECHANICAL, ELECTRICAL & CONTROLS COORDINATION NOTES A. CONTROLS CONTRACTOR TO PURCHASE PIPING TEMPERATURE SENSORS AND WIRE TO THE CONTROLLER. MECHANICAL CONTROLS CONTRACTOR TO PURCHASE PIPING TEMPERATURE SENSORS AND WIRE TO THE CONTROLLER. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL WELL AND INSTALL THE SENSOR. REFER TO CONTROL DRAWINGS FOR QUANTITY & LOCATION. B. DUCT SENSORS - CONTROLS CONTRACTOR TO FURNISH AND INSTALL SENSORS. REFER TO SCHEMATICS FOR FURTHER DUCT SENSORS - CONTROLS CONTRACTOR TO FURNISH AND INSTALL SENSORS. REFER TO SCHEMATICS FOR FURTHER DETAILS AND PLAN FOR QUANTITIES. C. BUILDING POWER METERS - CONTROLS CONTRACTOR TO FURNISH AND INSTALL POWER BUILDING METERS. REFER TO BUILDING POWER METERS - CONTROLS CONTRACTOR TO FURNISH AND INSTALL POWER BUILDING METERS. REFER TO DRAWINGS FOR LOCATION. D. NATURAL GAS METERS - CONTROLS CONTRACTOR TO PURCHASE METER AND WIRE TO THE CONTROLLER. MECHANICAL NATURAL GAS METERS - CONTROLS CONTRACTOR TO PURCHASE METER AND WIRE TO THE CONTROLLER. MECHANICAL CONTRACTOR TO INSTALL GAS METER. REFER TO DRAWINGS FOR SIZING & LOCATION. E. CONTROLS CONTRACTOR SHALL BE RESPSONSIBLE FOR PROVIDING POWER FOR ALL NEW ELECTRONIC VALVES. THIS CONTROLS CONTRACTOR SHALL BE RESPSONSIBLE FOR PROVIDING POWER FOR ALL NEW ELECTRONIC VALVES. THIS INCLUDES 110V & 24V. EXAMPLES ARE NEW HEAT PUMP VALVES & NEW MECHANICAL ROOM CONTROL VALVES. F. ALL NEW AND EXISTING PIPING/DUCT/EQUIPMENT SHALL BE LABELED IN MECHANICAL ROOMS WITH PLASTIC LABELS. ALL NEW AND EXISTING PIPING/DUCT/EQUIPMENT SHALL BE LABELED IN MECHANICAL ROOMS WITH PLASTIC LABELS. THIS SHALL INCLUDE SYSTEM LABELS WITH ARROWS INDICATING FLOW DIRECTION. LABELS SHALL BE SELF-ADHESIVE TYPE WITH PERMANENT-ADHESIVE PACKING. ALL NEW INSTALLED EQUIPMENT/OWNER FURNISHED EQUIPMENT SUCH AS PUMPS, RTUS, VFDS, ETC. SHALL BE LABELED WITH STENCILS. BLACK MARKER WRITING IS NOT ACCEPTABLE AND WILL NOT BE APPROVED. COORDINATE LABEL COLORS WITH EQUIPMENT AND INSULATION COLORS ALL NEW ROOF TOP EQUIPMENT (CHILLERS/RTUS/MAUS/ETC.) SHALL BE LABELED WITH TYPE TO MEET OUTDOOR CONDITIONS BLACK MARKERS LABELING SHALL NOT BE APPROVED.

MECHANICAL TAG NOTES

B

I

D

D

O

C

U

M

E

N

T

BOILER(S)

AutoCAD SHX Text
GYMNASIUM
AutoCAD SHX Text
LD ROOM
AutoCAD SHX Text
COMPUTER
AutoCAD SHX Text
1ST GRADE
AutoCAD SHX Text
2ND GRADE
AutoCAD SHX Text
1ST/2ND GRADE
AutoCAD SHX Text
2ND GRADE
AutoCAD SHX Text
2ND GRADE
AutoCAD SHX Text
1ST GRADE
AutoCAD SHX Text
1ST GRADE
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
TITLE 1
AutoCAD SHX Text
SPEECH
AutoCAD SHX Text
Stor.
AutoCAD SHX Text
KINDERGARTEN
AutoCAD SHX Text
KINDERGARTEN
AutoCAD SHX Text
KINDERGARTEN
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
1. REMOVE & DISCARD EXISTING BOILERS & ASSOCIATED BOILER FLUE VENTING. CAP/CAULK FLUE VENTING AT CHIMNEY. REUSE HOT REMOVE & DISCARD EXISTING BOILERS & ASSOCIATED BOILER FLUE VENTING. CAP/CAULK FLUE VENTING AT CHIMNEY. REUSE HOT WATER PIPING TO EXTENT POSSIBLE. 2. REMOVE & DISCARD ALL EXISTING FUEL OIL PIPING. TURN OVER PUMP TO OWNER. REMOVE & DISCARD ALL EXISTING FUEL OIL PIPING. TURN OVER PUMP TO OWNER. 3. EXISTING CONTROL CABINETS TO REMAIN AND BE REUSED TO EXTENT POSSIBLE. EXISTING CONTROL CABINETS TO REMAIN AND BE REUSED TO EXTENT POSSIBLE. 4. ELECTRICAL CONTRACTOR TO REPLACE EXISTING BOILER EMERGENCY STOP SWITCH WITH PUSH BUTTON TYPE. ELECTRICAL CONTRACTOR TO REPLACE EXISTING BOILER EMERGENCY STOP SWITCH WITH PUSH BUTTON TYPE. 5. CONTROLS CONTRACTOR TO FURNISH NEW HYDRONIC TEMPERATURE SENSORS. MECHANICAL TO INSTALL. CONTROLS CONTRACTOR TO FURNISH NEW HYDRONIC TEMPERATURE SENSORS. MECHANICAL TO INSTALL. 6. INSTALL IN EXISTING PIPING NEW B&G RL-3F AIR SEPARATOR. AIR SEPARATOR FURNISHED BY CMTA. INSTALL IN EXISTING PIPING NEW B&G RL-3F AIR SEPARATOR. AIR SEPARATOR FURNISHED BY CMTA. 7. CONNECT TO LOW PRESSURE REGULATOR. REGULATOR PROVIDED BY PROPANE COMPANY & MAINTAINED BY PROPANE COMPANY. INSIDE CONNECT TO LOW PRESSURE REGULATOR. REGULATOR PROVIDED BY PROPANE COMPANY & MAINTAINED BY PROPANE COMPANY. INSIDE PIPING TO BE LESS THAN 1 PSIG THREAD & COUPLE BLACK STEEL. EXTEND 1 1/2" PIPING FROM EACH REGULATOR TO EACH BOILER.
AutoCAD SHX Text
X
AutoCAD SHX Text
HWR FROM ZONE 1
AutoCAD SHX Text
HWR FROM ZONE 2
AutoCAD SHX Text
HWR FROM ZONE 3
AutoCAD SHX Text
EXPANSION TANK & MAKE-UP WATER PIPING NOT SHOWN & SHALL BE REUSED
AutoCAD SHX Text
HWS TO ZONE 1
AutoCAD SHX Text
HWS TO ZONE 2
AutoCAD SHX Text
HWS TO ZONE 3
AutoCAD SHX Text
T
AutoCAD SHX Text
5
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
EXISTING HOUSEKEEPING PAD
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
TO DRAIN
AutoCAD SHX Text
TO DRAIN
AutoCAD SHX Text
CONDENSATE NEUTRALIZATION TANK
AutoCAD SHX Text
CONDENSATE TRAP
AutoCAD SHX Text
VARIABLE SPEED BOILER PUMP PROVIDED BY BOILER VENDOR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
STRAINER WITH BLOW DOWN
AutoCAD SHX Text
BOILER FLUE
AutoCAD SHX Text
PRV
AutoCAD SHX Text
COMBUSTION AIR INTAKE
AutoCAD SHX Text
P/T PORT TYP.
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
SCHEMATIC TYPICAL OF THREE BOILERS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
6
AutoCAD SHX Text
M8.1
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL - PIPING SCHEMATIC
AutoCAD SHX Text
Scale: NONE
AutoCAD SHX Text
HOT WATER BOILER REPLACEMENT
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
MINERAL COUNTY SCHOOLS
AutoCAD SHX Text
GUARANTEED ENERGY SAVINGS CONTRACT
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL
AutoCAD SHX Text
FORT ASHBY, WV
AutoCAD SHX Text
Louisville, KY 40059
AutoCAD SHX Text
10411 Meeting Street
AutoCAD SHX Text
AutoCAD SHX Text
T 502 326.3085 F 859 326.2691
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
10/30/18
AutoCAD SHX Text
A :BIDDING 10/30/18
AutoCAD SHX Text
AAC
AutoCAD SHX Text
EXISTING BOILERS
AutoCAD SHX Text
EXISTING PUMPS
AutoCAD SHX Text
EXISTING FUEL OIL PUMP
AutoCAD SHX Text
REMARKS: 1. FM GAS TRAIN; 2) CONDENSATE NEUTRALIZATION KIT; 3) BACNET OVER MSTP COMMUNICATION; 4) SIDEWALL VENT TERMINATION KIT; 5) VARIABLE SPEED BOILER PUMP; 6) PROVIDE WITH 60 PSIG PRESSURE RELIEF VALVE FOR EACH BOILER;
AutoCAD SHX Text
INPUT (MBH)
AutoCAD SHX Text
362 @ 90.5%%% (120F)
AutoCAD SHX Text
400
AutoCAD SHX Text
MANUF. & MODEL
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
LOCHINVAR
AutoCAD SHX Text
B-1, 2 & 3
AutoCAD SHX Text
FLA / V / %%C / Hz
AutoCAD SHX Text
120 / 1 / 60
AutoCAD SHX Text
CONDENSING BOILER
AutoCAD SHX Text
HIGH EFFICIENCY
AutoCAD SHX Text
YES
AutoCAD SHX Text
INLET PRESSURE
AutoCAD SHX Text
FUEL
AutoCAD SHX Text
PROPANE GAS
AutoCAD SHX Text
TO GAS TRAIN
AutoCAD SHX Text
FM APPROVED
AutoCAD SHX Text
GAS TRAIN
AutoCAD SHX Text
14" WC MAXIMUM
AutoCAD SHX Text
4.0" WC MINIMUM
AutoCAD SHX Text
NET OUTPUT
AutoCAD SHX Text
@ FULL INPUT
AutoCAD SHX Text
MINIMUM / MAXIMUM
AutoCAD SHX Text
WATER FLOW
AutoCAD SHX Text
DESIGN FLOW RATE
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
280 LBS
AutoCAD SHX Text
50 GPM @ 20°F ΔT
AutoCAD SHX Text
356 @ 89%%% (160F)
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL - FIRST FLOOR MECHANICAL PLAN
AutoCAD SHX Text
Scale: 1/8" - 1'
AutoCAD SHX Text
BDUVALL
AutoCAD SHX Text
FTXL 400 FIRE TUBE

NOTES

B

I

D

D

O

C

U

M

E

N

T

AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1. DISCONNECT ELECTRICAL TO EXISTING BOILERS. DISCONNECT ELECTRICAL TO EXISTING BOILERS. 2. REPLACE EXISTING BOILER EMERGENCY SWITCH TO PUSH TYPE. REPLACE EXISTING BOILER EMERGENCY SWITCH TO PUSH TYPE. 3. EXISTING CONTROLS CABINET TO REMAIN.EXISTING CONTROLS CABINET TO REMAIN.
AutoCAD SHX Text
E8.2
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL - BOILER REPLACEMENT
AutoCAD SHX Text
Scale: 1/4" - 1'
AutoCAD SHX Text
HOT WATER BOILER REPLACEMENT
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
MINERAL COUNTY SCHOOLS
AutoCAD SHX Text
GUARANTEED ENERGY SAVINGS CONTRACT
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL
AutoCAD SHX Text
FORT ASHBY, WV
AutoCAD SHX Text
Louisville, KY 40059
AutoCAD SHX Text
10411 Meeting Street
AutoCAD SHX Text
AutoCAD SHX Text
T 502 326.3085 F 859 326.2691
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
10/30/18
AutoCAD SHX Text
A :BIDDING 10/30/18
AutoCAD SHX Text
AAC
AutoCAD SHX Text
BDUVALL

B

I

D

D

O

C

U

M

E

N

T

GENERAL CONTROL NOTES

“ ”

CONTROL NOTES

AutoCAD SHX Text
6
AutoCAD SHX Text
3
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
C8.1
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL - CONTROLS PLAN
AutoCAD SHX Text
Scale: 1/8" - 1'
AutoCAD SHX Text
CONTROLS UPGRADE / BOILER REPLACEMENT
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
MINERAL COUNTY SCHOOLS
AutoCAD SHX Text
GUARANTEED ENERGY SAVINGS CONTRACT
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL
AutoCAD SHX Text
FORT ASHBY, WV
AutoCAD SHX Text
Louisville, KY 40059
AutoCAD SHX Text
10411 Meeting Street
AutoCAD SHX Text
AutoCAD SHX Text
T 502 326.3085 F 859 326.2691
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
10/30/18
AutoCAD SHX Text
A :BIDDING 10/30/18
AutoCAD SHX Text
AAC
AutoCAD SHX Text
BP1
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
HWS TO ZONE 1
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
BP2
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
3
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
BP3
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
3
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS TO ZONE 2
AutoCAD SHX Text
HWS TO ZONE 3
AutoCAD SHX Text
P1
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
HWR FROM ZONE 1
AutoCAD SHX Text
P2
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
HWR FROM ZONE 2
AutoCAD SHX Text
P3
AutoCAD SHX Text
M
AutoCAD SHX Text
CT
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
BI - PUMP STATUS
AutoCAD SHX Text
BO - PUMP START/STOP
AutoCAD SHX Text
HWR FROM ZONE 3
AutoCAD SHX Text
T
AutoCAD SHX Text
AI - LOOP WATER SUPPLY
AutoCAD SHX Text
T
AutoCAD SHX Text
AI - LOOP WATER RETURN
AutoCAD SHX Text
T
AutoCAD SHX Text
AI - LOOP WATER RETURN
AutoCAD SHX Text
T
AutoCAD SHX Text
AI - LOOP WATER RETURN
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING BALANCE VALVE
AutoCAD SHX Text
FORT ASHBY PRIMARY SCHOOL CONTROLS SCHEMATIC
AutoCAD SHX Text
Scale: None
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
BO - BOILER ENABLE
AutoCAD SHX Text
BI - BOILER STATUS
AutoCAD SHX Text
AO - BOILER HOT WATER SUPPLY TEMP SETPOINT RESET
AutoCAD SHX Text
BI - BOILER ALARM STATUS
AutoCAD SHX Text
BI - LOW WATER LEVEL
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
BO - BOILER ENABLE
AutoCAD SHX Text
BI - BOILER STATUS
AutoCAD SHX Text
AO - BOILER HOT WATER SUPPLY TEMP SETPOINT RESET
AutoCAD SHX Text
BI - BOILER ALARM STATUS
AutoCAD SHX Text
BI - LOW WATER LEVEL
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
BO - BOILER ENABLE
AutoCAD SHX Text
BI - BOILER STATUS
AutoCAD SHX Text
AO - BOILER HOT WATER SUPPLY TEMP SETPOINT RESET
AutoCAD SHX Text
BI - BOILER ALARM STATUS
AutoCAD SHX Text
BI - LOW WATER LEVEL
AutoCAD SHX Text
A. A SET OF RECORD SCHEMATIC DRAWINGS AND SEQUENCE OF OPERATION TO BE AT EACH LOCAL EQUIPMENT PANEL A SET OF RECORD SCHEMATIC DRAWINGS AND SEQUENCE OF OPERATION TO BE AT EACH LOCAL EQUIPMENT PANEL AND AT THE CENTRAL COMPUTER AS DIRECTED BY CMTA. THESE SHALL BE SUPPLIED BY CONTROLS CONTRACTOR. EACH CONTROL CABINET SHALL HAVE A HARD PLASTIC HOLDER MOUNTED INSIDE OF THE CABINET DOOR THAT WILL HOUSE THE CONTROL DRAWINGS AND SEQUENCES. B. CONTROL WIRING INSTALLED CAN BE INSTALLED IN EMT TYPE CONDUIT. INSTALLATION OF CONTROL WIRING IN CONTROL WIRING INSTALLED CAN BE INSTALLED IN EMT TYPE CONDUIT. INSTALLATION OF CONTROL WIRING IN STAR PATTERN” SHALL NOT BE ALLOWED. ONLY DAISY CHAIN OF WIRING WILL BE ALLOWED. SHALL NOT BE ALLOWED. ONLY DAISY CHAIN OF WIRING WILL BE ALLOWED. C. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. D. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE & LOCAL CODES. CONTROLS ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE & LOCAL CODES. CONTROLS CONTRACTOR SHALL PROVIDE ALL PERMITS AND APPLICABLE FEES REQUIRED. E. CONTROLS CONTRACTOR IS RESPONSIBLE FOR AND SHALL COORDINATE CONTROL POWER REQUIREMENTS FOR NEW AND CONTROLS CONTRACTOR IS RESPONSIBLE FOR AND SHALL COORDINATE CONTROL POWER REQUIREMENTS FOR NEW AND REPLACEMENT CONTROLLERS / CONTROL DEVICES. EXISTING CONTROL CIRCUITS & TRANSFORMERS MAY BE UTILIZED TO EXTENT POSSIBLE. F. EXISTING CONTROL CABINETS MAY BE RE-USED PROVIDED THEY ARE UL LISTED. ALL CABLING AND CIRCUITS TAKEN EXISTING CONTROL CABINETS MAY BE RE-USED PROVIDED THEY ARE UL LISTED. ALL CABLING AND CIRCUITS TAKEN OUT OF SERVICE SHALL BE PULLED BACK TO NEAREST JUNCTION AND TERMINATED IN SAFE AND CODE APPROVED MANNER. SEAL ALL PENETRATIONS BACK TO ORIGINAL INCLUDING FIRE & SMOKE BARRIERS. G. REFER TO MECHANICAL DRAWINGS FOR ENERGY UPGRADES FOR NEW WORK & EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ENERGY UPGRADES FOR NEW WORK & EQUIPMENT. H. EXISTING CONDITIONS SHOWN IN THESE SET OF DOCUMENTS ARE BASED ON ORIGINAL AS-BUILT DRAWINGS & HAVE EXISTING CONDITIONS SHOWN IN THESE SET OF DOCUMENTS ARE BASED ON ORIGINAL AS-BUILT DRAWINGS & HAVE BEEN VERIFIED AS MUCH AS POSSIBLE. CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS PRIOR TO COMMENCING WORK. I. IN THE EVENT ASBESTOS IS DISCOVERED DURING THE COURSE OF DEMOLITION, CONTRACTOR SHALL STOP WORK IN THE EVENT ASBESTOS IS DISCOVERED DURING THE COURSE OF DEMOLITION, CONTRACTOR SHALL STOP WORK IMMEDIATELY & CONTACT CMTA TO SCHEDULE REMOVAL. J. CONTROLS CONTRACTOR SHALL BE RESPONSIBLE IN PROTECTING EXISTING ROOFS, FLOORS, FURNITURE, EQUIPMENT, CONTROLS CONTRACTOR SHALL BE RESPONSIBLE IN PROTECTING EXISTING ROOFS, FLOORS, FURNITURE, EQUIPMENT, ETC.. CONTROLS CONTRACTOR IS LIABLE FOR ANY DAMAGES, REPAIRS OR REPLACEMENTS THAT OCCUR. K. CONTROLS CONTRACTOR SHALL FURNISH CONTROL VALVES & MECHANICAL SHALL INSTALL. CONTROLS CONTRACTOR CONTROLS CONTRACTOR SHALL FURNISH CONTROL VALVES & MECHANICAL SHALL INSTALL. CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL ACTUATORS DUCTWORK/EQUIPMENT SENSORS. L. REFER TO BID CONTROLS SPECIFICATIONS DOCUMENTS FOR ADDITIONAL REQUIREMENTS. REFER TO BID CONTROLS SPECIFICATIONS DOCUMENTS FOR ADDITIONAL REQUIREMENTS.
AutoCAD SHX Text
1. EXISTING ANDOVER CX9702 Site Controller & Infinity LCX 800 UNIT CONTROLLER. EXISTING ANDOVER CX9702 Site Controller & Infinity LCX 800 UNIT CONTROLLER. 2. FURNISH NEW HYDRONIC TEMPERATURE SENSORS. MECHANICAL TO INSTALL. INSTALLATION LOCATION SHALL BE FURNISH NEW HYDRONIC TEMPERATURE SENSORS. MECHANICAL TO INSTALL. INSTALLATION LOCATION SHALL BE COORDINATED WITH CMTA PROJECT MANAGER. 3. VARIABLE SPEED BOILER PUMPS PROVIDED WITH BOILERS. VARIABLE SPEED BOILER PUMPS PROVIDED WITH BOILERS. 4. THERE ARE THREE SPACE ZONE TEMPERATURE SENSORS IN ZONE 3. FIELD DOCUMENT LOCATION OF THE THREE SENSORS. THERE ARE THREE SPACE ZONE TEMPERATURE SENSORS IN ZONE 3. FIELD DOCUMENT LOCATION OF THE THREE SENSORS. 5. RECALIBRATE OR REPLACE EXISTING OUTDOOR TEMPERATURE SENSOR. RECALIBRATE OR REPLACE EXISTING OUTDOOR TEMPERATURE SENSOR. 6. NEW BOILERS WILL BE INSTALLED. REFER TO MECHANICAL DWGS. NEW BOILERS WILL BE INSTALLED. REFER TO MECHANICAL DWGS. 7. REUSE EXISTING CONTROL CABINET TO EXTENT POSSIBLE. REUSE EXISTING CONTROL CABINET TO EXTENT POSSIBLE.
AutoCAD SHX Text
BDUVALL