dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr forj.k fuxe fy0 mUuko www.MVVNL.IN ij fufonk viyks M gks us ds lEcU/k es a Tender Specification No. Date of opening Issuing Authority Particulars 1 2 3 4 189/EDCU/ 2015-16 17-12-2015 Superintending Engineer Electricity Distribution Circle, Unnao Replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at 11 KV Chamrauli-II feeder from vill Jamuka T-off to vill Duwa of Block Bichiya, Unnao (under Business Plan 2015-16). 190/EDCU/ 2015-16 17-12-2015 Superintending Engineer Electricity Distribution Circle, Unnao ELECTRIFICATION OF RGGVY PHASE – II VILLAGE & Habitation : Saharia-Saharia Lalempur Istmurari, (Dabaoli-Khairi & Bajar, Naini Khera Laxman Purwa, Subba Khera, Chetai Purwa, Khalak Khera, Haibat Pur, Torna), (Rustam Pur-Rustam Pur, Kachiyan Khera, Badri Purwa), Khanpur-Alipur, (Khaira Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur- Sakat Pur(Total 18 No. Villages) BLOCK : Fatehpur-84 DISTRICT : UNNAO 191/EDCU/ 2015-16 17-12-2015 Superintending Engineer Electricity Distribution Circle, Unnao Construction of line & 25 KVA T/F at vill Rasoolpur, Block Bighapur near Savitri Bhawan of 11 KV Asgarganj Feeder, replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line from vill Jamuka to vill Pakra Khurd of 11 KV Chamrauli-II feeder, construction of line & 100 KVA T/F at vill Korari Kalan of Block Bichiya, Unnao of 11 KV Chamrauli-I feeder, construction of line & 100 KVA T/F at vill Amarsas, Block Bichiya, Unnao of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Duwa, Block Bichiya of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Jamuka, Block Bichiya of 11 KV Chamrauli-II feeder and replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at vill Mulk Garar of 11 KV Chamrauli-II feeder (under Business Plan 2015-16).

Upload: dangthien

Post on 08-Sep-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My

e/;kWpy fo|qr forj.k fuxe fy0 mUuko

www.MVVNL.IN ij fufonk viyksM gksus ds lEcU/k esa

Tender Specification No.

Date of opening

Issuing Authority Particulars

1 2 3 4

189/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at 11 KV Chamrauli-II feeder from vill Jamuka T-off to vill Duwa of Block Bichiya, Unnao (under Business Plan 2015-16).

190/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

ELECTRIFICATION OF RGGVY PHASE – II VILLAGE & Habitation : Saharia-Saharia Lalempur Istmurari, (Dabaoli-Khairi & Bajar, Naini Khera Laxman Purwa, Subba Khera, Chetai Purwa, Khalak Khera, Haibat Pur, Torna), (Rustam Pur-Rustam Pur, Kachiyan Khera, Badri Purwa), Khanpur-Alipur, (Khaira Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages) BLOCK : Fatehpur-84 DISTRICT : UNNAO

191/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Construction of line & 25 KVA T/F at vill Rasoolpur, Block Bighapur near Savitri Bhawan of 11 KV Asgarganj Feeder, replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line from vill Jamuka to vill Pakra Khurd of 11 KV Chamrauli-II feeder, construction of line & 100 KVA T/F at vill Korari Kalan of Block Bichiya, Unnao of 11 KV Chamrauli-I feeder, construction of line & 100 KVA T/F at vill Amarsas, Block Bichiya, Unnao of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Duwa, Block Bichiya of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Jamuka, Block Bichiya of 11 KV Chamrauli-II feeder and replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at vill Mulk Garar of 11 KV Chamrauli-II feeder (under Business Plan 2015-16).

Page 2: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

192/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Electrification of village Chatpathan Khera, Beerpur and Jhothra Khera majra Chatpathan Khera of 11 KV Sagwar feeder emanating from 33/11 KV S/S Nihalkhera, Unnao under Rajiv Gandhi Gramin Vidyutikaran Yojana Phase-II

193/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Quantum of works involved in Low Resistive conductive earthing of power transformers in District Unnao

194/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Quantum of works involved in shifting of H.T. line of 11 KV Magrayar feeder emanating from 33/11 KV S/S, Bighapur, Unnao under Deposit scheme

195/EDCU/ 2015-16 17-12-2015 Superintending Engineer

Electricity Distribution Circle, Unnao

Installation of new single phase electronic meters in the RAPDRP area of Electricity Distibution Sub Division-I, Shuklaganj, Unnao.

Page 3: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

e/;k¡py fo|qr forj.k fuxe fy0 fufonk lwpuk

v/kksgLrk{kjh }kjk vuqHkoh ,oa [;kfr izkIr fuekZ.kdrkZvksa@Bsdsnkjksa@QeksaZ ls izR;sd fufonk ds le{k vafdr lkexzh dh vkiwfrZ@dk;ksaZ gsrq nks Hkkxksa esa eqgj cUn fufonk,a muds lEeq[k vafdr frfFk dks 15%30 cts rd vkeaf=r dh tkrh gS] tks mlh fnu lkoZtfud :i ls 16%00 cts ls [kksyh tk;sxhA fufonk,a nks Hkkxksa esa vyx&vyx cUn fyQkQs esa gksuh pkfg,A ftlds izFke Hkkx ds fyQkQs es fu/kkZfjr /kjksgj /kujkf’k tks cSad tek jlhn fdlh jk”Vªh;dr̀ cSad }kjk tkjh fd;k x;k gks rFkk v/kh{k.k vfHk;Urk] fo|qr forj.k e.My] mUuko ds i{k esa ns; gks ,oa vU; fooj.k ;Fkk VsfDudy LislhfQds’ku] VuZvksoj] lsokdj iath;u ,oa vuqHko vkfn gksuk pkfg,A f}rh; Hkkx ds fyQkQs esa lkexzh@dk;Z dh njsa jgsaxhA fufonk,a fu/kkZfjr izi= ij nh tkuh gS ftls fufonk [kqyus dh frfFk ds ,d fnu iwoZ le; 13%00 cts rd fufonk izi= ewY; :0 230-00 bl dk;kZy; esa uxn Hkqxrku@,Q0Mh0vkj0] tks v/kh{k.k vfHk;Urk] fo|qr forj.k e.My] mUuko ds i{k esa mUuko ij ns; gks] izLrqr dj izkIr fd;k tk ldrk gSA fufonk izi= e/;kapy fo|qr forj.k fuxe fy0] y[kuÅ dh osclkbV www.mvvnl.in ls Hkh MkmuyksM fd;k tk ldrk gSA osclkbV ls MkmuyksM fd;s x;s fufonk izi=ksa ds lkis{k fufonk izi= ds ewY; dk cSad Mªk¶V tks v/kh{k.k vfHk;Urk] fo|qr forj.k e.My] mUuko ds i{k esa mUuko ij ns; gks] fufonk ds izFke Hkkx esa j[kuk vfuok;Z gksxkA fufonk ds izFke Hkkx dh 'krsaZ iw.kZ gksus dh n’kk esa gh fufonk dk f}rh; Hkkx [kksyk tk;sxkA fufonk [kqyus dh frfFk dks vodk’k gksus dh n’kk esa fufonk vxys dk;Z fnol dks [kksyh tk;sxhA

Ø0la0 1& vfr vYidkyhu fufonk la0%&189@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq:i fo|qr forj.k [k.M&izFke] mUuko ds vUrxZr 11 ds0oh0 pejkSyh f}rh; iks”kd ij xzke teqdk Vh0vkQ0 ls xzke nqvk CykWd fcfN;k ds e/; yxs ttZj th0vkbZ0 rkjksa Økl vkeZ bR;kfn ls cnyus o yEcs LiSuksa ds e/; u;s ih0lh0lh0 iksy LFkkfir djus dk dk;Z ¼vUrxZr fctusl Iyku o”kZ 2015&16A vuqekfur ykxr :0 0-94 yk[kA /kjksgj /kujkf’k #0 2]000-00 fufonk [kqyus dh frfFk 17-12-2015A Ø0la0 2& vfr vYidkyhu fufonk la0%&190@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq#i jktho xka/kh xzkeh.k fo|qrhdj.k ;kstuk f}rh; pj.k ds vUrxZr Cykd Qrsgiqj&84 ds 18 vnn xkaoksa@etjksa ds fo|qrhdj.k gsrq forj.k ifjorZd LFkkfir djrs gq;s 11 ds0oh0 ,p0Vh0@,y0Vh0 fo|qr ykbu ds fuekZ.k dk dk;ZA vuqekfur ykxr :0 21-77 yk[kA /kjksgj /kujkf’k] #0 22000-00 fufonk [kqyus dh frfFk 17-12-2015A Ø0la0 3& vfr vYidkyhu fufonk la0%&191@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq#i tuin] mUuko esa fctusl Iyku ¼o”kZ 2015&16½ ds vUrxZr 11 dsoh vlxjxat QhMj ls iksf”kr xzke jlwyiqj Cykd ch?kkiqj esas lkfo=h Hkou ds fudV ,d ux u;s 25 dsoh, forj.k ifjorZd dh LFkkiuk ,oa ykbu dk fuekZ.k] pejkSyh f}rh; iks”kd ij xzke teqdk ls xzke idjk [kqnZ ds e/; yx iqjkus ,oa ttZj rkjksa dks cnyuk] 11 dsoh pejkSyh izFke iks”kd ls iksf”kr xzke dksjkjh dyk] CykWd fcfN;k esa ,d ux u;s 100 dsoh, forj.k ifjorZd dh LFkkiuk ,oa ykbu dk fuekZ.k] 11 dsoh pejkSyh f}rh; iks”kd ls iksf”kr xzke vejll] CykWd fcfN;k esa ,d ux u;s 100 dsoh, forj.k ifjorZd dh LFkkiuk ,oa ykbu dk fuekZ.k] 11 dsoh pejkSyh f}rh; iks”kd ls iksf”kr xzke nqvk] CykWd fcfN;k esa ,d ux u;s 63 dsoh, forj.k ifjorZd dh LFkkiuk ,oa ykbu dk fuekZ.k] 11 dsoh pejkSyh f}rh; iks”kd ls iksf”kr xzke teqdk] CykWd fcfN;k esa ,d ux u;s 63 dsoh, forj.k ifjorZd dh LFkkiuk ,oa ykbu dk fuekZ.k ,oa 11 dsoh pejkSyh f}rh; iks”kd ls iksf”kr xzke eqYd xjkj dh ykbu esa yxs ttZj rkjksa] Økl vkeZ dks cnyus rFkk yEcs Lisuks ds e/; ih0lh0lh0 iksy yxkus dk dk;ZA vuqekfur ykxr :0 1-96 yk[kA /kjksgj /kujkf’k #0 4000-00 fufonk [kqyus dh frfFk 17-12-2015A Ø0la0 4& vfr vYidkyhu fufonk la0%&192@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq#i jktho xka/kh xzkeh.k fo|qrhdj.k ;kstuk f}rh; pj.k ds vUrxZr Cykd lqesjiqj ds xzke NViFku [ksM+k] chjiqj ,oa >ksFkjk [ksM+k] etjk NViFku [ksM+k ds fo|qrhdj.k gsrq forj.k ifjorZd LFkkfir djrs gq;s 11 ds0oh0 ,p0Vh0@,y0Vh0 fo|qr ykbu ds fuekZ.k dk dk;ZA vuqekfur ykxr :0 01-38 yk[kA /kjksgj /kujkf’k] #0 3000-00 fufonk [kqyus dh frfFk 17-12-2015A Ø0la0 5& vfr vYidkyhu fufonk la0%&193@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq#i fo|qr forj.k e.My] mUuko ds vUrxZr 33@11 ds0oh0 fo|qr midsUnzks esa LFkkfir 4 ux ikoj ifjorZdksa dh yks jsftfLVo dUMfDVo vfFkZx dk dk;ZA vuqekfur ykxr :0 01-72 yk[kA /kjksgj /kujkf’k] #0 3500-00 fufonk [kqyus dh frfFk 17-12-2015A Øe la0 6& vfr vYidkyhu fufonk la0%&194@fo0fo0e0m0@2015&16%& foHkkxh; fufonk fof’k"Vhdj.k ds vuq:i fo|qr forj.k [k.M&izFke] mUuko ds v/khuLFk 33@11 ds0oh0 ch?kkiqj ls fudyus okys 11 ds0oh0 exjk;j iks”kd ds 610 ehVj ykbu dh f’kf¶Vax dk dk;Z ¼vUrxZr iw.kZ tek ;kstuk½] vuqekfur ykxr :0 0-33 yk[kA /kjksgj /kujkf’k #0 1000-00 fufonk [kqyus dh frfFk 17-12-2015A Ø0la0 7& vfr vYidkyhu fufonk la0%&195@fo0fo0ea0m0@2015&16%& foHkkxh; fufonk fof’k”Vhdj.k ds vuq#i fo|qr forj.k [k.M&f}rh;] mUuko ds v/khuLFk fo|qr forj.k mi[k.M&izFke] ‘kqDykxat] mUuko ds vkj,ihMhvkjih ;kstuk vkPNkfnr {ks= esa vkbZ0Mh0,Q0@u;s la;kstukas ij u;s flaxy Qst bysDVªkfud ehVjksa dh LFkkiuk dk dk;ZA vuqekfur ykxr :0 02-00 yk[kA /kjksgj /kujkf’k] #0 4000-00 fufonk [kqyus dh frfFk 17-12-2015A

v/kksgLrk{kjh dks mijksDr fufonk vFkok fufonk ds fdlh Hkkx dks fujLr djus dk vf/kdkj gksxkA

v/kh{k.k vfHk;Urk fo|qr forj.k e.My

mUuko ^^cYc ds LFkku ij ,y0bZ0Mh0 yxk;saA jk”Vª fgr esa fctyh cpk;saA^^

Page 4: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran

Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 189/ EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 5: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 189/EDCU/2015-16

S.No. PARTICULARS REPLIES 1 Receipt No. & Date vide which cost of tender specification fees

deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/DD/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 6: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MANDHANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE UNNAO

Tender No. 189/EDCU/2015-16

Schedule of Rates for Replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at 11 KV Chamrauli-II feeder from vill Jamuka T-off to vill Duwa of Block Bichiya, Unnao (under Business Plan 2015-16).

Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Carriage of PCC Poles from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

No. 26

2 Carriage Loose line Materaial from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

Per KM. Length of Line

3.03

3

Carriage of T/F from ESC Unnao to S/S including loading ump site with loading, unloading and proper stocking with in distance 51-100 Km.

a.10 KVA T/F No.

b.16 KVA T/F No. c.25 KVAT/F No.

4 Erection of PCC Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.

No. 26

5 Grouting of PCC/ST Poles as per RESPO norms with grouting material. No. 26

6 Earthing of PCC/ST poles as per RESPO norms No. 26

7 Grouting of stay as per RESPO norms with grouting material. No. 2

8

Laying of 11 KV 3-Ph Line stringing and sagging of ACSR Waesel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required.

Ckt.Km. 3.03

9 Dismantling of 11K.V./3 Phase L.T. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site.

Ckt. Km. 3.03

10 Carriage of rusted G.I. wire reach from dump site to ESC Unnao with loading, unloading and proper stacking. Kg. 966.00

Signature & seal of Contractor Superintending Engineer

Page 7: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 189/EDCU/2015-16 SPECIAL TERMS & CONDITIONS

1. The work shall be completed within three month from the date of agreement

subject to the condition of Issue of material from store center in due time. 2. The work may be vary upto ± 10%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules

& per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule.

4. All the material of standard quality associated with the work shall be provided by the contractor as per tender specification.

5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract

will be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 8: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 190/EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 9: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 190/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 10: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE UNNAO

Tender Specification No. 190/EDCU/2015-16

QUANTUM OF WORKS INVOLVED IN ELECTRIFICATION OF RGGVY PHASE – II VILLAGE & Habitation : Saharia-Saharia Lalempur Istmurari, (Dabaoli-Khairi & Bajar, Naini Khera Laxman Purwa, Subba Khera, Chetai Purwa, Khalak Khera, Haibat Pur, Torna), (Rustam Pur-Rustam Pur, Kachiyan Khera, Badri Purwa), Khanpur-Alipur, (Khaira Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages) BLOCK : Fatehpur-84 DISTRICT : UNNAO

Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Carriage of PCC/ST Poles from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km. No. 418

2 Carriage Loose line Materaial from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

Per KM. Length of Line

24.71

3

Carriage of T/F from ESC Unnao to S/S including loading ump site with loading, unloading and proper stocking with in distance 51-100 Km.

a.10 KVA T/F No. 16

b.16 KVA T/F No. 17 c.25 KVAT/F No.

4 Erection of PCC/ST Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. No. 418

5 Erection of D/Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. No.

6 Grouting of PCC/ST Poles as per RESPO norms with grouting material. No. 200

7 Numbering of poles by making base from yellow paint and writing by black paint at height 6’ (No. of pole, year of erection scheme etc.). No. 418

8 Earthing of PCC/ST poles as per RESPO norms No. 1039

9 Mounting and commissioning of L.T. Distribution Boxes on P.C.C. pole making connections. No. 47

10 Grouting of stay as per RESPO norms with grouting material. No. 173

11 Laying of 11 KV 3-Ph Line stringing and sagging of ACSR Waesel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required.

Ckt.Km. 9.9

12

Laying, Sagging, Binding and jumping etc. of conductor on line newly erected pole for L.T. line as per RESPO norms.

a. 3-Ph A-B conductor size (3x95+1x70+1x16) sq.mm Km. b. 3-Ph A-B conductor size (3x50+1x35+1x16) sq.mm Km. c.1-Ph A-B conductor size (1x16) sq.mm Km. 14.81

13

Mounting of T/F on Pole/Double pole including its cartage from S/S and dragging upto pit site. No.

a.10 KVA T/F No. 16

b.16 KVA T/F No. 17 c.25 KVAT/F No.

14

Stringing and Sagging of 2 wire of 6 SWG GI wire for guarding and making lacing at one meter or a part in all the span between all supports of HVDS support inside village including carriage of GI wire from dump site to pit site.

No. of Span 230

15 Chopping of Tree Branches failing on the line. Job 24.71

16 Making arrangement of Video Graphy of electrification work after saturation of village. Job 1

Note:- Each PCC/ST Pole of H.T. line will be grouted and every seventh PCC/ST Pole of L.T. line will be grouted as per RESSPO Norms. Signature & seal of Contractor Superintending Engineer

Page 11: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 190/EDCU/2015-16 SPECIAL TERMS & CONDITIONS

1. The work shall be completed within one month from the date of agreement subject to

the condition of Issue of material from store center in due time. 2. The work may be varyupto± 25%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules &

per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule. 4. All the material of standard quality associated with the work shall be provided by the

contractor as per tender specification. 5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract will

be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 12: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 191/EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 13: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 191/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 14: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE UNNAO

Tender Specification No. 191/EDCU/2015-16

Schedule of Rates for construction of line & 25 KVA T/F at vill Rasoolpur, Block Bighapur near Savitri Bhawan of 11 KV Asgarganj Feeder, replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line from vill Jamuka to vill Pakra Khurd of 11 KV Chamrauli-II feeder, construction of line & 100 KVA T/F at vill Korari Kalan of Block Bichiya, Unnao of 11 KV Chamrauli-I feeder, construction of line & 100 KVA T/F at vill Amarsas, Block Bichiya, Unnao of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Duwa, Block Bichiya of 11 KV Chamrauli-II feeder, construction of line & 63 KVA T/F at vill Jamuka, Block Bichiya of 11 KV Chamrauli-II feeder and replacement of rusted GI wire & damaged fitting PCC Pole etc. of L.T. line at vill Mulk Garar of 11 KV Chamrauli-II feeder (under Business Plan 2015-16). Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Carriage of PCC Poles from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km. No. 43

2 Carriage Loose line Materaial from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

Per Km. Length of Line

5.869

3

Carriage of T/F from ESC Unnao to S/S including loading ump site with loading, unloading and proper stocking with in distance 51-100 Km.

a.63 KVA T/F No. 2

b.100 KVA T/F No. 2 c.25 KVAT/F No. 1

4 Erection of PCC Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. No. 33

5 Erection of D/Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. No. 5

6 Grouting of PCC Poles as per RESPO norms with grouting material. No. 31

7 Numbering of poles by making base from yellow paint and writing by black paint at height 6’ (No. of pole, year of erection scheme etc.). No.

8 Earthing of PCC poles as per RESPO norms No. 27

9 Mounting and commissioning of L.T. Distribution Boxes on P.C.C. pole making connections. No. 5

10 Grouting of stay as per RESPO norms with grouting material. No. 23

11 Laying of 11 KV 3-Ph Line stringing and sagging of ACSR Waesel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required.

Ckt.Km. 5.319

12

Laying, Sagging, Binding and jumping etc. of conductor on line newly erected pole for L.T. line as per RESPO norms.

a. 3-Ph A-B conductor size (3x95+1x70+1x16) sq.mm Km. b. 3-Ph A-B conductor size (3x50+1x35+1x16) sq.mm Km. 0.37

c.1-Ph A-B conductor size (1x16) sq.mm Km. 0.18

13

Mounting of T/F on Pole/Double pole including its cartage from S/S and dragging upto pit site.

a. 63 KVA T/F No. 2

b.100 KVA T/F No. 2 c.25 KVAT/F No. 1

14 Dismantling of 11K.V./3 Phase L.T. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site. Ckt. Km. 3.90

15 Carriage of rusted G.I. wire reach from dump site to ESC Unnao with loading, unloading and proper stacking. Kg. 1050.00

Note:- Each PCC/ST Pole of H.T. line will be grouted and every seventh PCC/ST Pole of L.T. line will be grouted as per RESSPO Norms. Signature & seal of Contractor Superintending Engineer

Page 15: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 191/EDCU/2015-16 SPECIAL TERMS & CONDITIONS

1. The work shall be completed within one month from the date of agreement subject to

the condition of Issue of material from store center in due time. 2. The work may be vary upto ± 10%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules &

per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule. 4. All the material of standard quality associated with the work shall be provided by the

contractor as per tender specification. 5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract will

be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 16: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 192/EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 17: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 192/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 18: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE UNNAO

Tender Specification No. 192/EDCU/2015-16

Quantum of works involved in electrification of village Chatpathan Khera, Beerpur and Jhothra Khera majra Chatpathan Khera of 11 KV Sagwar feeder emanating from 33/11 KV S/S Nihalkhera, Unnao under Rajiv Gandhi Gramin Vidyutikaran Yojana Phase-II

Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Carriage of PCC Poles from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km. No. 41

2 Carriage Loose line Material from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

Per Km. Length of Line

2.153

3

Carriage of T/F from ESC Unnao to S/S including loading ump site with loading, unloading and proper stocking with in distance 51-100 Km.

a.10 KVA T/F No. 1

b.16 KVA T/F No. 5 c.63 KVAT/F No.

4 Erection of PCC Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. No. 41

5 Grouting of PCC Poles as per RESPO norms with grouting material. No. 41

6 Earthing of PCC poles as per RESPO norms No. 20

7 Mounting and commissioning of L.T. Distribution Boxes on P.C.C. pole making connections. No. 13

8 Grouting of stay as per RESPO norms with grouting material. No. 13

9 Laying of 11 KV 3-Ph Line stringing and sagging of ACSR Waesel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required.

Ckt. Km 0.49

10

Laying, Sagging, Binding and jumping etc. of conductor on line newly erected pole for L.T. line as per RESPO norms. a. 3-Ph A-B conductor size (3x95+1x70+1x16) sq.mm Km. b. 3-Ph A-B conductor size (3x50+1x35+1x16) sq.mm Km.

c.1-Ph A-B conductor size (1x16) sq.mm Km. 1.663

11

Mounting of T/F on Pole/Double pole including its cartage from S/S and dragging upto pit site.

a. 10 KVA T/F No. 1 b.16 KVA T/F No. 5

c.63 KVAT/F No.

12

Stringing and Sagging of 2 wire of 6 SWG GI wire for guarding and making lacing at one meter or a part in all the span between all supports of HVDS support inside village including carriage of GI wire from dump site to pit site.

No. of Span 7

13 Dismantling of 11K.V./3 Phase L.T. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site.

Ckt. Km. 0.293

14 Carriage of rusted G.I. wire reach from dump site to ESC Unnao with loading, unloading and proper stacking. Kg. 17.00

Note:- Each PCC/ST Pole of H.T. line will be grouted and every seventh PCC/ST Pole of L.T. line will be grouted as per RESSPO Norms. Signature & seal of Contractor Superintending Engineer

Page 19: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 192/EDCU/2015-16 SPECIAL TERMS & CONDITIONS

1. The work shall be completed within one month from the date of agreement subject to

the condition of Issue of material from store center in due time. 2. The work may be vary upto ± 10%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules &

per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule. 4. All the material of standard quality associated with the work shall be provided by the

contractor as per tender specification. 5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract will

be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 20: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 193/EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 21: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 193/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 22: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE UNNAO Tender Specification No. 193/EDCU/2015-16

Quantum of works involved in Low Resistive conductive earthing of power transformers in District Unnao

Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Length of the Earthing Electrode (3 Mtr.)

One Job 08 Nos.

2 Dia Meter of the Earthing Electrode (75 mm.)

3 Material of casting (Marconite)

4 Length of the Rod (3 Mtr.) 5 Dia Meter of the Rod (Thickness) (16mm.) 6 Material of the Rod (MS rod)

Signature & seal of Contractor Superintending Engineer

Page 23: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 193/EDCU/2015-16 SPECIAL TERMS & CONDITIONS

1. The work shall be completed within one month from the date of agreement subject to

the condition of Issue of material from store center in due time. 2. The work may be varyupto± 10%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules &

per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule. 4. All the material of standard quality associated with the work shall be provided by the

contractor as per tender specification. 5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract will

be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 24: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MadhyanchalVidyutVitran Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 194/EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 25: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 194/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR/Bankers Cheque etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 26: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE UNNAO Tender Specification No. 194/EDCU/2015-16

Quantum of works involved in shifting of H.T. line of 11 KV Magrayar feeder emanating from 33/11 KV S/S, Bighapur, Unnao under Deposit scheme

Sl. No. Particulars Of Works Unit Qty. Rate Amount

1 Carriage of PCC Poles from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

No. 11

2 Carriage Loose line Material from store center Unnao to village dump site with loading, unloading and proper stocking. 100 Km.

Per Km.

Length of Line

0.610

3 Erection of PCC Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.

No. 11

4 Grouting of PCC Poles as per RESPO norms with grouting material. No. 11

5 Earthing of PCC poles as per RESPO norms No. 11

6 Grouting of stay as per RESPO norms with grouting material. No. 3

7

Laying of 11 KV 3-Ph Line stringing and sagging of ACSR Waesel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required.

Ckt. Km 0.610

8 Dismantling of 11K.V./3 Phase L.T. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site.

Ckt. Km. 0.25

9 Carriage of rusted G.I. wire reach from dump site to ESC Unnao with loading, unloading and proper stacking. Kg. 62.00

Signature & seal of Contractor Superintending Engineer

Page 27: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 194/EDCU/2015-16

SPECIAL TERMS & CONDITIONS

1. The work shall be completed within one month from the date of agreement subject to the condition of Issue of material from store center in due time.

2. The work may be varyupto± 10%. 3. The work shall be carried out in accordance with Indian Electricity Act and Rules &

per construction manual of U.P. Power Corporation Ltd. and RESSPO Schedule. 4. All the material of standard quality associated with the work shall be provided by the

contractor as per tender specification. 5. Any loss and damage shall be recovered from the contractor account. 6. No T & P shall be supplied by the department at any cost. The transportation

arrangement for safe carriage of materials shall be made by the Contractor at his own risk.

7. All general conditions of contract for execution of work will be governed as per form ‘A’ (General condition for the supply of plant and the execution of work in U.P. Power Corporation Ltd.)

8. The work shall be carried out under the direct supervision of junior engineer and Sub divisional Officer concerned.

9. Department will not be responsible for any accident, casualties and loss occurred at the time of execution of work. The contractor shall be fully responsible for the same.

10. The necessary permit for shutdown etc. will be given to the contractor by the representative of the department as and when required for completion of work in a planned way.

11. The security @ 10% of the tender value shall be deducted from the contractor’s bill which shall be released after 6 month from the date of completion of work.

12. The income tax and other taxes will be deducted from the bill, if and as applicable. 13. Penalty @ ½% per week subject to maximum of 10% of the total value of contract will

be levied and deducted if the work is not completed within the stipulated period.

Superintending Engineer Electricity Distribution Circle

Unnao

Page 28: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

Madhyanchal Vidyut Vitran

Nigam, Limited

Electricity Distribution Circle- Unnao

Tender No. : 195/ EDCU/2015-16

DATE OF OPENING 17-12-2015

Page 29: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

TENDER PROFORMA (TO BE FILLED BY TENDERER)

IMPORTANT INSTRUCTION FOR THE TENDERER Tender shall not be considered if tenderer fail to submit this proforma duly filled up Rates should be

complete without ambiguity and should be clearly written against each item. (Attach extra sheets if the space left not sufficient)

Tender No. 195/EDCU/2015-16

S.No.

PARTICULARS REPLIES

1 Receipt No. & Date vide which cost of tender specification fees deposited by you.

2 Name & Address of tenderer along with mobile no.

3 Year since when the tenderer has started execution of work tender.

4 Details of Earnest Money viz FDR etc. No. & Date and Amount.

5 Give two references who can certify your financial status and capability to undertake, execution of work/supply. One of the references should be of any scheduled/Nationalized Bank in India.

6 Name & Detail address of tenderer proprietor /partners/ Directors is given.

7 Statement of past/current experience in similar works in the following form:-

S.No

.

Name & Address of ordering authority

Order/Contract No. & Date

Particular of work executed

Quantum of work Remarks

Ordered Completed

1 2 3 4 5 6 7

1 What is the validity period of your tender. 2 Place & Date

Signature of Tenderer with Seal

Page 30: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE UNNAO

Tender Specification No. 195 /EDCU/2015-16 Schedule of Rates & Quantum of work involved in Installation of new single phase electronic meters in the RAPDRP area of Electricity Distibution Sub Division-I, Shuklaganj, Unnao.

Conditions:- 1- Single Phase Electronic meters shall be made available at Electricity Test Lab Unnao through Assistant Engineer (meter) of the concerned area. 2- The list of the complete details of consumers shall be made available by S.D.O., Electricity Distribution Sub Devision-I, Shuklaganj, Unnao (Under Electricity Distibution Division-II, Unnao).

Signature & seal of Contractor Superintending Engineer

Sl. No.

PARTICULAR OF WORK UNIT QTY RATE (PER

METER)

AMOUNT

1- Installation of new single phase electronic meters in the RAPDRP area of Electricity Distibution Sub Division-I, Shuklaganj, Unnao

No. 1700

Page 31: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED

ELECTRICITY DISTRIBUTION CIRCLE, UNNAO Instruction for the Tenders

TENDER SPECIFICATION NO- 195/EDCU/2015-16 Sealed Tendered against tender specification no.195/EDCU/2015-16 for the work of Installation of new single phase electronic meters in the RAPDRP area of Electricity Distibution Sub Division-I, Shuklaganj, Unnao as per attached price schedule (Tender Form) are invited. Tender shall be received by the Superintending Engineer, Electricity Distribution Circle, Unnao up to 15.30 hrs. Dated 17-12-2015 which shall be publicly opened on the same day at 16.00 hrs., in the presence of the tenders/ Representatives who may wish to be present. If this day happens to the holiday, tender shall be received & opened on the next working day on the same time. 1. Submission of Tender: Tender shall be received in two separate parts. Each part shall be in

separate envelope duly sealed as follow. (A) Tender bid part-I containing earnest money of Rupees 4000/- in acceptable form along with

evidence of his full filling Pre-qualifying condition, general information etc. in a sealed envelope subscribed as part-first earnest money against tender specification no. 195/EDCU/2015-16 due on 17-12-2015.

(B) Tender bid part II containing the schedule of quantity and prices offered along with other terms &Condition in a separate Sealed cover subscribe as part-II Schedule of quantity & prices against tenders specification no. 195/EDCU/2015-16 due on 17-12-2015.

2. Preparation of Tenders: Tender must be submitted on the attached from, any cutting or changes if done should be dully signed by the tenderer, tendered prices must be filled in figures.

3. Tender Performa: Tenderers are required to furnish their tender on the prescribed performa by filling all the replies of the condition. No tender shall be entertained which are not filed on the prescribed tender form.

4- Earnest Money: Tender must be accompanied by an earnest money amounting of Rs. 4000/- shape of FDR is issued from any nationalizedBank of India & Pledged in favor of Superintending Engineer, Electricity Distribution Circle, Unnao.

5- Opening of Tenders: Tender bid part-I shall opened First and if earnest money is found in order Pre-qualifying condition are fulfilled only then the tender bid part-II shall be opened otherwise second part of the tender envelope shall not be opened &out right rejected.

6- Modification Prior to date of opening of tender: Modification in the specification if required will be made by amendment copy of which shall be furnished those who have purchased the tender specification.

7- Prices: The price mentioned of the price schedule thereof will remain firm & Firm in all respect.

8- Tender Rates & Taxes: The tenders are required to quote their rate for destination inclusive of all taxes as applicable under rules accordingly.

9- Completion Period: Contractor shall make sure that above work will be completed within stipulated period.

10- Award of the contact: The purchaser does not pledge to accept the lowest of tender and reserve the right of rejecting the whole or part of any tender as he may think fit without assigning any reason.

11- Any action on the part of tender to reserve the prices of to change the structure of price/prices & withdrawal of tender after the opening within the validity period may result in rejection of tender and also debarring him from submission of tender to Corporation along with forfeiting the earnest money.

Superintending Engineer

Page 32: dk;kZy; v/kh{k.k vfHk;Urk fo|qr forj.k e.My e/;kWpy fo|qr ... · Gadha-Khaira Gadha, Lonariya Khera), (Shah Nagar-Shah Nagar, Lonar), Sarhasakar Pur-Sakat Pur(Total 18 No. Villages)

MADHYANCHAL VIDYUT VITRAN NIGAM LIMITED ELECTRICITY DISTRIBUTION CIRCLE, UNNAO

Tender No. 195/EDCU/2015-16

SPECIAL TERMS & CONDITIONS

1. Electronic Meters with box and meter sealing books as per requirment will be made available by Executive Engineer, Electricity Test. Division. Unnao after testing and marking departmental number.

2. List of complete details of consumers will be provided to contractor by Sub Divisional officer, Electricity Distribution Sub Division-I, Shuklaganj, Unnao (Under Electricity Distribution Division-II, Unnao).

3. T&P will be arranged by Contractor. 4. Contractor will be responsible for sealing of terminal plate of meter after its installation and issue

of sealing certificate to consumer and department duly signed by consumer and contractor and all column should be filled properly. In case of any revenue loss due to non issue of sealing certificate legal action will be taken against contractor. The sealing certificates must be verified and countersigned by Junior Engineer (Meter) concerned.

5. The tax will be deducted as per latest rules of taxation department. 6. Date of start of work shall be the date of issue of meters by Test Division. 7. Work will be carried out on live line and all risk /liabilities involved in the work will be

responsibility of the contractor. 8. In case the Contractor does not complete the work and leave in between the remaining work shall

be got completed by other agencies the cost so involve shall be charged from contractor. 9. Contractor will be liable to be penalized@ half percent per week subject to maximum to 10% of

the whole agreement value for delayed work. 10. Assistant Engineer (Meter) Unnao will arrange to open a P.l. meters in multiple of 100 to

contractor. The next lot shall be given to contractor after depositing the sealing certificate of previous lot consumers.

11. Contractor will submit the sealing certificates of installed meters . 12. Safe transportation of meters from Test Division to site shall be arranged by contractor. 13. If the meter installed is found not in working order the same will be replaced by contactor free of

cost after getting approval form A.E (M), Unnao. 14. Contactor shall install meters strictly on new connections/defective meters connection and in no

case shall replace theburnt meters. 15. The area of the contractor shall be the jurisdiction of Sub Divisional officers, Electricity

Distribution Sub Division -I, Shuklaganj, Unnao (Under Electricity Distribution Division-II, Unnao).

16. In case it is proved that contractor has replaced burnt meter or has installed meter in the area other than the jurisdiction of contractor a penality @ Rs. 225.00 per case shall be charged from the contractor.

17. The work shall be carried out under the direct supervision of Junior Engineer and S.D.O., E.D.S.D-I, Shuklaganj, Unnao.

18. In case of any dispute or difference of opinion in the agreement, Chief Engineer(Lucknow Zone), Madhyanchal Vidhut Vitaran Nigam Limited, Lucknow will be sole orbitrator and his decision shall be final and binding on both of the parties. Other terms and condition shall be governed by the standard form ‘A’ of UPPCL/MVVNL.

Superintending Engineer

Electricity Distribution Circle Unnao