I. A. FILL IN THE BLANKS

1. Philippine Architects Society

2. highest integrity

3. business capacity

4. artistic ability

5. technical ability

6. suspicion

7. unprejudiced

8. impartiality

9. moral

10. public

11. motives

12. conduct

13. sense of moral values

14. ability

15. promotional

16. construction phase

17. contract documents

18. Certificate of Payment

19. eight (8)

20. ten (10)

21. twelve (12)

22. P200.00

23. five (5)

24. fifteen (15)

25. thirty five (35)

26. eighty five (85)

27. owner

28. P500.00

29. five (5)

30. ten (10)

31. five (5)

32. fifteen (15)

33. Republic Act 545

34. Presidential Decree 49

35. full-time construction inspectors

I. B. FILL IN THE BLANKS

1. Time

2. technology

3. well-planned

4. soundly constructed

5. aesthetically satisfying

6. financial limitation

7. specialized allied services

8. physical environment

9. consultant

10. civic or charity

11. technical information

12. experience

13. unity

14. civic

15. specialization

16. good faith

17. abstract ideas

18. physical world

19. conferences

20. deliberations

21. discussions

22. evaluations

23. investigations

24. consultations

25. scientific

26. aesthetic

27. orderly

28. man-made

29. sound

30. fifteen (15)

I. C. FILLING IN THE BLANKS

1. Cost of the work

2. Landscape Design Services

3. Acoustic Communication and

Electronics Engineering Services

4. Human behavior

5. economic systems

6. laws and regulations

7. tax structures

8. infrastructure

9. utilities

10. P3,000.00

11. P2,000.00

12. Comprehensive Planning

Services

13. environmental planner

14. comprehensive planning services

15.

professional fee plus expenses

16. multiple of direct personal

expense

17. construction manager

18. post construction services

19. project management

20. lump sum

21. revolving capital

22. Architects National Code

23. human experience

24. physical world

25. culture

26. national aspirations

27. environment

28. time

29. Pre-Design Services

30. Group 2

I. D. FILL IN THE BLANKS

1. pre-design

2. construction

3. specialized allied

4. construction

5. post-construction

6. twenty (20)

7. one (1)

8. one and one half ( 1 ½)

9. eighty five (85)

10. fifty (50)

11. P500.00

12. contractor or successful bidder

13. surety

14. contractor

15. owner

16. fifteen (15)

17. three (3)

18. highest

19. ethical conduct

20. excellence

21. Board of Architects

22. Architecture

23. contract document

24. Pre-design services

25. Guarantee bond

26. competition code

27. Design Build Services

28. three (3)

29. seventh (7th

)

30. Critical Path Method

I. E. FILL IN THE BLANKS

1. General conditions

2. United Architects of the

Philippines (UAP)

3. Philippine Institute of Civil

Engineers (PICE)

4. Philippine Contractor’s Association (PCA)

5. Contract Documents

6. Act of God or Force Majeure

7. work

8. General Contractor

9. UAP Committee on Professional

Practice and Ethics

10. Inter-Professional Conference

Committee

11. drawings

12. specifications

13. furnish

14. ninety eight (98)

15. specifications

16. Special provisions

17. complementary

18. labor and materials

19. equipment

20. transportation

21. install

22. provide

23. fifty meters

24. water

25. light

26. telephone

27. toilet facilities

28. sixty days

29. fifteen (15)

30. Notice to Proceed

I. F. FILL IN THE BLANKS

1. Design Services/Basic Services

2. adviser

3. periodic visits

4. eighty five (85)

5. ten (10)

6. five (5)

7. instrument of service

8. Cost of expenses

9. summary of cost

10. architect

11. engineer

12. contractor

13. owner

14. fifteen (15)

15. prime professional

16. Full time supervision

17. Construction Management

18. Administration

19. Guaranteed Maximum Cost

20. in-house architect

21. full time supervision

22. construction inspector

23. fifteen (15)

24. fifteen (15)

25. thirty (30)

26. Bid contract

27. Negotiated Contract

28. People

29. client

30. contractor

31. manufacturers, dealers and

agents

32. colleagues and subordinates

33. civic

34. moral

35. administrative matters

36. technical matters

37. legal

38. Architecture

39. Construction

40. Pre-design services

I. G. FILL IN THE BLANKS

1. fifteen

2. contractor

3. architect

4. architect

5. fifteen

6. Certificate of Payment

7. Certificate of Payment

8. fifteen (15)

9. fifteen (15)

10. once

11. Retention money

12. ten (10)

13. fifty (50)

14. liquidated damages

15. Performance bond

16. five (5)

17. fifteen (15)

18. thirty (30)

19. thirty (30)

20. design services

21. basic services

22. Planning

23. ten to fifteen (10-15)

24. thirty (30)

25. fifty (50)

26. twenty (20)

27. ten to fifteen (10-15)

28. fifteen (15) and 12% to 20%

29. Design Competition

30. Percentage of Construction Cost

31. Multiple of direct personal cost

32. seven (7)

33. ten (10)

34. Specialized Allied

35. Post Construction

36. Construction

37. Comprehensive

38. Construction

39. Architectural Programming

40. PD No. 49 “Protection of Intellectual Property”.

I. H. FILL IN THE BLANKS

1. Pre-design services

2. Design Services

3. Specialized Allied Services

4. Construction Services

5. Post-construction services

6. Comprehensive services

7. Design build services

8. Interior Design

9. Acoustics, Communication and

electronics engineering

10. Landscape design

11. Physical Planning

12. Comprehensive Planning

13. Building and Equipment

Maintenance

14. Building and Ground

Administration

15. Post-Construction Evaluation

16. Architect

17. Architect

18. fifteen (15)

19. ten (10)

20. Breakdown of work and

Corresponding Value

21. Proposal bond

22. Contractor

23. Supplementary specification

24. 1%

25. 1 ½%

I. I. FILL IN THE BLANKS

1. plan

2. program

3. monitor

4. adviser

5. cost control

6. one and one half percent (1 ½%)

7. three percent (3%)

8. Scope of Work

9. Architects/Basic Services

10. architect’s fee & manner of payments

11. Pre-Design services

12. construction

13. specialized allied

14. construction

15. post-construction

16. fifty (50)

17. two (2)

18. five(5% )

19. eighty five (85)

20. fifty (50)

21. P 500.00

22. contractor or successful bidder

23. surety

24. contractor

25. Owner

26. fifteen (15)

27. three (3)

28. architect

29. contractor

30. project manager

31. consultant

32. construction manager

33. Ethics

34. Ethical conduct

35. people

36. client

37. contractor

38. agents

39. colleagues

40. subordinates

I. J. FILL IN THE BLANKS

1. lump sum

2. revolving capital

3. Architects National Code

4. Human experience

5. Critical Path Method (CPM)

6. coordinate

7. supervise

8. programs

9. plans

10. schedules

11. monitored

12. quality

13. records

14. change orders

15. payments

16. Project management

17. Project manager

18. Cosntruction manager

19. one (1)

20. one and one jalf (1 ½ )

21. Basic fee

22. six (6)

23. fifteen (15)

24. P500.00

25. eighty five (85)

26. contract documents

27. ten (10)

28. five (5)

29. fifteen percent (15%)

30. once

I. K. FILL IN THE BLANKS

1. Project construction cost

2. basic services

3. design services

4. Environmental planner

5. town and regional

6. urban renewal

7. master plan

8. Physical planning

9. Comprehensive Planning

Services

10. Planning

11. ten (10)

12. fifteen (15)

13. thirty (30)

14. fifty (50)

15. twenty (20)

16. ten (10)

17. fifteen (15)

18. fifteen (15)

19. twelve (12)

20. twenty (20)

21. ten (10)

22. fifty (50)

23. liquidated damages

24. Performance bond

25. fifteen (15)

26. fifteen (15)

27. thirty (30)

28. seven (7)

29. Instruction to bidders

30. Cost plus fixed fee

31. Cost plus percentage fee of cost

of the project

32. construction by administration

33. construction by management

34. Guaranteed Maximum Cost

35. Contractor

I. L. FILL IN THE BLANKS

1. Republic Act No. 545

2. Presidential Decree No. 49

3. Full time construction inspectors

4. Time

5. Technology

6. Well planned

7. Soundly constructed

8. aesthetically satisfying

9. financial limitation

10. Specialized allied services

11. physical environment

12. consultant

13. civic or charity

14. technical information

15. experience

16. unity

17. five (5)

18. ten (10)

19. five (5)

20. fifteen (15)

21. five (5)

22. fifteen (15)

23. thirty five (35)

24. eighty five (85)

25. contractor

26. P500.00

27. fifteen

28. contractor

29. architect

30. Certificate of Payment

II. A IDENTIFICATION

1. Economic Feasibility Study

2. Architectural Programming

3. Certificate of Payment

4. Architect

5. Owner

6. Project Construction Cost

7. Owner

8. Architecture

9. UAP Document No. 200

10. Standards of Professional

Practice

11. Physical Planning

12. Comprehensive Planning

Services

13. Environmental Planner

14. Owner

15. Contractor

16. General contractor

17. Project Management

18. Design Competition

19. Direct Selection

20. Comparative Selection

21. Professional fee plus expenses

22. Lump sum or fixed fee

23. Mixed Method of Compensation

24. UAP Document No. 203

25. UAP Document No. 208

26. Adherence to the principle of

Architects National Code of

Ethics

27. Architects Code of Ethics

28. United Architects of the

Philippines (UAP)

29. General Contractor

30. Cost of Work

II. B. IDENTIFICATION

1. General conditions

2. Contractor

3. Surety

4. Owner

5. Special Provisions

6. Proposal

7. Project Representative

8. Time Limits

9. Bid Bulletin

10. General Conditions

11. Payment Bond

12. Agreement

13. Guarantee Bond

14. Instruction to Bidders

15. Drawings

16. Specifications

17. Special Provisions

18. Breakdown of Work and

Corresponding Value

19. Contractor

20. Project Engineer or

Superintendent

21. Proposal Bond

22. Performance Bond

23. Supplementary Specifications

24. Written Notice

25. Local laws

26. Advertisement or Invitation

to Bidder

27. Contractor

28. Contractor

29. Unit price

30. 15%

II. C. IDENTIFICATION

1. Contractor

2. Owner

3. Architect

4. Retention fee

5. Guarantee Bond

6. Certificate of Payment

7. Surety

8. Arbitration

9. Liquidated Damages

10. Architect

11. Arbitration

12. Owner

13. Seven percent (7%)

14. Ten percent (10%)

15. Bid bulletin

16. Turn Key

17. Lump Sum

18. Owner

19. Working Drawings

20. Proposal

21. Install

22. Bid bulletin

23. Furnish

24. Contractor

25. Material Man

26. General conditions

27. Work

28. Time limit

29. Act of God or Force Majeure 30. Specifications

II. D. IDENTIFICATION

1. Guarantee Bond

2. 1 ½ % or 3%

3. 2% TO 5%

4. Administrative Contract

5. Management Contract

6. Guaranteed maximum and

percentage on savings

7. Lump sum Contract

8. Schedule of Detailed

Engineering Activities

9. Agency estimates

10. Bid/Tender Documents

11. Program of Work

12. Invitation to bidders

13. Bid bulletins

14. Bid bond

15. Performance Bond

16. Request for Payment

17. Retention fee

18. Liquidated damages

19. Contract Price Escalation Clause

20. Negotiated Contracts

21. Architect

22. As-built plans

23. Feasibility Studies

24. Specifications

25. Owner

26. Basic fee

27. January 17, 1975

28. Percentage of Construction Cost

29. Multiple of Direct Personal

Expense Method

30. Professional fee plus expenses

II. E. IDENTIFICATION

1. Schematic Design Phase

2. Design Development Phase

3. Contract Document Phase

4. Contract Document Phase

5. Construction Phase

6. Architect

7. Certificate of Payment

8. Architect

9. Full-time supervision

10. Per dien and travelling expenses

11. Owner

12. Owner

13. Project Construction Cost

14. Comprehensive planning

15. Environmental planning

16. Full-time supervision

17. Physical Planning

18. Arbitration

19. Cost of Work

20. Contractor

21. Lump Sum Contract

22. Unit price contract

23. Cost plus fixed fee contract

24. Cost and percentage fee of cost

of project

25. Construction manager

26. Project Manager

27. Contractor

28. Request for payment

29. Design by Administration

30. seven percent (7%)

II. F. IDENTIFICATION

1. Owner

2. Working drawings

3. Proposal

4. Install

5. Bid Bulletin

6. Furnish

7. Contractor

8. Material man

9. General condition

10. Work

11. Time Limit

12. Force Majeure

13. Specification

14. Surety

15. Arbitration

16. Liquidated damages

17. Lump-sum

18. Per diem plus reimburseable

expense

19. Subcontractor

20. Contractor

21. Manufacturers

22. six percent (6%)

23. seven percent (7%)

24. ten percent (10%)

25. eight percent (8%)

26. twelve percent (12%)

27. fifteen (15%)

28. Design services or Basic services

29. Pre-design service

30. Contract Time

II. G. IDENTIFICATION

1. Architect

2. Arbitration

3. Architect

4. Contractor

5. Owner

6. Architect

7. Retention

8. Guarantee Bond

9. Instruction to Bidders

10. Bid bond

11. Advertisement/Invitation to Bid

12. Bid bulletin

13. Turnkey

14. Lump sum contract

15. Unit price contract

16. Cost plus fixed fee contract

17. Cost plus percentage fee for cost

of payment

18. Administration Contract

19. Management contract

20. Guaranteed Maximum Plus

participation Savings

21. Contractor

22. Physical Planning

23. seven (7)

24. ten (10)

25. Project Management

26. Project Manger

27. Comprehensive Planning

Services

28. Physical Planning

29. Project Construction Cost

30. Breakdown of Work and

Corresponding Value

III. A. TRUE OR FALSE

1. False (does not include)

2. False (is not required)

3. False (construction phase not

design development phase