division 9 - connect ncdot · u-5738 u-2827b r-5736 i-5794 u-2579c u-4734 u-2707 eb-5722 i-5814...
TRANSCRIPT
ROWAN
DAVIDSON
DAVIE
FORSYTH
STOKES
52
158
52
64
601
52
29
421
70
158
311
40
74
85
40
150
66
152
47
801
65
66
704
8
109
8
772
Clemmons
Thomasville
Lexington
Salisbury
Lewisville
Winston-Salem
Kannapolis
AV-5754
TD-4743
AV-5749
AV-5738
B-5780
B-3159
B-5766
B-5784
B-5825
B-5779
B-4509
B-4746
B-5770
B-5160
B-4626
B-5772
B-5521
B-4808B-5769
W-5313
W-5510R-2247CD
I-5880
R-5737
R-2247EC
U-5755
R-5728
I-5887
U-5757
U-5536
I-5858
U-2579AA
I-5740
U-5760
U-5824
I-5859
U-5738
U-2827B
R-5736
I-5794
U-2579C
U-4734
U-2707
EB-5722I-5814
I-5793
U-5786
U-2579AB I-5795
I-5824
I-5823
I-3802B
R-2577A
I-5765
I-5767
I-5857
P-5206B
U-5820I-5741
I-5766
U-2579B
DRAFT STIPFY 2015-2025STI ProjectsDIVISION 9
0 7.5 153.75Miles
BRIDGES FUNDED THROUGH STI
STATEWIDE AVIATION
REGIONAL AVIATION
DIVISION AVIATION
DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES
* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not
let as of November 2014
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School
FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds
NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)
SW - StatewideTRN -Transition Project
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
M1500
A
NHP
4000
FUNDING CATEGORY (1)
used for each project phase.
FUNDING SOURCE (2)
U
B3000R
FY 2017
C
(3) WORK TYPE (ACTIVITY)
A - Acquisition
with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
dollars.)
of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE
SW CBSW
One or two letter
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
20000CRC 5000C 5000 BC B
WIDEN TO A FOUR-LANE FACILITY
A
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.
B
FY 2025 FY 2018
700
FY 2019
DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020FY 2015 FY 2016
M
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000NHP
C10000
FY 2021
C
FY 2023 FY 2024
FY 2022
5000
9000
APD - Appalachian Development
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
I-40 TO NC 3
Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.
work description.
way, utility, mitigation and construction cost estimates
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
for an explanation of funding categories
Phases of implementation: ESTIMATED COST Preliminary engineering, right of
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
BVarious - multiple routesNEW ROUTE or City
WORK TYPE (ACTIVITY) (3)
BOND (R) - Revenue Bond
HRRR - High Risk Rural Roads
L - LocalHSIP - Highway Safety Improvement Program
project until completion.
DIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
ER - Emergency Relief Funds
CMAQ - Congestion MitigationDP - Discretionary or Demonstration
FED - Federal Rail Funds
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
INTERSTATE PROJECTSI-5793 6386SR 2025 (SQUIRE BOWERS ROAD) TO 0.3
MILE NORTH OF NC 109 IN THOMASVILLE. PAVEMENT REHABILITATION.
4.4
SW
NHPIM C 6386 DAVIDSON I-85
I-5740 2001.7 MILES NORTH OF SR 2205 (OLD US 64) TO 0.3 MILES NORTH OF US 64. PAVEMENT REHABILITATION.
0.9
SW
NHPIM C 200 DAVIDSON I-85
INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION
I-2304 302638 208057NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29-52-70/I-85 BUSINESS IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833).
6.8
TRN
NHP 505RG AC RG 505 AC RG 505 AC RG 505 AC RG 495 AC RG 533 AC 533RG AC
NHP 16207CG AC CG 16199 AC CG 16199 AC CG 16198 AC CG 14672 AC CG 4110 AC 4110CG AC
NHP 466RG AD RG 466 AD RG 466 AD RG 466 AD RG 457 AD RG 492 AD 492RG AD
AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETETRN
AD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETETRN
AE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - IN PROGRESS
AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - UNDER CONSTRUCTIONTRN
DAVIDSON
ROWAN
I-85
RURAL PROJECTS
DESIGN-BUILD PROJECT
R-5737 18600SR 1798 (OLD GREENSBORO ROAD). CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.
2
DIV
T R 700
L R 2900
T C 15000
DAVIDSON US 29 / US 70 /
BUSINESS 85
UNDER CONSTRUCTION
R-4750 9885 9885I-85 TO NORTH OF SR 1297 (GREEN NEEDLES ROAD). PAVEMENT REHABILITATION AND UPGRADING TO INTERSTATE STANDARDS.
2.5DAVIDSON US 52 / NC 8
(FUTURE I-285)
URBAN PROJECTSU-5757 12549TH STREET TO SR 1408 (BIESECKER ROAD)
IN LEXINGTON. WIDEN TO MULTILANES.0.5
REG
NHP C 1254 DAVIDSON NC 8
(WINSTON ROAD)
U-5786 16312US 52 / NC 8 / FUTURE I-285 TO NC 150. WIDEN TO MULTILANES.
2.9
DIV
T 2248R
T 270U
T 13794C
DAVIDSON SR 1508
(HICKORY TREE
ROAD)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 8334 7834INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STPDA 40PE
L 10PE
STPDA 80R
L 20R
STPDA 280C
L 70C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FORMERLY U-9999D - IN PROGRESS
U-4951 4990 4790WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.
DIV
STPDA 160PE
L 40PE
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
9-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
URBAN PROJECTSU-5022 30885WINSTON-SALEM URBAN AREA
METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 1419 C 4911 4911C4911C4911C C 4911 C 4911DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS
U-5506 7000SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 560PE
L 140PE
STPDA 1120R
L 280R
STPDA 3920C
L 980C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FEDERAL BRIDGE PROJECTS
COORDINATE WITH B-5785
B-5779 4264REPLACE BRIDGE NO. 118 OVER SR 3346 (NORTH MAIN STREET) IN LEXINGTON.
REG
NHPB R 203
NHPB C 4061
DAVIDSON US 29 NB / US 64 EB /
US 70 EB / BUSINESS
85 NB
COORDINATE WITH B-5779
B-5785 4400REPLACE BRIDGE NO. 121 AND BRIDGE NO. 122 OVER LEONARD CREEK.
HF
HFB R 400
HFB C 4000
DAVIDSON US 29 / US 70 /
BUSINESS 85
B-5783 6066REPLACE BRIDGE NO. 164 AND BRIDGE NO. 168 OVER NORFOLK SOUTHERN RAILROAD.
REG
NHPB R 288
NHPB C 5778
DAVIDSON US 29 / US 70 /
BUSINESS 85
RIGHT OF WAY IN PROGRESS
B-3159 22691 9791REPLACE BRIDGE NO. 27 OVER US 29 / US 64 / US 70 / I-85 BUSINESS IN LEXINGTON.
REG
NHPB C 6450 C 6450 DAVIDSON NC 8
DIVISION DESIGN / CENTRAL LET
B-5780 1540REPLACE BRIDGE NO. 17 OVER SWEARING CREEK.
REG
STPON 140R
HFB C 1400
DAVIDSON NC 47
B-5787 2200REPLACE BRIDGE NO. 29 OVER NC 109.
HF
HFB 200R
HFB C 2000
DAVIDSON NC 49
COORDINATE WITH R-2220B AND R-2220CA
B-5777 2035REPLACE BRIDGE NO. 58 OVER US 64.
HF
HFB 185R
HFB 1850C
DAVIDSON NC 109
UNDER CONSTRUCTION
B-4740 1408 1408REPLACE BRIDGE NO. 7 OVER DYKERS CREEK.
DIV
DAVIDSON SR 1194
(YADKIN COLLEGE
ROAD)
9-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
FEDERAL BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5165 2083 100REPLACE BRIDGE NO. 42 OVER MUDDY CREEK.
HF
HFB R 180
HFB M 3
HFB C 1800
DAVIDSON SR 1485
(HAMPTON ROAD)
RIGHT OF WAY IN PROGRESS
B-4741 3200 1100REPLACE BRIDGE NO. 38 OVER MUDDY CREEK.
TRN
STPOFF 2100C DAVIDSON SR 1493
(FRYE BRIDGE ROAD)
B-5765 1870REPLACE BRIDGE NO. 115 OVER WINSTON-SALEM SOUTHBOUND RAILWAY.
HF
HFB R 170
HFB 1700C
DAVIDSON SR 1711 (GUMTREE
ROAD)
COORDINATE WITH B-5774
B-5776 1980REPLACE BRIDGE NO. 100 OVER ABBOTTS CREEK.
HF
HFB 180R
HFB 1800C
DAVIDSON SR 1810
(CLODFELTER ROAD)
COORDINATE WITH B-5776
B-5774 1320REPLACE BRIDGE NO. 99 OVER BUSHY FORK CREEK.
HF
HFB 120R
HFB 1200C DAVIDSON SR 1810
(CLODFELTER ROAD)
B-5773 3575REPLACE BRIDGE NO. 25 OVER WINSTON-SALEM SOUTHBOUND RAILWAY IN LEXINGTON.
HF
HFB 325R
HFB C 3250
DAVIDSON SR 3346
(SOUTH MAIN
STREET)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 16947 14947DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R
STPOFF 1800C
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 16572 16572ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5115 1551 1551SR 1533 (LEONARD BARRIER ROAD) AND SR 1515 (MOUNT OLIVET CHURCH ROAD). CONSTRUCT LEFT TURN LANE.
DAVIDSON NC 150
9-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5209 3890 3890DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LEXINGTON
C-5216 735EXTEND SIDEWALKS ON SOUTH MAIN STREET AND PROVIDE WIDE PAVED SHOULDERS ON ANNA LEWIS DRIVE AND EMERGENCY DRIVE TO PROVIDE BICYCLE ACCESS TO LEXINGTON MEMORIAL HOSPITAL IN LEXINGTON.
EX
CMAQ PE 107
L PE 27
CMAQ C 481
L C 120
DAVIDSON SR 3346
(SOUTH MAIN
STREET)
C-5620 3568PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ C 1784 C 1784 DAVIDSON
DAVIE
FORSYTH
VARIOUS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
CASWELL
DAVIDSON
FORSYTH
GUILFORD
MONTGOMERY
RANDOLPH
ROCKINGHAM
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LEXINGTON
C-5217 243BIKE AND PEDESTRIAN IMPROVEMENTS IN VICINITY OF SCHOOL. BISECKER AND MIZE ROADS, PROVIDE WIDE PAVED SHOULDERS AND CONSTRUCT SIDE-WALKS ON CORNELIA STREET AND HILLSIDE DRIVE IN LEXINGTON.
EX
CMAQ 42PE
L 11PE
CMAQ C 152
L C 38
DAVIDSON VARIOUS
IMPLEMENTATION BY DAVIDSON COUNTY
C-5232 100FEEDER ROUTE INFRASTRUCTURE AND MARKETING SUPPORT. BUS SHELTERS, SIGNAGE AND MARKETING SUPPORT FOR NEW FIXED TRANSIT SERVICE IN THOMASVILLE.
EX
CMAQ 80I
L 20I
DAVIDSON VARIOUS
C-5609 2554PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.
EX
CMAQ C 1277 C 1277 DAVIDSON
FORSYTH
GUILFORD
VARIOUS
IMPLEMENTATION BY DAVIDSON COUNTY
C-5559 180TRANSIT OPERATIONS SUPPORT FOR CITY OF LEXINGTON CIRCULATOR ROUTE AND THOMASVILLE / LEXINGTON CONNECTOR ROUTE.
EX
CMAQ 144I
L 36I DAVIDSON VARIOUS
9-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
CONGESTION MITIGATION PROJECTS
ACQISITION BY CITY OF LEXINGTON
C-5208 355CITY OF LEXINGTON HEAVY DUTY HYBRID REFUSE TRUCK. REPLACE EXISTING TRUCK WITH HYBRID TRUCK.EX
CMAQ 284A
L 71A
DAVIDSON CITYWIDE
IN PROGRESS BY TOWN OF DENTON
C-5560 38 38TOWN OF DENTON. PURCHASE ELECTRIC VEHICLE AND CHARGING STATION.
EX
DAVIDSON TOWNWIDE
INTERSTATE PROJECTSI-5794 15052 MILES EAST OF SR 1442 (REDLAND ROAD)
TO 1.4 MILES EAST OF NC 801. PAVEMENT REHABILITATION.
1.5
SW
NHPIM C 1505 DAVIE I-40
COORDINATE WITH I-5823
I-5765 112831.5 MILES EAST OF US 64 TO 1.2 MILES EAST OF SR 1410 (FARMINGTON ROAD). PAVEMENT REHABILITATION.
5
SW
NHPIM C 5642 C 5641 DAVIE I-40
PROJECT COMPLETE - GARVEE BOND FUNDING $13.8 MILLION; PAYBACK FY 2007 - FY 2018
I-3600 26864 20600SR 1436 (PINEBROOK DRIVE) TO WEST OF NC 801. PAVEMENT REHABILITATION.
5
TRN
NHP 1566CG CG 1566 CG 1566 CG 1566 DAVIE I-40
COORDINATE WITH I-5765
I-5823 113811 MILE EAST OF SR 1143 (DAVIE ACADEMY ROAD) TO 0.7 MILE EAST OF US 601. PAVEMENT REHABILITATION.
4.9
SW
NHPIM C 11381 DAVIE I-40
RURAL PROJECTSR-5728 2325SOUTH SALISBURY STREET IN
MOCKSVILLE. INTERSECTION IMPROVEMENTS.DIV
T R 450
T C 1875
DAVIE US 601
R-5736 8778SR 1345 (BLAISE CHURCH ROAD) TO SR 1408 (CANA ROAD). WIDEN TO MULTILANES.
1.5
DIV
T 2443R
T 293U
T 6042C
DAVIE US 601
URBAN PROJECTS
UNDER CONSTRUCTION
U-5540 1850 1850ACCESS ROAD OFF SR 1345 (INTERSTATE DRIVE). CONSTRUCT ROADWAY TO SERVE NEW MANUFACTURING IN MOCKSVILLE.
DAVIE NEW ROUTE
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 8334 7834INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STPDA 40PE
L 10PE
STPDA 80R
L 20R
STPDA 280C
L 70C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
U-5022 30885WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 1419 C 4911 4911C4911C4911C C 4911 C 4911DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
9-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
URBAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS
U-5506 7000SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 560PE
L 140PE
STPDA 1120R
L 280R
STPDA 3920C
L 980C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FORMERLY U-9999D - IN PROGRESS
U-4951 4990 4790WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.
DIV
STPDA 160PE
L 40PE
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FEDERAL BRIDGE PROJECTSB-5768 950REPLACE BRIDGE NO. 38 OVER CEDAR
CREEK.
HF
HFB 85R
HFB C 865
DAVIE NC 801
PROJECT COMPLETE - GARVEE BOND FUNDING $11.5 MILLION; PAYBACK FY 2007 - FY 2018
B-3637 32794 28194REPLACE BRIDGE NO. 37 AND REVISE INTERCHANGE AT I-40.
TRN
NHP 1150CG CG 1150 CG 1150 CG 1150 DAVIE NC 801
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 16947 14947DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R
STPOFF 1800C
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 16572 16572ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5209 3890 3890DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
CONGESTION MITIGATION PROJECTSC-5620 3568PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ C 1784 C 1784 DAVIDSON
DAVIE
FORSYTH
VARIOUS
9-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
CONGESTION MITIGATION PROJECTSC-5614 466PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE NORTHWEST PIEDMONT RPO.
EX
CMAQ C 466 DAVIE VARIOUS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-5222 250 250IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
DAVIE PIEDMONT
AUTHORITY
FOR REGIONAL
TRANSPORTATION
INTERSTATE PROJECTS
COORDINATE WITH I-5766
I-5857 102880.3 MILE EAST OF SR 3153 (HANES MALL BOULEVARD) TO 1.8 MILES EAST OF SR 1003 (HIGH POINT ROAD) IN WINSTON-SALEM. PAVEMENT REHABILITATION.
9.6
SW
NHPIM C 10288 FORSYTH I-40
I-5880 3335NC 109 (THOMASVILLE ROAD) / CLEMMONSVILLE ROAD SPLIT-DIAMOND INTERCHANGE IN WINSTON-SALEM. CONVERT HALF DIAMOND INTERCHANGE AT NC 109 TO FULL DIAMOND, AND REMOVE CONNECTOR ROADS AND HALF DIAMOND INTERCHANGE AT CLEMMONSVILLE ROAD
0.8
REG
NHP R 460
NHP 2875C
FORSYTH I-40 / US 311
I-5814 32260.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNTY. PAVEMENT REHABILITATION.
2.4
SW
NHPIM C 3226 FORSYTH
GUILFORD
I-40
I-5795 25101.8 MILES EAST OF SR 1003 (HIGH POINT ROAD) TO 0.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN WINSTON-SALEM AND KERNERSVILLE. PAVEMENT REHABILITATION.
3
SW
NHPIM C 2510 FORSYTH I-40
COORDINATE WITH I-5857
I-5766 150620.9 MILE EAST OF NC 150 TO NC 109 IN WINSTON-SALEM. PAVEMENT REHABILITATION.
1.8
SW
NHPIM C 7531 C 7531 FORSYTH I-40
UNDER CONSTRUCTION
I-5511 180 180I-40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. INSTALL SIGNAGE TO REFLECT INTERSTATE DESIGNATION.
12
TRN
FORSYTH
GUILFORD
I-74 / US 311
COORDINATE WITH I-5736
I-5767 47540.7 MILE EAST OF I-40 TO GUILFORD COUNTY LINE. PAVEMENT REHABILITATION.
8.5
SW
NHPIM C 4754 FORSYTH I-74 / US 311
9-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-2577* 110870 2196MULTI-LANES NORTH OF US 421 / I-40 BUSINESS IN WINSTON-SALEM TO US 220 IN STOKESDALE. WIDEN TO MULTI-LANES.
18.8 NHP 3900R A R 3900 A
NHP 1654U A U 1654 A
T M 366 A
NHP 12050C A C 12050 A
T 6800R B
T 36100C B
T 4800R C
T 25400C C
A MULTI-LANES NORTH OF US 421 / I-40 BUSINESS TO SR 1965 (BELEWS CREEK ROAD)REG
B SR 1965 (BELEWS CREEK ROAD) IN FORSYTH COUNTY TO SR 2034 (ANTHONY ROAD) IN GUILFORD COUNTY
C NORTH OF SR 2034 (ANTHONY ROAD) TO US 220
FORSYTH
GUILFORD
US 158
GARVEE BOND FUNDING $5 M FOR SEGMENT CD - PAYBACK FY 2016-2027; GARVEE BOND FUNDING $10 M FOR SEGMENT EC - PAYBACK FY 2016-2027
R-2247* 499158 62322WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, I-40 TO US 52. FOUR LANE EXPRESSWAY ON NEW LOCATION.
14.8 T 2423M
T 16624R B
T 51200C B
T 650R CA
T 44800C CA
T 7750R CB
T 38700C CB
T R 3200 CD
T M 954 CD
NHP 1025CG CDCG 513 CD CG 512 CD CG 513 CD CG 512 CD CG 513 CD 512CG CD513CG CD512CG CD CG 513 CD CG 512 CD
S(M) C 556 CD C 556 CD C 555 CD
NHP C 986 CD C 986 CD C 986 CD
T 11000R D
T 37700C D
T 6200R EA
T 32600C EA
T 26000R EB
T 116800C EB
T R 2160 EC
NHP 2050CG ECCG 1025 EC CG 1025 EC CG 1025 EC CG 1025 EC CG 1025 EC 1025CG EC1025CG EC1025CG EC CG 1025 EC CG 1025 EC
S(M) C 1111 EC C 1111 EC C 1111 EC
NHP C 56 EC C 56 EC C 55 EC
T 11500C F
B WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, SOUTH OF I-40 TO SOUTH OF US 421 INTERCHANGE
CA WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTERCHANGE WITH US 421 AND INTERCHANGE WITH SR 1140 (PEACE HAVEN ROAD)
CB WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NORTH OF US 421 INTERCHANGE TO SR 1348 (ROBINHOOD ROAD)
CC WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, MUDDY CREEK. REPLACE BRIDGE NO. 221 AND BRIDGE NO. 222 - COMPLETE - WORK ACCOMPLISHED UNDER B-4507
CD SR 1891 / NON-SYSTEM (PEACE HAVEN ROAD) - US 421 INTERCHANGE AND APPROACHES - DESIGN-BUILD PROJECTSW
D WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NORTH OF SR 1348 (MEADOWLARK DRIVE-ROBINHOOD ROAD) TO NC 67
EA WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NC 67 TO SOUTH OF US 52
EB WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTERCHANGE AT US 52
EC NC 65 INTERCHANGE. RECONSTRUCT INTERCHANGE. - DESIGN-BUILD PROJECTSW
F WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTELLIGENT TRANSPORTATION SYSTEMS DEPLOYMENT FOR SEGMENTS BA, BB, CA, CB, D, EA AND EB
FORSYTH NEW ROUTE
URBAN PROJECTS
PART B DESIGN-BUILD PROJECT
U-2827 107448 35783I-40 TO WEST OF US 158 IN WINSTON-SALEM. PAVEMENT REHABILITATION, REPLACE BRIDGE NOS. 178, 269, 278, 286, 288 291, 293, 305, 312 313, 336 AND VARIOUS SAFETY IMPROVEMENTS.
8 HP R 2000 B
NHP R 10225 B
NHP U 140 B
NHP C 19767 B C 19767 B C 19766 B
A WEST OF OLD VINEYARD ROAD TO EAST OF US 158 (STRATFORD ROAD) - COMPLETE
B WEST OF FOURTH STREET TO EAST OF CHURCH STREET - PLANNING / DESIGN IN PROGRESSREG
C WEST OF US 311 (MARTIN LUTHER KING, JR. DRIVE) TO WEST OF US 158 - COMPLETE
FORSYTH US 158 / US 421 /
NC 150 /
BUSINESS 40
U-5824 15998HARLEY DRIVE TO BELLAIRE CIRCLE / WHITEHALL VILLAGE LANE IN WALKERTOWN. WIDEN TO MULTILANES.
1.2
DIV
T 6955R
T 835U
T 8208C
FORSYTH NC 66
(OLD HOLLOW ROAD)
9-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
URBAN PROJECTSU-5755 10732MUSEUM DRIVE TO SR 4000 (UNIVERSITY
PARKWAY) IN WINSTON-SALEM. WIDEN TO MULTILANES.
0.5
DIV
T 1948R
T 234U
T 8550C
FORSYTH SR 1672
(HANES MILL ROAD)
UNDER CONSTRUCTION BY TOWN OF KERNERSVILLE
U-5512 1528 1528NELSON STREET TO NC 150 (NORTH MAIN STREET) AND NELSON STREET, SR 1969 TO FOOD LION SHOPPING CENTER IN KERNERSVILLE. WIDEN SR 1969, UPGRADE SR 1969-NC 150 INTERSECTION AND CONSTRUCT SIDEWALKS.
0.2FORSYTH SR 1969
(PINEY GROVE ROAD)
DESIGN-BUILD PROJECT - UNDER CONSTRUCTION
U-2800 64718 64718INDUSTRIAL PARK DRIVE TO SR 1005 (OLD US 421) IN KERNERSVILLE. WIDEN TO FOUR LANES WITH WIDE OUTSIDE LANES, CURB AND GUTTER, PART ON NEW LOCATION; AND CONVERT GRADE SEPARATION AT I-40 BUSINESS TO AN INTERCHANGE.
1.9
TRN
FORSYTH SR 2601
(MACY GROVE ROAD)
UNDER CONSTRUCTION
U-4909 94793 94462SR 2691 (WALLBURG ROAD) TO SR 2632 (SEDGE GARDEN ROAD) IN WINSTON-SALEM AND KERNERSVILLE. WIDEN TO MULTI-LANES.
3.6
TRN
CMAQ 331C A
A INSTALLATION OF ITS COMPONENTS - PLANNING / DESIGN IN PROGRESSTRN
FORSYTH SR 2643
(UNION CROSS ROAD)
UNDER CONSTRUCTION BY CITY OF WINSTON-SALEM
U-2923 10634 10634SR 3011 (OLD SALISBURY ROAD) TO SOUTH MAIN STREET IN WINSTON-SALEM. WIDEN TO MULTI-LANES.
1.9FORSYTH SR 2747
(CLEMMONSVILLE ROAD)
COORDINATE WITH B-5781
U-2707 15078 4778SR 2999 (HAMPTON ROAD) TO US 158 IN CLEMMONS. TWO LANE SHOULDER SECTION ON NEW LOCATION.
2.3
DIV
T C 10300 FORSYTH SR 3000 (IDOLS ROAD)
DESIGN-BUILD PROJECT - UNDER CONSTRUCTION
U-2925 91595 64595SALEM CREEK CONNECTOR, SR 4326 (RAMS DRIVE) TO SR 4325 (MARTIN LUTHER KING DRIVE) IN WINSTON-SALEM. MULTI-LANE FACILITY ON NEW LOCATION.
1
TRN
STP 27000C FORSYTH NEW ROUTE
U-4734 17930 2376MACY GROVE ROAD EXTENSION, SR 1005 (EAST MOUNTAIN STREET) TO NC 150 (NORTH MAIN STREET) IN KERNERSVILLE. FOUR-LANE DIVIDED FACILITY ON NEW LOCATION.
1.5
DIV
T R 4000
T U 154
T C 5700 C 5700
FORSYTH NEW ROUTE
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF LEWISVILLE - IN PROGRESS
U-5536 15293 100PROPOSED GREAT WAGON ROAD FROM SHALLOWFORD ROAD (SR 1001) TO LEWISVILLE-VIENNA ROAD (SR 1308) IN LEWISVILLE. MULTILANE FACILITY ON NEW LOCATION WITH BICYCLE AND PEDESTRIAN ACCOMMODATIONS.
1.1
DIV
STP 6618R
L 1654R
STP 794U
L 199U
STP 4742C
L 1186C
FORSYTH NEW ROUTE
$2 MILLION IN "OTHER" FUNDS PROGRAMMED ON PART B REFLECTS PARTICIPATION BY WAKE FOREST INNOVATION QUARTER
U-4918 28800 23000US 52 / US 421 / I-40 BUSINESS VICINITY AT WAKE FOREST INNOVATION QUARTER (FORMERLY PIEDMONT TRIAD RESEARCH PARK) IN WINSTON-SALEM. TRANSPORTATION IMPROVEMENTS.
TRN
HP 3800C B
O 2000C B
A STADIUM DRIVE TO THIRD STREET - UNDER CONSTRUCTION BY OTHERS - ECONOMIC DEVELOPMENT PROGRAM PROJECT
B CONSTRUCT MULTI-USE TRAIL FROM THIRD STREET TO RAMS DRIVE; CONSTRUCT PEDESTRIAN AMENITIES AND PROVIDE LANDSCAPING ON FOGLE STREET AND EXTEND ROAWAY FROM EXISTING TERMINUS TO RESEARCH PARKWAY; CONSTRUCT CENTRAL POND GREENWAY; CONSTRUCT PATTERSON ALLEY SIDEWALK. - PLANNING / DESIGN IN PROGRESS
TRN
FORSYTH VARIOUS
9-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
URBAN PROJECTS
FORMERLY U-9999D - IN PROGRESS
U-4951 4990 4790WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.
DIV
STPDA 160PE
L 40PE
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
U-5022 30885WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 1419 C 4911 4911C4911C4911C C 4911 C 4911DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS
U-5506 7000SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 560PE
L 140PE
STPDA 1120R
L 280R
STPDA 3920C
L 980C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 8334 7834INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STPDA 40PE
L 10PE
STPDA 80R
L 20R
STPDA 280C
L 70C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
9-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
URBAN PROJECTS
GARVEE BOND FUNDING $128.2 M FOR SEGMENT B; PAYBACK FY 2015-2026
U-2579* 918244 139601WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 52 TO I-74 / US 311. MULTI-LANE FREEWAY ON NEW LOCATION.
17.1 T R 4885 AA
T U 700 AA
T 15250C AA15250C AA C 15250 AA C 15250 AA
T R 27900 AB 27900R AB
T U 1400 AB 1400U AB
T 3821M AB
T 36000C AB36000C AB C 36000 AB C 36000 AB
NHP 13138CG BCG 13138 B CG 13138 B CG 13138 B CG 13138 B CG 13138 B 13138CG B13138CG B13138CG B CG 13138 B CG 13138 B
S(M) C 10681 B C 10681 B C 10681 B
T R 13110 C
T M 1966 C
T C 26300 C C 26300 C
T 26500R D
T 400U D
T 68900C D
T 33550R E
T 360U E
T 48000C E
T 45250R F
T 440U F
T 38000C F
AA WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-74 / US 311 TO I-40REG
AB WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-40 TO US 421 / NC 150 / BUSINESS 40REG
B WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 421 / NC 150 / BUSINESS 40 TO US 158 - UNDER CONSTRUCTIONTRN
C WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 158 TO US 311 - DESIGN-BUILD PROJECTREG
D WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 311 TO SR 2211 (BAUX MOUNTAIN ROAD)
E WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, SR 2211 (BAUX MOUNTAIN ROAD) TO NC 8
F WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, NC 8 TO EAST OF US 52
G WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, BRIDGE NO. 366 OVER US 421 / NC 150 / BUSINESS 40 - UNDER CONSTRUCTION
FORSYTH FUTURE I-74
STI FUNDING ELIGIBILITY DETERMINATION PENDING
U-5760 27000US 421 / BUSINESS 40 TO NC 66 (WEST MOUNTAIN STREET) IN KERNERSVILLE. WIDEN BIG MILL FARM ROAD AND SR 2649 (HOPKINS ROAD) AND CONSTRUCT INTERCHANGE AT US 421 / NC 150 / BUSINESS 40.
1.8
DIV
T 1918R
T 230U
T 24852C
FORSYTH KERNERSVILLE
SOUTHERN LOOP
(PHASE I)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1509A FORUM PARKWAY CONNECTOR, FORUM PARKWAY TO NC 66 (UNIVERSITY PARKWAY) IN RURAL HALL. 2-LANE FACILITY ON NEW LOCATION.
FORSYTH NEW ROUTE
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4506 9348 9348REHABILITATE BRIDGE NO. 319 AND BRIDGE NO. 335 OVER SR 1620 (TOBACCOVILLE ROAD) IN TOBACCOVILLE.
SW
FORSYTH US 52
PLANNING / DESIGN IN PROGRESS
B-5148 4910 100REPLACE BRIDGE NO. 276 OVER NC 67 IN WINSTON-SALEM.
HF
HFB R 435
HFB C 4375
FORSYTH SR 1001
(COUNTRY CLUB
ROAD)
UNDER CONSTRUCTION
B-5107 2237 2237REPLACE BRIDGE NO. 34 OVER ABBOTTS CREEK.
DIV
FORSYTH SR 1003
(HIGH POINT ROAD)
9-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
FEDERAL BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5152 760 100REPLACE BRIDGE NO. 95 OVER BLANKET CREEK IN CLEMMONS.
HF
HFB R 60
HFB C 600
FORSYTH SR 1100
(LASATER ROAD)
B-5771 1870REPLACE BRIDGE NO. 16 OVER MUDDY CREEK IN BETHANIA.
HF
HFB R 170
HFB 1700C
FORSYTH SR 1611
(MAIN STREET)
PLANNING / DESIGN IN PROGRESS
B-4746 7000 370REPLACE BRIDGE NO. 229 OVER NORFOLK SOUTHERN RAILROAD IN WINSTON-SALEM.
DIV
STPOFF 300R
HFB C 6330
FORSYTH SR 2264
(AKRON DRIVE)
B-4509 866 11REPLACE BRIDGE NO. 210 OVER SALEM CREEK IN WINSTON-SALEM.
DIV
STPOFF 80R
STPOFF C 775
FORSYTH SR 2377
(OLD
GREENSBORO
ROAD)
RIGHT OF WAY IN PROGRESS
B-4511 1584 384REPLACE BRIDGE NO. 201 OVER KERNER'S MILL CREEK IN WINSTON-SALEM.
TRN
STPOFF 1200C FORSYTH SR 2667
(HASTINGS HILL
ROAD)
COORDINATE WITH U-2707
B-5781 1320REPLACE BRIDGE NO. 109 OVER NORFOLK SOUTHERN RAILROAD.
HF
HFB 120R
HFB 1200C
FORSYTH SR 2999 (HAMPTON
ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 16947 14947DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R
STPOFF 1800C
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
B-5775 4950REPLACE BRIDGE NO. 275 OVER NC 67 IN WINSTON-SALEM.
HF
HFB 450R
HFB 4500C
FORSYTH ROBINHOOD ROAD
PLANNING / DESIGN IN PROGRESS
B-5770 4683 150REPLACE BRIDGE NO. 243 OVER NC 150 IN WINSTON-SALEM.
DIV
STPOFF R 216
STPOFF C 4317
FORSYTH SALISBURY RIDGE
ROAD
MUNICIPAL BRIDGE PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-2882 575REPLACE BRIDGE NO. 387 OVER PETERS CREEK IN WINSTON-SALEM.
DIV
STPOFF R 40
L R 420
STPOFF C 10
L C 105
FORSYTH GLADE STREET
9-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
MUNICIPAL BRIDGE PROJECTS
RIGHT OF WAY IN PROGRESS BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-5004 4929 479REPLACE BRIDGE NO. 86 OVER SALEM CREEK AND BRIDGE NO. 87 OVER BRUSHY FORK CREEK IN WINSTON-SALEM.
TRN
STPON 3560C
L 890C
FORSYTH REYNOLDS PARK
ROAD
PLANNING / DESIGN IN PROGRESS BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-5007 1024 254REPLACE BRIDGE NO. 296 OVER NORFOLK SOUTHERN RAILWAY IN WINSTON-SALEM.
DIV
STPOFF R 56
L R 14
STPOFF C 560
L C 140
FORSYTH WEST FIRST STREET
MITIGATION PROJECTS
IN PROGRESS
EE-4909 16572 16572ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
SF-4909F 29 29EAST OF SR 3652 (CRESTVIEW ROAD) AND WEST OF SR 1175 (HAUSER ROAD). INSTALL GUARDRAIL AT TWO CULVERTS.
FORSYTH SR 1173
(WILLIAMS ROAD)
UNDER CONSTRUCTION
W-5304 2090 2090SR 2693 (SAWMILL ROAD) AND SR 4203 (REID ROAD). IMPROVE INTERSECTIONS.
FORSYTH SR 2692
(GUMTREE ROAD)
PLANNING / DESIGN IN PROGRESS
W-5510 3279 418SR 4315 (SOUTH MAIN STREET), BUSINESS 40 / US 421 / NC 150 TO NORTH OF SR 4278 (SOUTH CHERRY STREET), AND SR 2648 (OLD WINSTON ROAD), WEST OF SOUTH CHERRY STREET TO SOUTH MAIN STREET IN KERNERSVILLE. SAFETY IMPROVEMENTS, INCLUDING RAISED MEDIAN, TURN LANES, ADDITIONAL LANE, ROUNDABOUT, AND INTERSECTION RELOCATION.
0.7
DIV
HSIP 500R
HSIP 361U
HSIP C 2000
FORSYTH SR 4315 (SOUTH
MAIN STREET);
SR 2648 (OLD
WINSTON ROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5209 3890 3890DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-5224 17651 17651UPGRADE CITY OF WINSTON-SALEM SIGNAL SYSTEM.
EX
FORSYTH VARIOUS
9-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
CASWELL
DAVIDSON
FORSYTH
GUILFORD
MONTGOMERY
RANDOLPH
ROCKINGHAM
VARIOUS
C-5609 2554PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.
EX
CMAQ C 1277 C 1277 DAVIDSON
FORSYTH
GUILFORD
VARIOUS
C-5142 435 435INTERIM WINSTON-SALEM TRAFFIC SIGNAL SYSTEM UPGRADES IN TWO PHASES.
EX A PHASE I - DELETED - WORK TO BE ACCOMPLISHED UNDER C-5224EX
B PHASE II - UNDER CONSTRUCTION BY CITY OF WINSTON-SALEMEX
FORSYTH VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM - IN PROGRESS
C-4981 326 326INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS IN WINSTON-SALEM.
EX
FORSYTH VARIOUS
C-5620 3568PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ C 1784 C 1784 DAVIDSON
DAVIE
FORSYTH
VARIOUS
INTERSTATE PROJECTS
INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION
I-2304 302638 208057NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29-52-70/I-85 BUSINESS IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833).
6.8
TRN
NHP 505RG AC RG 505 AC RG 505 AC RG 505 AC RG 495 AC RG 533 AC 533RG AC
NHP 16207CG AC CG 16199 AC CG 16199 AC CG 16198 AC CG 14672 AC CG 4110 AC 4110CG AC
NHP 466RG AD RG 466 AD RG 466 AD RG 466 AD RG 457 AD RG 492 AD 492RG AD
AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETETRN
AD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETETRN
AE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - IN PROGRESS
AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - UNDER CONSTRUCTIONTRN
DAVIDSON
ROWAN
I-85
COORDINATE WITH I-5505, I-5741 AND I-5859
I-5858 12501.3 MILES NORTH OF SR 2539 (PEACH ORCHARD RD) TO 0.8 MILE NORTH OF SR 2528 (JULIAN RD) IN SALISBURY. PAVEMENT REHABILITATION.
1
SW
NHPIM C 1250 ROWAN I-85
COORDINATE WITH I-5505, I-5858 AND I-5859
I-5741 2271US 601 TO 0.5 MILE SOUTH OF US 52 IN SALISBURY. PAVEMENT REHABILITATION.
1
SW
NHPIM C 2271 ROWAN I-85
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - IN PROGRESS - COORDINATE WITH I-5741, I-5858 AND I-5859
I-5505 80 80US 52 (INNES STREET) AND US 601 (JAKE ALEXANDER BOULEVARD) INTERCHANGES. STABILIZE SLOPES, REPLACE EMERGENCY LANE / SHOULDER , AND RESEAL JOINTS.
ROWAN I-85
I-5824 45520.5 MILE NORTH OF SR 1505 (MOUNT HOPE CHURCH ROAD) TO 1.3 MILES NORTH OF SR 2539 (PEACH ORCHARD ROAD). PAVEMENT REHABILITATION.
3.8
SW
NHPIM C 4552 ROWAN I-85 / US 601
9-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
INTERSTATE PROJECTS
PROJECT COMPLETE - GARVEE BOND FUNDING $3.4 MILLION; PAYBACK FY 2007 - FY 2018
I-4718 7595 6271CABARRUS COUNTY LINE TO NC 152. REPAIR PAVEMENT AND OVERLAY.
5
TRN
NHP 331CG CG 331 CG 331 CG 331 ROWAN I-85
PART B INCLUDES B-5365 AND I-3610 - PART B GARVEE BOND FUNDING $10 MILLION FOR RIGHT OF WAY AND $90 MILLION FOR CONSTRUCTION - PAYBACK FY 2016 - FY 2027
I-3802 413548 82109NC 73 IN CABARRUS COUNTY (EXIT 55) TO US 29/US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY. WIDEN TO EIGHT LANES.
13.6 NHP 53673C A C 53673 A C 53673 A
CMAQ C 1900 AA
NHP 2050RG BRG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B 1025RG B1025RG B1025RG B RG 1025 B RG 1025 B
S(M) R 1200 B R 1200 B R 1200 B
NHP U 2753 B
NHP M 1471 B
NHP 19066CG BCG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B 9533CG B9533CG B9533CG B CG 9533 B CG 9533 B
S(M) C 10000 B C 10000 B C 10000 B
NHP C 1334 B C 1333 B C 1333 B
A NC 73 IN CABARRUS COUNTY (EXIT 55) TO LANE STREET (EXIT 63) IN CABARRUS COUNTY. - UNDER CONSTRUCTIONTRN
AA ITS FOR I-3802 ATRN
B LANE STREET (EXIT 63) IN CABARRUS COUNTY TO US 29/US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY - PLANNING / DESIGN IN PROGRESS - DESIGN-BUILD PROJECTSW
CABARRUS
ROWAN
I-85
COORDINATE WITH I-5505, I-5741 AND I-5858
I-5859 19000.4 MILE NORTH OF SR 1002 (OLD CONCORD RD) TO SR 1002 (BRINGLE FERRY RD) IN SALISBURY. PAVEMENT REHABILITATION.
1.4
SW
NHPIM C 1900 ROWAN I-85
INCLUDED IN I-3802
I-3610 WEST OF US 29 / US 601 TO EAST OF I-85 IN CHINA GROVE. REVISE INTERCHANGES WITH US 29 / US 601 AND WITH I-85, AND IMPROVE CORRIDOR.
ROWAN NC 152
URBAN PROJECTSU-5738 11514US 601 (JAKE ALEXANDER BOULEVARD) TO
SR 2667 (SUMMIT PARK DRIVE) IN SALISBURY. WIDEN TO MULTILANES.
1.3
DIV
T R 814
T U 98
T 10602C
ROWAN SR 2528
(JULIAN ROAD)
STI FUNDING ELIGIBILITY DETERMINATION PENDING
U-5820 1865BENDIX DRIVE TO US 52 AT NEWSOME ROAD IN SALISBURY. CONSTRUCT A NEW MULTILANE ROADWAY.
0.6
DIV
T R 1015
T 850C
ROWAN NEW ROUTE
PLANNING / DESIGN IN PROGRESS
U-5608 9350 500SR 1211 (KIMBALL ROAD) EXTENSION, NORTH CHAPEL STREET TO SR 1221 (BOSTIAN ROAD) IN LANDIS. CONSTRUCT TWO-LANE CONNECTOR ON NEW LOCATION.
0.6
DIV
STPDA R 2640
S(M) R 660
STPDA U 960
S(M) U 240
STPDA C 3480
S(M) C 870
ROWAN NEW ROUTE
"O" FUNDING REFLECTS NC DEPARTMENT OF COMMERCE PARTICIPATION - PLANNING / DESIGN IN PROGRESS
U-5541 1435 75ACCESS ROAD OFF SR 2528 (HEILIG ROAD). CONSTRUCT ROADWAY TO SERVE NEW MANUFACTURING SITE NEAR SALISBURY.DIV
T 583C
O 777C
ROWAN NEW ROUTE
U-5614 24900STP-DA IN THE CABARRUS-ROWAN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA C 1020 C 2700 C 2700 2700C2700C2700C C 2700 C 2700
L C 255 C 675 C 675 675C675C675C C 675 C 675CABARRUS
ROWAN
VARIOUS
9-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
FEDERAL BRIDGE PROJECTS
INCLUDED IN I-3802
B-5365 150 150REPLACE BRIDGE NO. 21 AND BRIDGE NO. 34 OVER NORFOLK SOUTHERN RAILROAD AND US 29 IN CHINA GROVE.
ROWAN US 29;
NC 152
PLANNING / DESIGN IN PROGRESS
B-4626 6898 133REPLACE BRIDGE 790003 AND APPLY DECK PRESERVATION TREATEMENT TO BRIDGE 790008 OVER YADKIN RIVER AND WINSTON-SALEM SOUTHBOUND RAILROAD.SW
NHPB R 300
NHPB U 300
NHPB C 3083 3082C
ROWAN NC 8 / NC 49
B-5767 2090REPLACE BRIDGE NO. 63 OVER KERR CREEK.
HF
HFB R 190
HFB 1900C
ROWAN NC 150
B-5778 3520REPLACE BRIDGE NO. 61 OVER FOURTH CREEK.
HF
HFB 320R
HFB 3200C
ROWAN NC 801
PLANNING / DESIGN IN PROGRESS
B-4808 2150 300REPLACE BRIDGE NO. 141 OVER SOUTH SECOND CREEK.
DIV
STPON 300R
HFB C 1550 ROWAN SR 1004
(STOKES FERRY
ROAD)
PLANNING / DESIGN IN PROGRESS
B-5521 595 100REPLACE BRIDGE NO. 122 OVER AN UNNAMED CREEK.
DIV
STPOFF R 45
STPOFF C 450
ROWAN SR 1348
(GOLD FISH ROAD)
B-5772 1625REPLACE BRIDGE NO. 66 OVER NORFOLK SOUTHERN RAILROAD.
DIV
STPOFF R 77
STPOFF 1548C
ROWAN SR 1724 (HURLEY
SCHOOL ROAD)
PLANNING / DESIGN IN PROGRESS
B-5366 1585 100REPLACE BRIDGE NO. 19 OVER SLOANS CREEK.
HF
HFB R 135
HFB C 1350 ROWAN SR 1735
(GOODNIGHT ROAD)
PROJECT PART OF LOW-IMPACT BRIDGE PROGRAM (LIBR)
B-4628 1312 17REPLACE BRIDGE NO. 6 OVER BACK CREEK.
HF
HFB R 110
HFB C 1185
ROWAN SR 1759
(BELK ROAD)
PLANNING / DESIGN IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-5160 595 100REPLACE BRIDGE NO. 50 OVER NAILS BRANCH.
DIV
STPOFF 45R
STPOFF C 450
ROWAN SR 1986
(MT. VERNON ROAD)
B-5769 606REPLACE BRIDGE NO. 200 OVER TOWN CREEK.
DIV
STPOFF 29R
STPOFF C 577
ROWAN SR 2539 (PEACH
ORCHARD ROAD)
9-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
FEDERAL BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 16947 14947DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R
STPOFF 1800C
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 16572 16572ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
HAZARD ELIMINATION PROJECTS
RIGHT OF WAY IN PROGRESS
W-5316 3013 1913SR 2342 (GOLD KNOB ROAD), SR 2319 (CRESCENT ROAD), AND SR 2382 (ANTHONY ROAD). INTERSECTION IMPROVEMENTS.
SW
HSIP 1100C ROWAN US 52
PLANNING / DESIGN IN PROGRESS
W-5314 1019 100NC 801 AT SR 2048 (COOL SPRINGS ROAD / WOODLEAF ROAD), SR 1951 (PARKS ROAD) AT SR 2048 (WOODLEAF ROAD) AND NC 801 AT SR 2004 (WOODLEAF BARBER ROAD / QUARRY ROAD). WIDENING, INTERSECTION REALIGNMENT, TURN LANES AND GEOMETRIC IMPROVEMENTS.
REG
HSIP 119R
HSIP C 800
ROWAN NC 801;
SR 1951
(PARKS ROAD)
UNDER CONSTRUCTION - LET WITH B-4257
W-5303 230 230SR 2380 (ODDIE ROAD). INTERSECTION IMPROVEMENTS.
ROWAN SR 1004
(STOKES FERRY
ROAD)
RIGHT OF WAY IN PROGRESS
W-5516 16800 1700SR 1210 (OLD BEATTY FORD ROAD) / SR1221 (BOSTIAN ROAD) TO SR 1337 (LENTZ ROAD). RELOCATE EXISTINGROAD WITH GRADE SEPARATION OVER I-85.
2.9
DIV
HSIP 4215C
T 10885C
ROWAN SR 1221
(OLD BEATTY FORD
ROAD)
RIGHT OF WAY IN PROGRESS
W-5313 15635 8635SR 2335 (LOWER STONE CHURCH ROAD) TO SR 1337 (LENTZ ROAD). WIDEN AND INSTALL RUMBLE STRIPS.
7.4
DIV
HSIP C 2334 C 2333 C 2333 ROWAN SR 1221
(OLD BEATTY
FORD ROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5209 3890 3890DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
9-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY
C-5160 1396CITY OF SALISBURY - CONSTRUCT BIKE LANES.
EX
CMAQ 11PE
L 3PE
CMAQ 101R
L 25R
CMAQ 1005C
L 251C
ROWAN NEWSOME ROAD
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY
C-4908 1260 389CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN SALISBURY.
EX
CMAQ 52R G
L 13R G
CMAQ 298C G
L 75C G
CMAQ 239C E
L 60C E
CMAQ 107C H
L 27C H
A BRENNER AVENUE TO PARTEE STREET - PROJECT DELETED AT MPO REQUESTEX
B SPORTS COMPLEX, RYAN STREET TO CELEBRATION DRIVE AND SOUTH BOUNDARY STREET, HILLBORO STREET TO HILLS STREET - COMPLETEEX
C SALISBURY HIGH SCHOOL, ON VARIOUS STREETS AROUND HIGH SCHOOL - COMPLETEEX
D ARLINGTON AVENUE TO WALMART PARKING LOT - COMPLETEEX
E LONG STREET TO NEWSOME ROADEX
F SR 1002 (BRINGLE FERRY ROAD) TO SR 1004 (STOKES FERRY ROAD) - PROJECT DELETED AT MPO REQUESTEX
G US 601 (JAKE ALEXANDER BOULEVARD) - IN PROGRESSEX
H "D" AVENUE TO SUNSET DRIVEEX
ROWAN VARIOUS
UNDER CONSTRUCTION
C-5553 3209 3209CITY OF SALISBURY SIGNAL SYSTEM REPLACEMENT.
EX
ROWAN VARIOUS
C-5603 3268PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CABARRUS-ROWAN MPO.
EX
CMAQ C 1634 C 1634 CABARRUS
ROWAN
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF GRANITE QUARRY
C-5158 447CONSTRUCT SIDEWALKS ON KERN STREET, SALISBURY AVENUE, CROOK STREET, OAK STREET AND BALFOUR QUARRY ROAD IN GRANITE QUARRY.
EX
CMAQ 29PE
L 7PE
CMAQ 4R
L 1R
CMAQ C 325
L C 81
ROWAN VARIOUS
IN PROGRESS BY CATAWBA COLLEGE
C-4911 1088 1088EXPANSION OF AIR QUALITY OUTREACH PROGRAM TO REDUCE OZONE AIR POLLUTION.
EX
ROWAN CATAWBA COLLEGE
IN PROGRESS
C-5536 500 500MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EX
CABARRUS
GASTON
IREDELL
LINCOLN
MECKLENBURG
ROWAN
UNION
CHARLOTTE
9-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
INTERSTATE PROJECTSI-5887 11190SR 1102 (TRINITY CHURCH ROAD) NEAR
KING. CONVERT EXISTING GRADE SEPARATION TO FULL-MOVEMENT INTERCHANGE.
DIV
T R 930
T C 10260
STOKES US 52 / FUTURE I-74
URBAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS
U-5506 7000SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 560PE
L 140PE
STPDA 1120R
L 280R
STPDA 3920C
L 980C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
U-5022 30885WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 1419 C 4911 4911C4911C4911C C 4911 C 4911DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FORMERLY U-9999D - IN PROGRESS
U-4951 4990 4790WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.
DIV
STPDA 160PE
L 40PE
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 8334 7834INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STPDA 40PE
L 10PE
STPDA 80R
L 20R
STPDA 280C
L 70C
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1509B NC 65 IN VICINITY OF SR 1928 (STOKESBURG ROAD) IN WALNUT COVE. UPGRADE INTERSECTION WITH RAILROAD CROSSING IMPROVEMENTS.
STOKES US 311
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4645 7903 7903REPLACE BRIDGE NO. 29 AND BRIDGE NO. 30 OVER LITTLE YADKIN RIVER.
SW
STOKES US 52
B-5784 1139REPLACE BRIDGE NO. 125 OVER NORTH DOUBLE CREEK.
DIV
STPOFF R 54
STPOFF C 1085
STOKES SR 1484 (DAN
GEORGE ROAD)
B-5766 4568REPLACE BRIDGE NO. 82 OVER DAN RIVER IN DANBURY.
DIV
STPOFF 218R
STPOFF 4350C
STOKES SR 1674 (SHEPPARD
MILL ROAD)
9-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
FEDERAL BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-4819 2033 163REPLACE BRIDGE NO. 105 OVER SNOW CREEK.
HF
HFB R 170
HFB C 1700
STOKES SR 1697
(PITZER ROAD)
B-5509 2225REPLACE BRIDGE NO. 62 OVER NEATMAN CREEK.
HF
HFB R 200
HFB C 2025
STOKES SR 1961
(BOLEJACK ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 16947 14947DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R
STPOFF 1800C
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 16572 16572ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5209 3890 3890DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
DAVIDSON
DAVIE
FORSYTH
ROWAN
STOKES
VARIOUS
9-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
COUNTY ID
FUTURE YEARS
F
RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants
HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)
(1) FUNDING CATEGORY
DURHAM AREA
SR - Secondary Road
TRANSIT PARTNERROUTE / CITY /
NUMBER
TA-4738
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY
DIV
SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
CP
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
ESTIMATED COST Preliminary engineering, right of
C10000
dollars.)
of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.
way, utility, mitigation and construction cost estimates
(2) FUNDING SOURCES KEY
O - OtherL - Local
initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
work description. CPProject termini and a general
conception and remains with
9000
PROJECT BREAKS
CP
Various - multiple routes
A
5000
FY 2022
C
CP 3000CP
BCP 5000 B
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024FY 2021
STATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020
TOTAL PROJECT
COST (THOU)
FUZFUZ
FUN
DS
A
PRIOR YEARS COST
(THOU)
ACP 700
FY 2015 FY 2016
4000CP
FY 2025
5000
BB
CP CP 5000B
UNFUNDED
NON HIGHWAY PROGRAM
ADIV
FY 2017 FY 2018
BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
WORK TYPE (ACTIVITY) (3)Phases of implementation:
DIV C
20000
COMMITMENTSFUTURE
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
Preliminary engineering, Right of Way, UNFUNDED
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
with proposed work type or activity beginning in the
break.
One or two letter
CP
A
for an explanation of funding categories
FUNDING CATEGORY (1)
DIV
DIVISION 00
DEVELOPMENTAL PROGRAM
DURHAM
FY 2019
TRANSIT PARTNERROUTE / CITY /
NEW ROUTE or CityTRANSIT PARTNER
IDENTIFICATION NUMBER Assigned to each project at
US or NC RoutesI - Interstate
project until completion.
C - City
FEPD - Elderly and Persons with Disablity (5310)
FMOD - Fixed Guideway Modifications
designation for project
any project breaks.Category for the project and
LOCATION / DESCRIPTION
used for each project phase.
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
FSPR - State Planning and Research
FNF - New Freedom ProgramFNS - New Starts - Capital (5309)
FMPL - Metropolitan Planning (5303)
FED - Federal Rail Funds
FLAP - Federal Lands Access Program
FUZ - Urbanized Area Formula Program (5307)
CMAQ - Congestion Mitigation
FF - Federal Ferry
FNU - Non Urbanized Area Formula Program (5311)
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide
DIV - Division
DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
AVIATION PROJECTSAV-5749 3071INSTALL RUNWAY 6 MEDIUM INTENSITY
APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICATOR LIGHTS ACROSS I-85, INCLUDING INTERCHANGE LIGHTING.
DIV
T C 2764
L C 307
DAVIDSON DAVIDSON COUNTY
AIRPORT (EXX)
BICYCLE AND PEDESTRIAN PROJECTSU-5539 2126STREETSCAPE IMPROVEMENT PROJECTS IN
THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 80PE PE 10 PE 80
L 20PE PE 3 PE 20
STPDA 160R R 20 R 160
L 40R R 5 R 40
STPDA 560C C 70 C 560
L 140C C 18 C 140
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4741 9907 4467BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STPDA 120PE
L 30PE
STPDA 240R
L 60R
STPDA 840C
L 210C
TAP C 394 C 394 C 394 C 394 C 394 394C394C394C C 394 C 394
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTA-6245 528 266CAPITAL
HF
FNU 262CP DAVIDSON DAVIDSON COUNTY
TA-9001 200CAPITAL - PURCHASE OF SERVICE
HF
FEPD 160CP
L 20CP
S 20CP
DAVIDSON DAVIDSON COUNTY
TK-6125 2928 838ADMINISTRATION
HF
FNU 418O O 209 O 209 O 209 O 209 O 209 209O209O209O
FNU
DAVIDSON DAVIDSON COUNTY
TO-4790 47708 12938OPERATING ASSISTANCE
HF
FUZ 7250O O 3640 O 3650 O 3660 O 2404 O 2404 2404O2404O2404O
SMAP 870O O 435 O 435 O 435 O 475 O 475 475O475O475O
DAVIDSON
GUILFORD
RANDOLPH
HIGH POINT TRANSIT
SYSTEM
TS-5113 220 60SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 32CP CP 16 CP 16 CP 16 CP 16 CP 16 16CP16CP16CP DAVIDSON
GUILFORD
RANDOLPH
HIGH POINT TRANSIT
SYSTEM / HI-TRAN
TA-5126 124EXPANSION VAN - VANPOOL
HF
CMAQ 124CP DAVIDSON PIEDMONT AUTHORITY FOR
REGIONAL TRANSIT
TG-4814 3206 916ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)HF
FUZ 458CP CP 229 CP 229 CP 229 CP 229 CP 229 229CP229CP229CP DAVIDSON
GUILFORD
RANDOLPH
HIGH POINT TRANSIT
SYSTEM / HI TRAN
9-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
PUBLIC TRANSPORTATION PROJECTSTQ-9009 150CAPITAL - PURCHASE OF SERVICE
HF
FEPD 120CP
L 15CP
S 15CP
DAVIDSON THE LIFE CENTER
TQ-9008 160CAPITAL - PURCHASE OF SERVICE
HF
FEPD 160CP DAVIDSON THE WORKSHOP OF
DAVIDSON
PASSENGER RAIL PROJECTSC-4901 49729 35959BOWERS TO LAKE IN DAVIDSON COUNTY.
RESTORE DOUBLE TRACK AND GRADE SEPARATE.
4.5
EX
STHSR 7862C A C 5908 A
A RAILROAD ROADBED, TRACKWORK, AND SIGNALS - UNDER CONSTRUCTIONEX
B PHASE 1 - GRADING, DRAINAGE, PAVING, STRUCTURE - UNDER CONSTRUCTIONEX
C PHASE 2 - GRADING, DRAINAGE, PAVING, STRUCTURE - UNDER CONSTRUCTIONEX
DAVIDSON NC RAILROAD
IN PROGRESS
P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN
STHSR 64PE
STHSR 712R R 474
STHSR 3000C C 3000 C 941
O 881C C 880
ALAMANCE
CABARRUS
DAVIDSON
DURHAM
GUILFORD
MECKLENBURG
ORANGE
ROWAN
WAKE
VARIOUS
ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS
P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX
CMAQ 3750O O 3750
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESS
B PURCHASE 2 USED LOCOMOTIVES - COMPLETE
C EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESS
D EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETE
E PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESS
F CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESS
G PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESS
H CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESS
I EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCE
CABARRUS
DAVIDSON
DURHAM
GUILFORD
MECKLENBURG
ORANGE
RANDOLPH
ROWAN
WAKE
PIEDMONT CORRIDOR
BICYCLE AND PEDESTRIAN PROJECTSU-5539 2126STREETSCAPE IMPROVEMENT PROJECTS IN
THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 80PE PE 10 PE 80
L 20PE PE 3 PE 20
STPDA 160R R 20 R 160
L 40R R 5 R 40
STPDA 560C C 70 C 560
L 140C C 18 C 140
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
9-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4741 9907 4467BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STPDA 120PE
L 30PE
STPDA 240R
L 60R
STPDA 840C
L 210C
TAP C 394 C 394 C 394 C 394 C 394 394C394C394C C 394 C 394
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY TOWN OF MOCKSVILLE
EB-5005 700US 158, SR 1400 (CAMPBELL ROAD), AND RICH PARK IN MOCKSVILLE. CONSTRUCT MULTI-USE PATH.
TRN
STPEB 700C DAVIE RICH PARK
GREENWAY
PUBLIC TRANSPORTATION PROJECTSTA-6139 1973 899CAPITAL
HF
FNU 1074CP DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TK-6174 6002 1742ADMINISTRATION
HF
FNU 852O O 426 O 426 O 426 O 426 O 426 426O426O426O
FNU
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TD-4920D 1551 776VAN POOL REPLACEMENT TO SUPPORT NEW ROUTES
EX
CMAQ 775CP DAVIE
RANDOLPH
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TN-6122 12OPERATING
HF
FNF 12O DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TO-6113 356OPERATING ASSISTANCE
HF
FNU 267O
L 89O
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TQ-6798 100OPERATING
HF
FEPD 50O
L 50O
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TQ-8004 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF 36CP
L 4CP
S 4CP
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
9-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
AVIATION PROJECTSAV-5738 2100CLEAR TERRAIN OBSTRUCTIONS EAST OF
RUNWAY 15-33 AND TRANSPORT MATERIAL TO TAXIWAY EXTENSION SITE ON NORTH SIDE OF AIRFIELD.DIV
T C 1890
L C 210
FORSYTH SMITH REYNOLDS
AIRPORT (INT)
BICYCLE AND PEDESTRIAN PROJECTSEB-5722 495BOLTON STREET TO LOCKLAND AVENUE IN
WINSTON-SALEM. CONSTRUCT SIDEWALK ON NORTH SIDE TO CONNECT EXISTING SECTIONS.
1.5
DIV
TAP 36PE
L 9PE
TAP 360C
L 90C
FORSYTH NC 67
(SILAS CREEK PARKWAY)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4741 9907 4467BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STPDA 120PE
L 30PE
STPDA 240R
L 60R
STPDA 840C
L 210C
TAP C 394 C 394 C 394 C 394 C 394 394C394C394C C 394 C 394
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
U-5539 2126STREETSCAPE IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 80PE PE 10 PE 80
L 20PE PE 3 PE 20
STPDA 160R R 20 R 160
L 40R R 5 R 40
STPDA 560C C 70 C 560
L 140C C 18 C 140
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-4020 1968 918WATERWORKS ROAD TO REYNOLDS PARK ROAD IN WINSTON-SALEM. PAVED MULTI-USE TRAIL.
2.2
TRN
STPDA 8R C
L 2R C
STPDA 592C C
STPEB 300C C
L 148C C
A WATERWORKS ROAD TO OLD GREENSBORO ROAD - COMPLETE
B OLD GREENSBORO ROAD TO LOWERY STREET - COMPLETE
C LOWERY STREET TO REYNOLDS PARK ROAD - PLANNING / DESIGN IN PROGRESSTRN
FORSYTH BRUSHY FORK GREENWAY
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5523 920 120CEDAR TRAIL TO MUDDY CREEK GREENWAY IN WINSTON-SALEM. CONSTRUCT MULTI-USE PATH AND PEDESTRIAN BRIDGE OVER MUDDY CREEK.
0.6
TRN
STPEB 500C
STPDA 240C
L 60C
FORSYTH MUDDY CREEK /
CEDAR TRAIL
CONNECTION
PUBLIC TRANSPORTATION PROJECTSTI-6103 12802 3566INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU 2196O O 880 O 880 O 880 O 880 O 880 880O880O880O FORSYTH
GUILFORD
WATAUGA
WILKES
YADKIN
COACH AMERICA
TM-6139 634OPERATING ASSISTANCE
HF
JARC 317O
L 317O
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
9-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
PUBLIC TRANSPORTATION PROJECTSTO-5134B 1800OPERATING ASSISTANCE
HF
FUZ 900O
L 900O
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TO-5134C 700OPERATING Assistance
HF
FUZ 700O FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TS-5115 39 19SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 4CP CP 2 CP 2 CP 2 CP 2 CP 2 2CP2CP2CP ALAMANCE
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TA-6522 750 375PURCHASE VANS
REG
L 75CP
STPDA 300CP
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TA-4991B 845 469REPLACEMENT BUS
HF
CMAQ 376CP FORSYTH PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TG-5226 1312 500PREVENTIVE MAINTENANCE
REG
STPDA 812CP FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TG-6173 375ROUTINE CAPITAL
HF
FUZ 300CP
L 75CP
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TG-6173B 188ROUTINE CAPITAL
HF
FUZ 150CP
L 38CP
FORSYTH
GUILFORD
PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TM-5135 1800 400OPERATING ASSISTANCE
HF
JARC 400O O 200 O 200 O 200 O 200 O 200 FORSYTH PIEDMONT AUTHORITY FOR
REGIONAL TRANSPORTATION
TQ-6170 60OPERATING ASSISTANCE -PURCHASE OF SERVICE
HF
FEPD 48CP
L 6CP
S 6CP
FORSYTH TOWN OF KERNERSVILLE
see amendment #1 to 2012-2018 STIP
TA-5127 4118REPLACEMENT BUSES - LARGE AND SMALL
HF
CMAQ 4118CP FORSYTH WINSTON SALEM TRANSIT
TA-4795A 14240 4602REPLACEMENT BUS
HF
CMAQ 1403CP
FBUS
FUZ
STPDA 8235CP
FORSYTH WINSTON SALEM TRANSIT
TG-5241 16980 3670PREVENTIVE MAINTENANCE
HF
FUZ 5435CP CP 2625 CP 2625 CP 2625 FORSYTH WINSTON SALEM TRANSIT
9-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
PUBLIC TRANSPORTATION PROJECTS
see amendment #1 to 2012-2018 STIP
TG-4805 11348 2656ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
DIV
FUZ 1643CP CP 856 CP 856 CP 856 CP 856 CP 750 750CP750CP750CP
STPDA 625CP
FORSYTH WINSTON SALEM TRANSIT
see amendment #1 to 2012-2018 STIP
TG-4805C 27000 4500PREVENTIVE MAINTENANCE
HF
FUZ 3600O O 1800 O 1800 O 1800 O 1800 O 1800 1800O1800O1800O
SMAP 900O O 450 O 450 O 450 O 450 O 450 450O450O450O
FORSYTH WINSTON SALEM TRANSIT
TM-5004 4860 1320OPERATING ASSISTANCE
HF
JARC 708O O 354 O 354 O 354 O 354 O 354 354O354O354O FORSYTH WINSTON SALEM TRANSIT
TM-5303 2652 442WINSTON-SALEM TRANSIT, HERE 2 THERE TRANSPORTATION SERVICE, FAMILY SERVICES OF WINSTON-SALEM JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCE
HF
JARC 884O O 442 O 442 O 442 FORSYTH WINSTON SALEM TRANSIT
TM-5309 220 110FTA SECTION 5307 WINSTON-SALEM URBANIZED AREA SET ASIDE FOR JOB ACCESS REVERSE COMMUTE (JARC) PROJECTS
HF
JARC 55O
L 55O FORSYTH WINSTON SALEM TRANSIT
TN-5005 2956 876OPERATING ASSISTANCE - NEW FREEDOM - URBAN
HF
FNF 416O O 208 O 208 O 208 O 208 O 208 208O208O208O FORSYTH WINSTON SALEM TRANSIT
TN-5113 1620 270WINSTON-SALEM TRANSIT, PIEDMONT TRIAD REGIONAL COUNCIL, SHEPHERD'S CENTER, NEPAT MOBILE TRANSPORT, ENRICHMENT CENTER OF WINSTON-SALEM, AND GROMEDS INC,. NEW FREEDOM ASSISTANCE
HF
FNF 540O O 270 O 135 O 270
FNS O 135
FORSYTH WINSTON SALEM TRANSIT
see amendments to 2012-2018 STIP
TO-5126 38612 10928OPERATING ASSISTANCE
HF
FUZ 4128O O 1812 O 1812 O 1812 O 1812 O 1812 1812O1812O1812O
SMAP 1812O O 906 O 906 O 906 O 906 O 906 906O906O906O
FORSYTH WINSTON SALEM TRANSIT
TP-5105 1442 412PLANNING ASSISTANCE - 5303
HF
FMPL 206CP CP 103 CP 103 CP 103 CP 103 CP 103 103CP103CP103CP FORSYTH WINSTON SALEM TRANSIT
TQ-6782 756 335FTA SECTION 5310 WINSTON-SALEM ALLOCATION SET ASIDE FOR COMPET GRANT TO ELIGIBLE AGENCIES TO ASSIST IN MEETING THE TRANSPORTATION NEEDS OF LOW INCOME, DISABLED, AND ELDERLY POPULATIONS
HF
FEPD 337O
L 84O
FORSYTH WINSTON SALEM TRANSIT
see amendment #1 to 2012-2018 STIP
TS-5120 578 108SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 102CP CP 51 CP 51 CP 51 CP 51 CP 41 41CP41CP41CP FORSYTH WINSTON SALEM TRANSIT
TD-4743 16550RESTORE FORMER PASSENGER RAIL STATION FOR USE AS A REGIONAL / LOCAL BUS TERMINAL AND FUTURE RAIL STATION.
DIV
FED C 13228
T C 1661
L C 1661
FORSYTH WINSTON-SALEM
INTERMODAL
TRANSPORTATION
FACILITY
9-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
AVIATION PROJECTSAV-5754 7904EXTEND RUNWAY 20 AND 600-FOOT
EXTENDED RUNWAY SAFETY AREA, AND RELOCATE AND REPLACE EXISTING MEDIUM INTENSITY APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICATOR LIGHTS AND GLIDESLOPE.
DIV
T 7114C
L 790C
ROWAN ROWAN COUNTY
AIRPORT (RUQ)
BICYCLE AND PEDESTRIAN PROJECTSU-5545 3025CABARRUS ROWAN MPO TRANSPORTATION
ALTERNATIVES (TA) PROGRAM.
DIV
TAP 20R R 20 R 20 R 20 R 20 R 20 20R20R20R R 20 R 20
L 5R R 5 R 5 R 5 R 5 R 5 5R5R5R R 5 R 5
TAP 200C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200
L 50C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50
CABARRUS
ROWAN
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTQ-6171 490MOBILITY MANAGEMENT
HF
FEPD 400CP
L 40CP
S 50CP
ANSON
CABARRUS
GASTON
IREDELL
LINCOLN
MECKLENBURG
ROWAN
STANLY
UNION
CENTRALINA COUNCIL OF
GOVERNMENTS
TA-6240 423 350CAPITAL
HF
FNU 73CP ROWAN CITY OF SALISBURY
TK-5177 2996 856ADMINISTRATION
HF
FNU 428O O 214 O 214 O 214 O 214 O 214 214O214O214O
FNU
ROWAN CITY OF SALISBURY
TO-6136 768 128OPERATING - ELDERLY AND DISABLED PERSONS
HF
FNU 128O O 64 O 64 O 64 O 64 O 64 64O64O64O ROWAN CITY OF SALISBURY
TO-6105 10094 2884OPERATING ASSISTANCE
HF
FNU 1442O O 721 O 721 O 721 O 721 O 721 721O721O721O ROWAN CITY OF SALISBURY
TO-5201 4475 1341OPERATING ASSISTANCE - NEW SERVICE
HF
CMAQ 874O
SMAP 452O O 226 O 226 O 226 O 226 O 226 226O226O226O
ROWAN CITY OF SALISBURY
TG-5103A 7243 993ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ 1250CP CP 625 CP 625 CP 625 CP 625 CP 625 625CP625CP625CP CABARRUS
ROWAN
RIDER TRANSIT / CONCORD
TG-5103B 2256 376ROUTINE CAPITAL - ADA SERVICEs
HF
FUZ 376Oc Oc 188 Oc 188 Oc 188 Oc 188 Oc 188 188Oc188Oc188Oc CABARRUS
ROWAN
RIDER TRANSIT / CONCORD
TG-5103C 9825 1075PREVENTIVE MAINTENANCE
HF
FUZ 1750Oc Oc 875 Oc 875 Oc 875 Oc 875 Oc 875 875Oc875Oc875Oc CABARRUS
ROWAN
RIDER TRANSIT / CONCORD
TA-6214 464 61CAPITAL
HF
FNU 403CP ROWAN ROWAN COUNTY
TK-6160 2562 726ADMINISTRATION
HF
FNU 380O O 182 O 182 O 182 O 182 O 182 182O182O182O
FNU
ROWAN ROWAN COUNTY
9-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
PUBLIC TRANSPORTATION PROJECTSTM-6132 480OPERATING ASSISTANCE
HF
JARC 240O
L 240O
ROWAN ROWAN COUNTY
TQ-6169 670OPERATING ASSISTANCE
HF
FEPD 335O
L 335O ROWAN ROWAN COUNTY
PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN
STHSR 64PE
STHSR 712R R 474
STHSR 3000C C 3000 C 941
O 881C C 880
ALAMANCE
CABARRUS
DAVIDSON
DURHAM
GUILFORD
MECKLENBURG
ORANGE
ROWAN
WAKE
VARIOUS
UNDER CONSTRUCTION
U-3459 20434 20434SR 2541 (KLUMAC ROAD) IN SALISBURY. CONSTRUCT A GRADE SEPARATION.
0.4ROWAN NORTH CAROLINA
RAILROAD
ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS
P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX
CMAQ 3750O O 3750
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESS
B PURCHASE 2 USED LOCOMOTIVES - COMPLETE
C EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESS
D EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETE
E PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESS
F CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESS
G PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESS
H CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESS
I EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCE
CABARRUS
DAVIDSON
DURHAM
GUILFORD
MECKLENBURG
ORANGE
RANDOLPH
ROWAN
WAKE
PIEDMONT CORRIDOR
UNDER CONSTRUCTION
P-5206 93893 93893RESTORE DOUBLE TRACK, REID TO NORTH KANNAPOLIS.
TRN
ROWAN PIEDMONT CORRIDOR
BICYCLE AND PEDESTRIAN PROJECTSU-5539 2126STREETSCAPE IMPROVEMENT PROJECTS IN
THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.
DIV
STPDA 80PE PE 10 PE 80
L 20PE PE 3 PE 20
STPDA 160R R 20 R 160
L 40R R 5 R 40
STPDA 560C C 70 C 560
L 140C C 18 C 140
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
9-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4741 9907 4467BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STPDA 120PE
L 30PE
STPDA 240R
L 60R
STPDA 840C
L 210C
TAP C 394 C 394 C 394 C 394 C 394 394C394C394C C 394 C 394
DAVIDSON
DAVIE
FORSYTH
STOKES
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTA-6139 1973 899CAPITAL
HF
FNU 1074CP DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TK-6174 6002 1742ADMINISTRATION
HF
FNU 852O O 426 O 426 O 426 O 426 O 426 426O426O426O
FNU
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TN-6122 12OPERATING
HF
FNF 12O DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TO-6113 356OPERATING ASSISTANCE
HF
FNU 267O
L 89O
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TQ-6798 100OPERATING
HF
FEPD 50O
L 50O
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
TQ-8004 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF 36CP
L 4CP
S 4CP
DAVIE
STOKES
SURRY
YADKIN
YADKIN VALLEY ECONOMIC
DEVELOPMENT DISTRICT
9-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project