Prequalification Questionnaire / Expression of Interest LAWPS-MLM-2017-003 Construction Subcontract For The Low Activity Waste Pretreatment System (LAWPS) T. F. Kisenwether Washington River Protection Solutions LLC Date Published August 21, 2017 Prepared for the U.S. Department of Energy Office of River Protection Contract No. DE-AC-27-08RV14800

Upload: truongkiet

Post on 07-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Prequalification Questionnaire / Expression of Interest

LAWPS-MLM-2017-003

Construction SubcontractFor The Low Activity Waste Pretreatment System (LAWPS)

T. F. Kisenwether

Washington River Protection Solutions LLC

Date Published August 21, 2017

Prepared for the U.S. Department of EnergyOffice of River Protection

Contract No. DE-AC-27-08RV14800

P.O. Box 850Richland, Washington

Page 2: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 2 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

1.0 SUMMARY

Only those capable Subcontractors who are interested in receiving a Request for Proposal (RFP) should complete the attached Prequalification / EOI questionnaire. The information provided by the Subcontractor’s will be used by Washington River Protection Solutions, LLC (WRPS) to identify Subcontractor’s that will receive an RFP for the construction of the Low Activity Wastes Pretreatment System (LAWPS). Any and all information transmitted by the Subcontractor, up to and including Subcontractor’s response to the RFP, may be used to verify the Subcontractor’s qualifications to perform the work. Failure to meet all requirements, at any time, may deem the Subcontractor ineligible. Subcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file and pdf file via e-mail to [email protected] no later than Friday, October 20, 2017. Responses that are unnecessarily excessive may be rejected in their entirety. Responses received after Friday, October 20, 2017 including mailed sections, might not be considered. Receipt of responses will be acknowledged by e-mail. If your company has previously completed an EOI response it is recommended that your company provide an updated EOI response which identifies the potential OFFERORs complete Team. Several early responses did not provide their proposed Team organizational structure. If the previously submitted EOI has no changes or newer data is not available there is no need to resubmit a new EOI. In addition the proposed LEAD Subcontractor shall submit their Quality Assurance Program for WRPS evaluation. Note the date and scope changes.

Name of Participating Firm(s):Point(s) of Contact:Telephone Number(s):Facsimile Number(s):E-mail Address(es):

2.0 INTRODUCTION

WRPS is planning to issue a Request for Proposal (RFP) in the first quarter of FY 2018 for construction services that include furnishing the design, materials, equipment, and labor to construct and test the new Low Active Waste Pretreatment System (LAWPS) Facility on the Department of Energy's (DOE) Hanford Site located in southeastern Washington State. This project is governed by DOE Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” with stringent Quality and Earned Value Management System requirements.

3.0 PROJECT BACKGROUND

The DOE Office of River Protection (ORP) currently manages approximately 56 million gallons of highly radioactive mixed waste that is stored in underground tanks at the Hanford Site, located in southeastern Washington State. ORP is constructing a set of new facilities, collectively referred to as the Waste Treatment and Immobilization Plant (WTP), which will be used to treat and vitrify these nuclear wastes.

Page 3: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 3 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

The LAWPS Project will separate High Level Waste (HLW) components from Low Activity Waste (LAW) components by filtration and ion exchange and will stage the treated LAW in Lag Storage Tanks. From these staging tanks, the waste will be transferred to the Waste Treatment Plant (WTP) LAW facility where it will be immobilized through a vitrification process. Construction of the LAWPS Facility will enable the U.S. Department of Energy to treat and immobilize Hanford Tank Waste.

WRPS has formed an Engineering, Procurement and Construction (EPC) Projects organization to execute the design and construction of the LAWPS Project. The construction phase of the project will be surrounded by it’s a fence which will it isolated from other existing Hanford Facilities. SUBCONTRACTOR and WRPS EPC procedures specifically tailored to permit efficient (near greenfield) execution of this large complex project will be utilized throughout the construction phases. This Project, both design and construction phases, is being carried out in accordance with DOE Order 413.3B.

Although WRPS ultimately manages and controls activities necessary to execute the Project, LAWPS has established an Integrated Project Team with some of its functions including: 1) participating in weekly status meetings, design reviews, risk workshops, 2) Direct Feed LAW (DF LAW) Program strategy development, 3) budget planning, 4) project reviews, 5) variance analysis, and 6) project document development/maintenance. The LAWPS Project has engaged an Architect/Engineer (A/E) subcontractor to develop the preliminary and detailed design, who will remain engaged throughout the project execution. WRPS Engineering is acting as the Design Authority for the design, procurement, construction, commissioning, and operation of the LAWPS Facility. WRPS has established the Construction Management Team (CMT), as a subset of the IPT. The selected construction subcontractor awarded the construction subcontract for the facility will be a key member of the CMT. The subcontractor must have the experience and ability to engineer, procure and construct complex projects that include safety significant systems. The LAWPS has been evaluated per the methodology in DOE-STD-1027-92, “Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports,” to be a Hazard Category 2 nuclear facility (i.e., hazard analysis shows the potential to release sufficient quantities of hazardous material and energy during a design basis accident to result in significant consequences to on-site facility workers). The facility documented safety analysis identifies the resulting selected nuclear safety controls that include safety-significant (SS) structures, systems, and components (SSCs) along with technical safety requirements and other defense-in-depth design and administrative features. Assurance that installed SSCs can be relied upon to perform their intended preventive or mitigating functions requires adherence to a rigorous acquisition processes. The subcontractor must have an established Quality Assurance Program meeting ASME NQA-1 2008/2009 Parts I and II requirements, an approved Cost Accounting System, and have a certified Earned Value Management System. Additionally, the subcontractor and sub-tier subcontractors must have an average Safety Experience Modification Rate (EMR) rating of 1.0 or below for the last three years.

WRPS will direct the commissioning for the project with support provided by the construction subcontractor. The WRPS Test Director will utilize resources provided by the Subcontractor to carry out system testing and acceptance prior to transfer of the facility to operations.

WRPS is issuing a separate Site Preparation Subcontract to clear, grub, level and gravel the site, install temporary construction offices to support WRPS Staff and the Full Construction Subcontractor, install temporary utilities, install construction fencing, and install an excavation support system to allow immediate vault construction to begin upon WRPS issuing a Notice to Proceed (NTP) for full

Page 4: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 4 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

construction activities. This site preparation work is scheduled to begin in the first quarter of FY18 and be completed by the end of FY18.

4.0 QUESTIONNAIRE SECTIONS

This prequalification questionnaire / EOI has Sections A through L. Each section must be completed in its entirety. Failure to complete each section may disqualify potential Subcontractor’s. Each section is designed provide the key requirements anticipated to be in the request for proposal (RFP) for this Construction Service Subcontract, and asks related qualification questions. Responses should be limited to a few paragraphs unless directed otherwise. Responses that are unnecessarily excessive may be rejected in their entirety. The included questionnaire is focused on twelve (12) Sections below:

1. Facility Scope Definition

2. Type of Contract Discussion

3. Cost Accounting System

4. Earned Value Management System

5. Small Business Qualification

6. Team Identification

7. Organizational Structure & Staff Qualifications

8. Capability and Experience

9. Property and Material Management Planning

10. Health and Safety Program

11. Quality Assurance Program

12. Labor Agreements

NOTE: This is an Expression of Interest/Prequalification questionnaire only. This is not a Request for Proposal (RFP) and shall not be construed as a commitment by WRPS to award a contract.

A response to each section is required.

Page 5: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 5 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

1.0 SUBCONTRACT SCOPE DEFINITION

Under the Department of Energy Tank Operations Contract No. DE-AC27-08RV14800, Washington River Protection Solutions (WRPS) has been directed to design, construct, and operate the Low Activity Waste Pretreatment System (LAWPS) Project T5L01. The LAWPS project is being implemented in accordance with DOE Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The purpose of this subcontract is to furnish safe, compliant, cost-effective, on schedule design, construction, and commissioning of the LAWPS Project T5L01 by:

1) Applying performance-based contracting approaches;

2) Expecting the SUBCONTRACTOR to innovate and implement techniques that maximize performance efficiencies and

3) Complete the project on schedule.

As a result of the DOE Order 413.3B Critical Decision Process and the stringent LAWPS Project Schedule the Construction Subcontract procurement and this Statement of Work is structured as follows (Reference Figure 1):

1. The Phase 1 Pre-Planning and Constructability scope will be awarded to one or more successful bidders, based on the Best Value criteria established in the Request for Proposal (RFP) package.

2. After completion of the preplanning activities the planning subcontracts will be suspended and the initial successful bidders will provide a best and final offer to complete the CD 2/3 scope of work (Phases 2, 3 and 4). The CD 2/3 Work will be awarded to one successful bidder based on the Best Value criteria established for the BAFO. The unsuccessful bidder(s) subcontract(s) will be terminated.

3. The successful bidder for the final BAFO will resume Phase 1 Pre-Planning and Constructability and begin the Phase 2 Optional 3A scope released by the WRPS, while WRPS obtains DOE approval for the CD 2/3 (Phases 3 and 4) scope of work.

4. After DOE approval of CD 2/3, Phases 3 and 4 Optional Work will be released by WRPS.

Page 6: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 6 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 1. Lifecycle

BACKGROUND / INTRODUCTION

The fundamental purpose of the LAWPS Project T5L01 is to provide the capability to remove undissolved solids and radioactive cesium from Double Shell Tank (DST) supernatants and feed the treated waste directly to the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) Vitrification Facility for immobilization. The project will be carried out under the DOE Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets.” The schedule objective is to provide a complete construction start up tested facility that feeds low active waste (LAW) to the Waste Treatment Plant (WTP) LAW Facility by the target date of TBD. The 60% design is complete and is anticipated to be finalized with comments incorporated mid-year 2017. The 90 % design completion is anticipated in the last quarter of FY2018 with DOE approval of Critical Decision 2/3 (CD-2/3) authorizing construction in early FY19. Early construction funding is being requested in a CD3A

Page 7: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 7 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

package which is targeted for late in the first quarter of FY18. Full construction authorization CD-3 is expected in early FY19. See Figure 2.

Figure 2. LAWPS Timeline

The LAWPS is essential to the achievement of the overall Direct Feed LAW (DFLAW) mission described in the Department’s Hanford Tank Waste Retrieval, Treatment and Disposition Framework document. The mission requirements for DFLAW and the LAWPS portion of DFLAW are developed in the Direct Feed LAW Business Case (DOE/ORP-2013-01) and documented in the Mission Need Statement for the Low Activity Waste Pretreatment System at the Hanford Site (March 2014).

The LAWPS facility will be located on the 586-square-mile Hanford Site along the Columbia River in southeastern Washington State. The LAWPS facility will be located on the corner of WTP Loop Road and 4th Street as shown in (Figure 3). The LAWPS site is approximately 2000 feet west of the WTP construction site and 1500 feet northeast of the 241-AP Tank Farm (Figure 4). Access to the WTP site can be made from two primary routes; from Route 4 South (from the Wye or Rattlesnake barricades), north on Canton Avenue and then east on 4th Street, and from Route 11A (from the Wye, Rattlesnake or Yakima barricades) south on Canton Avenue and then east on 4th Street.

Page 8: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 8 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 3. LAWPS Location

Page 9: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 9 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

WRPS’s Design Agent is designing a majority of the project on a build to print basis. However, there will be several design elements within the construction scope that will be provided by the Construction SUBCONTRACTOR that will require design submittal approvals by WRPS’s Design Authority and Agent. These designs may be executed by the SUBCONTRACTOR’S vendors or sub-tiers, and will include a variety of equipment skids, control systems, tanks, and other engineered commodities. The construction sequence involves site preparation, excavation, foundations and structural work, tank fabrication, process equipment installation, utilities tie-in, system testing, instrument loop testing, and finally hot (or radioactive service) tie-in, which is outside the scope of this Subcontract.

Below are the anticipated phased construction subcontract scope descriptions based on each Project Critical Decisions Pre-Planning, CD-3A and CD-2/3. Each scope will require DOE funding authorizations.

Phase 1 Work – Pre-planning and Constructability – This includes performing a site assessment, constructability reviews, develop mobilization documentation, develop the construction strategy, and risk identification.

Phase 2 Work – CD-3A Mobilization and Other Preparation Activities – This includes mobilization/preparation activities; main process facility excavation, procurement/ fabrication of concrete reinforcement, embeds, forms, and supporting materials; long lead equipment design and procurement; placement of the mud mats; and initial rebar mats/embed mat installation; and form assembly/installation.

Phase 3 Work – CD-2/3 Full Construction – This includes the facility construction including civil, architectural, mechanical, process, utilities, I&C, electrical and construction acceptance testing. Phase 3 ends after completion of Construction Acceptance Testing (CATS) and closure of CATS open items.

Phase 4 Work – CD 2/3 Startup Construction Testing (SCTs) – This includes providing support to the WRPS during the startup testing activities prior to turning the facility over to the WRPS for Operational Acceptance Testing (OATS). Phase 4 ends after completion of the startup testing and acceptance by the WRPS.

Estimated Key Quantities for Construction & Installation

Concrete construction (~14,400 CY).

Weather protection building construction above vaults including resin handling, north annex and lag storage buildings (~ 20,000SF), ~980 tons structural steel.

Electrical installation (site transformer installed by others during or before site prep)

o ~110,000 lf conduito ~1,800 lf underground duct banko ~225,000 lf Cableo ~5,000 lf Cable Trayo includes fiber optic cableo prefabricated electrical equipment building.

Control systems (Allen Bradley).

Page 10: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 10 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Safety significant control system.

HVAC general service system – intake skid and duct work.

HVAC safety significant system – intake skid fan/controls module and ducting.

HVAC exhaust skid, ducting, stack and CIDs.

Piping – 316LStainless – ~14,200 lf 1.5” and less, ~12,600 >= 2” (Safety Significant).

Valves: 137 (Remotely Maintainable Safety Significant, GFE) 240 (Safety Significant), 475 (General Service)

REMOTE Connectors/Jumpers – ~46 – 2” and larger fabrication and installation (Purex jumper fittings furnished by WRPS).

Piping systems general service.

Mechanical equipment including tanks.

Instrumentation – ~2,333 instruments – wiring & terms included in electrical above.

Fire protection system.

Government furnished equipment and materials (See Section “I”)

Overhead Crane

Ion Exchange skid

Cross Flow Filter skid

Filter Feed Valve Skid

All Grayloc and Purex connectors will be furnished loose. (Jumper fabrication will be done

under this subcontract)

Xomox valves that are required for the valve skid assembly’s above.

ASME Tanks

Schedule Objective

The schedule objective is to provide a facility that feeds low active waste (LAW) to the Waste Treatment Plant (WTP) LAW Facility by the target date TBD. The project design is 60% complete. 90% design completion is anticipated in the last quarter of FY2018 with DOE approval of Critical Decision 2/3 authorizing construction (CD-2/3) near the end of the first quarter of FY 2019. Early construction funding is being requested in a CD3A package which is targeted for late in the first quarter of FY18.

Page 11: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 11 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

The construction schedule will be very aggressive in order to meet DOE commitments to initiate tank waste treatment and disposal. The current construction schedule assumes working a rolling 4-10’s schedule for the construction in order to support the project completion dates.

The P6 schedule will be resource loaded including labor hours, equipment, and total cost of each activity. Critical path analysis, description of any variances and corrective action will be required as a monthly reporting requirement. Weekly updates to the target schedule will be required.

The current RFP schedule:

• Receipt of Responses for the Revised Expression of Interest - 10/20/17• Issue the RFP - 12/2017• Submittal of proposals to WRPS 4/2018• Award of the construction Subcontract(s) for Phase 1 - 4/18• Suspend Phase 1 Subcontract(s) 8/18• Issue Step 2 Procurement for Phases 2 through 4 – 8/18• Receive Step 2 proposals 11/18• Resume Phase 2 Work (1 Subcontractor) - 12/18

The LAWPS Facility will be a Hazard Category 2 nuclear facility which will be remotely operated. The LAWPS facility will receive compliant waste from AP Tank Farm, employ a cross-flow filtration (CFF) system to separate the solids from the waste and an ion exchange (IX) system to remove soluble radioactive cesium (Cs) from the filtered waste. Along with the capability to remove solids and Cs from the waste, the LAWPS facility will have waste transfer lines connecting LAWPS with AP Farm and LAWPS with WTP, and lag storage tanks to store the treated LAW. At the lag storage tanks, the WTP waste acceptance criteria (WAC) will be confirmed prior to the treated LAW being transferred to the WTP LAW Facility for vitrification. Waste will be transferred via in-ground, double-walled, waste transfer lines from the 241-AP Tank Farm to the LAWPS and from the LAWPS to the WTP. The solids removed by the CFF system are continuously returned to the AP Farms and the Cs removed by the IX system is accumulated for transfer back to the DST system. The facility contains main process vaults which have multiple embedment depths with the deepest found 47 feet below grade with top of concrete elevation approximately equal to grade. The process vaults are enclosed within a 125 foot by 85 foot by 60 foot tall above grade structural steel weather enclosure building, which houses a 30 ton overhead crane and truck airlock. Located immediately adjacent to this are support structures housing electrical, HVAC, process equipment, 5 ton overhead crane, and spent resin dewatering, packaging and storage system. Balance of plant equipment is installed on slabs placed on grade. Balance of plant equipment is primarily designed to be fabricated and delivered as sub-assemblies. Plant utilities and piping systems are buried or located within trenches with covers. Double walled underground waste transfer piping lines (WTL) from LAWPS to the 200 East Area AP Tank Farm and to the Waste Vitrification Plant will also be installed (the tie in connections at the AP Farm and WTP will be completed by others). See Figures 5 and 6 for general facility and main process building general layouts.

A key element of the LAWPS Project will be the fabrication, testing, and installation of pre-fabricated valve, equipment, tanks, and HVAC modules/skids that will be placed inside of below grade vaults. Figures 7 through 11 provide model cut examples of several of these modules/skids. The NQA-1 fabrication of these modules/skids will require close tolerance fabrication, accurate positioning inside the vaults, and detailed as-built information to support installation/removal of remote connectors for maintenance and replacement.

Page 12: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 12 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Page 13: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 13 of 3908/21/2017Washington River Protection Solutions LLC LAWPS Facility Construction

EOI-LAWPS-MLM-2017-003 Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 4. LAWPS Project Plant View

Page 14: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 14 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 5. Main Process Building.

Figure 6. Plan View of Process Vaults Inside The Weather Enclosure

Page 15: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 15 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

(Vault Cover Plates Removed)

Figure 7. Elevation View Inside The Ion Exchange Valve Pit Module/Skid

Page 16: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 16 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 8. Cesium Tank

Page 17: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 17 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 9 Filter Feed Tank

Page 18: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 18 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Figure 10 Cross Flow Filter Module/Skid

Page 19: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 19 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Page 20: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 20 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

2.0 TYPE OF CONTRACT DISCUSSION

Cost Range - The Construction Subcontract value is anticipated to be between $150 and $200 Million dollars.

Construction Contracting Strategy

The project anticipates an incentivized cost reimbursable subcontract to execute the facility construction. The initial Request for Proposal (RFP) will contain the 60% design media. The source selection board will evaluate the bids and recommend award based on the source selection evaluation criteria included in the RFP. DOE approval will be required prior to awarding the subcontract.

The cost reimbursable contract will include fee incentives that are designed to ensure safe on time delivery and promote cost efficiencies. The incentives are currently visualized as affording opportunity for the constructor to increase his total fee by earning bonuses for early/on time completion, and for underrunning cost. Conversely, a portion of the subcontractor’s fee will be subject to forfeiture for poor safety, quality, schedule, or cost performance.

The subcontractor will also be authorized to negotiate and enter into agreements for preparation and submittal of detail design and shop drawings for tanks, embedments, concrete reinforcement drawings, HVAC, etc. as part of the Phase 2 Work. The subcontractor will be authorized to initiate fabrications and other material procurements, mobilize to site, carry out site preparation activities and any other scope included in the CD3A package immediately after its approval by the DOE.

The subcontractor will be authorized to proceed with the balance of the facility construction immediately after approval of the CD2/3 package by the DOE. The Tank Farms Operations Contract (TOC) currently expires in October of 2018. In the event the WRPS is not successful during the re-competition of the TOC contract, this subcontract for the construction of the LAWPS will be novated to the new TOC operator selected by the DOE.

This contracting strategy has been adopted to:

• Achieve the current completion date imposed by the DOE to meet the commitments to initiate tank waste treatment.

• Provide sufficient schedule for the construction subcontractor to preplan the work concurrent with DOE approval of the design package and Critical Decision Steps.

• Providing time to engage the subcontractor to development an achievable target price and schedule based on finalized design drawings, including the identification and assignment of project risks.

• Provide opportunities to identify and implement earlier construction activities to shorten the project schedule and cost.

Page 21: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 21 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Questions:

1. Do you believe a target price cost reimbursable contract with incentives is the most appropriate contract vehicle for this scope of work?

Yes / No (Circle one and explain below)

Explanation:

2. The milestone commitments established by DOE adds to the importance of safely performing this scope within the stated durations. The contract form above was chosen in part to accommodate change in the most expeditious manner possible within the requirements imposed by federal regulations.

Do you concur, or would you propose an alternate contract format?

Yes / No (Circle one and explain below)

Explanation:

Page 22: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 22 of 3908/21/2017Washington River Protection Solutions LLC LAWPS Facility Construction

EOI-LAWPS-MLM-2017-003 Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

3.0 Cost Accounting System

The Subcontractor is required to have a Certified Cost Accounting System (CAS) subject to the requirements of the Cost Accounting Standards Board (48 CFR Chapter 99). The subcontractor shall complete Attachment 1, “Exhibit 2: Cost Accounting Standard Notices and Certification,” and submit it as part of the Prequalification Questionnaire / EOI.

Note: The Subcontractor shall also resubmit the Cost Accounting Standard Notices and Certification Form with the solicitation proposal.

Page 23: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 23 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

4.0 Earned Value Management System

The subcontractor will be required to develop, implement and manage an Earned Value Management System (EVMS) in compliance with the Electronic Industries Alliance (EIA)-748 “Earned Value Management Systems.” Key aspects of this EVMS are to develop, implement and manage a baseline and forecast schedule with corresponding time-phased budget and forecast resources. The schedule shall include significant external and internal interfaces, be an integrated, logical network-based plan that correlates to the WBS, will be vertically traceable to the EVMS control accounts, and be successfully aligned in summary activities to the WRPS schedule. The schedule shall be capable of summarizing from control accounts to higher WBS levels and support earned value reporting. A baseline change control process is also a key aspect. In addition to EIA-748, the DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” provides further requirements for this size of contract, including but not limited to the certification and on-going surveillance of the subcontractor’s EVMS.

Questions:

1. Is your company currently EVMS Certified in accordance with EIA-748?

Yes / No (Circle one and explain below)

Explanation:

2. If you company is not EVMS Certified, briefly describe your implementation plan and schedule for getting certified?

3. Provide a description of your companies change control practices. Include a description of baseline cost and schedule management, request for equitable adjustment procedures, and contract and subcontract administration processes.

Page 24: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 24 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

5.0 Small Business Information

This procurement is not reserved for a Small Business, however teaming arrangements or subtier subcontracting to local and small businesses are encouraged.

Questions:

1. Can your company (or team members) provide an example of small business plans that have been utilized on previous large (>$750,000) construction subcontracts?

Yes / No (Circle one and explain below)

Explanation:

2. Can your company (or team members) provide a description of the methods and techniques that it would envision utilizing to attract small and local businesses to join your Team?

Yes / No (Circle one and explain below)

Explanation:

NOTE 1: Any questions concerning small business partnering relationships or minimum small business participation for this procurement should be addressed to the Small Business Administration.

Page 25: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 25 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

6.0 Team Identification

Identify you Company information and your planned teaming partner arrangement(s):1 Company Name:

Address:Point of Contact:Title:Phone:Email Address:

2 Company Information:

Duns Number -Socioeconomic Status -Potential Team Members -

3 Teaming Partners & Scope:Company Name:Address:Point of Contact:Title:Phone:Email Address:Scope:Experience/QualificationsCompany Name:Address:Point of Contact:Title:Phone:Email Address:Scope:Experience/Qualifications

NOTES:

1. Include/expand additional sheets for all Key Teaming/Sub-tiers in particularly module and ASME tank fabricators.

2. Structural Steel Fabricator(s) minimum 5 years of documented experience. Fabricator shall participate in the AISC Quality Certification Program and shall be designated an AISC Certified Plant, Category BU (formerly STD).

3. Structural Steel Erector minimum 5 years of documented experience. Erector shall participate in the AISC Certification Program and shall be designated an AISC Certified Erector, Category ACSE or CSEA.

Page 26: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 26 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)7.0 Organizational Structure & Staff Qualifications

1. Provide a description of the Project Management/Project Execution procedures utilized by your Company/Team:

2. Describe the availability of qualified personnel and staff for this project:

3. Provide an anticipated organization chart:

4. Provide resumes of the types of qualified personnel and staff available for this project:

Expected Requirements for Key Personnel

Project Manager

Twenty (20) years managing large scale construction projects including experience:• Establishing means and methods• Managing sub-tier subcontractors• Integrating work force with customer’s onsite support personnel• Managing union craft (e.g., pipefitters, iron workers, etc.)• Managing Engineering activities.• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 5 years)

• With nuclear facility construction/operation• With earned value management techniques and methods

Project Engineer

Twenty (20) years engineering experience for construction projects including:• Demonstrated ability to engineer solutions to complex problems relevant to this scope.• Licensed Professional Engineer in State of Washington• Mechanical equipment design, procurement, installation, and testing• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 5 years).

Site Construction Superintendent (fulltime during on site work activities)

Fifteen (15) years’ experience supervising construction projects, including:

• 2 year in civil operations (excavation, backfill, paving, etc.) experience.• 5 years mechanical equipment and piping fabrication/installation• 3 years concrete placement/finishing• Experience working with union workforce labor management associated with bargaining units

(building trades)• Experience integrating work crews with customer support personnel, including union personnel

Page 27: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 27 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 3 years)

Safety and Health Manager (Full time on-site position)

Fifteen (15) years construction safety experience including:• 5 years heavy industrial construction• The SUBCONTRACTOR Safety and Health Program shall be supported by either a Certified

Industrial Hygienist (CIH) or Certified Safety Professional (CSP) to ensure the technical and cultural aspects of safety and health are met [10 CFR 851.20]. Persons working on site within the Subcontractor's authority must meet one of the following criteria:

o Construction Health Safety Technician (CHST),o Occupational Health and Safety Technician (OHST),o Associated Safety Professional (ASP),o Industrial Hygienist in Training (IHIT) or Certified Associate Industrialo Hygienist (CAIH),

• 3 years DOE site experience.

Quality Assurance Manager

Twenty (20) years’ experience in quality assurance/control including:• 10 years quality assurance/control experience implementing NQA 1• 5 years DOE site experience• Experience evaluating QA Program compliance for procurement and construction installation

activities• Experience evaluating SUBCONTRACTOR QA programs

Supplier Quality Assurance Manager

Ten (10) years’ experience in supplier quality assurance inspection and control:• 5 years supplier quality assurance/control experience implementing NQA 1• 2 years DOE site experience• Experience inspecting subcontractor products for compliance to procurement and fabrication

requirements• Experience evaluating SUBCONTRACTOR QA programs

Procurement Manager

• Twenty (20) years’ experience in procurement and subcontracting:• Demonstrated ability to issue complex procurement actions relevant to this scope• Certified Procurement Manager• 10 years procurement experience purchasing NQA-1 services, equipment, and commodities • 5 years procurement experience with FAR compliant purchases• 5 years procurement experience on DOE or other government agency project

Page 28: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 28 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Administrative / Document Control Manager

Fifteen (15) years’ experience in administrative/document control including: Five (5) years’ supervisory/management Five (5) years’ document control including supplier submittals Three (3) years’ nuclear project document control

Additional Questions

Potential Subcontractors must be able to propose Key Personnel which meets the following criteria:

1. Can your company (or team members) deliver a staff that would meet or exceed these requirements?

Yes / No (Circle one and explain below)

Explanation:

3. Can your company (or team members) demonstrate a history of process improvements and innovative construction approaches made on projects under their leadership?

Yes / No (Circle one and explain below)

Explanation:

4. Is your Company / Team have the organizational structure and ability to effectively manage and

staff a rolling 4-10 schedule?

Yes / No (Circle one and explain below)

Explanation:

5. Can your company (or team members) provide an example an organization structure that was utilized on a similar construction project or the proposed organization for this scope?

Yes / No (Circle one and explain below)

Explanation:

Page 29: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 29 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)8.0 Capability and Experience

1. Describe your Company/Team Construction capabilities:

2. Describe your Company/Team Procurement capabilities:

3. Describe your Company/Team Engineering capabilities:

4. Describe your Company/Team Materials Management Experience:

It is expected that the Subcontractor’s will be required to show evidence of meeting the following requirements if invited to submit a Proposal. Subcontractor may consist of an individual company, joint venture, or teaming or partnering arrangement. Failure to meet requirements, at any time, may deem Subcontractor ineligible for award. The Subcontractor:

• must have demonstrated capability and a minimum of twenty (20) years’ experience in performing procurement, planning, and installation of scope descriptions identified in Section "A";

• must have twenty (20) years’ experience performing similar construction services;• must be able to post a Miller Act Payment and Performance Bonds, or approved equivalent, at the

time of award of Subcontracts having a penal sum equal to the amount of the subcontract contract value.

Questions

NOTE: In support of answers below, please complete the Relevant Project Experience table at the end of this section. The Subcontractor shall list projects that demonstrate the capability and experience of your company (and team members) in performing work similar to the Scope describe in Section "A." Address the types of work discussed in Section "A" and referenced in the questions below.

1. Can your company (or team members) demonstrate a successful history of years of executing Construction Subcontracts of this size and complexity?

Yes / No (Circle one and explain below)

Explanation:

2. Does your company (or team members) have experience working construction services involving nuclear material handling piping system installations at DOE Facilities?

Yes / No (Circle one and explain below)

Explanation:

Page 30: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 30 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)3. Does your company (or team members) have experience fabricating and installing piping and

electrical jumpers to very stringent tolerance requirements installed in a remote controlled canyon environment?

Yes / No (Circle one and explain below)

Explanation:

4. Can your company (or team members) demonstrate work experience with major dirt work (excavation, hauling, loading, backfilling, grading, etc.), road construction/paving, and heavy equipment use, and installation of Engineered Shoring Systems?

Yes / No (Circle one and explain below)

Explanation:

5. Does your company (or team members) have the capability and experience to design, procure, and install equipment, structures, and components necessary to accomplish the types of scope identified in Section “A”?

Yes / No (Circle one and explain below)

Explanation:

6. Can your company (or team members) demonstrate the depth of corporate support and show a history of being a full service provider of the scope described in Section “A,” above?

Yes / No (Circle one and explain below)

Explanation:

7. Does your company (or team members) evaluate and document hazardous conditions for the purpose of planning and executing the field work activities safely?

Yes / No (Circle one and explain below)

Explanation:

8. Is there a component of this scope that your company (or team members) does not want to provide or cannot provide?

Yes / No (Circle one and explain below)

Explanation:

Page 31: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 31 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)9. Can your company (or team members) demonstrate the depth of a comprehensive Quality

Assurance Program (QAP) including those elements as described in Section “K” below?

Yes / No (Circle one and explain below)

Explanation:

10. Can your company (or team members) demonstrate the construction experience with heavy concrete, structural steel, and architectural installations for a large scale nuclear facility?

Yes / No (Circle one and explain below)

Explanation:

11. Can your company (or team members) demonstrate the project controls processes for managing and controlling a fully resource loaded project schedule?

Yes / No (Circle one and explain below)

Explanation:

Relevant Project Experience

Please list specific projects that provide evidence of the capability and experience of your company (including team members) in all the areas of work included in the Scope identified in Section “A.” Please include the following information for each project:

• Year • Duration• Company performing the work• Project Description relevant to the Section “A’ Scope of Work and the types of constructions

performed (DOE Experience/NRC Experience)• Contract Type• Initial Contract Value• *Final Contract Total Value• Customer/Contact (Reference)

Page 32: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Relevant Project Experience

Item

Year Duration Company Project Description

Type of Contrac

t

Initial Contract Value $

*Final Contract Value $

Customer/Contact Phone Number

1

2

3

4

5

6

7

8

9

10

11

12

13

14

*Explain and summarize the overall dollar variance from initial award and final subcontract value (i.e. directed changes cost vs. claims)

Page 33: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 33 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)9.0Property and Material Management Planning

The subcontractor will be required to develop, implement and maintain a Property Management System compliant with Federal Acquisition Requirements (FAR) 52.245-1, Property Management. The subcontractor’s Property Management System Plan will be a submittal requirement for interested Subcontractor’s. WRPS will review the plans and must approve them prior to prospective Subcontractor’s being placed on our approved Subcontractor’s list.

Questions:

1. Summarize your company’s Property/Material Management Plan?

2. Has your Property Management Plan/Program been utilized on previous/other Government contracts?

3. Explain how the material purchases will be received, identified, stored and allocated to specific installation work packages. How will allocation be documented? How material not used will be handled (including bulks)?

4. Explain the process for identifying in storage maintenance requirements and maintaining equipment both in storage and installed?

5. How will equipment/material in storage be segregated and protected from loss/damage? How will loss/damage be reported?

6. Explain process for completion and reporting of physical inventory.

7. Explain process for self-assessment of Property Management Plan/Program?

8. Explain the process for segregation and control of non-conforming equipment and materials.

Page 34: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 34 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)10.0 Health and Safety Program

The Subcontractor will be required to submit a site specific Environmental, Health, and Safety Plan for the Project. This specific plan may be tailored from the Subcontractor’s corporate plan, however the site specific plan must be fully compliant with the applicable sections of Title 29 CFR Part 1926 (Construction)– Safety and Health Regulations for Construction and, Title 29 CFR Part 1910 (General Industry) – Occupational Safety and Health Standards. Where applicable, the site specific plan will also reference, due to Title 10 CFR Part 851, Worker Safety and Health Program, the safety standards enumerated in listed codes/regulations, such as the American National Standards Institute (ANSI), National Fire Protection Association (NFPA), and American Conference of Governmental Industrial Hygienists (ACGIH) and applicable DOE Orders and other Federal/State environmental and worker health/safety rules and regulations.

It is anticipated this project will start on a “Green Field” site, that is clear of any radiological and chemical contaminants, as a precaution, WRPS will provide health physics technicians during excavations to ensure no contamination is encountered within the soils. Recent soils explorations of the intended site boundary have recently been conducted and no contamination was found.

The waste transfer line installations included in the scope will be performed in the area between the existing tank farm fences the temporary construction fence boundary, and the boundary of the Waste Treatment Plant (WTP) site. The crews carrying out the construction and installation associated with portions of these lines that are close to existing facilities may be required to obtain additional training. This project will not require introduction of waste or chemicals into the systems installed by the subcontractor until after these systems have been transferred to the facility operator.

WRPS anticipates that the Subcontractor will be required to show evidence of meeting the following requirements if invited to submit a proposal. Failure to meet the requirements, at any time, may result in the Subcontractor being ineligible for award.

• Integrated Safety Management Program• Site Specific Health and Safety Plan (Manual)• Work Control Program/Procedure(s)• Safety Experience Factors, other key safety indicators • Subcontractor’s and team members must provide last 5 years of safety data (OSHA Recordable

Injury Rate; OSHA DART rate). WRPS will perform an evaluation of this data as part of the review. Subcontractors with a poor safety track record may not be allowed to participate in the solicitation. The criteria utilized for this evaluation will be similar to the safety performance requirements of the RCCC.

• Subcontractor’s, including team members and sub tiers, must have an average Interstate Experience Modification Rate (EMR) and a State EMR of 1.0 or lower for the current and previous two (2) calendar years. Companies with an EMR greater than 1.0 may be considered provided a robust corrective action safety improvement plan is provided.

Questions

1. Can you (and/or your team) demonstrate a corporate history of safe work including OSHA logs for the last 5 years?

Yes / No (Circle one and explain below) Explanation:

Page 35: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 35 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

2. Please complete Attachment 2, “Exhibit 1. Vendor ESH&Q Questionnaire and provide with your Company’s prequalification response.

3. Provide corrective action plan if the three year average EMR is greater than 1.0.

NOTE: Each Subcontractor may be asked to provide a copy of the Health and Safety Manual(s).

Page 36: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 36 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)11.0Quality Assurance Program

Expected Requirements

Subcontractors must have a Quality Assurance Program (QAP) that conforms to the requirements ASME NQA-1 2008/2009 Parts I and II and the following:

• Uses national/international consensus standards • Applies national standards, as appropriate, to specific work activities• Addresses detection and control of suspect/counterfeit items.

Subcontractors that do not have a robust NQA-1 program or cannot meet the stringent quality assurance requirements likely will not be qualified. The subcontractor(s) that received an award must be evaluated by WRPS and placed on the Evaluated Suppliers List (ESL) based on specific quality requirements specified in a Quality Assurance Requirements document at time of award. The subcontractors who have not had their NQA-1 programs approved prior to requests best and final proposals within the request for proposal process, may be ineligible for final consideration or award of this subcontract.

Subcontractor will be required to have a robust commercial grade dedication process and procedures in place. Experience with commercial grade dedication is essential and will be included in the award criteria.

Subcontractor’s must have experience applying its QAP to the aspects of work to be performed under the Construction Services Subcontract Agreement, including procurement, fabrication, welding, construction, installation, testing services, design services, and software development.

The Subcontractor and their sub tier subcontractors shall flow down the Quality Assurance requirements to each Sub Tier Subcontractor in the form of a QA Implementing Document for the work being performed by the sub tier subcontractor.

Questions

1. Provide the NQA-1 Quality Assurance Program Description of the Lead OFFEROR?

Yes / No (Circle one and explain below)

Explanation:

2. Does the Lead Subcontractor maintain a Quality Assurance Program that satisfies the requirements of ASME NQA-1, Parts I and II?

Yes / No (Circle one and explain below)

Explanation:

3. Does the Lead Subcontractor have experience applying the QA Program(s) to the full range of services required under the construction services scope in Section "A," above?

Page 37: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 37 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

Yes / No (Circle one and explain below)

Explanation:

4. Does the LEAD Subcontractor have a robust Commercial Grade Dedication program and procedures? Do you plan to use subcontractors to perform the dedication services?

Yes / No (Circle one and explain below)

Explanation:

5. Does LEAD Subcontractor have an evaluated supplier program and procedures?

Yes / No (Circle one and explain below) Explanation:

NOTE: Each LEAD Subcontractor may be asked to provide a copy of the LEAD Subcontractors Quality Assurance Manual and asked to allow access for WRPS personnel to perform formal NQA-1 evaluations prior to issuance of the RFP.

Page 38: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 38 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)12.0Labor Agreements

It is important to WRPS that we team with quality subcontractor to deliver to the government value; therefore, we want any subcontractor to be successful so that we are successful. Past experience with labor organizations is an important indicator toward future success. The Subcontractor and their sub-tier subcontractors shall become signatory to the Hanford Site Stabilization Agreement.

Questions

1. Can you (and/or your team) demonstrate a corporate history of working with unionized labor forces?

Yes / No (Circle one and explain below)

Explanation:

2. Can you (and/or your team) demonstrate a history of union labor dispute resolution?

Yes / No (Circle one and explain below)

Explanation:

3. Can you (and/or your team) demonstrate corporate experience in establishing and working within labor agreements with local building trade unions?

Yes / No (Circle one and explain below)

Explanation:

4. Can you (and/or your team) demonstrate corporate experience with executing Capital Line Item Project under United States Davis Bacon Act?

Yes / No (Circle one and explain below)

Explanation:

Page 39: Summary -   · Web viewPrequalification Questionnaire / Expression of Interest. Construction Subcontract for the LAWPS Facility (Revision 3) LAWPS Facility Construction

Page 39 of 3908/21/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-003

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 3)

ATTACHMENTS:

Section “C,” Attachment, Cost Accounting System Form, (Attachment 1)

Section “J,” Attachment, Health and Safety Program Form, (Attachment 2)