DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington. Areas of interest, DLR contribution. As being not involved in building spacecrafts and responsible for ground operations the main interest of DLR/GSOC focus on ground related issues Security WG Navigation WG - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

Folie 1 > Vortrag > AutorDokumentname > 23.11.2004

DLR - CMC Report

Martin Pilgram, DLR-GSOC, October 2005, Washington

Page 2: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 2 DLR-CCSDS-Report-F05 - October 2005

Areas of interest, DLR contributionAs being not involved in building spacecrafts and responsible for ground operations the main interest of DLR/GSOC focus on ground related issues

Security WG Navigation WG S/C Mon + Control WG SLE Data Trans. Service WG

other interests, which couldn’t be supported are SLE Service Mgmt. WG RF & Modulation WG

No contribution to the more space related areas as SPACECRAFT ONBOARD INTERFACE SERVICES and SPACE INTERNETWORKING SERVICES

Page 3: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 3 DLR-CCSDS-Report-F05 - October 2005

CESG resolutions

DLR requests to have access to the CESG CWE or at least to be informed about CESG resolutions, when they are taken.

Today we have no access to the CESG CWE, we will be informed on CESG work and decisions first by the report given at the CMC.

This is to late to be able for proper decisions on the CCSDS Operating Plan (A01x2y32[16Jun05]) during CMC.

Page 4: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 4 DLR-CCSDS-Report-F05 - October 2005

CCSDS liaisons

DLR propose CCSDS secretary to inform the liaisons on new work items in CCSDS after they are approved by the CMC.

This information flow on new work items should be established also the other way round.

DLR got aware of the following work items:

– SC14: Space Debris

– ECSS: Ranging

The CCSDS WGs should coordinate with the work to be proposed in the liaisons.

Page 5: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 5 DLR-CCSDS-Report-F05 - October 2005

ECSS-CCSDS liaison

ECSS wants to establish a liaison with CCSDS and formalize the approach.

DLR propose to coordinate a liaison statement on secretary level based on the CMC discussion of the April meeting in Athens, which describes

• the points of contact in CCSDS and ECSS,

• the exchange of new work items,

• the preference where to handle the work items,

• the involvement in the review process of each others

AI: CCSDS secretary

Page 6: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 6 DLR-CCSDS-Report-F05 - October 2005

IOAG liaison

As one result of the working group meetings in Atlanta, DLR has to thank CESG for picking up the IOAG resolutions and integration the requested work items into the current CCSDS WG structure e.g.

– Forming new BOFs or

– Integration of the requests into the current WGs

Page 7: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 7 DLR-CCSDS-Report-F05 - October 2005

WGs and BOFs

DLR proposes to check on extending the lifetime of WGs and BOFs

if there is only one agency is participating / spending resources

If a BOF is not able to set up a workplan and get resources for a proper work in a resonable time frame.

If there is an interest by the participants the work should be continued outside CCSDS and opened as a BOF or WG if the work item is more consolidated.

Page 8: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 8 DLR-CCSDS-Report-F05 - October 2005

Lifetime of BOFs

F03 S04 F04 S05 F05

SANA BOF        

Space/Ground Interoperability Architecture BOF  

Onboard Plug-'n-Play BOF          

Onboard Transducer BOF          

Wireless BOF      

Long Eras. Codes BOF        

High Rate Uplink BOF  

Async. Messaging Service BOF    

IP-over-CCSDS Links BOF    

Page 9: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 9 DLR-CCSDS-Report-F05 - October 2005

Participation in Atlanta WGsWG/BOF Participants Agencies

1.1 System Architecture WG 6 2

1.2 Security WG 13 5

1.3 Information Architecture WG 8 1

1.4 SANA BOF 8 1

1.6 Space/Ground Interoperability Architecture BOF 5 2

2.2 Navigation WG 13 3

2.4 S/C Mon + Control WG 23 7

3.1 Cross Support Ref. Mod WG 0 0

3.3 Cross Support Service Mgnt. WG 13 5

3.6 Cross Support Transfer Services WG 18 6

4.1 Onboard Bus + LAN WG 8 2

4.2 Time Crit. O/B Net Svc WG 10 3

4.3 Time Crit. O/B Apps. WG 4 3

4.4 Onboard Plug-'n-Play BOF 5 3

4.5 Onboard Transducer BOF 4 2

4.6 Wireless BOF 6 2

5.2 Space Link Code/Sync. WG 11 3

5.3 Data Comp. WG 9 4

5.4 Space Link Protocols WG 10 4

5.5 TC Channel Coding WG 10 4

5.7 Prox-1 Building-2 WG 5 2

5.8 Long Eras. Codes BOF 2 2

6.4 Cislunar Space Internetworking WG 21 2

6.6 Async. Messaging Service BOF 12 3

6.7 IP-over-CCSDS Links BOF 17 3

Page 10: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 10 DLR-CCSDS-Report-F05 - October 2005

Resource allocation (some agencies incl. NASA still missing)

The following WG/BOFs have resources less than 0.1 man/year:

All BOFs without Cross Support Architecture BOF

and the following WGs:

Cross Support Concept/Ref. Mod WG

Prox-1 Build-2 WG

Page 11: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 11 DLR-CCSDS-Report-F05 - October 2005

Promotion

DLR thanks the secretary for the increased effort in promoting CCSDS.

There might be a promotion package defined by each Area, CESG, CMC (CCSDS CD) which enables members of the CCSDS easily to promote CCSDS.

Page 12: DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington

DLR – CCSDS report –Fall 05 - Martin Pilgram - page 12 DLR-CCSDS-Report-F05 - October 2005

Meeting Cycle

DLR propose a meeting cycle for the technical WGs twice meetings a year. There should be one plenary a year, which brings all WGs together for necessary discussions of inter-WG related issues and to inform the WG members on CCSDS work items outside their WG.

The intermediate meetings can be organized by the WGs itselfes.