do it proper with copper

11
“Do It Proper With Copper” Video Series Filming: Day 1

Upload: copperdevelopment

Post on 14-Jul-2015

66 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Do It Proper With Copper

“Do It Proper With Copper”

Video Series

Filming: Day 1

Page 2: Do It Proper With Copper

1

Tools and copper fittings for the

video shoot are laid out on the

table.

Page 3: Do It Proper With Copper

CDA Project Manager Harold Moret prepares the set for the video shoot.

Page 4: Do It Proper With Copper

Harold Moret practices his lines during a run-through of the video shoot.

Page 5: Do It Proper With Copper

“Do It Proper With Copper”

Video Series

Filming: Day 2

Page 6: Do It Proper With Copper

CDA Project Manager Larry Peters gives Harold Moret advice on the script for the medical gas installation video shoot.

Page 7: Do It Proper With Copper

7

Harold Moret organizes the copper tube and fittings prior

to shooting the video.

Page 8: Do It Proper With Copper

8

Harold Moret and Ron Gumucio practice their lines while the

camera crew sets up the shot and lighting on set.

Page 9: Do It Proper With Copper

9

Harold and Ron go over their lines for the

video shoot prior to filming.

Page 10: Do It Proper With Copper

10

The video crew frames the shot in camera.

Page 11: Do It Proper With Copper

11

Rolling: Ron asks Harold to explain the various types of

copper tube, pipe and fittings used for different plumbing

applications.